CN206614914U - A kind of 3D justifies gold stamping device - Google Patents

A kind of 3D justifies gold stamping device Download PDF

Info

Publication number
CN206614914U
CN206614914U CN201720244762.5U CN201720244762U CN206614914U CN 206614914 U CN206614914 U CN 206614914U CN 201720244762 U CN201720244762 U CN 201720244762U CN 206614914 U CN206614914 U CN 206614914U
Authority
CN
China
Prior art keywords
gold stamping
circle
frame
fixing roller
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720244762.5U
Other languages
Chinese (zh)
Inventor
李新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Botai Digital Intelligent Technology Co ltd
Original Assignee
BROTECH GRAPHIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BROTECH GRAPHIC Co Ltd filed Critical BROTECH GRAPHIC Co Ltd
Priority to CN201720244762.5U priority Critical patent/CN206614914U/en
Application granted granted Critical
Publication of CN206614914U publication Critical patent/CN206614914U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Printing Methods (AREA)

Abstract

The utility model is applied to gold stamping device field, justify gold stamping device there is provided a kind of 3D, the 3D circles gold stamping device includes the first frame being sequentially connected, second frame, 3rd frame, 4th frame, it is arranged on the unwinding unit in the first frame, it is arranged on the printing element in the second frame, it is arranged on the gold stamping unit of circle and the rolling unit being arranged in the 4th frame in the 3rd frame, the gold stamping unit of circle unreels device including being arranged on the first of circle gold stamping unit upper end side, it is arranged on the first coiler of circle gold stamping unit upper end opposite side, and it is arranged on the gold stamping mechanism of circle of the lower section at the first midpoint for unreeling device and the first coiler central junction line.Needed for solving gold stamping device and can not being quickly finished, gold stamping speed is slow, and gold stamping device cost of manufacture is high, it is impossible to carry out continuous production process and can not technical problem that accurately gilding film is positioned.

Description

A kind of 3D justifies gold stamping device
Technical field
The utility model belongs to gold stamping device field, more particularly to a kind of 3D circle gold stamping devices.
Background technology
At present, all there are some shortcomings in all equipment of the golden apparatus field of cold wave, and these shortcomings are then to be scalded Needed for each gold stamping device can not be quickly finished when golden, gold stamping speed is slow, and gold stamping device cost is high, it is impossible to carry out Continuous production process and can not accurately gilding film positioning technical problem.
Utility model content
The purpose of this utility model is to provide a kind of 3D circles gold stamping device, it is intended to which solving gold stamping device can not be carried out quickly Completion needed for, gold stamping speed is slow, and gold stamping device cost is high, it is impossible to carry out continuous production process and can not accurately gilding film positioning Technical problem.
The utility model is achieved in that a kind of 3D circles gold stamping device, and the 3D circles gold stamping device includes being sequentially connected The first frame, the second frame, the 3rd frame, the 4th frame, the unwinding unit being arranged in the first frame, be arranged on the second machine Printing element on frame, the gold stamping unit of circle being arranged in the 3rd frame and the rolling unit being arranged in the 4th frame, it is described The gold stamping unit of circle unreels device including being arranged on the first of circle gold stamping unit upper end side, is arranged on circle gold stamping unit upper end opposite side The first coiler, and be arranged on the circle gilding press of the lower section at the first midpoint for unreeling device and the first coiler central junction line Structure, operationally, unwinding unit carry out stock releasing, and the stock of releasing is printed by printing element, by printing Stock carrying out gilding film by the gold stamping unit of circle, finally withdrawn by rolling unit.
Further technical scheme of the present utility model is:The gold stamping unit of circle also include be used for connect first unreel device with First fixed mount of the gold stamping mechanism of circle, and for connecting the first coiler and the second fixed mount of the gold stamping mechanism of circle.
Further technical scheme of the present utility model is:The gold stamping mechanism of circle includes the gold stamping frame of circle, is arranged on circle and scalds The fixed plate of golden frame lower end, is arranged on the gold stamping upper round roller of circle in the gold stamping frame of circle, is arranged on below the gold stamping upper round roller of circle The gold stamping lower round roller of circle, and the gold stamping power roller of circle below the gold stamping lower round roller of circle is arranged on, one end of the gold stamping power roller of circle is set It is equipped with the shaft coupling being sequentially connected from inside to outside, reductor and servomotor.
Further technical scheme of the present utility model is:The gold stamping upper round roller of circle is the gold stamping round hollow copper roller of circle.
Further technical scheme of the present utility model is:The gold stamping unit of circle also includes detent mechanism, the localization machine Structure includes color mark sensor, connects the processor of color mark sensor, connects the servomotor controller of processor, and connection servo The private of electric machine controller takes motor.
Further technical scheme of the present utility model is:What the unwinding unit included being arranged in the first frame second puts Device is rolled up, and is arranged on the Deviation rectifier of the first frame upper end side.
Further technical scheme of the present utility model is:Characterized in that, the printing element includes being successively set on the Printing equipment in two frames, is arranged on the binder spray in the second frame, and the UV solidification devices being arranged in the second frame.
Further technical scheme of the present utility model is:The printing equipment is that digital printing equipment or silk-screen printing are set It is standby.
Further technical scheme of the present utility model is:The rolling unit includes being arranged on the second of the 4th frame lower Coiler, and it is arranged on the 3rd coiler of the 4th upper rack.
Further technical scheme of the present utility model is:3D circle gold stamping device also includes being arranged on the first frame, the The first fixing roller for being play the guiding role in two frames, the 3rd frame and the 4th frame, the second fixing roller, the 3rd fixing roller, the 4th Fixing roller, the 5th fixing roller, the 6th fixing roller, the 7th fixing roller, the 8th fixing roller, the 9th fixing roller, the tenth fixing roller, the tenth One fixing roller, the 12nd fixing roller, the 13rd fixing roller, the 14th fixing roller, the 15th fixing roller, the 16th fixing roller, 17 fixing rollers, the 18th fixing roller, the 19th fixing roller, the 20th fixing roller, the 21st fixing roller, the 22nd are fixed Roller, the 23rd fixing roller, the 24th fixing roller, the 25th fixing roller, the 26th fixing roller, the 27th are fixed Roller, the 28th fixing roller, the 29th fixing roller, the 30th fixing roller, the 31st fixing roller, and be arranged in frame and rise The first carry-over pinch rolls, the second carry-over pinch rolls, the 3rd carry-over pinch rolls, the 4th carry-over pinch rolls, the 5th carry-over pinch rolls of draw.
The beneficial effects of the utility model are:Needed for such a gold stamping device can be quickly finished, gold stamping speed is fast, scalds Golden equipment making cost is low, can carry out continuous production process and accurately gilding film can position.
Brief description of the drawings
Fig. 1 is the structure chart that a kind of 3D that the utility model embodiment is provided justifies gold stamping device;
Fig. 2 is the detent mechanism structure chart that a kind of 3D that the utility model embodiment is provided justifies gold stamping device.
Embodiment
Reference:The frame 5- unwinding units 6- of the 3rd frame 4- of 1- the first frame 2- the second frame 3- the 4th print Brush unit 7-, which justifies gold stamping unit 8- rolling units 9- first and unreels the first coilers of device 10- 11-, justifies gold stamping mechanism 12- the One the second fixed mounts of fixed mount 13- 14- justifies the gold stamping gold stamping upper round roller 17- of frame 15- fixed plates 16- circles and justifies gold stamping lower circle Roller 18- justifies gold stamping power roller 19- color mark sensors 20- second and unreels device 21- Deviation rectifier 22- printing equipment 23- glue sprayings Coiler 27- the first fixing roller the second fixing rollers of the 28- 29- of device 24-UV solidification devices the second coilers of 25- 26- the 3rd The fixing roller 34- the 8th of three the 5th the 6th fixing roller 33- of fixing roller 32- of fixing roller the 4th fixing roller 31- of 30- the 7th are fixed The fixing roller 39- the 13rd of the tenth the 11st fixing roller 38- of fixing roller 37- of roller the 9th fixing roller 36- of 35- the 12nd are fixed The fixing roller 44- the 18th of the 15th the 16th fixing roller 43- of fixing roller 42- of roller the 14th fixing roller 41- of 40- the 17th The fixing rollers of the 20th the 21st fixing roller 48- of fixing roller 47- of fixing roller the 19th fixing roller 46- of 45- the 22nd The fixing roller 53- of the 25th fixing roller 52- of 49- the 24th fixing roller 51- of the 23rd fixing roller 50- the 26th The fixing roller 57- the 31st of the 28th the 29th fixing roller 56- of fixing roller 55- of 27 fixing roller 54- the 30th The carry-over pinch rolls of the 3rd the 4th carry-over pinch rolls 62- of carry-over pinch rolls 61- of fixing roller 58- the first carry-over pinch rolls 59- the second carry-over pinch rolls 60- the 5th 63- printed article 64- processor 65- servomotor controller 66- servomotors.
Fig. 1,2 show a kind of 3D circle gold stamping devices that the utility model is provided, and the 3D circles gold stamping device is included successively The first frame 1, the second frame 2, the 3rd frame 3, the 4th frame 4 of connection, the unwinding unit 5 being arranged in the first frame 1, set The gold stamping unit 7 of circle that put the printing element 6 in the second frame 1, is arranged in the 3rd frame 3 and it is arranged in the 4th frame 4 Rolling unit 8, the gold stamping unit 7 of circle, which includes being arranged on the first of the gold stamping upper end side of unit 7 of circle, unreels device 9, is arranged on First coiler 10 of the gold stamping upper end opposite side of unit 7 of circle, and be arranged on first and unreel device 9 and be connected with the center of the first coiler 10 The gold stamping mechanism 11 of circle of the lower section at the midpoint of line, operationally, unwinding unit 5 carry out stock 63 and released, the stock of releasing 63 are printed by printing element 6, and the stock 63 by printing is carrying out gilding film by the gold stamping unit 7 of circle, finally exists Withdrawn by rolling unit 8.Gilding film is placed on first unreeled and gilding film is carried out on device 9 unreel, by gilding film Blanching on printed article 63 after remaining gilding film recovery is being carried out by the first coiler 10, by an equipment will print and The process of gilding film is all carried out, and needed for so can quickly finishing, is also preferably minimized the cost of manufacture of gold stamping device, But also printing and gilding film need not separately be carried out, the same operating efficiency also improved.
The gold stamping unit 7 of circle also includes being used to connect the first the first fixed mount 12 for unreeling device 9 and the gold stamping mechanism 11 of circle, And for connecting the first coiler 10 and the second fixed mount 13 of the gold stamping mechanism 11 of circle.Fixed by the first fixed mount 12 and second First on the gold stamping unit 7 of circle is unreeled the coiler 10 of device 9 and first and is fixed in the gold stamping mechanism 11 of circle by frame 13, so can be square Just the coiler 10 of device 9 and first that unreeled to first is easily dismantled and changed.
The gold stamping mechanism 11 of circle includes the gold stamping frame 14 of circle, is arranged on the fixed plate 15 of the gold stamping lower end of frame 14 of circle, if Put circle in the gold stamping frame 14 of circle it is gold stamping on round roller 16, be arranged on the gold stamping lower round roller 17 of circle of the gold stamping upper lower section of round roller 16 of circle, And the gold stamping power roller 18 of circle of the gold stamping lower lower section of round roller 17 of circle is arranged on, one end of the gold stamping power roller 18 of circle is provided with by interior To the shaft coupling being sequentially connected outside(Not shown in figure), reductor(Not shown in figure)And servomotor 66(Not shown in figure, but Shown in circuit diagram part).Set fixed plate 15 mainly conveniently to say in the bottom of the gold stamping frame 14 of circle and entirely justify gold stamping list Member 7 is dismantled, changed and repaired, be when being operated by the circle being arranged in the gold stamping mechanism 11 of circle it is gold stamping on justify Roller 16 and the gold stamping lower round roller 17 of circle carry out gilding film, by the gold stamping power roller 18 of circle come gold stamping to the gold stamping upper round roller 16 of circle and circle Lower round roller 17 provides power.It can thus realize and be rapidly performed by gilding film work.The gold stamping power roller of circle can also be passed through 18 carry out the speed adjustment and the positioning of gilding film adjustment of gilding film.
The gold stamping upper round roller 16 of circle is the gold stamping round hollow copper roller of circle.The gold stamping upper round roller 16 of circle is made into this hollow copper Roller is that this gold stamping upper round roller 16 of circle can pass through electrical heating in order to be heated when work to justifying round roller 16 on gold stamping Or oil heating carries out the heating to whole roll body, and then gilding film is heated, with required for reaching gilding film blanching Temperature, the gold stamping upper round roller 16 of circle is detachable roller, can be changed accordingly as needed.
The gold stamping unit 7 of circle also includes detent mechanism, and the detent mechanism includes color mark sensor 19, and connection colour code is passed The processor 64 of sensor 19, connects the servomotor controller 65 of processor 64, and the private of connection servomotor controller 65 takes Motor 66.The effect of a positioning to gilding film and printed article 63 is primarily served by the detent mechanism on gold stamping unit 7, So that being not in that gilding film and printed article 63 misplace, the patterned acquisition for carrying out printed article 63 by color mark sensor 19 is passing through Processing is compared in processor 63, if it find that there is misalignment after the completion of comparison processing, then processor 63, which is sent, is adjusted It is whole to instruct to servomotor controller 65, servomotor controller 65 and then to control servomotor 66 to be adjusted correspondingly, Untill processor 63 sends gilding film blanching instruction, otherwise it can be adjusted always, when comparison is done without misplacing Situation, then processor 63 send progress gilding film blanching instruction to servomotor controller 65, servomotor controller 65 and then Gilding film blanching is carried out to control private to take motor 66.
What the unwinding unit 5 included being arranged in the first frame 1 second unreels device 20, and is arranged in the first frame 1 Hold the Deviation rectifier 21 of side.Initial printed article 63 is placed on second and unreeled on device 20, the printed article 63 when being operated The degree of bias adjustment of printed article 63 is carried out by Deviation rectifier 21 so that printed article 63 is not in the phenomenon of deviation.
The printing element 6 includes the printing equipment 22 being successively set in the second frame 2, is arranged in the second frame 2 Binder spray 23, and the UV being arranged in the second frame 2(Ultraviolet)Solidification device 24.Realized by setting printing element 6 pair The pattern printing of printed article 63, is carrying out gluing by the pattern of printed article 63, is delivering to UV in the printed article 63 for completing gluing and consolidate Change device 24 and carry out gluing drying, realize the work of gilding film blanching early stage.
The printing equipment 22 is digital printing equipment or screen printing apparatus.It is a variety of in the selection of printing equipment 22 It is various, the mainly digital printing equipment or screen printing apparatus of selection herein.
The rolling unit 8 includes the second coiler 25 for being arranged on the bottom of the 4th frame 4, and is arranged on the 4th frame 4 3rd coiler 26 on top.The printed article 63 that gilding film blanching is completed is wound.
The 3D circles gold stamping device also includes being arranged on the first frame 1, the second frame 2, the 3rd frame 3 and the 4th frame 4 On the first fixing roller 27, the second fixing roller 28, the 3rd fixing roller 29, the 4th fixing roller 30, the 5th fixing roller that play the guiding role 31st, the 6th fixing roller 32, the 7th fixing roller 33, the 8th fixing roller 34, the 9th fixing roller 35, the tenth fixing roller the 36, the 11st are consolidated Fixed roll 37, the 12nd fixing roller 38, the 13rd fixing roller 39, the 14th fixing roller 40, the 15th fixing roller the 41, the 16th are fixed Roller 42, the 17th fixing roller 43, the 18th fixing roller 44, the 19th fixing roller 45, the 20th fixing roller the 46, the 21st are fixed Roller 47, the 22nd fixing roller 48, the 23rd fixing roller 49, the 24th fixing roller 50, the 25th fixing roller 51, second 16 fixing rollers 52, the 27th fixing roller 53, the 28th fixing roller 54, the 29th fixing roller 55, the 30th fixing roller 56th, the 31st fixing roller 57, and it is arranged on the first carry-over pinch rolls 58 that draw is played in frame, the second carry-over pinch rolls the 59, the 3rd Carry-over pinch rolls 60, the 4th carry-over pinch rolls 61, the 5th carry-over pinch rolls 62.
Needed for such a gold stamping device can be quickly finished, gold stamping speed is fast, and gold stamping device low manufacture cost can be carried out Continuous production process and the accurate gilding film positioning of energy.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (10)

1. a kind of 3D justifies gold stamping device, it is characterised in that the first frame that the 3D circles gold stamping device includes being sequentially connected, second Frame, the 3rd frame, the 4th frame, the unwinding unit being arranged in the first frame, the printing element being arranged in the second frame, The gold stamping unit of circle and the rolling unit being arranged in the 4th frame in the 3rd frame are arranged on, the gold stamping unit of circle includes setting Put and unreel device the first of circle gold stamping unit upper end side, be arranged on the first coiler of circle gold stamping unit upper end opposite side, and The gold stamping mechanism of circle of the lower section at the first midpoint for unreeling device and the first coiler central junction line is arranged on, operationally, is unreeled Unit carries out stock releasing, and the stock of releasing is printed by printing element, and the stock by printing is by justifying Gold stamping unit carries out gilding film, is finally withdrawn by rolling unit.
2. 3D according to claim 1 justifies gold stamping device, it is characterised in that the gold stamping unit of circle also includes being used to connect First unreels device and the first fixed mount of the gold stamping mechanism of circle, and is fixed for connecting the first coiler with the second of the gold stamping mechanism of circle Frame.
3. 3D according to claim 2 justifies gold stamping device, it is characterised in that the gold stamping mechanism of circle includes circle gilding press Frame, is arranged on the fixed plate of the gold stamping frame lower end of circle, is arranged on the gold stamping upper round roller of circle in the gold stamping frame of circle, is arranged on circle gold stamping The gold stamping lower round roller of circle below upper round roller, and the gold stamping power roller of circle below the gold stamping lower round roller of circle is arranged on, the circle is gold stamping dynamic One end of power roller is provided with the shaft coupling being sequentially connected from inside to outside, reductor and servomotor.
4. 3D according to claim 3 justifies gold stamping device, it is characterised in that the gold stamping upper round roller of circle is the gold stamping upper circle of circle Hollow copper roller.
5. the 3D circle gold stamping devices according to claim any one of 1-4, it is characterised in that the gold stamping unit of circle also includes Detent mechanism, the detent mechanism includes color mark sensor, connects the processor of color mark sensor, connects the servo electricity of processor Machine controller, and the private of connection servomotor controller take motor.
6. 3D according to claim 5 justifies gold stamping device, it is characterised in that the unwinding unit includes being arranged on the first machine Second on frame unreels device, and is arranged on the Deviation rectifier of the first frame upper end side.
7. 3D according to claim 6 justifies gold stamping device, it is characterised in that the printing element includes being successively set on the Printing equipment in two frames, is arranged on the binder spray in the second frame, and the UV solidification devices being arranged in the second frame.
8. 3D according to claim 7 justifies gold stamping device, it is characterised in that the printing equipment be digital printing equipment or Screen printing apparatus.
9. 3D according to claim 8 justifies gold stamping device, it is characterised in that the rolling unit includes being arranged on the 4th machine Second coiler of frame bottom, and it is arranged on the 3rd coiler of the 4th upper rack.
10. 3D according to claim 9 justifies gold stamping device, it is characterised in that the 3D circles gold stamping device also includes setting The first fixing roller for being play the guiding role in the first frame, the second frame, the 3rd frame and the 4th frame, the second fixing roller, Three fixing rollers, the 4th fixing roller, the 5th fixing roller, the 6th fixing roller, the 7th fixing roller, the 8th fixing roller, the 9th fixing roller, Ten fixing rollers, the 11st fixing roller, the 12nd fixing roller, the 13rd fixing roller, the 14th fixing roller, the 15th fixing roller, 16 fixing rollers, the 17th fixing roller, the 18th fixing roller, the 19th fixing roller, the 20th fixing roller, the 21st are fixed Roller, the 22nd fixing roller, the 23rd fixing roller, the 24th fixing roller, the 25th fixing roller, the 26th are fixed Roller, the 27th fixing roller, the 28th fixing roller, the 29th fixing roller, the 30th fixing roller, the 31st fixing roller, And be arranged on the first carry-over pinch rolls that draw is played in frame, the second carry-over pinch rolls, the 3rd carry-over pinch rolls, the 4th carry-over pinch rolls, the 5th lead Pick-up roll.
CN201720244762.5U 2017-03-14 2017-03-14 A kind of 3D justifies gold stamping device Expired - Fee Related CN206614914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720244762.5U CN206614914U (en) 2017-03-14 2017-03-14 A kind of 3D justifies gold stamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720244762.5U CN206614914U (en) 2017-03-14 2017-03-14 A kind of 3D justifies gold stamping device

Publications (1)

Publication Number Publication Date
CN206614914U true CN206614914U (en) 2017-11-07

Family

ID=60232706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720244762.5U Expired - Fee Related CN206614914U (en) 2017-03-14 2017-03-14 A kind of 3D justifies gold stamping device

Country Status (1)

Country Link
CN (1) CN206614914U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106864018A (en) * 2017-03-14 2017-06-20 深圳市博泰印刷设备有限公司 A kind of 3D justifies gold stamping device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106864018A (en) * 2017-03-14 2017-06-20 深圳市博泰印刷设备有限公司 A kind of 3D justifies gold stamping device

Similar Documents

Publication Publication Date Title
CN106364127B (en) Intermittent double-sided film laminating device
CN202053674U (en) Transfer-printing pattern positioning and embossing machine
CN205854698U (en) A kind of full-automatic adhesive mask sheet marking machine with automatic dust removing apparatus
CN206614914U (en) A kind of 3D justifies gold stamping device
CN202727556U (en) Online printing system for packaging production line
CN106864018A (en) A kind of 3D justifies gold stamping device
CN213679069U (en) Capacitor film winding device
CN204622788U (en) A kind of hot transfer printing pad printer
KR101141581B1 (en) Label transfer apparatus
CN209191470U (en) A kind of horizontal gilding press device
CN110682677A (en) Gold stamping printing machine
CN206678575U (en) Gold stamping device
CN212687108U (en) Multifunctional coating and compounding equipment
CN108328380A (en) A kind of graphene electrothermal film preparation copper strips unwinding device
CN108691137B (en) Cloth embossing clothing manufacturing equipment
CN106429563B (en) A kind of membrane coiler structure of glass film production line
CN205185520U (en) Two strip double width printing machines of thermal contraction casing membrane
CN106864036A (en) A kind of digital cold gold stamping device
CN208812739U (en) A kind of overlay film embossing integral mechanism
CN207579333U (en) A kind of humidifying type printing machine
CN207643885U (en) A kind of cold wave machine that achievable anodized aluminium cold wave foil is pulled back
CN206614915U (en) A kind of flat gold stamping devices of 3D
CN206579299U (en) A kind of auxiliary clamp equipment for advertising painting machine
CN106863998B (en) A kind of flat gold stamping device of 3D
CN208199949U (en) A kind of bamboo mat composite production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518103, Guangdong, Fuyong Province, Shenzhen street, new and rich industrial zone 8, 1-2 East

Patentee after: Shenzhen Botai Digital Intelligent Technology Co.,Ltd.

Address before: 518103, Guangdong, Fuyong Province, Shenzhen street, new and rich industrial zone 8, 1-2 East

Patentee before: SHENZHEN BROTECH GRAPHICS CO.,LTD.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171107

CF01 Termination of patent right due to non-payment of annual fee