CN206611237U CN201720316838.0U CN201720316838U CN206611237U CN 206611237 U CN206611237 U CN 206611237U CN 201720316838 U CN201720316838 U CN 201720316838U CN 206611237 U CN206611237 U CN 206611237U
Authority
CN
China
Prior art keywords
main casing
switch
power supply
cabinet door
plc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720316838.0U
Other languages
Chinese (zh)
Inventor
吴桂林
殷银华
姚红梅
段茂森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Sanning Chemical Co Ltd
Original Assignee
Hubei Sanning Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Sanning Chemical Co Ltd filed Critical Hubei Sanning Chemical Co Ltd
Priority to CN201720316838.0U priority Critical patent/CN206611237U/en
Application granted granted Critical
Publication of CN206611237U publication Critical patent/CN206611237U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Patch Boards (AREA)

Abstract

A kind of bus realizes the real-time switching controls of dual power supply PLC, including digital display meter, switch board, main casing, breaker, controlling switch, intelligent switch, contactor, intelligent chip, air switch, coil and single knife switch, the switch board includes main casing and cabinet door, cabinet door is set on a main housing, cabinet door is hinged with main casing, lockhole is provided with cabinet door, cabinet door is fixedly connected with main casing by lockhole;The digital display meter is embedded in cabinet door.This bus realizes the real-time switching controls of dual power supply PLC; by prolonged operation; the double-power supply switching device of this set PLC controls can quickly be switched to another road power supply in the case of power failure dead electricity all the way and power; avoid after one section of power supply goes wrong; the operation of visual plant is influenceed to use because of back brake time length; production of these visual plants caused by power failure is avoided after coming into operation to shut down; equipment heavy losses; generation of casualties etc.; cost greatly reduces, operating efficiency is improved.

Description

A kind of bus realizes the real-time switching controls of dual power supply PLC
Technical field
The utility model is related to PLC control circuit applied technical fields, and specifically a kind of bus realizes that dual power supply PLC is real-time Switching control.
Background technology
Former cyclohexanone security personnel section bus subordinate equipment, boiler security personnel section bus subordinate equipment are independent current source, by originally matching somebody with somebody The security transformer of electric room is powered, security personnel's section subordinate equipment be steam turbine oil pump, boiler motor-driven valve, the power supply of sewage collecting well and The control power supply of one drag two frequency conversion, visual plant and the facility such as emergency lighting, the corporate office building in device area.If security transformer Power supply is needed manually to arrive on-site manual back brake after going wrong, during which need the operating time of 5-10 minutes, and power-off time length is caused Electrically operated valve is not opened, and fitting badly causes the risk of boiler shutdown, and sump dead electricity causes wastewater disposition to cause environmental pollution, Oil pump dead electricity, causes pump to lose oil and damage.Emergency lighting dead electricity, causes producers to lose direction, also easily causes personal injury The generation of accident.
The content of the invention
The purpose of the utility model technology is that providing a kind of bus realizes the real-time switching controls of dual power supply PLC, with The problem of solving to propose in above-mentioned background technology.By prolonged operation, the double-power supply switching device of this set PLC controls can Quickly it is switched to another road power supply in the case of failure dead electricity to power, it is to avoid after one section of power supply goes wrong, during because of back brake Between long and operation that influence visual plant use, these visual plants are avoided after coming into operation shutdown are produced caused by power failure, The problems such as losing serious, greatly reduces cost, improves operating efficiency.
To achieve the above object, the utility model provides following technical scheme:
A kind of bus realizes the real-time switching controls of dual power supply PLC, including digital display meter, switch board, main casing, open circuit Device, controlling switch, auxiliary switch, relay, intelligent chip, air switch, coil, switch board include main casing and cabinet door, cabinet Door is set on a main housing, and cabinet door is hinged with main casing, and lockhole is provided with cabinet door, and cabinet door and main casing are fixed by lockhole to be connected Connect;Digital display meter is embedded in cabinet door, and cabinet door is provided with indicator lamp and master switch, and indicator lamp and digital display meter are connected by wire, main The side of housing is provided with five spring hole scokets, and five spring hole scokets are inlayed on a main housing, and the top of main casing is provided with hoisting mechanism, lifting Mechanism is fixed with main casing and welded;Breaker is fixedly mounted on power distribution cabinet electric power incoming line side, and side and the relay of breaker are touched Head connection, relay is arranged on the inside of main casing, and controlling switch is connected with breaker by wire, and auxiliary switch is arranged on disconnected The inside of road device, indicator lamp is connected with auxiliary switch by wire.Intelligent chip is provided at both ends with binding post, relay connection On the binding post of intelligent chip both sides, the other end of relay is connected by wire, and the two ends of relay are in parallel miniature disconnected Road device;Air switch is arranged on the inside of main casing, and air switch is connected with indicator lamp, and the two ends of digital display meter are connected with air Switch, the two ends bridging coil of air switch is serially connected with relay contact and provides control power supply to breaker.
Above-mentioned intelligent chip is arranged on the inside of PLC, and PLC is connected by shielding line with bus breaker Connect.
Above-mentioned main casing is stainless steel, and the inside of main casing sets one layer of electro-insulating rubber pad.
Above-mentioned coil is entwined using copper wire, and coil is internally provided with magnetic core.
Two indicator lamps and switch are installed, switch connects one to one with indicator lamp on above-mentioned switch board.
Compared with prior art, the utility model beneficial effect:
This bus realizes the real-time switching controls of dual power supply PLC, and intelligent chip is arranged on the inside of PLC, PLC The intelligent work of controller control whole system, reaction speed is fast, and PLC is connected by shielding line with bus breaker Connect, the electromagnetic interference of power line generation can be substantially reduced, engineering is obtained satisfied effect, different types of signal respectively by Different cable transmissions, forbid with the different conductor of same cable while transmitting electrical source of power and signal;Avoid signal wire and power Cable is close to parallel laid, to reduce electromagnetic interference;Circuit is simple, easy to maintenance using reliable.Main casing is stainless steel Matter, the inside of main casing sets one layer of electro-insulating rubber pad, with good insulation effect;Coil is entwined using copper wire, line That encloses is internally provided with magnetic core, and coil good heat dissipation effect, service life is long;Two indicator lamps and switch are installed on switch board, Switch connects one to one with indicator lamp, the working condition of indicator lamp prompt switch;By prolonged operation, this set PLC controls The double-power supply switching device of system can quickly be switched to another road power supply in the case of failure dead electricity and power, it is to avoid one section After power supply goes wrong, the operation of visual plant is influenceed to use because of back brake time length, these important loads are to avoid supplying after coming into operation Electricity, which is interrupted, causes production to shut down, and causes heavy losses, cost greatly reduces, improve operating efficiency.
Brief description of the drawings
Fig. 1 is switch board schematic diagram of the present utility model;
Fig. 2 is dual power supply major loop figure of the present utility model;
Fig. 3 is dual power supply PLC control principle drawings of the present utility model.
Embodiment
A kind of bus realizes the real-time switching controls of dual power supply PLC as Figure 1-3, including digital display meter 2, switch board 6, Main casing 7, breaker 10, controlling switch 11, auxiliary switch 12, relay 14, intelligent chip 16, air switch 18, coil 20 With relay contact 21, switch board 6 includes main casing 7 and cabinet door 1, and cabinet door 1 is arranged on main casing 7, cabinet door 1 and main casing 7 It is hinged, lockhole 9 is provided with cabinet door 1, cabinet door 1 is fixedly connected with main casing 7 by lockhole 9;Digital display meter 2 is embedded in cabinet door 1, Cabinet door 1 is provided with indicator lamp 3 and fling-cut switch 4, and indicator lamp 3 and digital display meter 2 are connected by wire, and the side of main casing 7 is set There are five spring hole scokets 8, five spring hole scokets 8 are embedded on main casing 7, the top of main casing 7 is provided with hoisting mechanism 5, hoisting mechanism 5 and master Housing 7 fixes welding;Breaker 10 is fixedly mounted on power distribution cabinet electric power incoming line side, and side and the relay contact of breaker 10 connect Connect, relay is arranged on the inside of main casing 7, controlling switch 11 is connected with breaker 10 by wire, and auxiliary switch 12 is set In the inside of breaker 10, indicator lamp 3 is connected with auxiliary switch 12 by wire.Intelligent chip 16 is provided at both ends with terminals Sub 15 relays 14 are connected on the binding post 15 of the both sides of intelligent chip 16, and the other end of relay 14 is connected by wire, The two ends of relay 14 miniature circuit breaker 13 in parallel;Air switch 18 is arranged on the inside of main casing 7, and air switch 18 is with indicating Lamp 3 is connected, and the two ends connection having air switch 17 of digital display meter 2, the two ends bridging coil 20 of air switch 17 is touched with relay First 21 be serially connected to breaker provide control power supply.Main casing 7 is stainless steel, and the inside of main casing 7 sets one layer absolutely Edge rubber blanket, with good insulation effect;Intelligent chip 16 is arranged on the inside of PLC, and PLC is controlled really The intelligent work of system, reaction speed is fast, by prolonged operation, and the double-power supply switching device of this set PLC controls can Quickly it is switched to another road power supply in the case of failure dead electricity to power, it is to avoid after one section of power supply goes wrong, during because of back brake Between it is long and operation that influence visual plant is used, these important loads are made to avoid power failure from causing production to shut down after coming into operation Into heavy losses, cost greatly reduces, operating efficiency is improved.

Claims (6)

1. a kind of bus realizes the real-time switching controls of dual power supply PLC, including digital display meter(2), switch board(6), main casing (7), breaker(10), controlling switch(11), auxiliary switch(12), relay(14), intelligent chip(16), air switch (18), coil(20)And relay contact(21), it is characterised in that:The intelligent chip(16)Be provided at both ends with binding post (15), relay(14)It is connected to intelligent chip(16)The binding post of both sides(15)On, relay(14)The other end pass through Wire is connected, relay(14)Two ends miniature circuit breaker in parallel(13);Air switch(18)Installed in main casing(7)It is interior Portion, air switch(18)With indicator lamp(3)It is connected, digital display meter(2)Two ends connection having air switch(17), air switch (17)Two ends bridging coil(20), with relay contact(21)It is serially connected and provides control power supply to breaker.
2. a kind of bus according to claim 1 realizes the real-time switching controls of dual power supply PLC, it is characterised in that:Institute State intelligent chip(16)The inside of PLC is arranged on, PLC is connected by shielding line with bus breaker.
3. a kind of bus according to claim 1 realizes the real-time switching controls of dual power supply PLC, it is characterised in that:Institute State main casing(7)For Stainless Steel Shell, main casing(7)Be internally provided with electro-insulating rubber pad.
4. a kind of bus according to claim 1 realizes the real-time switching controls of dual power supply PLC, it is characterised in that:Institute State coil(20)It is entwined using copper wire, coil(20)Be internally provided with magnetic core.
5. a kind of bus according to claim 1 realizes the real-time switching controls of dual power supply PLC, it is characterised in that:Institute State switch board(6)On two indicator lamps are installed(3)And switch(4), switch(4)With indicator lamp(3)Connect one to one.
6. a kind of bus according to claim 1 realizes the real-time switching controls of dual power supply PLC, it is characterised in that:Institute State switch board(6)Including main casing(7)And cabinet door(1), cabinet door(1)It is arranged on main casing(7)On, cabinet door(1)With main casing(7) It is hinged, cabinet door(1)On be provided with lockhole(9), cabinet door(1)And main casing(7)Pass through lockhole(9)It is fixedly connected;Digital display meter(2)Edge It is embedded in cabinet door(1)On, cabinet door(1)It is provided with indicator lamp(3)And fling-cut switch(4), indicator lamp(3)And digital display meter(2)By leading Line is connected, main casing(7)Side be provided with five spring hole scokets(8), five spring hole scokets(8)It is embedded in main casing(7)On, main casing (7)Top be provided with hoisting mechanism(5), hoisting mechanism(5)With main casing(7)Fixed welding;Breaker(10)It is fixedly mounted on Power distribution cabinet electric power incoming line side, breaker(10)Side be connected with relay contact, relay be arranged on main casing(7)It is interior Portion, controlling switch(11)With breaker(10)Connected by wire, auxiliary switch(12)It is arranged on breaker(10)Inside, refer to Show lamp(3)With auxiliary switch(12)Connected by wire.
CN201720316838.0U 2017-03-29 2017-03-29 A kind of bus realizes the real-time switching controls of dual power supply PLC Expired - Fee Related CN206611237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720316838.0U CN206611237U (en) 2017-03-29 2017-03-29 A kind of bus realizes the real-time switching controls of dual power supply PLC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720316838.0U CN206611237U (en) 2017-03-29 2017-03-29 A kind of bus realizes the real-time switching controls of dual power supply PLC

Publications (1)

Publication Number Publication Date
CN206611237U true CN206611237U (en) 2017-11-03

Family

ID=60173873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720316838.0U Expired - Fee Related CN206611237U (en) 2017-03-29 2017-03-29 A kind of bus realizes the real-time switching controls of dual power supply PLC

Country Status (1)

Country Link
CN (1) CN206611237U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109378802A (en) * 2018-09-29 2019-02-22 浙江大唐乌沙山发电有限责任公司 The application of anti-tripping power distribution equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109378802A (en) * 2018-09-29 2019-02-22 浙江大唐乌沙山发电有限责任公司 The application of anti-tripping power distribution equipment

Similar Documents

Publication Publication Date Title
CN102646546B (en) Intelligent self-energy-obtaining vacuum breaker
CN101521408B (en) Remote monitoring device of disconnector
CN206611237U (en) A kind of bus realizes the real-time switching controls of dual power supply PLC
CN202695269U (en) Intelligent self-energy-fetching vacuum circuit breaker
CN202353052U (en) Vehicle-mounted intensive substation
CN203339607U (en) Closed bus and transformer wiring terminal connection wire outlet box
CN102545370A (en) Power supply device for control system of wind driven generator
CN204536514U (en) Sea-freight strip control system UPS inlet wire power failure alarm device
CN201490961U (en) Energy-saving automatic control device of transformer
CN103366985A (en) Mobile power switch special for maintenance and debugging
CN203398542U (en) Improved cubicle gas insulated switchgear electric operation device
CN209963758U (en) Circuit for realizing direct current turn-off by using alternating current panel switch
CN203397961U (en) Special mobile power supply switch for maintenance and debugging
CN207149835U (en) A kind of crane trench electric installation
CN101996816A (en) High-voltage electric isolating switch
CN208164807U (en) Railway power system and outdoor parallel modular device for railway power system
CN201185404Y (en) Control device for intelligently monitoring and detecting power supply real time
CN205772546U (en) A kind of band independence band-type brake controls the switch board in loop
CN202094037U (en) On-load switchingin or switchingoff prevention isolating switch for box substation
CN201063419Y (en) Electric appliance energy-saving circuit of office building
CN202094695U (en) Communication base station automatic power switching device
CN201490075U (en) Remote control isolation switch
CN204068406U (en) A kind of Waste Heat Power Station direct current system
CN217848771U (en) Novel intelligent box transformer
CN217563300U (en) High-voltage cable butt-joint box for indoor use

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

CF01 Termination of patent right due to non-payment of annual fee