CN206609419U - A kind of three proofings engineering mapping levelling rod - Google Patents

A kind of three proofings engineering mapping levelling rod Download PDF

Info

Publication number
CN206609419U
CN206609419U CN201720340035.9U CN201720340035U CN206609419U CN 206609419 U CN206609419 U CN 206609419U CN 201720340035 U CN201720340035 U CN 201720340035U CN 206609419 U CN206609419 U CN 206609419U
Authority
CN
China
Prior art keywords
levelling rod
telescopic outrigger
proofings
connector
containment vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720340035.9U
Other languages
Chinese (zh)
Inventor
刘子铭
刘凤菊
楚公博
赖献美
曾湘林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720340035.9U priority Critical patent/CN206609419U/en
Application granted granted Critical
Publication of CN206609419U publication Critical patent/CN206609419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

The utility model discloses a kind of three proofings engineering mapping levelling rod, including pedestal and containment vessel, the lower surface of the pedestal is provided with connector, telescopic outrigger is installed on the connector, and telescopic outrigger is rotated with connector and is connected, regulating tank is offered on the telescopic outrigger, peg button is installed on the extensible member of the telescopic outrigger, the bottom of the telescopic outrigger is provided with cone pin, protective case is provided with the cone pin, the lower surface middle part of the pedestal is provided with protecting crust, medium line is provided with the protecting crust, upper surface inside the protecting crust is connected by cord with shot, the containment vessel is installed on the upper surface of pedestal, the front of the containment vessel is provided with observation window, the inside of the containment vessel is provided with levelling rod, scale is provided with the levelling rod, this three proofings engineering mapping levelling rod is simple in construction, data record is accurate, quick horizontal adjustment can be accomplished, shorten adjustment time, improve operating efficiency.

Description

A kind of three proofings engineering mapping levelling rod
Technical field
The utility model is related to mapping equipment technical field, specially a kind of three proofings engineering mapping levelling rod.
Background technology
In Surveying and Mapping Industry, the utilization of levelling rod is quite varied, and up to the present its is indispensable, and levelling rod is level The scale used is measured, it is typically made of materials such as the timber, fiberglass or aluminium alloy of high-quality.Conventional levelling rod has Sopwith staff With two kinds of reversible rod.When using spirit level measurement ground level difference, it is necessary to use levelling rod to carry out conjunction measuring, When in use, the two hand-held levelling rod of special messenger former and later two measurement positions of instrument, then used by mapping worker up to standard are arranged first Spirit level observes levelling rod, so as to draw the difference in height of two positions;And the people of hand-held levelling rod stands in measurement position, it is necessary to protect Levelling rod is demonstrate,proved perpendicular to horizontal plane, can just ensure the accuracy of spirit level measurement.
In existing device, after long usage, the visual fatigue of operating personnel is caused, so as to cause in water Occur error during the horizontal adjustment of object staff, then make it that measurement data is inaccurate, and the scale on levelling rod causes to see The dim eyesight for the person of examining, in reading, is easily misread, and existing device is more bothered in adjustment, has been delayed work, has been reduced Operating efficiency.
Utility model content
The purpose of this utility model is to provide a kind of three proofings engineering mapping levelling rod, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of three proofings engineering mapping levelling rod, including Pedestal and containment vessel, the lower surface of the pedestal, which is provided with connector, the connector, is provided with telescopic outrigger, and flexible branch Leg is rotated with connector and is connected, and is offered and is provided with regulating tank, the extensible member of the telescopic outrigger on the telescopic outrigger Peg button, the bottom of the telescopic outrigger, which is provided with cone pin, the cone pin, is provided with protective case, the connector and supporting leg Connection is rotated, the bottom of the supporting leg, which is provided with cone pin, the cone pin, to be provided with the middle of protective case, the lower surface of the pedestal Position, which is provided with protecting crust, the protecting crust, is provided with medium line, and the upper surface inside the protecting crust passes through cord and shot Connection, the containment vessel is installed on the upper surface of pedestal, and the front of the containment vessel is provided with observation window, the containment vessel it is interior Portion is provided with levelling rod, the levelling rod and is provided with scale.
It is preferred that, the containment vessel is designed as detachable pattern.
It is preferred that, the observation window is right against levelling rod.
It is preferred that, the connector is arranged by 120 ° of angle of angle two-by-two.
It is preferred that, the telescopic outrigger is designed with two.
Compared with prior art, the beneficial effects of the utility model are:This three proofings engineering mapping levelling rod is simple in construction, leads to The protection to levelling rod is crossed, and observed using observation window, substantially reduce measuring for numeral, it is to avoid be prolonged Work causes staff's misregistration, accomplishes that data record is accurate, passes through the plumb line installed in base bottom and two Telescopic outrigger, when supporting leg is fixed, by observing the swing and the adjustment to two telescopic outriggers of plumb line, can accomplish Quick horizontal adjustment, shortens adjustment time, improves operating efficiency.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the internal structure schematic diagram of containment vessel in the utility model.
In figure:1- pedestals;2- containment vessels;3- observation windows;4- levelling rods;5- scales;6- connectors;7- telescopic outriggers;8- Bore pin;9- protective cases;10- regulating tanks;11- peg buttons;12- supporting legs;13- protecting crusts;14- medium lines;15- shots.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of three proofings engineering mapping levelling rod, including base Seat 1 and containment vessel 2, the lower surface of the pedestal 1, which is provided with connector 6, the connector 6, is provided with telescopic outrigger 7, and stretches Contracting supporting leg 7 is rotated with connector 6 and is connected, and regulating tank 10, the pars contractilis of the telescopic outrigger 7 are offered on the telescopic outrigger 7 Peg button 11 is installed, the bottom of the telescopic outrigger 7, which is provided with cone pin 8, the cone pin 8, is provided with protective case 9 on part, The connector 6 is rotated with supporting leg 12 and is connected, and the bottom of the supporting leg 12, which is provided with cone pin 8, the cone pin 8, is provided with protection Set 9, the lower surface middle part of the pedestal 1, which is provided with protecting crust 13, the protecting crust 13, is provided with medium line 14, described anti- Upper surface inside protective case 13 is connected by cord with shot 15, and the containment vessel 2 is installed on the upper surface of pedestal 1, the guarantor The front of protective case 2 is provided with observation window 3, and the inside of the containment vessel 2, which is provided with levelling rod 4, the levelling rod 4, is provided with quarter Degree 5.
The containment vessel 2 is designed as detachable pattern, is easy to the carrying of device, and the protection to levelling rod, the sight Examine window 3 and be right against levelling rod 4, reduce the data in the visual field, it is to avoid prolonged observation causes record data mistake, the company Fitting 6 is arranged by 120 ° of angle of angle two-by-two, accomplishes the uniform force of supporting leg, the telescopic outrigger 7 is designed with two, is led to Two telescopic outriggers 7 are overregulated, the level of device is reached.
Operation principle:In use, removing protective case 9, supporting leg 12 is fixed using pin 8 is bored, is passing through shot 15 Swing state, adjusts telescopic outrigger 7, by carrying out the length adjustment of telescopic outrigger 7 in regulating tank 10, is utilizing peg button 11 pairs its be fixed, the reclosing of medium line 14 on the cord on shot 15 and protecting crust 13, in the upper table of pedestal 1 Containment vessel 2 is installed in face, is read the scale 5 on levelling rod 4 by the observation window 3 on containment vessel 2, after observation terminates, will be protected Set 9 is respectively fitted over the bottom of telescopic outrigger 7 and supporting leg 12, is being arranged, it is to avoid cone pin 8 is damaged to staff.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of three proofings engineering mapping levelling rod, including pedestal(1)And containment vessel(2), it is characterised in that:The pedestal(1)'s Lower surface is provided with connector(6), the connector(6)On telescopic outrigger is installed(7), and telescopic outrigger(7)With connector (6)Rotate connection, the telescopic outrigger(7)On offer regulating tank(10), the telescopic outrigger(7)Extensible member on install There is peg button(11), the telescopic outrigger(7)Bottom cone pin is installed(8), the cone pin(8)On be provided with protective case (9), the connector(6)With supporting leg(12)Rotate connection, the supporting leg(12)Bottom cone pin is installed(8), the cone pin (8)On be provided with protective case(9), the pedestal(1)Lower surface middle part protecting crust is installed(13), the protecting crust (13)It is interior to be provided with medium line(14), the protecting crust(13)Internal upper surface passes through cord and shot(15)Connection, it is described to protect Protective case(2)It is installed on pedestal(1)Upper surface, the containment vessel(2)Front be provided with observation window(3), the containment vessel(2) Inside levelling rod is installed(4), the levelling rod(4)Inside it is provided with scale(5).
2. a kind of three proofings engineering mapping levelling rod according to claim 1, it is characterised in that:The containment vessel(2)Design For detachable pattern.
3. a kind of three proofings engineering mapping levelling rod according to claim 1, it is characterised in that:The observation window(3)It is just right In levelling rod(4).
4. a kind of three proofings engineering mapping levelling rod according to claim 1, it is characterised in that:The connector(6)With two Two angles are 120 ° of angle arrangement.
5. a kind of three proofings engineering mapping levelling rod according to claim 1, it is characterised in that:The telescopic outrigger(7)If In respect of two.
CN201720340035.9U 2017-04-01 2017-04-01 A kind of three proofings engineering mapping levelling rod Expired - Fee Related CN206609419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720340035.9U CN206609419U (en) 2017-04-01 2017-04-01 A kind of three proofings engineering mapping levelling rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720340035.9U CN206609419U (en) 2017-04-01 2017-04-01 A kind of three proofings engineering mapping levelling rod

Publications (1)

Publication Number Publication Date
CN206609419U true CN206609419U (en) 2017-11-03

Family

ID=60174613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720340035.9U Expired - Fee Related CN206609419U (en) 2017-04-01 2017-04-01 A kind of three proofings engineering mapping levelling rod

Country Status (1)

Country Link
CN (1) CN206609419U (en)

Similar Documents

Publication Publication Date Title
CN203069185U (en) Measurement instrument for building construction
CN206876159U (en) Pole wire angle quick test device
CN213238877U (en) Building settlement measuring device
CN206609419U (en) A kind of three proofings engineering mapping levelling rod
CN204649196U (en) Level marks chi
CN109186544A (en) A kind of method and device for facing the measurement of higher degree of sky interface
CN207123280U (en) A kind of novel building engineering surveying instrument
CN106705932A (en) Outdoor comprehensive surveying and mapping device for military topography
CN209654938U (en) A kind of construction supervision auxiliary device
CN206235317U (en) A kind of military topography field synthesis plotting board
CN205843665U (en) A kind of grade rod
CN204718561U (en) Portable electric pole gradient measurement instrument
CN209131664U (en) Ruler is used in a kind of detection of construction engineering quality
CN209387023U (en) A kind of industrial production laser orientation instru-ment
CN208187412U (en) A kind of mold plate verticality guiding ruler
CN207717091U (en) A kind of building template measuring for verticality seton device
CN206132044U (en) Water conservancy construction is with measuring sopwith staff
CN209654028U (en) Construction of Pile Bedding Boring verticality dynamic observation device
CN207231460U (en) The mounting structure of engineering surveying instrument Sopwith staff
CN212806997U (en) Height measurement is with sopwith staff auxiliary device
CN213455440U (en) Fast leveling theodolite
CN214197807U (en) Novel level for hydraulic engineering
CN207407888U (en) The engineering surveying instrument that a kind of having electronic is found a view
CN220649266U (en) Ruler for decoration
CN109724563B (en) Vertical rod inclinometer and method for measuring inclination of vertical rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

Termination date: 20180401