CN206608184U - A kind of zigzag service channel structure - Google Patents

A kind of zigzag service channel structure Download PDF

Info

Publication number
CN206608184U
CN206608184U CN201720224323.8U CN201720224323U CN206608184U CN 206608184 U CN206608184 U CN 206608184U CN 201720224323 U CN201720224323 U CN 201720224323U CN 206608184 U CN206608184 U CN 206608184U
Authority
CN
China
Prior art keywords
way
transverse passage
threaded list
list road
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720224323.8U
Other languages
Chinese (zh)
Inventor
郭晓刚
陈聪
向功兴
李立国
周丹
唐飞
余婧杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201720224323.8U priority Critical patent/CN206608184U/en
Application granted granted Critical
Publication of CN206608184U publication Critical patent/CN206608184U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of zigzag service channel structure, it is characterised in that:The left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) are provided with subway up-downgoing tunnel, the left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) pass through bell-mouthed connection between tunnel, connected between the described left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) by access ramp (3), the described left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) set movement joint (5) respectively with tunnel junction, the described left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) are provided with portal ring beam (6) with described access ramp (3) junction;It is overcome in the prior art by ground environment conditionality, it is difficult to perform the shortcoming of open cut vertical shaft on ground, is greatly reduced investment with service channel structure of being constructed in vertical shaft, is shortened the advantage of duration.

Description

A kind of zigzag service channel structure
Technical field
The utility model is related to subway engineering technical field, is more specifically a kind of zigzag service channel structure.
Background technology
Service channel is the passage OR gate hole of two driving running tunnels of the same circuit up-downgoing of connection, in train in interval When meeting disaster, the forced shutdowns such as fire, used for passenger from accident tunnel to the evacuation of zero defects tunnel safety.
According to《Metro design code》(GB50157-2013), two single track line tunnels should set service channel, adjacent two The distance between individual service channel not should be greater than 600m;Interval drainage pumping plant should be with interval service channel or middle wind when having ready conditions Well is built jointly.
Transverse passage-way is set between up-downgoing tunnel, the common practices of service channel is belonged to using Mining Method boring construction.
With the fast development of metro construction, track traffic underground terminal station, circuit are more and more.Newly-built circuit It is notable all the more by surrounding enviroment restraining factors, there is increasing superimposing thread or the up-downgoing running tunnel of the big discrepancy in elevation.For example it is military No. 7 line first stage of the project Hong Kong way stations of Chinese track traffic~tri- are positive, and way station is interval.
For ease of evacuating personnel, service channel is built between big discrepancy in elevation up-downgoing running tunnel, stair need to be set.According to 《Civil buildings design general rule》(GB50352-2005), the depth-width ratio of stair step should meet width >=0.26m, highly≤ 0.17m.Often subway up-downgoing tunnel level interval is not too large, and this is resulted in sets between big discrepancy in elevation up-downgoing running tunnel Putting service channel can not be using conventional transverse passage-way mode.
The structure that connection up-downgoing running tunnel is performed in open cut vertical shaft, vertical shaft is performed on ground, it is possible to achieve big high Service channel is built between poor up-downgoing running tunnel.But city strategic road or intensive building are worn under subway tunnel major part Group, by ground environment conditionality, it is difficult to perform open cut vertical shaft on ground.Such as No. 7 line first stage of the project of Wuhan rail transit are fragrant Port way station~tri- are positive, and way station is interval.The interval from Hong Kong way station by up and down in the way of overlapping tunnel it is outbound, circuit is with R=340m's Major trunk roads Ao Menlu is reached behind several 1~6 floor house such as curve Xia Chuan General Hospital of Yangtze River Shipping, does not possess ground construction open cut and erects The condition of interval service channel is built after well.
The content of the invention
The purpose of this utility model is the weak point for overcoming above-mentioned background technology, and proposes that a kind of zigzag contact is logical Road structure.
What the technical solution of the utility model was implemented by following measure:A kind of zigzag service channel structure, in subway Up-downgoing tunnel is provided with the left plug-in transverse passage-way in threaded list road and the right plug-in transverse passage-way in threaded list road, the left plug-in transverse passage-way in threaded list road and the right side By bell-mouthed connection between the plug-in transverse passage-way in threaded list road and tunnel,
Connected between the described left plug-in transverse passage-way in threaded list road and the right plug-in transverse passage-way in threaded list road by access ramp,
The described left plug-in transverse passage-way in threaded list road and the right plug-in transverse passage-way in threaded list road set movement joint respectively with tunnel junction, The described left plug-in transverse passage-way in threaded list road and the right plug-in transverse passage-way in threaded list road are provided with portal with described access ramp junction Ring beam.
In the above-mentioned technical solutions:The bottom of the described right plug-in transverse passage-way in threaded list road is provided with draining pump house.
In the above-mentioned technical solutions:The described left plug-in transverse passage-way in threaded list road, the right plug-in transverse passage-way in threaded list road and access ramp Use stalk crowned section structure.
The utility model has following technological merit:When the 1st, solving the unconditional construction shaft in ground, big discrepancy in elevation up-downgoing The problem of service channel can not be built between running tunnel.
2nd, using Mining Method boring construction, more traditional ground construction vertical shaft, the interior construction service channel structure of vertical shaft is big It is big to reduce investment, shorten the duration, reduce the influence to surrounding enviroment.
3rd, passage and tunnel junction set movement joint, substantially reduce Freezing Method for Cross-passage Construction phase and operation phase up-downgoing tunnel Influencing each other between road.
Brief description of the drawings
Fig. 1 is structural plan figure of the present utility model.
Fig. 2 is section of structure of the present utility model.
In figure:The left plug-in transverse passage-way 1 in threaded list road, the plug-in transverse passage-way 2 in right threaded list road, access ramp 3, draining pump house 4, movement joint 5th, portal ring beam 6.
Embodiment
Describe performance of the present utility model in detail below in conjunction with the accompanying drawings, but they are not constituted to of the present utility model Limit, it is only for example, while by illustrating that advantage of the present utility model will become clearer and be readily appreciated that.
Shown in reference picture 1-2:A kind of zigzag service channel structure, is provided with outside left threaded list road in subway up-downgoing tunnel Hang transverse passage-way 1 and the plug-in transverse passage-way 2 in right threaded list road, the plug-in transverse passage-way 2 of the left plug-in transverse passage-way 1 in threaded list road and right threaded list road and tunnel Between pass through it is bell-mouthed connection (way is with general service channel).
Connected between the described plug-in transverse passage-way 2 of the plug-in transverse passage-way 1 in left threaded list road and right threaded list road by access ramp 3,
The described plug-in transverse passage-way 2 of the plug-in transverse passage-way 1 in left threaded list road and right threaded list road sets deformation respectively with tunnel junction Seam 5, movement joint is to reduce influencing each other between Freezing Method for Cross-passage Construction phase and operation phase up-downgoing tunnel.
Consider the stress unfavorable factor of labyrinth body each several part junction, the described plug-in He of transverse passage-way 1 in left threaded list road The right plug-in transverse passage-way 2 in threaded list road is provided with portal ring beam 6 with the described junction of access ramp 3.
The bottom of the described plug-in transverse passage-way 2 in right threaded list road is provided with draining pump house 4.
The described plug-in transverse passage-way 1 in left threaded list road, the plug-in transverse passage-way 2 in right threaded list road and access ramp 3 uses stalk arch Section structure.
Before Z " font service channel boring constructions, corresponding measure is taken to carry out stratum consolidation depending on strata condition.
At left and right line shield driving to proposed transverse passage-way position, assembled special lined steel section of jurisdiction is corresponded, each piece of section of jurisdiction is tight Lattice are installed according to special section of jurisdiction drawing requirement.
In Special Ring steel pipe sheet both sides, opening does not install temporary support, support plate etc., to control Freezing Method for Cross-passage Construction When shield duct piece deform.
" Z " font Freezing Method for Cross-passage Construction order be:First construct the plug-in transverse passage-way 1 in left threaded list road and right threaded list road it is plug-in horizontal logical Road 2, then construction drainage pump house 4, access ramp 3 of finally constructing.To ensure digging process safety, access ramp is excavated should be according to by up to Under order apply.
Each several part construction sequencing be:The soil body, first pneumatically placed concrete, extension inner side bar-mat reinforcement, erection grid steel frame are excavated, is hung Outside bar-mat reinforcement, multiple pneumatically placed concrete.Gunite concrete surface is levelling, lays waterproof layer after-pouring secondary lining.Arch and side wall Secondary lining reserves mud jacking hole later stage slip casting filling, it is ensured that closely knit between preliminary bracing and two linings.
Above-mentioned unspecified part is prior art.

Claims (3)

1. a kind of zigzag service channel structure, it is characterised in that:Left threaded list road is provided with subway up-downgoing tunnel plug-in horizontal logical Road (1) and the right plug-in transverse passage-way in threaded list road (2), the left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) and tunnel By bell-mouthed connection between road,
Connected between the described left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) by access ramp (3),
The described left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) set deformation respectively with tunnel junction Stitch (5), the described left plug-in transverse passage-way in threaded list road (1) and the right plug-in transverse passage-way in threaded list road (2) are connected with described access ramp (3) Place is provided with portal ring beam (6).
2. a kind of zigzag service channel structure according to claim 1, it is characterised in that:Outside described right threaded list road The bottom for hanging transverse passage-way (2) is provided with draining pump house (4).
3. a kind of zigzag service channel structure according to claim 1 or 2, it is characterised in that:Outside described left threaded list road Hang transverse passage-way (1), the right plug-in transverse passage-way in threaded list road (2) and access ramp (3) and use stalk crowned section structure.
CN201720224323.8U 2017-03-09 2017-03-09 A kind of zigzag service channel structure Active CN206608184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720224323.8U CN206608184U (en) 2017-03-09 2017-03-09 A kind of zigzag service channel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720224323.8U CN206608184U (en) 2017-03-09 2017-03-09 A kind of zigzag service channel structure

Publications (1)

Publication Number Publication Date
CN206608184U true CN206608184U (en) 2017-11-03

Family

ID=60165234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720224323.8U Active CN206608184U (en) 2017-03-09 2017-03-09 A kind of zigzag service channel structure

Country Status (1)

Country Link
CN (1) CN206608184U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057817A (en) * 2018-08-02 2018-12-21 中铁隆工程集团有限公司 Suitable for folding the c-type service channel structure and construction method that fall Subway Tunnel up and down
CN112360499A (en) * 2020-10-26 2021-02-12 中铁大桥勘测设计院集团有限公司 Connection channel structure suitable for double-line tunnel and construction method thereof
CN113605923A (en) * 2021-09-18 2021-11-05 中铁第六勘察设计院集团有限公司 Subway laminated line interval tunnel connection channel structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057817A (en) * 2018-08-02 2018-12-21 中铁隆工程集团有限公司 Suitable for folding the c-type service channel structure and construction method that fall Subway Tunnel up and down
CN112360499A (en) * 2020-10-26 2021-02-12 中铁大桥勘测设计院集团有限公司 Connection channel structure suitable for double-line tunnel and construction method thereof
CN113605923A (en) * 2021-09-18 2021-11-05 中铁第六勘察设计院集团有限公司 Subway laminated line interval tunnel connection channel structure and construction method
CN113605923B (en) * 2021-09-18 2023-11-21 中铁第六勘察设计院集团有限公司 Subway line overlapping section tunnel connection channel structure and construction method

Similar Documents

Publication Publication Date Title
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN105298501A (en) Construction method for auxiliary air duct structure of underground excavation station
CN206608184U (en) A kind of zigzag service channel structure
CN101769154A (en) Excavation supporting method for tunnel construction
CN103114857A (en) Shield tunnel construction method
CN104047623A (en) Large-span grotto excavation construction method
CN109854253A (en) A kind of existing Metro folds the enlargement method of island transfer station
US20240003254A1 (en) Vertical orthogonal top exhausting air duct structure of deeply-buried subway station and construction method therefor
CN105201516A (en) Subway station body structure and four-joint-arch PBA underground excavation construction method thereof
CN108361036B (en) A kind of construction method that subway station accessory structure is plug-in
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN110685709A (en) Construction method and structure of connection channel of superposed tunnel
CN113847040A (en) Large-span non-column underground station underground excavation construction method
CN111720126A (en) Construction method for entering tunnel through ingate of underground excavation tunnel
CN208718690U (en) The reparation plugging structure of windowing in long range shield tunnel
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN208518680U (en) A kind of spray concrete plug structure for vcehicular tunnel corrugated steel preliminary bracing
CN204851266U (en) Secretly dig shaft structure directly over station
CN108222945B (en) Construction method for excavating underground excavation station of subway with super-large section by using main and auxiliary layered tunnels
CN106930768B (en) Tunnel Construction and application
CN108756897A (en) A kind of construction method of breaking surrounding rock people's air defense tunnel cross point
CN110005440A (en) Double side wall pilot tunnel formula construction method under lateral pipe shed support
CN106988748B (en) High-order parallel heading construction and capacity expansion revamping are the construction method of double line tunnel
CN206111182U (en) Wear supporting construction at existing station under rectangle tunnel section zero distance
CN111577292B (en) Double-branch road construction method for underground excavation station of local water-rich sand layer