CN206594244U CN201720369195.6U CN201720369195U CN206594244U CN 206594244 U CN206594244 U CN 206594244U CN 201720369195 U CN201720369195 U CN 201720369195U CN 206594244 U CN206594244 U CN 206594244U
Authority
CN
China
Prior art keywords
short
circuit test
generator
test system
field
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720369195.6U
Other languages
Chinese (zh)
Inventor
徐振阳
张鑫
甘园林
李京
王彤
王国冕
崔新育
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JINGFENG GAS FIRED POWER Co Ltd
Original Assignee
BEIJING JINGFENG GAS FIRED POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JINGFENG GAS FIRED POWER Co Ltd filed Critical BEIJING JINGFENG GAS FIRED POWER Co Ltd
Priority to CN201720369195.6U priority Critical patent/CN206594244U/en
Application granted granted Critical
Publication of CN206594244U publication Critical patent/CN206594244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

The utility model is related to a kind of short-circuit test system for gas turbine, including:Startup field power supply switch, startup exciting transformer, startup excitation disconnecting link, field switch and the power cell being sequentially connected, power cell is also connected with field regulator and rotor coil respectively, field regulator is also connected with generator as output end, and rotor coil provides operating fields for generator.A kind of short-circuit test system for gas turbine that the utility model is provided, it need not disconnect exciting transformer high-pressure side when carrying out short-circuit test and draw and connect temporary source, it is simple to operate and safe, have the advantages that energy-saving and emission-reduction, high financial profit, test efficiency are high and practical.

Description

A kind of short-circuit test system for gas turbine
Technical field
The utility model is related to fuel gas generation field, more particularly to a kind of short-circuit test system for gas turbine.
Background technology
After short-circuit test system overhaul when gas turbine, G-T protective plant modification, it is required for carrying out short-circuit test, To verify whether generator and short-circuit test systematic parameter, protection device parameter are correct.
Existing gas turbine short-circuit test system is when carrying out short-circuit test, according to traditional test method, it is necessary to will Exciting transformer high-pressure side disconnects, and connects and leads to station-service 6kV temporary sources, the excitation needed when providing experiment by exciting transformer Electric current.When carrying out short-circuit test, with being related to, measure is more, and the operation maintenance personnel of participation is more, and security risk is higher to be lacked Point, and do disconnect, recover high-pressure side wiring when, due to unobvious cut-off point, unit, which must be shut down, to be carried out, to combustion A start and stop process is needed for gas-turbine, therefore, before short-circuit test system test safety measure and experiment after measure recover The time is required for, rule of thumb needing at least six hour, (measure of doing needs or so 3 hours, and Gas Generator Set is again started up interval It is required that 2 hours, shutdown process is respectively needed 0.5 hour), cause experimental test excessively very long, increase manpower, the goods and materials cost of experiment.
Meanwhile, because short-circuit test is carried out in the case of unit rated speed, unit no-load running needs to expend a large amount of Natural gas, a quarter when natural gas is about rated load is consumed when unloaded, with 400MW Gas-steam Combined Cycles Natural gas about 20000Nm is consumed exemplified by unit, when unloaded3/ h, gas industry gas price presses 2.30 yuan/Nm3Calculate, unit is unloaded When about 4.6 ten thousand yuan of fuel cost per hour, cause experimentation cost too high.
Utility model content
Technical problem to be solved in the utility model is to be used for gas turbine there is provided one kind in view of the shortcomings of the prior art Short-circuit test system.
The technical scheme that the utility model solves above-mentioned technical problem is as follows:
A kind of short-circuit test system for gas turbine, including:The startup field power supply being sequentially connected switchs, starts and encourage Magnetic transformer, start excitation disconnecting link, field switch and power cell, the power cell also respectively with field regulator and rotor Coil is connected, and the field regulator is also connected as output end with generator, and the rotor coil provides for the generator Operating fields.
The beneficial effects of the utility model are:A kind of short-circuit test system for gas turbine that the utility model is provided System, need not disconnect exciting transformer high-pressure side and draw and connect temporary source when carrying out short-circuit test, simple to operate and safe, Compared with traditional gas turbine short-circuit test system, the test period of or so 3 hours can be saved, excitation is being carried out in addition After no-load test, transformer unit short-circuit test, then the fast quick-recovery normal operating mode of energy carries out set grid-connection, if excitation Dynamic test, can also realize that experiment is uninterrupted and carry out, meanwhile, during test period when saving 3 small or so, it can save 13.8 ten thousand yuan of costs, have the advantages that energy-saving and emission-reduction, high financial profit, test efficiency are high and practical.
On the basis of above-mentioned technical proposal, the utility model can also do following improvement.
Further, the startup field power supply switch is connected with station-service 6kV power supplys.
Further, the field regulator is also associated with current transformer, and the current transformer is the adjustment of field excitation Device provides mutual inducing current, is connected between the field regulator and the generator by voltage transformer, the mutual induction of voltage Device provides mutual voltage for the field regulator.
Further, 220V dc source is connected between the power cell and the rotor coil.
Further, Generator Outlet Switchgear and main transformer pressure are also connected between the generator and the output end in turn Device.
Further, static frequency change starting module is also associated between the Generator Outlet Switchgear and the generator.
Further, the static frequency change starting module includes the SFC power switches and SFC units being sequentially connected, the SFC Unit is connected in the lower mouth of the Generator Outlet Switchgear with the generator outlet.
Further, the SFC power switches are connected with station-service 6kV power supplys.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.
Brief description of the drawings
A kind of structural framing for short-circuit test system for gas turbine that Fig. 1 provides for the utility model embodiment Figure;
A kind of structure for short-circuit test system for gas turbine that Fig. 2 provides for another embodiment of the utility model Figure.
Embodiment
Principle of the present utility model and feature are described below in conjunction with accompanying drawing, example is served only for explaining this practicality It is new, it is not intended to limit scope of the present utility model.
As shown in figure 1, a kind of knot of the short-circuit test system for gas turbine provided for the utility model embodiment Structure frame diagram, the system includes:The startup field power supply being sequentially connected switchs 101, starts exciting transformer 102, starts excitation Disconnecting link 103, field switch 104 and power cell 105, power cell 105 also respectively with field regulator 106 and rotor coil 107 connections, field regulator 106 is also connected with generator 108 as output end, and rotor coil 107 is that generator 108 provides work Make magnetic field.
A kind of short-circuit test system for gas turbine that above-described embodiment is provided, need not when carrying out short-circuit test Disconnection exciting transformer high-pressure side, which is drawn, connects temporary source, simple to operate and safe, with traditional gas turbine short-circuit test System is compared, and can save the test period of or so 3 hours, is carrying out excitation no-load test, transformer unit short-circuit test in addition Afterwards, the fast quick-recovery normal operating mode of energy, then carries out set grid-connection, if excitation dynamic test, can also realize experiment It is uninterrupted to carry out, meanwhile, during test period when saving 3 small or so, 13.8 ten thousand yuan of costs can be saved, are subtracted with energy-conservation The high and practical advantage of row, high financial profit, test efficiency.
As shown in Fig. 2 a kind of short-circuit test system for gas turbine provided for another embodiment of the utility model Structure chart, the system includes:The startup field power supply being sequentially connected switchs 101, starts exciting transformer 102, starts excitation Disconnecting link 103, field switch 104 and power cell 105, power cell 105 also respectively with field regulator 106 and rotor coil 107 connections, field regulator 106 is also connected with generator 108 as output end, and rotor coil 107 is that generator 108 provides work Make magnetic field.
For example, field regulator 106 can select Mitsubishi's MEC5000 types.
Further, start field power supply switch 101 and be connected with station-service 6kV power supplys.
Further, field regulator 106 is also associated with current transformer 109, and current transformer 109 is field regulator 106 provide mutual inducing current, are connected between field regulator 106 and generator 108 by voltage transformer 110, voltage transformer 110 be that field regulator 106 provides mutual voltage.
Further, 220V dc source is connected between power cell 105 and rotor coil 107.
Further, Generator Outlet Switchgear 111 and main transformer are also connected between generator 108 and output end in turn 112。
Further, static frequency change starting module is also associated between Generator Outlet Switchgear 111 and generator 108.
Further, static frequency change starting module includes the SFC power switches 113 and SFC units 114 being sequentially connected, and SFC is mono- Member 114 is connected in the lower mouth of Generator Outlet Switchgear 111 with the outlet of generator 108.
Further, SFC power switches 113 are connected with station-service 6kV power supplys.
It should be noted that SFC units 114 are static frequency change starter unit, it is used for the initial stage in unit starting External force is provided for unit, promotes the rotor of unit to reach certain rotating speed, is unit ignition, generating unit speed is risen to combustion engine and controls oneself Rotating speed, allows unit smoothly to start, and can be generally made up of starting transformer, rectifier and inverter etc..
The instrument and device of concrete model are not provided in above-described embodiment, can be realized using conventional instrument and device Above-mentioned functions.
In another embodiment, with reference to short circuit experiment, the short-circuit test system to gas turbine is described further.
First, allow unit normally to start, the rotating speed of unit is maintained at 3000 revs/min, unit is possessed short-circuit test Condition.
Then confirm the correct exhaustive of safety measure, prepare experiment Work tool and record form.
Field regulator is cut to MANUAL CONTROL mode, and the initial value of manual excitation is adjusted to minimum.
Field power supply switch will be started and start excitation disconnecting link and be cut to manual control mode.
Short dot is chosen, startup field power supply switch is incorporated into manually, is started after excitation disconnecting link and field switch, is adjusted manually Section excitation is slowly flowed up.
Test, the related short-circuit test data of record, after being completed, are reduced to 0 by exciting current manually, excitation are disconnected manually Switch, startup field power supply switch and startup excitation disconnecting link.
If any other short dots, short dot is chosen again, is tested again, until total Test is completed.
After the completion of experiment, field power supply switch will be started, start excitation disconnecting link and revert to automatic control mode, unit without Shut down, can be normally grid-connected, then carry out unit dynamic test or formally put into operation.
In the description of this specification, reference term " embodiment one ", " embodiment two ", " example ", " specific example " or The description of " some examples " etc. means that combining the embodiment or specific method, device or the feature of example description is contained in this reality With at least one new embodiment or example.In this manual, the schematic representation of above-mentioned term is necessarily directed to Be identical embodiment or example.Moreover, description specific features, method, device or feature can any one or it is many Combined in an appropriate manner in individual embodiment or example.In addition, in the case of not conflicting, those skilled in the art can So that the not be the same as Example or the feature of example and non-be the same as Example or example described in this specification to be combined and combine.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (8)

1. a kind of short-circuit test system for gas turbine, it is characterised in that including:The startup field power supply being sequentially connected is opened (101) are closed, starts exciting transformer (102), start excitation disconnecting link (103), field switch (104) and power cell (105), institute State power cell (105) to be also connected with field regulator (106) and rotor coil (107) respectively, the field regulator (106) Also it is connected with generator (108) as output end, the rotor coil (107) is that the generator (108) provides operating fields.
2. short-circuit test system according to claim 1, it is characterised in that the startup field power supply switch (101) is even It is connected to station-service 6kV power supplys.
3. short-circuit test system according to claim 1, it is characterised in that the field regulator (106) is also associated with Current transformer (109), the current transformer (109) is that the field regulator (106) provides mutual inducing current, the excitation Connected between adjuster (106) and the generator (108) by voltage transformer (110), the voltage transformer (110) is The field regulator (106) provides mutual voltage.
4. short-circuit test system according to claim 1, it is characterised in that the power cell (105) and the rotor 220V dc source is also associated between coil (107).
5. short-circuit test system according to any one of claim 1 to 4, it is characterised in that the generator (108) and Also it is connected with Generator Outlet Switchgear (111) and main transformer (112) between the output end in turn.
6. short-circuit test system according to claim 5, it is characterised in that in the Generator Outlet Switchgear (111) and Static frequency change starting module is also associated between the generator (108).
7. short-circuit test system according to claim 6, it is characterised in that the static frequency change starting module is included successively The SFC power switches (113) and SFC units (114) of connection, the SFC units (114) are in the Generator Outlet Switchgear (111) lower mouth is connected with the generator (108) outlet.
8. short-circuit test system according to claim 7, it is characterised in that the SFC power switches (113) are connected with factory Use 6kV power supplys.
CN201720369195.6U 2017-04-10 2017-04-10 A kind of short-circuit test system for gas turbine Expired - Fee Related CN206594244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720369195.6U CN206594244U (en) 2017-04-10 2017-04-10 A kind of short-circuit test system for gas turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720369195.6U CN206594244U (en) 2017-04-10 2017-04-10 A kind of short-circuit test system for gas turbine

Publications (1)

Publication Number Publication Date
CN206594244U true CN206594244U (en) 2017-10-27

Family

ID=60121155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720369195.6U Expired - Fee Related CN206594244U (en) 2017-04-10 2017-04-10 A kind of short-circuit test system for gas turbine

Country Status (1)

Country Link
CN (1) CN206594244U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108919030A (en) * 2018-06-25 2018-11-30 北京京丰燃气发电有限责任公司 A kind of selection method starting exciting transformer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108919030A (en) * 2018-06-25 2018-11-30 北京京丰燃气发电有限责任公司 A kind of selection method starting exciting transformer

Similar Documents

Publication Publication Date Title
EP1761984B1 (en) Engine driven power inverter system with cogeneration
JP5641679B2 (en) Wind power plant startup method, wind power plant and wind power plant utilization method
CN105846463B (en) A kind of black-start method and system of multi-source coordination
RU2552882C2 (en) Method of power plant operation
CN206594244U (en) A kind of short-circuit test system for gas turbine
CN102636753B (en) Testing method of low-voltage ride through capability of fossil power plant auxiliary engine
CN102157962A (en) Wind power generator unit based complementary power generating system and grid combined debugging method
CN112311016A (en) Black start system and method for single-bus subsection gas turbine power station with bypass bus connection
CN202433501U (en) Novel electrical design system for frequency superposition test platform of wind power generator
CN202049382U (en) Electric power system for pulp mill owned critical power plant black-start
Liu et al. Selection and simulation of black-start diesel generating set in regional power grid
CN107707175A (en) A kind of dead electricity of electric drive compressor crosses over control system and method
CN107508320A (en) A kind of wind power station and its black-start method
CN103603726B (en) Gas Turbine Generating Units automatic control system
CN113221358A (en) Standby output optimization method of electric-gas coupling system based on reliability parameters
Yu et al. Study on microturbine as a back-up power supply for power grid black-start
CN105484882A (en) Diesel generator set convenient to install, fast in starting and capable of achieving automatic parallel operation and withdrawing operation
CN209642579U (en) Gas turbine starts excitation system
CN205911985U (en) Take USB outlet's generator panel control circuit
CN201908734U (en) Full-automatic controller of gasoline generator set
CN110401227A (en) The gas-steam combined cycle set same period determines the adjustment method of phase study
CN202914189U (en) Starting load control system of diesel generator
CN200944572Y (en) Brushless exciting control arrangement for TRT synchronous generator
CN102183936B (en) Blackout start electric power system of autonomous critical heat-engine plant of paper mill and power supply method of system
CN204082323U (en) A kind of waste gas electricity generation grid-connecting unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

CF01 Termination of patent right due to non-payment of annual fee