CN206594171U CN201720194075.7U CN201720194075U CN206594171U CN 206594171 U CN206594171 U CN 206594171U CN 201720194075 U CN201720194075 U CN 201720194075U CN 206594171 U CN206594171 U CN 206594171U
Authority
CN
China
Prior art keywords
detection pipe
fixed block
grouting material
groove
stationary half
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720194075.7U
Other languages
Chinese (zh)
Inventor
许友山
陈朝祥
李盈灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Traffic Engineering Test And Inspection Co Ltd
Original Assignee
Wenzhou Traffic Engineering Test And Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Traffic Engineering Test And Inspection Co Ltd filed Critical Wenzhou Traffic Engineering Test And Inspection Co Ltd
Priority to CN201720194075.7U priority Critical patent/CN206594171U/en
Application granted granted Critical
Publication of CN206594171U publication Critical patent/CN206594171U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a kind of grouting material fullness degree detector, can easily it reuse.A kind of grouting material fullness degree detector, including support and the glass tube being fixed on support, the glass tube includes into 120 ° of the first detection pipe and the second detection pipe, first detection pipe is provided with integrally formed first fixed block close to one end of the second detection pipe, second detection pipe is provided with integrally formed second fixed block close to one end of the first detection pipe, the both sides of first fixed block and the second fixed block are equipped with the groove being connected, the fix bar being connected respectively with groove both sides side wall provided with two ends in one of them described groove, the fix bar rotates the screw rod being connected provided with one end with fix bar, the other end of the screw rod is passed from another groove, one end that the screw rod passes groove is provided with the crushing block coordinated with screw flight.

Description

Grouting material fullness degree detector
Technical field
The utility model is related to a kind of detecting instrument, more particularly to a kind of grouting material fullness degree detector.
Background technology
At present, the performance indications of back-tension prestressed channel mudjacking material should be met《Highway bridge and culvert construction technique normalizing》Mark 7.9.3 provide, wherein fullness degree test method in duct is to require in internal diameter to be 40mm, and two ends angle is 120 °, a length of per part Whether 0.5 meter of transparent organic glass pipe, place 7 days under conditions of 20 DEG C ± 3 DEG C, have diameter to be more than inside observation tube 3mm bubble or vapor.After grouting material is being stood 7 days, technical staff is typically all that selection cuts glass tube from centre Open, then take out the grouting material after solidification.Lucite tube cancels so after off-test, it is impossible to reuses, causes pole The big wasting of resources, improves the cost of experiment.
Authorization Notice No. discloses a kind of prestress hole path pressure grouting slurry for CN203178265U utility model patent and filled Degree of being full of test instrument.After the utility model causes that grouting material takes out by forming the glass tube of V-type after two tubes adhesion It can reuse.But there is problems with the utility model:Use every time needs with glue again adhesion, ten after finishing Divide trouble.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of grouting material fullness degree detector, Can easily it reuse.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of grouting material fullness degree Detector, including support and the glass tube being fixed on support, the glass tube include into 120 ° of the first detection pipe and second Detection pipe, first detection pipe is provided with integrally formed first fixed block, second inspection close to one end of the second detection pipe Test tube is provided with integrally formed second fixed block close to one end of the first detection pipe, first fixed block and the second fixed block Both sides are equipped with the groove being connected, the fixation being connected respectively with groove both sides side wall provided with two ends in one of them described groove Bar, the fix bar rotates the screw rod being connected provided with one end with fix bar, and the other end of the screw rod is worn from another groove Go out, one end that the screw rod passes groove is provided with the crushing block coordinated with screw flight.
By above-mentioned technical proposal, screw crushing block to be fixedly connected with the first fixed block and the second fixed block, such first Detection pipe and the second detection pipe are also just fixed.When needing separated first detection pipe and the second detection pipe to take out style Also only need to unscrew crushing block.
It is further arranged to:Seal groove is equipped with the face that first fixed block and the second fixed block fit, wherein Sealing ring is provided with one seal groove.
By above-mentioned technical proposal, sealing ring is set in seal groove in crushing block extruding connection the first fixed block and second Sealing is cooperatively formed when fixed block.
It is further arranged to:First detection pipe dorsad one end of the first fixed block and the second detection pipe dorsad second consolidate The one end for determining block is equipped with closure.
By above-mentioned technical proposal, closure is set to seal the first detection pipe and the disjunct one end of the second detection pipe.
It is further arranged to:First detection pipe and the second detection pipe are respectively equipped with integrally formed hinged block, described Closure is hinged with hinged block.
By above-mentioned technical proposal, closure is set to be hinged with hinged block, so in sealing block and the first detection pipe and the Two detection pipes are also connected to all the time when separating, it is to avoid sealing losing of cover.
It is further arranged to:One end in the closure insertion glass tube is provided with caulking gum.
By above-mentioned technical proposal, set caulking gum cause when closure inserts glass tube by caulking gum come It is fully sealed.
It is further arranged to:The both sides in the pedestal lower end face are equipped with mounting blocks, and the both sides of each mounting blocks are equal Castor provided with strap brake.
By above-mentioned technical proposal, glass tube can be driven steadily slow by castor when support needs to move Ground is moved, and can thus avoid producing influence to style during movement as far as possible.
It is further arranged to:The both sides in the pedestal upper end face are respectively provided with a connecting rod, and the upper end of the connecting rod is set There is the geometrical clamp of fixed glass tube.
By above-mentioned technical proposal, geometrical clamp is set to fix glass tube on support.
It is further arranged to:The geometrical clamp includes the first stationary half being fixedly connected with the connecting rod, the geometrical clamp Also include being located at the second stationary half that the first stationary half side and one end are hinged with connecting rod, the first stationary half face Through hole is provided with to the second stationary half side, the via bottoms are more than the neck of through hole provided with section, and described second fixes half The other end of ring is provided with projection to the first stationary half side, the projection dorsad second stationary half one end provided with being caught in card Rubber fixture block in groove.
By above-mentioned technical proposal, so that the position of the first stationary half and the second stationary half when rubber fixture block is caught in neck Put and fix to clamp glass tube.Firmly rubber fixture block is extracted i.e. from neck when needing to unclamp glass tube after the experiment has been completed Can.
In summary, the utility model has the advantages that:
1st, coordinated by screw rod and crushing block and fix the first fixed block and the second fixed block to cause the first detection pipe and the It is detachably connected between two detection pipes;
The 2nd, castor is installed come allow when needing smoothly movable glass pipe without influenceing the formula in testing Sample.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment;
Fig. 2 is the sectional view of embodiment;
Fig. 3 is the enlarged drawing at A in Fig. 2;
Fig. 4 is the structural representation of fixed mount.
Reference:1st, support;2nd, glass tube;3rd, the first detection pipe;4th, the second detection pipe;5th, the first fixed block;6th, Two fixed blocks;7th, groove;8th, fix bar;9th, screw rod;10th, crushing block;11st, seal groove;12nd, sealing ring;13rd, hinged block;14th, it is close Capping;15th, caulking gum;16th, mounting blocks;17th, castor;18th, connecting rod;19th, geometrical clamp;20th, the first stationary half;21st, Two stationary halfs;22nd, projection;23rd, rubber fixture block;24th, through hole;25th, neck;26th, elastic ring.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment:
A kind of grouting material fullness degree detector.As shown in figure 1, including support 1 and glass tube 2.
As depicted in figs. 1 and 2, glass tube 2 includes the first detection pipe 3 and the second detection pipe 4, the first detection pipe 3 and second Angle between detection pipe 4 is 120 °.First detection pipe 3 is connected with integrally formed first close to one end of the second detection pipe 4 Fixed block 5, the second detection pipe 4 is connected with the second integrally formed fixed block 6 close to one end of the first detection pipe 3.First fixes Block 5 is provided with the groove 7 being connected with the both sides of the second fixed block 6, and the two ends of fix bar 8 are adhesive in the first fixation by glass On block 5 on the both sides side wall of groove 7, fix bar 8 is passed through to rotate with screw rod 9 behind one end of screw rod 9 and is connected.Screw thread connects on screw rod 9 Crushing block 10 is connected to, the one end of screw rod 9 is passed on the second fixed block 6 when the axis of screw rod 9 is parallel with the length direction of groove 7 Groove 7, can screw crushing block 10 so that crushing block 10 extrudes the second fixed block 6.Thus cause first by crushing block 10 The fixed block 6 of fixed block 5 and second is fixed so that the first detection pipe 3 is fixed with the second detection pipe 4.If necessary to which first is fixed The fixing pipe 4 of pipe 3 and second is split, then reversely rotates crushing block 10, then rotate screw rod 9 around fix bar 8, it is possible to will First detection pipe 3 and the second detection pipe 4, which are split, to be come.
As shown in Fig. 2 being also provided with seal groove 11, the first fixed block in the junction of the first fixed block 5 and the second fixed block 6 Sealing ring 12 is bonded with 5 seal groove 11, during installation, sealing ring 12 seal groove 11 on the second fixed block 6 is directed at, then When crushing block 10 extrudes the second fixed block 6, the crush seal ring 12 of the second fixed block 6 reaches the first detection pipe 3 and second of sealing The effect of detection pipe 4.
As shown in Figure 1 to Figure 3, the first detection pipe 3 and second one end of detection pipe 4 away from junction are connected with integrally formed Hinged block 13, hinged block 13 is hinged with closure 14, and one end of closure 14 is bonded with caulking gum 15, caulking gum 15 Internal diameter of the diameter slightly larger than the first detection pipe 3 and the second detection pipe 4.When closure 14 is rotated around pin joint towards glass tube 2 When, because caulking gum 15 has certain elasticity, Gu caulking gum 15 can enter in glass tube 2 and extrude the interior of glass tube 2 Wall, the two ends of sealed glass tube 2.
As shown in Figure 1, Figure 2 and Figure 4, the both sides of the lower surface of support 1 are welded with two mounting blocks 16, each mounting blocks 16 Both sides are respectively provided with the castor 17 of a strap brake.Two connecting rods 18, the top of connecting rod 18 are welded with the top of support 1 Geometrical clamp 19 is installed.Geometrical clamp 19 includes the first stationary half 20 and the second stationary half 21, wherein the first stationary half 20 Welded with connecting rod 18, the second stationary half 21 and connecting rod 18 are hinged.In second one end of stationary half 21 away from pin joint The projection 22 of two cylindrical types is formed with, the one end of projection 22 away from the second stationary half 21 is bonded with the rubber of dome-type Fixture block 23, the diameter of rubber fixture block 23 is more than the diameter of projection 22.Opened at the position of the first stationary half 20 correspondence projection 22 There are diameter and the diameter identical through hole 24 of projection 22, through hole 24 is communicated with the diameter neck 25 equal with rubber fixture block 23. Elastic ring 26 is also bonded with the inwall of one stationary half 20 and the second stationary half 21.Glass tube 2 is placed on geometrical clamp 19 After interior, the second stationary half 21 is rotated so that rubber fixture block 23 is caught in neck 25, after glass tube 2 is fixed, elastic ring 26 An extruding force can be produced to glass tube 2 so that glass tube 2 is more securely attached.If necessary to which glass tube 2 is pulled down, then use Power rotates the second stationary half 21 by the center of circle of pin joint to away from the direction of the first stationary half 20 so that rubber fixture block 23 is remote From neck 25, then glass tube 2 can just be taken out.
The course of work:
Glass tube 2 is placed on geometrical clamp 19, after clamping, grouting material is added into glass tube 2, then with glass tube 2 The sealing block at two ends seals up glass tube 2, and after standing 7 days under conditions of 20 DEG C ± 3 DEG C, geometrical clamp 19 is opened, taken out Glass tube 2, the first detection pipe 3 and the second detection pipe 4 then split, and takes out the grouting material after the inside solidifies, detection pressure Whether the fullness degree of slurry is qualified.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (8)

1. a kind of grouting material fullness degree detector, including support (1) and the glass tube (2) that is fixed on support (1), its feature It is:The glass tube (2) includes into 120 ° of the first detection pipe (3) and the second detection pipe (4), and first detection pipe (3) is leaned on One end of nearly second detection pipe (4) is provided with integrally formed first fixed block (5), and second detection pipe (4) is close to the first inspection One end of test tube (3) is provided with integrally formed second fixed block (6), the two of first fixed block (5) and the second fixed block (6) Side is equipped with the groove (7) being connected, and connects respectively with groove (7) both sides side wall provided with two ends in one of them described groove (7) The fix bar (8) connect, the fix bar (8) rotates the screw rod (9) being connected, the screw rod (9) provided with one end with fix bar (8) The other end passed from another groove (7), the screw rod (9) pass groove (7) one end be provided with and screw rod (9) screw thread coordinate Crushing block (10).
2. grouting material fullness degree detector according to claim 1, it is characterized in that:First fixed block (5) and second Seal groove (11) is equipped with the face that fixed block (6) fits, sealing ring (12) is provided with one of them described seal groove (11).
3. grouting material fullness degree detector according to claim 1, it is characterized in that:First detection pipe (3) dorsad One end of one end of one fixed block (5) and the second detection pipe (4) dorsad the second fixed block (6) is equipped with closure (14).
4. grouting material fullness degree detector according to claim 3, it is characterized in that:First detection pipe (3) and second Detection pipe (4) is respectively equipped with integrally formed hinged block (13), and the closure (14) is hinged with hinged block (13).
5. grouting material fullness degree detector according to claim 4, it is characterized in that:The closure (14) inserts glass tube (2) one end in is provided with caulking gum (15).
6. grouting material fullness degree detector according to claim 1, it is characterized in that:The both sides of support (1) lower surface Mounting blocks (16) are equipped with, the both sides of each mounting blocks (16) are equipped with the castor (17) of strap brake.
7. grouting material fullness degree detector according to claim 1, it is characterized in that:The both sides of support (1) upper surface A connecting rod (18) is respectively provided with, the upper end of the connecting rod (18) is provided with the geometrical clamp (19) of fixed glass tube (2).
8. grouting material fullness degree detector according to claim 7, it is characterized in that:The geometrical clamp (19) is included with being connected The first stationary half (20) that bar (18) is fixedly connected, the geometrical clamp (19) also includes being located at the first stationary half (20) side And the second stationary half (21) that one end and connecting rod (18) are hinged, first stationary half (20) is towards the second stationary half (21) side is provided with through hole (24), and through hole (24) bottom is more than the neck (25) of through hole (24), described second provided with section The other end of stationary half (21) is provided with projection (22), the projection (22) dorsad second to the first stationary half (20) side Stationary half (21) one end is provided with the rubber fixture block (23) being caught in neck (25).
CN201720194075.7U 2017-03-01 2017-03-01 Grouting material fullness degree detector Expired - Fee Related CN206594171U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720194075.7U CN206594171U (en) 2017-03-01 2017-03-01 Grouting material fullness degree detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720194075.7U CN206594171U (en) 2017-03-01 2017-03-01 Grouting material fullness degree detector

Publications (1)

Publication Number Publication Date
CN206594171U true CN206594171U (en) 2017-10-27

Family

ID=60127067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720194075.7U Expired - Fee Related CN206594171U (en) 2017-03-01 2017-03-01 Grouting material fullness degree detector

Country Status (1)

Country Link
CN (1) CN206594171U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114393339A (en) * 2022-01-20 2022-04-26 沧州昊海水利工程质量检测有限公司 Metal pipeline welding device for water conservancy construction and using method thereof
CN116973511A (en) * 2023-07-25 2023-10-31 秦皇岛市政建材集团有限公司 Device and method for measuring filling degree of grouting material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114393339A (en) * 2022-01-20 2022-04-26 沧州昊海水利工程质量检测有限公司 Metal pipeline welding device for water conservancy construction and using method thereof
CN116973511A (en) * 2023-07-25 2023-10-31 秦皇岛市政建材集团有限公司 Device and method for measuring filling degree of grouting material
CN116973511B (en) * 2023-07-25 2024-05-03 秦皇岛市政建材集团有限公司 Device and method for measuring filling degree of grouting material

Similar Documents

Publication Publication Date Title
CN206594171U (en) Grouting material fullness degree detector
CN109000950B (en) Response device and method for simulating stress deformation and support after tunnel rock-soil body excavation
CN103323537B (en) Coupling device for realizing acquisition of acoustic emission signals in triaxial pressure cell
CN108106991A (en) A kind of fluid sealant bond strength detection device and method
CN110673205B (en) Micro-seismic sensor taking and placing device with strain gauge pasting structure and using method thereof
CN204630841U (en) External pressure resistant testing device
CN106436588B (en) A kind of concrete pier based on aluminium alloy/column bracing means and its construction method
CN105546321B (en) Hydrops remover on a kind of dry gas holder piston
CN102168951B (en) Detachable rigidity-to-flexibility optical fiber sensor and arrangement method thereof
CN203259508U (en) Coupling device capable of collecting acoustic emission signals in tri-axial pressure chamber
CN212111051U (en) Road surface infiltration appearance
CN104596803A (en) Deep-water sludge sampler
CN108571012B (en) Piping lane construction joint integrated installation mold construction technology
CN109520892B (en) Electric field-temperature-wind pressure coupling field radon and daughter diffusion migration device thereof
CN209247591U (en) A kind of bituminous highway pavement seepage detection device
CN205749239U (en) Survey rubber and the laboratory holder of concrete peel strength and test structure
CN209372863U (en) A kind of fullness degree detection device
CN210664904U (en) Acoustic pipe seal detection device
CN108168829A (en) A kind of doors and windows sealing device for the detection of door and window resisting wind press capacity
CN101608427B (en) Method for connecting and sealing hot-extrusion coating steel wire inhaul cables and cable clips
CN210742263U (en) A sufficient degree detecting instrument for engineering detects
CN113668716A (en) Detachable waterstop deformation joint waterproof structure and construction process thereof
CN211148349U (en) A flow appearance for concrete fluidity test
CN208505539U (en) A kind of optical cable infiltration test device
CN209469445U (en) A kind of prefabricated tunnel steel arch frame with monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027