CN206591687U - A kind of pillar construction and combinations thereof formula compartment - Google Patents
A kind of pillar construction and combinations thereof formula compartment Download PDFInfo
- Publication number
- CN206591687U CN206591687U CN201720142082.2U CN201720142082U CN206591687U CN 206591687 U CN206591687 U CN 206591687U CN 201720142082 U CN201720142082 U CN 201720142082U CN 206591687 U CN206591687 U CN 206591687U
- Authority
- CN
- China
- Prior art keywords
- pillar construction
- sub
- column
- attachment fastener
- combined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000010276 construction Methods 0.000 title claims abstract description 125
- 238000005192 partition Methods 0.000 claims abstract description 26
- 230000004048 modification Effects 0.000 claims description 10
- 238000012986 modification Methods 0.000 claims description 10
- NOQGZXFMHARMLW-UHFFFAOYSA-N Daminozide Chemical group CN(C)NC(=O)CCC(O)=O NOQGZXFMHARMLW-UHFFFAOYSA-N 0.000 claims description 7
- 230000009467 reduction Effects 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 22
- 239000002184 metal Substances 0.000 description 12
- 230000008901 benefit Effects 0.000 description 7
- 239000000463 material Substances 0.000 description 5
- 230000002860 competitive effect Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of pillar construction and combinations thereof formula compartment, the pillar construction at least includes the corresponding group of sub- column set and the attachment fastener being correspondingly arranged between sub- column, sub- column sets an at least holding section in the side of contact attachment fastener, the sub- column side of attachment fastener correspondence is provided with an at least card division, card division correspondence is arranged in holding section, to form a stop surface, making sub- column, correspondence is combined into pillar construction by attachment fastener, and Combined partitions include at least one pillar construction, at least a spreader structure and an at least wallboard;Thereby, the utility model forms pillar construction by the sub- column set face-to-face backstop corresponding with attachment fastener, combination in advance can be done prior to workshop to set, combine required spreader structure to set Combined partitions then at scene, actually reach quick assembly and disassembly, reduction hardware cost and lifting product competitiveness.
Description
Technical field
The utility model relates to a kind of pillar construction and combinations thereof formula compartment, can group in advance in particular to one kind
The pillar construction of conjunction is with combining the Combined partitions that pillar construction and spreader structure are reached.
Background technology
Press, the building of modernization is in order to increase the usability of the interior space, it will usually by the interior space with complex trace compartment
Wall is separated into plurality of compartments, to provide each compartment distinctive independence, and is used to the panel wall of compartment except traditional soil system
Beyond panel wall, the material that also aspect such as metal, timber or glass is constituted is available for users to selection, wherein using metal frame
The form of construction work light weight of frame and simple structure, therefore selected by most users, the form of construction work of metal framework is main first
Required metal framework is positioned in advance in the place of planning, wherein metal framework is by the structure institute group such as a plurality of columns and spreader
Conjunction is formed, and will then be met again in the wallboard insertion metal framework of size, most after wallboard surrounding with fixation kit by wallboard
It is fixed on metal framework;The assembling fixed form of traditional metal frame is set in two ends of spreader structure at pillar construction
At least one hole for allowing fixed screw to assemble is equipped with, however, can not due to being limited to the width of spreader structural material plane
Reserved excessive or excessive hole, and can not also make because the structure of screw is limited to the structures such as column and spreader effective and flat
Site preparation is against so that it cannot quick assembly and disassembly;Furthermore, traditional pillar construction is only capable of assembling at the scene, and can not be first
In workshop pre-assembly, this measure does not simply fail to reduce the cost that hardware is set, and can not also save the time spent by integral construction;
Therefore, how to be designed by the hardware of innovation, to provide the enough columns of an intensity and the isostructural combination of spreader, and can
Combine, can not effectively and be quickly assembled and lacking for constructing with effectively solving conventional ASSEMBLE metal compartment in advance effective in workshop
Point, actually reaches quick assembly and disassembly, reduction hardware cost and the lifting advantage such as product competitiveness, be still combined metal every
Between the related industry such as device exploitation dealer need ongoing effort to overcome the problem with solving with related researcher.
Utility model content
The technical problem that the utility model is solved is providing a kind of pillar construction and combinations thereof formula compartment, and its purpose exists
In providing a kind of pillar construction that can be combined in advance with combining the Combined partitions that pillar construction and spreader structure are reached, mainly
The pillar construction that the sub- column backstop corresponding with attachment fastener being correspondingly arranged by two-phase is formed, can do advance group prior to workshop
The setting of conjunction, required spreader structure is combined to set Combined partitions then at scene, is effectively solved conventional ASSEMBLE compartment and is held
Easily it is limited to the width of material or the structure of screw and larger hole can not be reserved and lead to not quick assemble and construction
Shortcoming, actually reaches the main advantage of quick assembly and disassembly, reduction hardware cost, and lifting product competitiveness.
The technological means that the utility model is used is as described below.
A kind of pillar construction is provided, at least included:Corresponding group of two sub- columns setting and it is arranged at two sons and stands
An attachment fastener between post;Wherein, respectively the sub- column is provided with an at least engaging in the sidepiece contacted with the attachment fastener
Portion, and the attachment fastener is provided with an at least card division, the holding section can contact with each other to form a stop surface with the card division, make
By attachment fastener, correspondence is combined into pillar construction to sub- column.
Pillar construction as described above, wherein respectively the sub- column flats down extension and recessed inwardly in the sidepiece on one
There is a recess, the recess lower edge is provided with one first holding section, first holding section has extended downwardly one first interface, this
One interface lower edge is provided with one second holding section, and second holding section has extended downwardly one second interface.
Pillar construction as described above, two ends of the wherein attachment fastener respectively include one first card division, and one the
Two card divisions, first card division is arranged in first holding section, and to form one first stop surface, and second card division is arranged in this
In second holding section, to form one second stop surface.
Pillar construction as described above, wherein attachment fastener is incorporated into the sub- column by a connection piece.
Pillar construction as described above, wherein connector is formed as combined by a screw with a nut, the top of the screw
End is arranged between the recess of the sub- column, and the screw simultaneously runs through the attachment fastener, and the nut lock is located at the screw.
Pillar construction as described above, wherein second interface is arranged with one first buckle, and the two of the attachment fastener
End is each provided with an alar part, the corresponding first buckle position of the alar part and be provided with one second buckle.
Pillar construction as described above, the bottom of the wherein attachment fastener is further provided with a modification piece, the modification
The end of piece two is each provided with a salient point, and salient point correspondence is mounted between first buckle and second buckle.
Pillar construction as described above, the other side for the wherein sub- column is provided with an at least C-shaped channel.
Pillar construction as described above, wherein connector further wears a cornual plate.
Pillar construction as described above, wherein C-shaped channel are a kind of aspect therein such as Small-sized C type groove or large-scale C-shaped channel.
Pillar construction as described above, the sub- column of wherein two, which encloses, is set as a corner upright structure.
Pillar construction as described above, wherein four sub- columns, which enclose, is set as one or four edge column structures.
Pillar construction as described above, wherein three sub- columns, which enclose, is set as one or three edge column structures.
Pillar construction as described above, wherein connector can further wear a cornual plate, so that pillar construction is by the angle
Piece is locked in one of position such as ground or metope.
In addition, the utility model people separately proposes a kind of Combined partitions, to the Combined partitions in the space of construction one, this reality
At least one foregoing pillar construction, at least a spreader structure are included with new Combined partitions, and at least one combines Jian ﹔
The spreader structure is connected to the other side of the pillar construction, and a section of the wherein spreader structure is provided with an at least connection
At least one side of hole and the spreader structure is provided with an at least groove, and the engaging member runs through the sub- column of the pillar construction
And it is locked in the connecting hole.
Combined partitions as described above, wherein being further provided with an at least wallboard, correspondence is mounted on the spreader structure
The groove and the pillar construction the C-shaped channel.
Combined partitions as described above, the wherein c-type of the width of the groove of the spreader structure and the pillar construction
The width of groove is more than or equal to the thickness of the wallboard.
Technique effect produced by the utility model:Pillar construction of the present utility model and combinations thereof formula compartment is by two
The pillar construction that the sub- column backstop corresponding with attachment fastener set face-to-face is formed, can do setting of combining in advance prior to workshop
Put, required spreader structure is combined to set Combined partitions then at scene, effectively solve conventional ASSEMBLE compartment and be easily limited
Larger hole can not be reserved in the width of material or the structure of screw and leads to not the quick shortcoming assembled with construction, really
Main advantage of the Star to quick assembly and disassembly, reduction hardware cost, and lifting product competitiveness;In addition, this practicality is new
Pillar construction, spreader knot that pillar construction of type and combinations thereof formula compartment is combined into by two corresponding sub- columns
Structure, wallboard, are designed in conjunction with attachment fastener, modification piece etc. hardware, formed one completely with compartment attractive in appearance, effectively applied with brand-new
Work mode, actually reaches quick and convenient construction quality, and the cost payout and room for promotion compartment of construction are greatly reduced with pole
The purposes such as the competitive advantage of product.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model pillar construction one preferred embodiment.
Fig. 2 is the overall structure exploded view of the utility model pillar construction one preferred embodiment.
Fig. 3 is the overall structure top view of the utility model pillar construction one preferred embodiment.
Fig. 4 is the utility model pillar construction secondly the sub- column dimensional structure diagram of preferred embodiment.
Fig. 5 is the utility model pillar construction thirdly the sub- column dimensional structure diagram of preferred embodiment.
Fig. 6 is the sub- column dimensional structure diagram of its four preferred embodiment of the utility model pillar construction.
Fig. 7 is the corner upright structural representation of its five preferred embodiment of the utility model pillar construction.
Fig. 8 is the corner upright structure combination diagram of its five preferred embodiment of the utility model pillar construction.
Fig. 9 is four edge column structural representations of its six preferred embodiment of the utility model pillar construction.
Figure 10 is four edge column structure combination diagrams of its six preferred embodiment of the utility model pillar construction.
Figure 11 is three edge column structural representations of its seven preferred embodiment of the utility model pillar construction.
Figure 12 is three edge column structure combination diagrams of its seven preferred embodiment of the utility model pillar construction.
Figure 13 is the pillar construction and cornual plate combination diagram of the utility model pillar construction its eight preferred embodiment.
Figure 14 combines top view for the pillar construction of its eight preferred embodiment of the utility model pillar construction with cornual plate.
Figure 15 is the spreader structural representation of the utility model Combined partitions one preferred embodiment.
Figure 16 is the utility model Combined partitions secondly the spreader structural representation of preferred embodiment.
Figure 17 is the utility model Combined partitions thirdly the spreader structural representation of preferred embodiment.
Figure 18 is the overall structure top view of the utility model Combined partitions one preferred embodiment.
Figure 19 is the overall structure decomposing schematic representation of the utility model Combined partitions one preferred embodiment.
Figure 20 is the utility model Combined partitions secondly the overall structure combination diagram of preferred embodiment.
Figure 21 is the utility model Combined partitions thirdly the overall structure combination diagram of preferred embodiment.
Figure number explanation:
The sub- column of 1 pillar construction 11
The holding section of 111 holding section 1,111 first
Plane on 1112 second holding sections 112
The interface of 113 recess 114 first
The buckle of 115 second interface 116 first
The card division of 12 attachment fastener 121
The card division of 1211 first card division 1,212 second
The buckle of 122 alar part 1,221 second
The 13 modification salient points of piece 131
The Small-sized C type groove of 14C type grooves 141
The 142 large-scale connectors of C-shaped channel 2
The nut of 21 screw 22
The hole of 23 cornual plate 231 first
The corner upright structure of 232 second hole 3
The edge column structure of 4 four edge column structure 5 three
The spreader structure of 6 Combined partitions 7
The groove of 71 connecting hole 72
The wallboard of 8 engaging member 9.
Embodiment
First, refer to shown in Fig. 1 to Fig. 3, be the stereochemical structure of the utility model pillar construction one preferred embodiment
Schematic diagram, overall structure exploded view, and overall structure top view, are primarily characterized in that:Pillar construction 1 of the present utility model
At least include the corresponding group of sub- column 11 of two set, and the clip being correspondingly arranged between two sub- columns 11
Part 12, by two, the sub- correspondence of column 11 is combined the attachment fastener 12;Wherein the sub- column 11 in should attachment fastener 12 connect
A tactile sidepiece (figure does not indicate label) is provided with an at least holding section 111, and the attachment fastener 12 corresponds to being somebody's turn to do for the sidepiece
Holding section 111 is provided with an at least card division 121, and the holding section 111 can be clamped or engage mutually with the card division 121, Yu Benshi
Apply the correspondence of the card division of this in example 121 to be arranged in the holding section 111, to form a stop surface, and cause when two sub- columns 11
Correspondence will not be traversing in left and right directions when being combined into the pillar construction 1 and cause two sub- columns 11 to separate;It is new in this practicality
In type one preferred embodiment, the sub- column 11 in correspondence contact the sidepiece on one plane 112 extend down and towards indent
Provided with a recess 113, the lower edge of the recess 113 is provided with one first holding section 1111, and first holding section 1111 is extended downwardly
There is one first interface 114, the lower edge of the first interface 114 is provided with one second holding section 1112, second holding section 1112
One second interface 115 is extended downwardly, second interface 115 is arranged with one first buckle 116, and the attachment fastener 12
Two ends respectively include one first card division 1211, and one second card division 1212, first card division 1211 correspondence be arranged in this
In one holding section 1111, to form one first stop surface, and second card division 1212 correspondence is arranged in second holding section 1112
It is interior, to form one second stop surface, so that two sub- correspondences of column 11 are combined into the pillar construction 1;Certainly, the attachment fastener
12 also can be incorporated into two sub- columns 11 by the correspondence of a connection piece 2 in addition, and wherein the connector 2 is by a screw 21 and a spiral shell
Formed combined by cap 22, the top of the screw 21 is first arranged between two of two sub- columns 11 recesses 113, in two
After the sub- correspondence of column 11 is combined, the screw 21 is formed through the attachment fastener 12, then the screw 21 is locked on by the nut 22
On, the attachment fastener 12 is locked on two sub- columns 11, incited somebody to action with being formed by the connector 2 and the attachment fastener 12
The two sub- locking of column 11 packings, and so that will not be in a left side when two sub- correspondences of columns 11 are combined into the pillar construction 1
Right direction is traversing and causes two sub- columns 11 to separate;In addition, two ends of the attachment fastener 12 can be respectively further provided with
The corresponding position of first buckle 116 of one alar part 122, the wherein alar part 122 and be provided with one second buckle 1221;In addition, should
The bottom of attachment fastener 12 can be further provided with a modification piece 13, and wherein the end of modification piece 13 2 is each provided with a salient point
131, the salient point 131 correspondence is mounted between first buckle 116 and second buckle 1221, and the modification piece 13 is main to cover
The hole for covering and modifying between two sub- columns 11, with the outward appearance of pillar construction 1 of the present utility model attractive in appearance;In addition, at this
In another preferred embodiment of utility model, the attachment fastener 12 is incorporated into the sub- column 11 by stop surface correspondence, that is, should
First stop surface that attachment fastener 12 can be formed by first card division 1211 engaging corresponding with first holding section 1111,
And second stop surface that second card division 1212 engaging corresponding with second holding section 1112 is formed, formed with the backstop
Face correspondence is incorporated into two sub- columns 11.
In addition, the sub- column 11 the other side relative with the sidepiece (figure does not indicate label) is provided with an at least c-type
Groove 14, the wherein C-shaped channel 14 are a kind of aspects therein such as the large-scale C-shaped channel 142 of a Small-sized C type groove 141 or one, also referring to
Shown in Fig. 4 to Fig. 6, be the utility model pillar construction secondly the sub- column dimensional structure diagram of preferred embodiment, thirdly compared with
The sub- column dimensional structure diagram of good embodiment, and its four preferred embodiment sub- column dimensional structure diagram, wherein
Fig. 4's secondly in preferred embodiment, the bottom of the sub- column 11 the other side relative with the sidepiece is provided with one
The Small-sized C type groove 141, so that the wallboard (not shown) that thickness is less than or equal to the width of Small-sized C type groove 141 can be mounted on
Wherein, and Fig. 5's thirdly in preferred embodiment, the other side of the sub- column 11 is provided with two Small-sized C type grooves
141 so that two thickness be less than or equal to the width of Small-sized C type groove 141 the wallboard can be mounted on wherein, Fig. 6 its four
In preferred embodiment, the other side of the sub- column 11 is provided with the large-scale C-shaped channel 142, so that thickness is less than or waited
It can be mounted on wherein in the wallboard of the large-scale width of C-shaped channel 142.
In addition, being the corner of its five preferred embodiment of the utility model pillar construction also referring to shown in Fig. 7 and Fig. 8
Pillar construction schematic diagram, and corner upright structure combination diagram, wherein the two of Fig. 7 sub- columns 11 can enclose and be set as one turn
Corner pillar structure 3, and respectively sidepiece of two sub- columns 11 is set in vertical direction each other, the corner upright structure 3 is main
90 degree of vertical corner positions are used in, two sub- columns 11 can be one of the forming and the sample that is combined as a whole in the present embodiment
State;And two of Fig. 8 column 11 can lock by two correspondences respectively again according to the erection mode of the above-mentioned pillar construction 1
The connector 2 the other two sub- columns 11 are assembled into the corner upright structure 3, and other two foregoing sub- columns
Two of 11 the other sides are each provided with the large-scale C-shaped channel 142, so that thickness is less than or equal to the large-scale C-shaped channel 142
The wallboard of width is mounted on wherein.The corner upright structure 3 is the variant embodiment of the pillar construction 1.
Furthermore, it is four sides of its six preferred embodiment of the utility model pillar construction also referring to shown in Fig. 9 and Figure 10
Pillar construction schematic diagram, and four edge column structure combination diagrams, wherein the four of Fig. 9 sub- columns 11 can enclose and be set as one or four
Edge column structure 4, and respectively sidepiece of four sub- columns 11 sets in vertical direction each other, the four edge columns structure 4 is main
The center position of the vertical cell of four compartments (not shown) is used in, four sub- columns 11 can be in the present embodiment
The integrally formed and pattern that is combined as a whole;And four of Figure 10 column 11 can be again according to the erection side of the above-mentioned pillar construction 1
Formula, by corresponding four connectors 2 locked, by four additional, the sub- column 11 is assembled into the four edge columns structure 4 respectively, and
Four the other sides of the foregoing four additional sub- column 11 are each provided with the Small-sized C type groove 141, so that thickness is small
It is mounted on wherein in or equal to the wallboard of the width of Small-sized C type groove 141.The four edge columns structure 4 is the change of the pillar construction 1
Shape embodiment.
In addition, also referring to shown in Figure 11 and Figure 12, being the three of the utility model pillar construction its seven preferred embodiment
Edge column structural representation, and three edge column structure combination diagrams, wherein the three of Figure 11 sub- columns 11 enclose and are set as one
Three edge column structures 5, and respectively sidepiece of three sub- columns 11 sets in vertical direction each other, the three edge columns structure 5 is led
The center position of the vertical cell of three compartments (not shown) is used in, three sub- columns 11 can in the present embodiment
It is one of the forming and the pattern that is combined as a whole;And three of Figure 12 column 11 can be again according to the erection of the above-mentioned pillar construction 1
Mode, by corresponding three connectors 2 locked, by the other three, the sub- column 11 is assembled into the three edge columns structure 5 respectively,
And three the other sides of the foregoing the other three sub- column 11 are each provided with the Small-sized C type groove 141, so that thickness
The wallboard less than or equal to the width of Small-sized C type groove 141 is mounted on wherein.The three edge columns structure 5 is the pillar construction 1
Variant embodiment.
Figure 13 is referred to, furthermore, the connector 2 can further wear a cornual plate 23, so that the pillar construction 1 is by the angle
Piece 23 is locked on one of position such as ground or metope;Refer to shown in Figure 13 and Figure 14, be the utility model column
The pillar construction of its eight preferred embodiment of structure and cornual plate combination diagram, and pillar construction combine top view with cornual plate, its
In the top of the screw 21 of the connector 2 be first arranged between two of two sub- columns 11 recesses 113, in two
After the sub- correspondence of column 11 is combined, the screw 21 runs through one first hole 231 of the cornual plate 23, then is locked on this by the nut 22
On screw 21, so that two sub- more strong bondeds of column 11 is outer, and one second hole 232 of the cornual plate 23 and first hole
Hole 231 forms the setting of vertical aspect, and second hole 232 is against metope or ground, and user only needs to use an another connection
Part (not shown), such as another screw passes through second hole 232, you can the pillar construction 1 is locked in into ground or metope
On, so that whole pillar construction 1 or integral combined compartment (not shown) are firm for main purpose.Then, then by this repair
The hole that spike 13 is covered and modified between two sub- columns 11, with the outward appearance of pillar construction 1 of the present utility model attractive in appearance.
Figure 18 is referred to, in addition, the utility model people separately proposes a kind of Combined partitions 6 to construction space, the group
Box-like compartment 6 at least includes:A plurality of foregoing pillar constructions 1, a spreader structure 7 and a wallboard 9;Wherein, at least two
Respectively the other side of the individual relative sub- column 11 is each provided with the C-shaped channel 14.
Also referring to shown in Figure 15 to Figure 17 and Figure 19, being the utility model Combined partitions one preferred embodiment
Spreader structural representation, secondly the spreader structural representation of preferred embodiment, thirdly the spreader structural representation of preferred embodiment,
And overall structure decomposing schematic representation, wherein, the spreader structure 7 is arranged between a plurality of pillar constructions 1, the spreader structure
7 section is provided with an at least connecting hole 71 and at least one side of the spreader structure 7 is provided with an at least groove 72, with
When the sub- column 11 of the pillar construction 1 is locked in the connecting hole 71 by an at least engaging member 8 correspondence, make the spreader structure
The width of 7 groove 72 obtains thickness of the width more than or equal to the wallboard 9 with the C-shaped channel 14 of the pillar construction 1, therefore
It can must correspond to and be mounted on the groove 72 of the C-shaped channel 14 of the pillar construction 1 and the spreader structure 7 for the wallboard 9;Figure 15
Spreader structure 7 inside include a connecting hole 71, and upper and lower two sides respectively include the groove 72, and Figure 16
In the section of the spreader structure 7 include two connecting holes 71, and respectively include one this is recessed for upper and lower two sides
The section of the spreader structure 7 in groove 72, Figure 17 includes two connecting holes 71, and upper and lower two sides respectively include
There is the groove 72.
The wallboard 9 correspondence is mounted between the spreader structure 7 and the pillar construction 1;In the utility model preferred embodiment
In, the wallboard 9 correspondence is mounted on the groove 72 of the C-shaped channel 14 of the pillar construction 1 and the spreader structure 7, wherein the wall
Plate 9 is made up of metal material or cellular decorative panel.
Referring again to Figure 19 embodiment, when assembling, the spreader structure 7 runs through the sub- column 11 simultaneously by the engaging member 8
It is locked in the connecting hole 71.The section of the spreader structure 7 is provided with two connecting holes 71, the son of the pillar construction 1
Column 11 by two engaging members 8 respectively correspond to be locked in two connecting holes 71, with reach fasten the pillar construction 1 with
The purpose of the spreader structure 7, and make the spreader structure 7 the groove 72 the c-type with the sub- column 11 of the pillar construction 1
The correspondence group of groove 14 is set, to cause the wallboard 9 correspondence to be mounted on the C-shaped channel 14 and the horizontal stroke of the sub- column 11 of the pillar construction 1
On the groove 72 of rod structure 7.
In addition, being the utility model Combined partitions secondly preferred embodiment also referring to shown in Figure 20 and Figure 21
Overall structure combination diagram, and thirdly the overall structure combination diagram of preferred embodiment, is somebody's turn to do wherein can be used in compartment
Four edge column structures 4 constitute the Combined partitions 6 and constituted, when a plurality of spreader structures 7 correspondence is mounted on four edge column
After the C-shaped channel (not shown) of structure 4, the four edge columns structure 4 is also locked in by (not shown) correspondence of the engaging member
In the connecting hole 71, to reach the purpose for fastening the four edge columns structure 4 and the spreader structure 7, then again by the correspondence of wallboard 9
On the groove 72 for being mounted on the C-shaped channel of the pillar construction 1 and the spreader structure 7, and then reach and completely cover the column knot
Structure 1 encloses the purpose in the region set with the spreader structure 7;And in Figure 21, user also can only in connect the spreader structure 7 at set
The four edge columns structure 4 is put, and is locked in using engaging member correspondence in the connecting hole 71, is finally at the groove 72 that group is set
The wallboard 9, also can effectively reach the purpose for fastening the four edge columns structure 4 and the spreader structure 7.
Illustrated from above-mentioned implementation, the utility model is compared down with prior art and product, the utility model tool
Have the advantage that.
1. pillar construction of the present utility model and combinations thereof formula compartment is by the son of two identical sizes set face-to-face
The pillar construction that column backstop corresponding with attachment fastener is formed, can do the setting combined in advance prior to workshop, then at scene knot
Spreader structure needed for closing solves conventional ASSEMBLE metal compartment to set combined metal compartment, effectively and is easily limited to material
Width or screw structure and larger hole can not be reserved and lead to not the quick shortcoming assembled with construction, actually reach
The main advantage of quick assembly and disassembly, reduction hardware cost, and lifting product competitiveness.
2. pillar construction of the present utility model and combinations thereof formula compartment is combined into by two corresponding sub- columns
Pillar construction, spreader structure, wallboard, designed in conjunction with attachment fastener, modification piece etc. hardware, formed one completely with it is attractive in appearance every
Between, effectively with brand-new form of construction work, quick and convenient construction quality is actually reached, the cost branch of construction is greatly reduced with pole
Go out and the purpose such as the competitive advantage of room for promotion compartment product.
Claims (12)
1. a kind of pillar construction, it is characterised in that at least include:The sub- column (11) of corresponding group of two set and it is arranged at two
An attachment fastener (12) between the individual sub- column (11);Wherein, respectively the sub- column (11) contacts in the attachment fastener (12)
A sidepiece be provided with an at least holding section (111), and the attachment fastener (12) is provided with an at least card division (121), the engaging
Portion (111) can contact with each other to form a stop surface with the card division (121).
2. pillar construction as claimed in claim 1, it is characterised in that respectively the sub- column (11) in the sidepiece plane on one
(112) extend down and be arranged with a recess (113) inwardly, recess (113) lower edge is provided with one first holding section (1111),
First holding section (1111) has extended downwardly one first interface (114), and the first interface (114) lower edge is provided with one
Two holding sections (1112), second holding section (1112) has extended downwardly one second interface (115).
3. pillar construction as claimed in claim 2, it is characterised in that two ends of the attachment fastener (12) respectively include one
One card division (1211), and one second card division (1212), first card division (1211) are arranged in first holding section (1111),
To form one first stop surface, and second card division (1212) is arranged in second holding section (1112), to form one second
Stop surface.
4. pillar construction as claimed in claim 3, it is characterised in that the attachment fastener (12) is combined by a connection piece (2)
In the sub- column (11).
5. pillar construction as claimed in claim 4, it is characterised in that the connector (2) is by a screw (21) and a nut
(22) combined to form, the top of the screw (21) is arranged between respectively recess (113) of the sub- column (11), the screw
(21) and through the attachment fastener (12), the nut (22) is locked on the screw (21).
6. pillar construction as claimed in claim 2, it is characterised in that second interface (115) is arranged with one first buckle
, and two ends of the attachment fastener (12) are each provided with an alar part (122), corresponding first buckle of the alar part (122) (116)
(116) position and be provided with one second buckle (1221).
7. pillar construction as claimed in claim 6, it is characterised in that the bottom of the attachment fastener (12) is provided with a modification
Piece (13), the end of modification piece (13) two is each provided with a salient point (131), and the salient point (131) correspondence is mounted on first buckle
(116) between second buckle (1221).
8. pillar construction as claimed in claim 1, it is characterised in that the other side for the sub- column (11) is provided with least
One C-shaped channel (14).
9. pillar construction as claimed in claim 5, it is characterised in that the connector (2) wears a cornual plate (23).
10. a kind of Combined partitions, it is characterised in that comprising at least one pillar construction (1) as claimed in claim 8, extremely
A few spreader structure (7), and an at least engaging member (8);
The spreader structure (7) is connected to the other side of the pillar construction (1), and a section of the wherein spreader structure (7) is set
At least one side for being equipped with an at least connecting hole (71) and the spreader structure (7) is provided with an at least groove (72), the combination
Part (8) runs through the sub- column (11) of the pillar construction (1) and is locked in the connecting hole (71).
11. Combined partitions as claimed in claim 10, it is characterised in that be provided with an at least wallboard (9), correspondence is mounted on
The groove (72) of the spreader structure (7) and the C-shaped channel (14) of the pillar construction (1).
12. Combined partitions as claimed in claim 11, it is characterised in that the width of the groove (72) of the spreader structure (7)
Degree and the width of the C-shaped channel (14) of the pillar construction (1) are more than or equal to the thickness of the wallboard (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720142082.2U CN206591687U (en) | 2017-02-16 | 2017-02-16 | A kind of pillar construction and combinations thereof formula compartment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720142082.2U CN206591687U (en) | 2017-02-16 | 2017-02-16 | A kind of pillar construction and combinations thereof formula compartment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206591687U true CN206591687U (en) | 2017-10-27 |
Family
ID=60127870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720142082.2U Withdrawn - After Issue CN206591687U (en) | 2017-02-16 | 2017-02-16 | A kind of pillar construction and combinations thereof formula compartment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206591687U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442576A (en) * | 2017-02-16 | 2018-08-24 | 昆山升威光电科技有限公司 | A kind of pillar construction and combinations thereof formula compartment |
-
2017
- 2017-02-16 CN CN201720142082.2U patent/CN206591687U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442576A (en) * | 2017-02-16 | 2018-08-24 | 昆山升威光电科技有限公司 | A kind of pillar construction and combinations thereof formula compartment |
CN108442576B (en) * | 2017-02-16 | 2024-01-23 | 昆山升威光电科技有限公司 | Upright post structure and combined compartment thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102155062B (en) | External trim strip system for curtain wall | |
CN201056776Y (en) | Combined partition wall | |
CN206591687U (en) | A kind of pillar construction and combinations thereof formula compartment | |
CN216889611U (en) | Embedded derrick | |
CN108442576A (en) | A kind of pillar construction and combinations thereof formula compartment | |
CN206143997U (en) | Suspended ceiling keel subassembly and use suspended ceiling system of this subassembly | |
CN209959084U (en) | A multi-functional landscape wall for landscape architecture | |
CN201528906U (en) | Octagonal screen connecting member | |
CN207660161U (en) | Novel eight word top | |
CN203334478U (en) | Frame connection component with cross-shaped sectional materials | |
CN221012501U (en) | Novel television screen furniture | |
CN202108262U (en) | Combined house | |
CN207302182U (en) | Prize drawing case | |
CN205776939U (en) | A kind of glass curtain wall supporting mechanism | |
CN211065465U (en) | IC whole boundless square table | |
CN211774928U (en) | Corner unit type curtain wall splicing structure | |
CN217420156U (en) | Installation device for perforating aluminum plate of stadium | |
CN218622896U (en) | Aluminum veneer for curtain wall assembly | |
CN109057007A (en) | A kind of twin-stage top structure of Chinese style frame room of aluminum profile preparation | |
CN203256937U (en) | Building-block assembly-type purified room wall structure | |
CN207268059U (en) | A kind of building decoration decorative panel | |
CN101769053A (en) | Outer cover plate aluminum alloy sections for decorating steel structure curtain wall posts | |
CN206956761U (en) | A kind of coupled column attachment structure | |
CN201190401Y (en) | Outer cover plate aluminium alloy sections for column of decorative steel structure curtain wall | |
CN203097576U (en) | Window edge pattern section bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20171027 Effective date of abandoning: 20240123 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20171027 Effective date of abandoning: 20240123 |