CN206591398U CN201720178183.5U CN201720178183U CN206591398U CN 206591398 U CN206591398 U CN 206591398U CN 201720178183 U CN201720178183 U CN 201720178183U CN 206591398 U CN206591398 U CN 206591398U
Authority
CN
China
Prior art keywords
burner
air door
dedusting
oil removing
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720178183.5U
Other languages
Chinese (zh)
Inventor
吕威龙
杨伦磊
李�灿
李家春
杨文浩
李广明
李政
王昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou XCMG Road Construction Machinery Co Ltd
Original Assignee
Xuzhou XCMG Road Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou XCMG Road Construction Machinery Co Ltd filed Critical Xuzhou XCMG Road Construction Machinery Co Ltd
Priority to CN201720178183.5U priority Critical patent/CN206591398U/en
Application granted granted Critical
Publication of CN206591398U publication Critical patent/CN206591398U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses blow device before the burner with multiple control modes, including burner, drying drum, wind direction selection device, deduster and oil spot treatment device, master controller is connected with burner and wind direction selection device.Blow device before the burner with multiple control modes that the utility model is provided, before production asphalt, according to application conditions selective combustion device, the operational mode of dedusting air door and oil removing air door, oil removing air door is first opened and dedusting air door is closed, then turn on the preceding purging function of burner, residual greasy dirt in drying drum and burner oil pipe enters wind direction selection device with purge gass stream, pass sequentially through oil removing air door and oily waste treatment air channel enters oil spot treatment device, it is to be purged to finish, dedusting air door is opened, oil removing air door is closed, it is ready for production asphalt, it is simple in construction, the residual greasy dirt in drying drum and burner oil pipe can effectively be removed, improve the service life of deduster, have a extensive future.

Description

Blow device before burner with multiple control modes
Technical field
The utility model is related to road building machine field, and in particular to dress is purged before the burner with multiple control modes Put.
Background technology
Highway can be divided into two kinds of bituminous paving and cement pavement, the surface layer material of bituminous paving according to the difference of its surface material Material is asphalt, and asphalt blending station is the complete set of equipments for producing asphalt, is that the core of road building machine engineering is set It is one of standby.
During production asphalt, oil product is easily remained in burner oil pipe, it is imperfect combustion in combustion Oil product, the sewage that produces of the impurity in oil product and cold aggregate etc. can remain in drying drum, if without using preceding purging Function carries out cleaning oil pollution, can produce influence to burner ignition function, not only delay production, economic loss is caused to client, Aggregate pollution is also resulted in, finished product material quality is influenceed, and then influences bituminous paving quality, therefore pitch is carried out in asphalt blending station Before compound production, it is necessary to using the preceding purging function of burner institute band to the oil residues in drying drum and burner oil pipe Dirt is cleared up.The existing asphalt blending station product of existing market is by the residual greasy dirt in drying drum and burner oil pipe Directly by purging functional blow valve before burner to deduster, the application process causes residual greasy dirt to produce pollution to deduster, Dust removing effects are had a strong impact on, deduster service life is substantially reduced.
Utility model content
To solve the residual oil pollution deduster in drying drum and burner oil pipe present in prior art, decontamination Difficult and halfway problem, the utility model provides blow device before the burner with multiple control modes.
To achieve the above object, the technical solution adopted in the utility model is:
Blow device before burner with multiple control modes, including master controller, for purging function before providing Burner and drying drum, the boot and end case of drying drum set burner and wind direction selection device, wind direction selection dress respectively Put provided with air door and the YE for driving air-door opening-closing, wind direction selection device respectively by air door and deduster and Oil spot treatment device is communicated, and master controller is connected with burner and YE, and master controller output control signal is simultaneously transmitted To burner and YE, the keying to control burner and YE.
Further, the air door has two, respectively dedusting air door and oil removing air door, and the YE has two It is individual, respectively dedusting YE and oil removing YE.
Further, the dedusting air door connects deduster by Dustproof air flue, and oil removing air door passes through oily waste treatment air channel Connect oil spot treatment device.
Further, data processor and signal modulator be set on the master controller, master controller by data at Reason device carries out data processing and output control signal and is respectively sent to burner and electronic execution after being modulated through signal modulator Device.
Further, several operating switches are additionally provided with the master controller, the operating switch includes being used to drive Master controller starts the interlocking switch of interlocking operational mode, for driving master controller to start half half single action operational mode of interlocking Preceding purging prepare switch, for drive burner open and close before purging function purging switch, for drive dedusting air door opening or The dedusting switch of closing and for driving what oil removing air door opened or closed to remove oil circuit breaker.
Further, the drying drum relative level is obliquely installed, and the level height of drying drum boot is less than end The level height of case.
Further, the wind direction selection device is arranged at the flue gas of drying drum end case and draws dirt mouthful.
Further, the master controller be PLC, single-chip microcomputer, dsp controller, ARM controller it is any, The YE is any of air damper controller, band valve cylinder, butterfly valve, electric pushrod.
Compared with prior art, the utility model has advantages below:
The utility model discloses blow device before the burner with multiple control modes, including master controller, burning Device, drying drum, wind direction selection device, Dustproof air flue, oily waste treatment air channel, deduster and oil spot treatment device, burner are carried For preceding purging function, master controller provides control function.Before the burner with multiple control modes that the utility model is provided Blow device and its application process, burner and wind direction selection device can pass through wind direction selection device using three kinds of operational modes Decontamination airflow direction is selected, operation is flexible, before asphalt blending station production asphalt, according to practical application condition The operational mode of selective combustion device, dedusting air door and oil removing air door, oil removing YE starts first, and then drives except alopecia areata Door is opened, and dedusting air door is closed mode, closes drying drum to the air channel of deduster, drying drum to oil spot treatment device Air channel it is clear and coherent, then turn on residual greasy dirt in the preceding purging function of burner, drying drum and burner oil pipe with blowing Scavenging stream enters after wind direction selection device, enters the oily waste treatment for being used for removing greasy dirt by oil removing air door and oily waste treatment air channel Device, it is to be purged to finish, the ventilation state of wind direction selection device is adjusted, dedusting YE is worked and drives dedusting air door Open, now oil removing YE is stopped, and oil removing air door is closed, and makes drying drum to the air channel of deduster Smoothness, the air channel closing of drying drum to oil spot treatment device, is ready for production asphalt.The utility model is provided The burner with multiple control modes before blow device, apparatus structure is simple, can effectively remove drying drum and burner Residual greasy dirt in oil pipe, prevents oil pollution deduster, improves the service life of deduster, has broad application prospects.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model wind direction selection device;
Fig. 3 is control flow chart of the present utility model;
Wherein, 1- burners;2- drying drums;3- wind direction selection devices;4- Dustproof air flues;5- oily waste treatments air channel;6- Deduster;7- oil spot treatment devices;8- dedusting YEs;9- dedusting air doors;10- oil removing air doors;The electronic execution of 11- oil removings Device.
Embodiment
The utility model is further described with reference to specific embodiment.
As Figure 1-3, blow device before a kind of burner with multiple control modes, including master controller, burning Device 1, drying drum 2, wind direction selection device 3, Dustproof air flue 4, oily waste treatment air channel 5, deduster 6 and oil spot treatment device 7, wind Include dedusting YE 8, dedusting air door 9, oil removing air door 10 and oil removing YE 11, wind direction choosing to selection device 3 Select dedusting air door 9 on device 3 the oil removing air door 10 on deduster 6, wind direction selection device 3 is connected by Dustproof air flue 4 and pass through Oily waste treatment air channel 5 connects oil spot treatment device 7, the input connection power supply of master controller, the output end of master controller It is connected respectively with burner 1, dedusting YE 8 and oil removing YE 11, master controller output control signal is simultaneously passed Burner 1, dedusting YE 8 and oil removing YE 11 are delivered to, to control burner 1, dedusting YE 8 With the keying of oil removing YE 11, burner 1 is used for purging function before providing, all around four direction of drying drum 2 A support wheel is respectively equipped with, drying drum 2 is fixed on base by symmetrically arranged four support wheels, the phase of drying drum 2 Set for horizontal plane, the level height of the boot of drying drum 2 is less than the level height of the end case of drying drum 2, for Material is set to be moved to boot, the boot of drying drum 2 and combustion by the end case of drying drum 2 by Gravitative Loads during heating, drying Burner 1 is connected, and the end case of drying drum 2 is connected with wind direction selection device 3, and wind direction selection device 3 is arranged at the end case of drying drum 2 Flue gas draws dirt mouthful, and oil spot treatment device 7 is used to remove the residual greasy dirt from drying drum 2 and the oil pipe of burner 1 etc., dedusting YE 8 is used to drive dedusting air door 9 to open or close, and oil removing YE 11 is used to drive oil removing air door 10 to open Or close, dedusting air door 9 and oil removing air door 10 open or close state when being in different.
Master controller is provided with data processor and signal modulator, and master controller is to burner 1, dedusting YE 8 and oil removing YE 11 take three kinds of operational modes, including interlocking operational mode, half half single action operational mode of interlocking and list Dynamic operational mode, can carry out free switching, the operational mode that master controller is selected according to operating personnel according to practical application condition Corresponding data processing and logical operation are carried out by data processor and corresponding control signal is exported, signal modulator is to institute Some control signals are respectively sent to burner 1, dedusting YE 8 and oil removing YE after being modulated conversion 11, and then drive burner 1, dedusting YE 8 and oil removing YE 11 to work or be stopped, on master controller Several operating switches are additionally provided with, operating switch includes interlocking switch, preceding purging and prepares switch, for driving before burner 1 Purging function on or the purging switch of stopping, the dedusting for adjusting the state of wind direction selection device 3 are switched and except oil circuit breaker, connection Lock-switch and preceding purging prepare switch and are respectively used to drive master controller to start interlocking operational mode and driving master controller startup Half half single action operational mode of interlocking, dedusting is switched for driving dedusting YE 8 to open or close dedusting air door 9, oil removing Switch for driving oil removing YE 11 to open or close oil removing air door 10, master controller be PLC, single-chip microcomputer, Any, dedusting YE 8 and the respectively airdoor control of oil removing YE 11 of dsp controller, ARM controller Any of device, band valve cylinder, butterfly valve, electric pushrod.
The application process of blow device before burner with multiple control modes, including:
When opening interlocking switch, master controller starts interlocking operational mode, master controller interlocked control burner 1, dedusting YE 8 and oil removing YE 11, comprise the following steps:Master controller carries out data processing by data processor After logical operation, opening signal is exported first and oil removing YE 11 is sent to after signal modulator modulation conversion, Driving oil removing YE 11 starts, and then drives oil removing air door 10 to open, while master controller exports shutdown signal and passed through Dedusting YE 8 is transmitted after signal modulator modulation conversion, control dedusting YE 8 does not work, at dedusting air door 9 In closed mode, it is ensured that oil removing air door 10 is opened completely and dedusting air door 9 is completely closed, and makes drying drum 2 to the wind of deduster 6 Road is closed, and the air channel of drying drum 2 to oil spot treatment device 7 is clear and coherent, and after delayed 1-10 seconds, master controller passes through data processing Device carries out purging signal before data processing and logical operation, output and is modulated conversion to preceding purging signal through signal modulator After be sent to burner 1, purging function before driving burner 1 starts proceeds by purging;
Purging prepares switch before opening, and master controller starts half half single action operational mode of interlocking, master controller interlocking control Dedusting YE 8 and oil removing YE 11 processed, the isolated operation of burner 1 comprise the following steps:Master controller to except The control of dirt YE 8 and oil removing YE 11 is identical with interlocking operational mode, when oil removing air door 10 is opened and is removed When dirt air door 9 is closed, the air channel closing of drying drum 2 to deduster 6, the air channel of drying drum 2 to oil spot treatment device 7 leads to It is suitable, then switch is purged by manual unlocking, the signal processor of master controller carries out data processing and logical operation, exports fore blow Sweep signal and burner 1 be sent to after signal modulator modulation conversion, purging function before driving burner 1 starts, start into Row purging;
Oil circuit breaker is removed by manual unlocking, the signal processor of master controller carries out data processing with being exported after logical operation Opening signal is simultaneously sent to oil removing YE 11 after signal modulator modulation conversion, and driving oil removing YE 11 is opened It is dynamic, and then drive oil removing air door 10 to open, switched by manual-lock dedusting, master controller carries out data by data processor Processing and logical operation, export shutdown signal and dedusting YE 8 are transmitted after signal modulator modulation conversion, control is removed Dirt YE 8 is not worked, and dedusting air door 9 is closed, it is ensured that oil removing air door 10 is opened completely and dedusting air door 9 is complete Contract fully, closes drying drum 2 to the air channel of deduster 6, and the air channel of drying drum 2 to oil spot treatment device 7 is clear and coherent, passes through Manual unlocking purging switch, master controller carries out data processing by data processor to be believed with purging before logical operation and output Number, burner 1 is sent to after being modulated conversion to preceding purging signal through signal modulator, driving burner 1 starts preceding purging Function, proceeds by purging, and the working condition of burner 1, dedusting air door 9 and oil removing air door 10 is unrelated, realizes that single action is transported Row mode.
It is to be purged finish after, any of three kinds of operational modes can be selected according to the actual requirements, by master controller to except Dirt YE 8 exports opening signal, and driving dedusting YE 8 works, and then drives dedusting air door 9 to open, and to Oil removing YE 11 exports shutdown signal, and driving oil removing YE 11 is stopped, and oil removing air door 10, which is in, closes State, makes the air channel of drying drum 2 to deduster 6 clear and coherent, the air channel closing of drying drum 2 to oil spot treatment device 7, for production Asphalt is ready.
The course of work of the present utility model:
Before asphalt blending station production asphalt, select master controller to burner 1 according to practical application condition, remove The operational mode of dirt YE 8 and oil removing YE 11, master controller is exported to oil removing YE 11 first Opening signal, starts oil removing YE 11, and then drives oil removing air door 10 to open, while defeated to dedusting YE 8 Go out shutdown signal, control dedusting YE 8 is in off position, and dedusting air door 9 is closed, and makes drying drum 2 close to the air channel of deduster 6, and the air channel of drying drum 2 to oil spot treatment device 7 is clear and coherent, and subsequent master controller is to burner 1 Output before purging signal, start burner 1 and proceed by the residual greasy dirt in purging, drying drum 2 and the oil pipe of burner 1 with Purge gass stream to enter after wind direction selection device 3, pass sequentially through oil removing air door 10 and oily waste treatment air channel 5 enters oily waste treatment and filled Put 7, for removing greasy dirt, it is to be purged finish after, the ventilation state of adjustment wind direction selection device 3 makes dedusting by master controller YE 8 works and drives dedusting air door 9 to open, and controls oil removing YE 11 to be stopped, oil removing air door 10 It is closed, makes the air channel of drying drum 2 to deduster 6 clear and coherent, the air channel envelope of drying drum 2 to oil spot treatment device 7 Close, be ready for production asphalt.
Embodiment 1
As Figure 1-3, blow device before a kind of burner with multiple control modes, including master controller, burning Device 1, drying drum 2, wind direction selection device 3, Dustproof air flue 4, oily waste treatment air channel 5, deduster 6 and oil spot treatment device 7, wind The oil removing air door 10 on deduster 6, wind direction selection device 3 is connected by Dustproof air flue 4 to the dedusting air door 9 on selection device 3 Oil spot treatment device 7 is connected by oily waste treatment air channel 5, the input of master controller connects power supply, master control by wire The output end of device processed is connected by wire with burner 1, dedusting YE 8 and oil removing YE 11 respectively, master control Device output control signal processed is simultaneously sent to burner 1, dedusting YE 8 and oil removing YE 11, to control combustion The keying of burner 1, dedusting YE 8 and oil removing YE 11, burner 1 is used for purging function before providing, and dries All around four direction is respectively equipped with a support wheel to roller 2, and drying drum 2 is fixed on base by four support wheels, The angle of drying drum 2 and horizontal direction is 3.5 °, and the level height of the boot of drying drum 2 is less than the water of the end case of drying drum 2 Flat height, for making material rely on Gravitative Loads to be moved to boot by the end case of drying drum 2 during heating, drying, is dried The boot of roller 2 is connected with burner 1, and the end case of drying drum 2 is connected with wind direction selection device 3, and wind direction selection device 3 is arranged at dry The dedusting air door 9 that the flue gas of the dry end case of roller 2 draws on dirt mouthful, wind direction selection device 3 connects deduster 6, wind by Dustproof air flue 4 Oil spot treatment device 7 is connected by oily waste treatment air channel 5 to the oil removing air door 10 on selection device 3, oil spot treatment device 7 is used for The residual greasy dirt from drying drum 2 and the oil pipe of burner 1 etc. is removed, dedusting YE 8 is used to drive dedusting air door 9 Open or close, oil removing YE 11 is used to drive oil removing air door 10 to open or close, dedusting air door 9 and oil removing air door 10 In it is different when open or close state.
Master controller is provided with data processor and signal modulator, and master controller is to burner 1, dedusting YE 8 and oil removing YE 11 take three kinds of operational modes, including interlocking operational mode, half half single action operational mode of interlocking and list Dynamic operational mode, can carry out free switching, the operational mode that master controller is selected according to operating personnel according to practical application condition Corresponding data processing and logical operation are carried out by data processor and corresponding control signal is exported, signal modulator is to institute Some control signals are respectively sent to burner 1, dedusting YE 8 and oil removing YE after being modulated conversion 11, and then drive burner 1, dedusting YE 8 and oil removing YE 11 to work or be stopped, on master controller Several operating switches are additionally provided with, operating switch includes interlocking switch, preceding purging and prepares switch, for driving before burner 1 Purging function on or the purging switch of stopping, the dedusting for adjusting the state of wind direction selection device 3 are switched and except oil circuit breaker, connection Lock-switch and preceding purging prepare switch and are respectively used to drive master controller to start interlocking operational mode and driving master controller startup Half half single action operational mode of interlocking, dedusting is switched for driving dedusting YE 8 to open or close dedusting air door 9, oil removing Switch for driving oil removing YE 11 to open or close oil removing air door 10, master controller is PLC, passes through center Processing unit CPU carries out data processing and logical operation, and dedusting YE 8 and oil removing YE 11 are respectively air door Controller.
The application process of blow device before burner with multiple control modes, including:
When opening interlocking switch, master controller starts interlocking operational mode, master controller interlocked control burner 1, dedusting YE 8 and oil removing YE 11, comprise the following steps:Master controller carries out data processing by data processor After logical operation, opening signal is exported first and oil removing YE 11 is sent to after signal modulator modulation conversion, Driving oil removing YE 11 starts, and then drives oil removing air door 10 to open, while master controller exports shutdown signal and passed through Dedusting YE 8 is transmitted after signal modulator modulation conversion, control dedusting YE 8 does not work, at dedusting air door 9 In closed mode, it is ensured that oil removing air door 10 is opened completely and dedusting air door 9 is completely closed, and makes drying drum 2 to the wind of deduster 6 Road is closed, and the air channel of drying drum 2 to oil spot treatment device 7 is clear and coherent, after delayed 1-10 seconds, purging letter before master controller output Number and be sent to burner 1 after being modulated conversion to preceding purging signal through signal modulator, driving burner 1 starts preceding purging Function, proceeds by the residual greasy dirt in purging, drying drum 2 and the oil pipe of burner 1 as purge gass stream is selected into wind direction After device 3, pass sequentially through oil removing air door 10 and oily waste treatment air channel 5 enters oil spot treatment device 7 and is purged greasy dirt;
Purging prepares switch before opening, and master controller starts half half single action operational mode of interlocking, master controller interlocking control Dedusting YE 8 and oil removing YE 11 processed, the isolated operation of burner 1 comprise the following steps:Master controller to except The control of dirt YE 8 and oil removing YE 11 is identical with interlocking operational mode, when oil removing air door 10 is opened and is removed When dirt air door 9 is closed, the air channel closing of drying drum 2 to deduster 6, the air channel of drying drum 2 to oil spot treatment device 7 leads to It is suitable, then switch is purged by manual unlocking, the signal processor of master controller carries out data processing and logical operation, exports fore blow Sweep signal and burner 1 be sent to after signal modulator modulation conversion, purging function before driving burner 1 starts, start into Row is purged, and the residual greasy dirt in drying drum 2 and the oil pipe of burner 1 enters after wind direction selection device 3 with purge gass stream, successively Oil spot treatment device 7 is entered by oil removing air door 10 and oily waste treatment air channel 5 and greasy dirt is purged;
Oil circuit breaker is removed by manual unlocking, the signal processor of master controller carries out data processing and logical operation, master control Device processed output opening signal is simultaneously sent to oil removing YE 11 after signal modulator modulation conversion, and oil removing is electronic holds for driving Row device 11 starts, and then drives oil removing air door 10 to open, and is switched by manual-lock dedusting, and master controller output shutdown signal is simultaneously Dedusting YE 8 is transmitted after signal modulator modulation conversion, control dedusting YE 8 does not work, dedusting air door 9 It is closed, it is ensured that oil removing air door 10 is opened completely and dedusting air door 9 is completely closed, and makes drying drum 2 to deduster 6 Air channel is closed, and the air channel of drying drum 2 to oil spot treatment device 7 is clear and coherent, is purged and switched by manual unlocking, master controller output Preceding purging signal is simultaneously sent to burner 1 through signal modulator to preceding purge after signal is modulated conversion, driving burner 1 is opened Purging function before dynamic, proceeds by the residual greasy dirt in purging, drying drum 2 and the oil pipe of burner 1 as purge gass stream enters After wind direction selection device 3, pass sequentially through oil removing air door 10 and oily waste treatment air channel 5 enters oil spot treatment device 7 and is purged Greasy dirt, the working condition of burner 1, dedusting air door 9 and oil removing air door 10 is unrelated, realizes single action operational mode.
It is to be purged finish after, any of three kinds of operational modes can be selected according to the actual requirements, master controller passes through data Processor carries out corresponding data processing and logical operation, and opening signal is exported to dedusting YE 8, and driving dedusting is electronic Actuator 8 is worked, and then drives dedusting air door 9 to open, and shutdown signal is exported to oil removing YE 11, and driving oil removing is electronic Actuator 11 is stopped, and oil removing air door 10 is closed, and is made the air channel of drying drum 2 to deduster 6 clear and coherent, is dried rolling Cylinder 2 to the air channel of oil spot treatment device 7 is closed, and is ready for production asphalt.
Described above is only preferred embodiment of the present utility model, it should be pointed out that:For the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (8)

1. blow device before the burner with multiple control modes, including master controller, the combustion for providing preceding purging function Burner(1)And drying drum(2), it is characterised in that the drying drum(2)Boot and end case burner is set respectively(1) With wind direction selection device(3), wind direction selection device(3)It is provided with air door and the YE for driving air-door opening-closing, wind To selection device(3)Pass through air door and deduster respectively(6)And oil spot treatment device(7)Communicate, master controller and burner(1) It is connected with YE, master controller output control signal is simultaneously sent to burner(1)And YE, to control combustion Burner(1)With the keying of YE.
2. blow device before the burner according to claim 1 with multiple control modes, it is characterised in that the wind Door has two, respectively dedusting air door(9)With oil removing air door(10), the YE has two, and respectively dedusting is electronic Actuator(8)With oil removing YE(11).
3. blow device before the burner according to claim 2 with multiple control modes, it is characterised in that described to remove Dirt air door(9)Pass through Dustproof air flue(4)Connect deduster(6), oil removing air door(10)Pass through oily waste treatment air channel(5)Connect greasy dirt Processing unit(7).
4. blow device before the burner according to claim 1 with multiple control modes, it is characterised in that the master Data processor and signal modulator are set on controller, and master controller carries out data processing by data processor and output is controlled Signal processed is simultaneously respectively sent to burner after being modulated through signal modulator(1)And YE.
5. blow device before the burner according to claim 1 with multiple control modes, it is characterised in that the master Several operating switches are additionally provided with controller, the operating switch includes being used to drive master controller to start interlocking operational mode Interlocking switch, the preceding purging for driving master controller to start half half single action operational mode of interlocking prepare switch, for driving Burner(1)The purging of purging function is switched, for driving dedusting air door before opening and closing(9)The dedusting switch and use opened or closed In driving oil removing air door(10)What is opened or closed removes oil circuit breaker.
6. blow device before the burner according to claim 1 with multiple control modes, it is characterised in that described dry Dry roller(2)Relative level is obliquely installed, drying drum(2)Level height of the level height of boot less than end case.
7. blow device before the burner according to claim 1 with multiple control modes, it is characterised in that the wind To selection device(3)It is arranged at drying drum(2)The flue gas of end case draws dirt mouthful.
8. blow device before the burner according to claim 1 with multiple control modes, it is characterised in that the master Controller be PLC, single-chip microcomputer, dsp controller, ARM controller it is any, the YE be airdoor control Any of device, band valve cylinder, butterfly valve, electric pushrod.
CN201720178183.5U 2017-02-27 2017-02-27 Blow device before burner with multiple control modes Expired - Fee Related CN206591398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720178183.5U CN206591398U (en) 2017-02-27 2017-02-27 Blow device before burner with multiple control modes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720178183.5U CN206591398U (en) 2017-02-27 2017-02-27 Blow device before burner with multiple control modes

Publications (1)

Publication Number Publication Date
CN206591398U true CN206591398U (en) 2017-10-27

Family

ID=60125803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720178183.5U Expired - Fee Related CN206591398U (en) 2017-02-27 2017-02-27 Blow device before burner with multiple control modes

Country Status (1)

Country Link
CN (1) CN206591398U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059551A (en) * 2017-02-27 2017-08-18 徐州徐工筑路机械有限公司 Blow device and its application process before burner with multiple control modes
CN110327708A (en) * 2019-08-02 2019-10-15 浙江蓝天除尘设备有限公司 A kind of series connection multi-mode bag filter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059551A (en) * 2017-02-27 2017-08-18 徐州徐工筑路机械有限公司 Blow device and its application process before burner with multiple control modes
CN110327708A (en) * 2019-08-02 2019-10-15 浙江蓝天除尘设备有限公司 A kind of series connection multi-mode bag filter
CN110327708B (en) * 2019-08-02 2021-08-31 浙江蓝天除尘设备有限公司 Series multi-mode bag-type dust collector

Similar Documents

Publication Publication Date Title
US10259372B2 (en) Mobile-type power equipment maintenance device
CN206591398U (en) Blow device before burner with multiple control modes
CN106760576B (en) A kind of concrete overlay film mounted maintenance equipment
CN206279426U (en) A kind of heat-regenerating paver of asphalt pavement
CN104229855B (en) Utilize electricity generation boiler or the technique of sintering device flue gas on-line heating oxidation sweetening ash
CN107059551A (en) Blow device and its application process before burner with multiple control modes
CN103306232A (en) Snow sweeper cold air blowing automatic control device and method based on pressure feedback
CN105502025A (en) Wagon tippler dust removing device
CN205617201U (en) Heat regeneration device
CN107560383A (en) A kind of Tea Production processing drying plant
CN104209235A (en) Automatic roller spraying machine
CN207395403U (en) A kind of biscuit of ceramics drying device
CN204509953U (en) A kind of asphalt-regenerating mixture drying unit
CN203304137U (en) Automatic rolling spraying machine
CN203583320U (en) Mobile multifunctional forced intermittent asphalt stirring equipment
CN205957639U (en) Portable construction for building and dry integration equipment
CN206495113U (en) A kind of Asphalt Concrete Drying and dust arrester
CN109894417A (en) A kind of equipment cleaning device
CN209759382U (en) flue gas desulfurization device for coke oven ground dust removal station
KR100606291B1 (en) Recycle method for waste asphalt concrete
CN207290525U (en) Pitch batching plant blowing dust-extraction unit
CN206705946U (en) The quick anhydration system of sludge
KR200364479Y1 (en) Recycle system for waste asphalt concrete
CN204027237U (en) Bitumen concrete drying unit
CN204159169U (en) A kind of asphalt mixing terminal smoking dust collect plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027