CN206583774U - A kind of concrete penetrometer of Fast Installation - Google Patents
A kind of concrete penetrometer of Fast Installation Download PDFInfo
- Publication number
- CN206583774U CN206583774U CN201720269625.7U CN201720269625U CN206583774U CN 206583774 U CN206583774 U CN 206583774U CN 201720269625 U CN201720269625 U CN 201720269625U CN 206583774 U CN206583774 U CN 206583774U
- Authority
- CN
- China
- Prior art keywords
- master mold
- base
- inserted block
- lid
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of concrete penetrometer of Fast Installation, a kind of concrete penetrometer of Fast Installation includes casing, workbench on casing, base on workbench, it is used for the master mold of filling regeneration concrete on base, discharge outlet is provided with base, base is set to circular ring type, master mold is plugged in base, base is provided with a spring inserted block, the buckling groove of an ammunition feed spring inserted block grafting is offered on master mold, spring inserted block includes and the horizontally disposed inserted block of workbench, it is fixed on pull lever of the inserted block with respect to master mold one end, and it is set in the spring in pull lever, the through hole and sliding groove slided respectively for pull lever and inserted block is offered on base, pull lever is extended outside base, spring one end abuts inserted block, the other end is connected to slip trench bottom, upper surface Dao You oblique angle of the inserted block towards master mold one end, master mold is spacing in the base, with the fixation procedure for simplifying base and master mold, improve the advantage of operating efficiency.
Description
Technical field
The utility model is related to a kind of concrete NDT equipment, more particularly to a kind of concrete penetrometer of Fast Installation.
Background technology
Concrete penetrometer is the instrument for determining Waterproof sand anti-permeability performance, can carry out mixing mixed with the regeneration of waterproofing agent
The contrast test of solidifying soil and normal concrete.It is designed according to hydraulic principle, is pressed with motor run water pump, pass through pipeline
With pressure vessel, control valve, die trial seat etc. be connected.Pressure enters pressure vessel by water pump output.It is then delivered to each test specimen system
System carries out load test.Electro connecting pressure gauge and electric control system are housed, by the electricity in electro connecting pressure gauge in pipeline
The regulation of contact, can make pressure carry out constant pressure experiment in 0.1-1.5MPa prescribed limit.
Authorization Notice No. is CN200968922, the Chinese patent document on 10 days November 2006 applying date discloses one kind
Extrusion side wall and permeability testing machine of flexible concrete, including test specimen cylinder, drainpipe, base and blast pipe, test specimen cylinder are pyramidal structure, examination
Part cylinder is connected by test specimen cylinder lower plate by bolt with base, and porous disc is provided between test specimen cylinder and base, and the top of test specimen cylinder is set
There is drainpipe, bottom is provided with blast pipe, and base has support angle steel, and the bottom of base is provided with threeway, one end of threeway and examination
Part cylinder is communicated, and another two end is communicated with water pipe and graduated glass tube respectively.Above-mentioned test specimen cylinder lower plate relies on bolt and base
It is connected, due to being provided with drainpipe below examination barrier part, the upward draining of drainpipe has a upward thrust, institute to examination barrier part
To need to use many bolts to be distributed in a ring to being fixed between test specimen cylinder and base, fixation procedure is relatively complicated, influence
The efficiency of whole detection process.
Utility model content
The purpose of this utility model is to provide a kind of concrete penetrometer of Fast Installation, with simplifying base and master mold
Fixation procedure, improves the advantage of operating efficiency.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of concrete penetrometer of Fast Installation, including casing, the workbench on casing, positioned at workbench
On base, be used for the master mold of filling regeneration concrete on base, discharge outlet is provided with the base, the base is set
For circular ring type, master mold is plugged in base, and the base is provided with a spring inserted block, and an ammunition feed spring is offered on the master mold and is inserted
The buckling groove of block grafting, the spring inserted block include with the horizontally disposed inserted block of workbench, be fixed on the relative master mold one of inserted block
Offer what is slided respectively for pull lever and inserted block on the pull lever at end and the spring being set in pull lever, the base
Through hole and sliding groove, the pull lever are extended outside base, and the spring one end abuts inserted block, and the other end is connected to sliding groove
Bottom, the inserted block is towards the upper surface Dao You oblique angles of master mold one end, and the inserted block half is caught in buckling groove, and half stays in cunning
It is in dynamic groove, master mold is spacing in the base.
Using said structure, it is necessary to which when being detected to regeneration concrete, master mold is plugged in base, master mold lower end is supported
The inclined-plane of block is patched, when master mold continues slide downward, drives inserted block to be retracted base under the force of a spring, master mold is caught in completely
To after base, inserted block is ejected under the elastic acting force of spring, and half is snapped onto in the buckling groove of master mold, and half stays in base
It is in sliding groove, master mold is spacing in the base, contrast bolt of the prior art and fix, greatly simplify whole fixation procedure,
Improve operating efficiency.
More preferably:One end that the pull lever extends base is provided with the poke rod conveniently pulled.
Using said structure, facilitate staff to pull inserted block to skid off in the buckling groove on master mold by poke rod, make it
Easily master mold can be departed from base, facilitate the operation of staff.
More preferably:The multiple guide grooves shifted to install with sliding groove, the mother are offered on the base inner wall
Mould outer wall is provided with the guide pad for corresponding and inserting in guide groove with guide groove.
Using said structure, by the guide groove on the guide pad inserted base on master mold, making it more accurately will
Inserted block is caught in the buckling groove on master mold, facilitates operation.
More preferably:The master mold contacts end face with workbench provided with first sealing gasket of circle.
Using said structure, passing through the first sealing gasket strengthens the sealing between master mold and workbench, it is to avoid water is from mother
Overflowed in gap between mould and base.
More preferably:The master mold is prevented again with respect to one end of workbench provided with one for covering parent upper end
The lid that growing concrete is skidded off, the lid upper end offers the through hole that internal diameter is less than master mold internal diameter, lid and master mold side wall phase
Veneer is provided with the L-type neck being correspondingly provided with multiple fixture blocks, the master mold for fixture block rotary clamping, the lid and master mold
The second sealing gasket is provided between end face.
Using said structure, it is caught in by fixture block on lid in the L-type neck of master mold, its lid is firmly covered in mother
On mould, when preventing detection regeneration concrete, regeneration concrete is skidded off above the master mold, then passes through the between master mold and lid
Two sealing gaskets, the sealing between enhancing regeneration concrete and master mold, it is to avoid in gap of the water between regeneration concrete and master mold
Overflow.
More preferably:The master mold is prevented again with respect to one end of workbench provided with one for covering parent upper end
The lid that growing concrete is skidded off, the lid upper end offers the through hole that internal diameter is less than master mold internal diameter, lid and master mold side wall phase
Veneer is provided with external screw thread, and master mold side wall is provided with the internal thread being adapted with lid external screw thread, the lid and master mold
The second sealing gasket is provided between upper surface.
Using said structure, lid is coordinated by the external screw thread screw thread on internal thread and master mold, and lid is easily and firm
Card labor on master mold, when preventing detection regeneration concrete, regeneration concrete is skidded off above the master mold, then passes through master mold and lid
The second sealing gasket between body, the sealing between enhancing regeneration concrete and master mold, it is to avoid water is from regeneration concrete and master mold
Between gap in overflow.
More preferably:The master mold, which is provided with, facilitates portable handle.
Using said structure, by master mold up knob, staff is facilitated to carry master mold.
In summary, the utility model has the advantages that:
1st, master mold is firmly fixed on base by the cooperation of the first latch and the second latch, reaches and be simplified to fix
Journey, facilitates staff to operate, and improves the effect of operating efficiency;
2nd, by covering the lid in master mold upper end, reach prevent detection when regeneration concrete depart from master mold, make its more preferable
Detect the effect of regeneration concrete performance.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one, shows overall structure;
Fig. 2 is the enlarged diagram at A in Fig. 1, shows the attachment structure between master mold and base;
Fig. 3 is the enlarged diagram at B in Fig. 1, shows the attachment structure between lid and master mold;
Fig. 4 is the structural representation of embodiment two, shows overall structure.
In figure, 1, casing;2nd, workbench;3rd, base;4th, master mold;5th, discharge outlet;6th, buckling groove;7th, spring;8th, inserted block;
9th, pull lever;10th, sliding groove;11st, guide groove;12nd, guide pad;13rd, the first sealing gasket;14th, lid;15th, fixture block;16th, L-type card
Groove;17th, the second sealing gasket;18th, handle;19th, controlling switch;20th, pressure display instrument;21st, poke rod.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in protection domain of the present utility model by Patent Law.
Embodiment 1:A kind of concrete penetrometer of Fast Installation, as shown in figure 1, including casing 1, being provided with casing 1
Some bases 3 are installed, base 3 is evenly distributed on workbench 2, put on the base 3 on one workbench 2, workbench 2
Some and base 3 is provided with correspondingly and for the master mold 4 of filling regeneration concrete, master mold 4 is set to hollow cylinder, often
A discharge outlet 5 is offered in individual base 3.
Several are additionally provided with reference picture 1, above-mentioned casing 1 to correspond with base 3, and for controlling discharge outlet 5
Controlling switch 19, and a pressure display instrument 20, wherein pressure display instrument 20 and controlling switch 19 are absorbed in casing 1, kept away
Exempt from the usually course of work, collide controlling switch 19 and pressure display instrument 20.
With reference to Fig. 1 and 2, above-mentioned base 3 is arranged between circular ring type, the inserted base 3 of master mold 4, and the outer wall of master mold 4 and base
3 inwalls are affixed, by setting the inserted block 8 of spring 7 to be on the base 3 inserted into the buckling groove 6 on master mold 4, by master mold 4 it is spacing
In base 3, the inserted block 8 of spring 7 by with the horizontally disposed inserted block of workbench 28, be fixed on inserted block 8 with respect to the one end of master mold 4 pulling
Bar 9 and the spring 7 being set in pull lever 9 are constituted, and are offered on base 3 respectively for leading to that pull lever 9 and inserted block 8 are slided
Hole and sliding groove 10, one end of spring 7 are connected to inserted block 8, and the other end is connected to the bottom of sliding groove 10, and inserted block 8 is towards master mold 4 one
The upper surface Dao You oblique angles at end, during by 4 inserted base 3 of master mold, are abutted by the lower surface of master mold 4 with the inclined-plane of inserted block 8, master mold 4 after
During continuous slide downward, inserted block 8 is driven to be retracted base 3 under the active force of spring 7, master mold 4 is snapped onto after base 3 completely, inserted block 8
Ejected under the elastic acting force of spring 7, half is snapped onto in the buckling groove 6 of master mold 4, and half stays in the sliding groove 10 of base 3
In, master mold 4 is spacing in base 3, and the above-mentioned inserted block 8 of spring 7 is axially evenly arranged with two groups along base 3;Wherein master mold 4 passes through
The multiple guide pads 12 shifted to install with buckling groove 6, are inserted in the guide groove 11 of base 3, and guide effect is carried out to master mold 4,
Its master mold 4 is more easily inserted in base 3, and keep master mold 4 to be connected with the buckling groove 6 on base 3.
One end that reference picture 1, wherein pull lever 9 extend base 3 is provided with the poke rod 21 conveniently pulled;Staff
Inserted block 8 can be easily pulled to skid off in the buckling groove 6 on master mold 4 by poke rod 21, can be easily by master mold 4 and base 3
Separation.
Reference picture 2, above-mentioned master mold 4 is contacted with workbench 2 is provided with first sealing gasket of circle 13 on end face, be conducive to carrying
Sealing between high master mold 4 and workbench 2, it is to avoid flowed out in gap of the current between master mold 4 and workbench 2, leads to
The mutual abrasion between master mold 4 and workbench 2 can also be avoided by crossing the first sealing gasket 13.
One lid 14 is installed on reference picture 1 and 3, the upper surface of above-mentioned master mold 4, lid 14 by with the side wall phase of master mold 4
Fixed fixture block 15, slides into the L-type neck 16 on master mold 4, lid 14 is firmly fixed on master mold 4, entered on veneer
And the internal diameter opened up by the upper end of lid 14 is less than the through hole of the inwall of master mold 4, regeneration concrete is blocked in master mold 4, it is to avoid
In detection process, regeneration concrete is skidded off in master mold 4;Wherein the second sealing is also placed between lid 14 and the upper surface of master mold 4
Pad 17, by the second sealing gasket 17, strengthens the sealing between lid 14, master mold 4 and regeneration concrete, it is to avoid current are from again
Flow out, can also be avoided between lid 14 and master mold 4 by the second sealing gasket 17 in gap between growing concrete master mold 4
Mutually abrasion.
Two handles 18 have also been relatively fixed on reference picture 1, the side wall of above-mentioned master mold 4, staff is facilitated by handle 18
Master mold 4 is extracted, facilitates staff to operate.
The operation principle of embodiment 1:When needing to detect regeneration concrete, master mold 4 is plugged in base 3, master mold 4
Lower end abuts the inclined-plane of inserted block 8, when master mold 4 continues slide downward, drives inserted block 8 to be retracted base 3 under the active force of spring 7,
Master mold 4 is snapped onto after base 3 completely, and inserted block 8 is ejected under the elastic acting force of spring 7, and half snaps onto the buckling groove of master mold 4
In 6, half is stayed in the sliding groove 10 of base 3, and master mold 4 is spacing in base 3, and regeneration concrete is placed in master mold 4
Afterwards, and then by lid 14 it is caught in by fixture block 15 in L-type neck 16, rotates lid 14, its fixture block 15 is blocked jail in L-type neck
In 16, it is firmly covered in the upper end of master mold 4, prevent regeneration concrete from being come off from master mold 4.
Embodiment 2:As shown in figure 4, being with the difference of embodiment 1, one is provided with the upper surface of above-mentioned master mold 4
Lid 14, lid 14 is coordinated by the external screw thread screw thread on the internal thread with being opened up on the side wall phase veneer of master mold 4 and master mold 4, will
Lid 14 is firmly fixed on master mold 4, and then the internal diameter opened up by the upper end of lid 14 is less than the through hole of the inwall of master mold 4, will
Regeneration concrete is blocked in master mold 4, it is to avoid in detection process, and regeneration concrete is skidded off in master mold 4;Wherein lid 14 and master mold
The second sealing gasket 17 is also placed between 4 upper surfaces, by the second sealing gasket 17, strengthens lid 14, master mold 4 and regeneration coagulation
Sealing between soil, it is to avoid flowed out in gap of the current between regeneration concrete master mold 4, by the second sealing gasket 17 also
The mutual abrasion between lid 14 and master mold 4 can be avoided.
Claims (7)
1. a kind of concrete penetrometer of Fast Installation, including casing (1), the workbench (2) on casing (1), it is located at
In base (3) on workbench (2), the master mold (4) on base (3) for filling regeneration concrete, the base (3)
Provided with discharge outlet (5), it is characterized in that:The base (3) is set to circular ring type, and master mold (4) is plugged in base (3), the bottom
Seat (3) is provided with the buckling groove that ammunition feed spring (7) inserted block (8) grafting is offered on a spring (7) inserted block (8), the master mold (4)
(6), spring (7) inserted block (8) includes and workbench (2) horizontally disposed inserted block (8), to be fixed on inserted block (8) relatively female
Offer and supply respectively on the pull lever (9) of mould (4) one end and the spring (7) being set in pull lever (9), the base (3)
Through hole and sliding groove (10) that pull lever (9) and inserted block (8) are slided, the pull lever (9) extends base (3) outside, described
Spring (7) one end abuts inserted block (8), and the other end is connected to sliding groove (10) bottom, and the inserted block (8) is towards master mold (4) one end
Upper surface Dao You oblique angles, inserted block (8) half is caught in buckling groove (6), and half is stayed in sliding groove (10), by master mold
(4) it is spacing in base (3).
2. a kind of concrete penetrometer of Fast Installation according to claim 1, it is characterized in that:The pull lever (9) is prolonged
The one end for stretching out base (3) is provided with the poke rod (21) conveniently pulled.
3. a kind of concrete penetrometer of Fast Installation according to claim 2, it is characterized in that:Base (3) inwall
On offer the multiple guide grooves (11) shifted to install with sliding groove (10), master mold (4) outer wall is provided with and guide groove
(11) guide pad (12) for corresponding and inserting in guide groove (11).
4. a kind of concrete penetrometer of Fast Installation according to claim 3, it is characterized in that:The master mold (4) and work
Make platform (2) contact end face provided with first sealing gasket of circle (13).
5. a kind of concrete penetrometer of Fast Installation according to claim 4, it is characterized in that:The master mold (4) is relative
One end of workbench (2) is used to cover the lid (14) that parent upper end prevents regeneration concrete from skidding off, the lid provided with one
Body (14) upper end offers the through hole that internal diameter is less than master mold (4) internal diameter, and lid (14) is with master mold (4) side wall phase veneer provided with many
The L-type neck (16) for fixture block (15) rotary clamping, the lid (14) are correspondingly provided with individual fixture block (15), the master mold (4)
The second sealing gasket (17) is provided between master mold (4) upper surface.
6. a kind of concrete penetrometer of Fast Installation according to claim 5, it is characterized in that:The master mold (4) is relative
One end of workbench (2) is used to cover the lid (14) that parent upper end prevents regeneration concrete from skidding off, the lid provided with one
Body (14) upper end offers the through hole that internal diameter is less than master mold (4) internal diameter, and lid (14) is with master mold (4) side wall phase veneer provided with outer
Screw thread, master mold (4) side wall is provided with the internal thread being adapted with lid (14) external screw thread, the lid (14) and master mold
(4) the second sealing gasket (17) is provided between upper surface.
7. a kind of concrete penetrometer of Fast Installation according to any one of claim 5 or 6, it is characterized in that:It is described
Master mold (4), which is provided with, facilitates portable handle (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720269625.7U CN206583774U (en) | 2017-03-18 | 2017-03-18 | A kind of concrete penetrometer of Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720269625.7U CN206583774U (en) | 2017-03-18 | 2017-03-18 | A kind of concrete penetrometer of Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206583774U true CN206583774U (en) | 2017-10-24 |
Family
ID=60113771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720269625.7U Expired - Fee Related CN206583774U (en) | 2017-03-18 | 2017-03-18 | A kind of concrete penetrometer of Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206583774U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109283113A (en) * | 2018-10-31 | 2019-01-29 | 中国矿业大学 | A kind of the concrete impermeability test device and test method of elimination of level circumferential pressure |
CN110108617A (en) * | 2019-05-14 | 2019-08-09 | 南京研华智能科技有限公司 | Concrete impervious instrument locking device |
CN112858137A (en) * | 2021-02-03 | 2021-05-28 | 石家庄宏业交通建设监理有限公司 | Automatic pressure-regulating concrete impermeability instrument |
-
2017
- 2017-03-18 CN CN201720269625.7U patent/CN206583774U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109283113A (en) * | 2018-10-31 | 2019-01-29 | 中国矿业大学 | A kind of the concrete impermeability test device and test method of elimination of level circumferential pressure |
CN109283113B (en) * | 2018-10-31 | 2023-12-29 | 中国矿业大学 | Concrete impermeability test device and test method for eliminating horizontal hoop pressure |
CN110108617A (en) * | 2019-05-14 | 2019-08-09 | 南京研华智能科技有限公司 | Concrete impervious instrument locking device |
CN110108617B (en) * | 2019-05-14 | 2024-02-09 | 南京研华智能科技有限公司 | Locking device for concrete anti-seepage instrument |
CN112858137A (en) * | 2021-02-03 | 2021-05-28 | 石家庄宏业交通建设监理有限公司 | Automatic pressure-regulating concrete impermeability instrument |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206583774U (en) | A kind of concrete penetrometer of Fast Installation | |
CN104458532B (en) | Device and method for testing water permeability resistance of concrete joint under action of controllable lateral restriction | |
CN104458531B (en) | Device and method for testing water permeability resistance of lateral restriction-free concrete joint | |
CN203414384U (en) | Concrete seepage height testing device | |
CN206258352U (en) | Concrete impervious instrument and its die trial | |
CN209280524U (en) | A kind of rock joint seepage flow shearing test device | |
CN209878238U (en) | Steel pipeline hydrostatic testing machine | |
CN113670500B (en) | Shield tunnel segment buoyancy measurement model experimental device | |
CN205643059U (en) | Measurement device for cement concrete pavement top layer scour resistance ability | |
CN112012729A (en) | Multifunctional oil-gas well wall simulation experiment device and application | |
CN102095643B (en) | Method for testing leak stopping of tunnel joint | |
CN207717587U (en) | A kind of mortar permeameter | |
CN103645287B (en) | A kind of device for carrying out laboratory slip casting test to test block | |
CN205607724U (en) | Impervious test mould of concrete | |
CN105716924B (en) | Concrete impervious test mould | |
CN205786236U (en) | A kind of concrete impervious instrument | |
CN206804415U (en) | A kind of universal water test unit of fire-proof motor | |
CN206787995U (en) | The concrete penetrometer of Fast Installation | |
CN217542775U (en) | Maintain structure surface water permeability detection device among building structure | |
CN205898628U (en) | Mortar infiltration appearance | |
CN204554223U (en) | Flexible pipe seal arrangement | |
CN212378962U (en) | Pipeline is suppressed and is sealed testing arrangement and system | |
CN210071817U (en) | Similar simulation experiment grouting device | |
CN203782898U (en) | Shear wall bolt hole blocking device | |
CN208981359U (en) | The gang form structure of the inspection shaft cast-in-place construction of town road pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171024 Termination date: 20200318 |