Summary of the invention
The objective of the invention is weak point according to above-mentioned prior art; The test method of a kind of tunnel seam lost circulation material is provided; This method is through the force-bearing situation of simulation tunnel seam seepage; Thereby adopt corresponding lost circulation material, can judge the actual effect of leak stopping, the platform of a test is provided for tunnel seam leak stopping from now on to the various lost circulation material straightway testings of tunnel seam seepage.
The object of the invention realizes being accomplished by following technical scheme:
A kind of tunnel seam plugging test method is characterized in that said method adopts following steps: adopt two block concrete die trials, promptly upper and lower die trial; Upper and lower die trial is built respectively on upper bracket and undersetting; It is fixing to connect supporting through four screw rods between the upper and lower bearing, between upper and lower die trial, places inside and outside steel ring, is placed with Grouting Pipe on the sidewall of outer rim; In upper testing mould, reserve three pipelines; Be gas outlet, water inlet pipe and grout outlet, steel ring encircled the interior zone that encloses in wherein gas outlet and water inlet pipe passed to, and said grout outlet passes to the zone between the inside and outside steel ring; Measure the joint gap between the upper and lower die trial; The slurries that configure are injected in the zone between the inside and outside steel ring through said Grouting Pipe, have slurries to overflow, stop slip casting until slurry outlet; After treating institute's injection slurry stable in properties, apply water pressure to a certain size, observe water pressure and can keep stable at the appointed time, thereby the hydraulic pressure resistance performance of injecting paste material is made preliminary conclusion through water inlet pipe.
Preset certain thickness annular rubber ring between inside and outside steel ring and upper testing mould is in order to reduce the concentration of local stress between steel ring and the upper testing mould.
Before the slip casting, with the interim shutoff seam of the quick hardening cement outside.
Advantage of the present invention is; Through above-mentioned test unit, can make judgement to the leak stopping effect of lost circulation material intuitively, simultaneously for the lost circulation material that possesses certain non-deformability; Can pass through above-mentioned test unit, clearly draw the quantization index value of its resistance to deformation through test.
Embodiment
Through embodiment characteristic of the present invention and other correlated characteristic are done further explain below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
Shown in Fig. 1-3, label 1-13 representes respectively: Grouting Pipe 1, upper bracket 2, gas outlet 3, water inlet pipe 4, grout outlet 5, upper testing mould 6, screw rod 7, lower testing mould 8, undersetting 9, outer rim 10, interior steel ring 11, screw rod 12, nut 13.
The tunnel seam plugging test method that present embodiment relates to adopts following steps:
Adopt two block concrete die trials; Be upper testing mould 6, lower testing mould 8, what upper bracket 2 and undersetting 9 all adopted is iron plate, and upper testing mould 6 is built on the bottom surface of upper bracket 2; Lower testing mould 8 is built on the end face of undersetting 9; Upper and lower bearing 2, between 9 through four screw rods 12, that nut 13 connects supporting is fixing, steel ring 11, outer rim 10 are placed with Grouting Pipe 1 between upper testing mould 6, lower testing mould 8, placing on the sidewall of outer rim 10; In upper testing mould 1, reserve three pipelines; Be gas outlet 3, water inlet pipe 4 and grout outlet 5, the interior zone that 11 rings of steel ring enclosed in wherein gas outlet 3 passed to water inlet pipe 4 is in the zone in grout outlet 5 passes between steel ring 11 and the outer rim 10.
Preset certain thickness annular rubber ring between interior steel ring 10, outer rim 11 and upper testing mould 6 is in order to reduce the concentration of local stress between steel ring and the upper testing mould.
Turn nut and be fixed upper and lower die trial temporarily, and, record 3 values at least along circumference with the joint gap between the upper and lower die trial of vernier caliper measurement;
Prepare the elastic epoxy slurries to scale, pour in the grouting pump then.Smear a little quick hardening cement on interior steel ring 10 surfaces, flow into the pore that interior steel ring is blocked water inlet pipe 4, gas outlet 3 in order to prevent water sample elastic epoxy slurries.Place upper and lower die trial, need note avoiding the pore of Grouting Pipe 1 this moment with the interim shutoff seam of the quick hardening cement outside.
Connect Grouting Pipe 1, then Grouting Pipe 1 is linked to each other with grouting equipment, beginning slip casting is injected into the slurries that configure in the zone between the inside and outside steel ring through said Grouting Pipe, has slurries to overflow until slurry outlet.The slip casting flexible pipe is bent upwards and uses the iron wire colligation, in case slurries ooze out from grouting hole;
After treating that the elastic epoxy slurries solidify basically, remove the quick hardening cement of outer rim 10 seam crossings, wait for about 14 days of elastic epoxy slurry material stable in properties.
Carry out the pressurization of device again, promptly apply water pressure to 0.3MPa, observe water pressure and in 2 hours, can keep stable through water inlet pipe 4;
Pressurize after 2 hours, the record experimental phenomena is made preliminary conclusion to the hydraulic pressure resistance performance of the injecting paste material of elastic epoxy slurries.
Whether turn the nut at four screw rod tops in turn, make upper testing mould 6 slow rising 0.5mm, use the vernier caliper measurement joint gap, guarantee that new joint gap reaches the requirement of new operating mode, observing has percolating water phenomenon again.