CN206581280U - A kind of device for emergent precipitation of being constructed for basement foundation ditch - Google Patents

A kind of device for emergent precipitation of being constructed for basement foundation ditch Download PDF

Info

Publication number
CN206581280U
CN206581280U CN201720261506.7U CN201720261506U CN206581280U CN 206581280 U CN206581280 U CN 206581280U CN 201720261506 U CN201720261506 U CN 201720261506U CN 206581280 U CN206581280 U CN 206581280U
Authority
CN
China
Prior art keywords
casing
emergent
foundation ditch
constructed
precipitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720261506.7U
Other languages
Chinese (zh)
Inventor
竺维彬
米晋生
朱育宏
钟长平
黄威然
马子皓
李阶智
刘乐元
朱统步
祝思然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Original Assignee
GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd filed Critical GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Priority to CN201720261506.7U priority Critical patent/CN206581280U/en
Application granted granted Critical
Publication of CN206581280U publication Critical patent/CN206581280U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

There is the casing of opening the utility model discloses a kind of device for emergent precipitation of being constructed for basement foundation ditch, including bottom, the casing is provided with drainage gallery and slip casting passage.Using the utility model, cover occurring that water burst gushes sand ground point and indwelling drainage gallery reduces groundwater pressure on casing by casing, so as to during the secondary excavation in later stage, weaken adverse effect of the ground water pressure to substrate significantly.

Description

A kind of device for emergent precipitation of being constructed for basement foundation ditch
Technical field
The utility model is related to road construction field, and in particular to a kind of dress for emergent precipitation of being constructed for basement foundation ditch Put.
Background technology
Substantial amounts of basement foundation ditch excavation construction is included in civil engineering, but during excavation of foundation pit, may be sent out The husky situation of swelling swelling under the dried rhizome of rehmannia, for example, dash forward and meet high water head underground bearing water, fractured zones or foundation pit enclosure structure construction Gap is excessive etc..At present under this urgent accident, traditional treatment method be by direct fill concrete or the earthwork come Carry out back-pressure;Or the directly water filling into foundation ditch, to balance ground water pressure.
This traditional processing method fundamentally can not solve the problem of water burst gushes sand.For example, using concrete or This method that husky point is backfilled is gushed in the earthwork to water burst, and water burst can be caused to gush husky point and be transferred to the weak part of other substrates, Or foundation ditch is penetrated into by the hole between soil body particle.If using the method for water filling, follow-up excavation work band can be given Carry out many inconvenience.
The main weak point of prior art processing method is listed below:
1st, handled due to carrying out the principle of balancing water pressure merely by the recovery original load in excavation face top, it is impossible to from root Ground water pressure is cut down in sheet and applies the venture influence brought to follow-up foundation ditch;
2nd, it is necessary to put into the backfill operation that substantial amounts of human and material resources carry out true generous amount in processing procedure;Treat Chu Liwan Secondary excavation is needed again after finishing, therefore adds construction investment amount;
3rd, backfill, reinforce, precipitation can not be carried out synchronously, the influence to construction speed is larger.
Utility model content
In view of the shortcomings of the prior art, the utility model is aimed to provide a kind of constructs emergent precipitation for basement foundation ditch Device, realizes that more effective water burst gushes the processing of husky emergency case.
To achieve these goals, the utility model is adopted the following technical scheme that:
A kind of device for emergent precipitation of being constructed for basement foundation ditch, including bottom have the casing of opening, the casing It is provided with drainage gallery and slip casting passage.
Further, the casing is communicated with three-way pipe ball valve as drainage gallery;In addition, the top of the casing is provided with At least one set of pipeline with ball valve is used as drainage gallery and slip casting passage.
Further, the pipeline is mainly formed by connecting by more piece body by way of screw thread or buckle.
Further, the bottom margin of the casing is connected with skirtboard, and the skirtboard is main by sponge underlay and rubber face Layer composition.
Further, the outside of the casing is provided with hanger.
Further, the bottom inside the casing is provided with filter screen.
The beneficial effects of the utility model are:
1st, sand ground point is gushed occurring water burst by the way that casing is covered, and indwelling drainage gallery reduces ground water pressure on casing Power, so that during the secondary excavation in later stage, influence of the ground water pressure to base will weaken significantly;
2nd, because by drainage gallery, groundwater effect can progressively reduce in the pressure of substrate, can save backfill back-pressure Side amount, so as to save a part of investment.It can in addition contain realize that backfill back-pressure, precipitation, reinforcing can be carried out synchronously, reduce pair The influence of construction speed.
3rd, backfill back-pressure, precipitation, reinforcing can be carried out synchronously, reduce the influence to construction speed.
Brief description of the drawings
Fig. 1 is cross section structure schematic diagram of the present utility model.
Embodiment
Below with reference to accompanying drawing, the utility model will be further described, it is necessary to which explanation, the present embodiment is with this skill Premised on art scheme, detailed embodiment and specific operating process are given, but protection domain of the present utility model is not It is limited to the present embodiment.
As shown in figure 1, a kind of device for emergent precipitation of being constructed for basement foundation ditch, including bottom have the casing of opening 1 (can use steel pile casting), the casing 1 is provided with drainage gallery and slip casting passage.
The method for carrying out the emergent precipitation of basement foundation ditch construction using described device is:
If 1) broke-out diseases gush husky phenomenon, described device is hung and covers substrate water burst and gushes husky position, and scheduling job people Member gushes husky region fill concrete or the earthwork to carry out back-pressure around casing to water burst;
2) sluiced by drainage gallery, drainage gallery is connected to extension pipeline, led to water pair by water pump Engineering devoid of risk position;
3) while water-pumping/draining, carry out slip casting around foundation ditch and at substrate position, reinforce;
4) after treating that ground water pressure is stable, slip casting closure is carried out by slip casting passage.
Further, the casing 1 is communicated with three-way pipe ball valve 2 as drainage gallery;In addition, the top of the casing 1 Provided with least one set, the pipeline 3 with ball valve 32 is used as drainage gallery and slip casting passage.
When in use, by three-way pipe ball valve connection extension pipeline, the extension pipeline is connected to water pump, is starting to sluice When, open three-way pipe ball valve and export to water to engineering devoid of risk position through extension pipeline by water pump.It is described with ball valve Pipeline can both make drainage gallery, can also be used as slip casting passage.When water is larger, three-way pipe ball valve, which sluices, can not meet requirement When, can the ball valves of opening conduits together sluiced using the pipeline.Multigroup pipeline can be set, according to reality when specifically used Need to determine that opening a how many group pipelines is together sluiced.It is to be seen to arrive after ground water pressure stabilization, then entered by the pipeline Row slip casting is blocked.
Further, the pipeline 3 is mainly formed by connecting by more piece body 31 by way of screw thread or buckle.It is described Pipeline can be according to head size spreading.
Further, the bottom margin of the casing 1 is connected with skirtboard 4, and the skirtboard 4 is main by sponge underlay 42 and rubber Glue surface layer 41 is constituted.Foundation ditch is usually out-of-flatness, by soft and skirtboard that flexible sponge and rubber constitutes contributes to Stable and sealing steel cylinder, ballast is on skirtboard when fill concrete or the earthwork.
Further, the outside of the casing 1 is provided with hanger 5.The setting of hanger can facilitate the lifting of described device.
Further, the bottom inside the casing 1 is provided with filter screen 6.The filter screen can use close mesh Steel net, mainly For filtering the debris such as the sandstone in the water released, drainage gallery can be avoided to block, while avoiding soil particle from outflowing with water generation Stratum Loss, causes surrounding formations to sink.The filter screen should be adjusted according to geological condition, in this way the less fine sand of particle Layer, should select the less filter screen of mesh number.The larger stratum of particle, the filter screen that mesh number should be selected larger in this way.
For those skilled in the art, technical scheme that can be more than and design, make various corresponding Change and deform, and all these change and deformation should be construed as being included in the utility model scope of the claims it It is interior.

Claims (6)

1. a kind of device for emergent precipitation of being constructed for basement foundation ditch, it is characterised in that there is the casing of opening including bottom, The casing is provided with drainage gallery and slip casting passage.
2. the device of emergent precipitation according to claim 1 of being constructed for basement foundation ditch, it is characterised in that the casing Three-way pipe ball valve is communicated with as drainage gallery;In addition, the top of the casing is provided with least one set of pipeline conduct with ball valve Drainage gallery and slip casting passage.
3. the device of emergent precipitation according to claim 2 of being constructed for basement foundation ditch, it is characterised in that the pipeline Mainly it is formed by connecting by more piece body by way of screw thread or buckle.
4. the device of emergent precipitation according to claim 1 of being constructed for basement foundation ditch, it is characterised in that the casing Bottom margin be connected with skirtboard, the skirtboard is mainly made up of sponge underlay and rubber surface layer.
5. the device of emergent precipitation according to claim 1 of being constructed for basement foundation ditch, it is characterised in that the casing Outside be provided with hanger.
6. the device of emergent precipitation according to claim 1 of being constructed for basement foundation ditch, it is characterised in that the casing Internal bottom is provided with filter screen.
CN201720261506.7U 2017-03-17 2017-03-17 A kind of device for emergent precipitation of being constructed for basement foundation ditch Active CN206581280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720261506.7U CN206581280U (en) 2017-03-17 2017-03-17 A kind of device for emergent precipitation of being constructed for basement foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720261506.7U CN206581280U (en) 2017-03-17 2017-03-17 A kind of device for emergent precipitation of being constructed for basement foundation ditch

Publications (1)

Publication Number Publication Date
CN206581280U true CN206581280U (en) 2017-10-24

Family

ID=60114332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720261506.7U Active CN206581280U (en) 2017-03-17 2017-03-17 A kind of device for emergent precipitation of being constructed for basement foundation ditch

Country Status (1)

Country Link
CN (1) CN206581280U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867653A (en) * 2018-07-31 2018-11-23 济南轨道交通集团有限公司 A kind of pore type soil layer Foundation Pit Pouring quick treatment device and method
CN109339086A (en) * 2018-10-17 2019-02-15 中国冶集团有限公司 For dummy seal cover and application method under the concrete water of piping
CN114182747A (en) * 2022-01-04 2022-03-15 北京建工集团有限责任公司 Foundation pit dewatering device for emergency construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867653A (en) * 2018-07-31 2018-11-23 济南轨道交通集团有限公司 A kind of pore type soil layer Foundation Pit Pouring quick treatment device and method
CN109339086A (en) * 2018-10-17 2019-02-15 中国冶集团有限公司 For dummy seal cover and application method under the concrete water of piping
CN114182747A (en) * 2022-01-04 2022-03-15 北京建工集团有限责任公司 Foundation pit dewatering device for emergency construction

Similar Documents

Publication Publication Date Title
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN206581280U (en) A kind of device for emergent precipitation of being constructed for basement foundation ditch
CN107761753B (en) A kind of foundation pit water burst rapid rescue slip casting method for blocking
JP2013535597A (en) In-situ leaching method by liquid injection
CN106703692A (en) Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN104947650B (en) Grouting behind shaft or drift lining closed reinforcing method after sand drain piling prepressing
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN206941616U (en) A kind of coating bank protection discharge structure
CN110685272B (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN105274994B (en) Anti-suck sludge proof grouting process and grouting device in deep saturated sand
CN106869154A (en) The flow control system and method for the dynamic water karst of closure high speed, big flow
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN204715341U (en) A kind of Grouting Pipe for miscellaneous fill stratum
CN108316250A (en) Technology and construction method are cleared using the silt that stops for dynamically stopping silt storage capacity separation mud-rock flow
CN205662938U (en) Drainage excavation structure falls in foundation ditch
CN101229951B (en) Bottom soft vacuum method for pumping surface water of sullage yard
CN204753654U (en) Underground continuous wall reentrant corner position piping block structure
CN206844136U (en) Closure high speed, big flow move the flow control system of water karst
CN106400751A (en) Sand blocking ridge structure and construction process thereof
CN207143849U (en) A kind of man-made lake polycrystalline substance for improving water body self-purification ability
CN107044140A (en) Plane grout cover water burst mouthful flow control device and construction technology
CN104929564A (en) High-pressure water hole grouting and feeding device
CN204849791U (en) Structure of earth rock cofferdam prevention of seepage system
CN208395782U (en) Using the row's guide structure for dynamically stopping silt storage capacity separation mud-rock flow
CN203768927U (en) Flexible underground impervious curtain structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant