CN206581269U - A kind of novel universal is replaced and beaten - Google Patents
A kind of novel universal is replaced and beaten Download PDFInfo
- Publication number
- CN206581269U CN206581269U CN201720156004.8U CN201720156004U CN206581269U CN 206581269 U CN206581269 U CN 206581269U CN 201720156004 U CN201720156004 U CN 201720156004U CN 206581269 U CN206581269 U CN 206581269U
- Authority
- CN
- China
- Prior art keywords
- plectane
- pipe
- buddha
- hand
- square tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model is a kind of novel universal to beat, including Buddha's hand and for beating body, the Buddha's hand is located to beat this body side surface, the Buddha's hand is a sliding sleeve, the Buddha's hand is operationally enclosed on the location-plate beside stake, it is described for beat body include pipe A, plectane A, pipe B, plectane B, pipe C and square tube, the pipe A, plectane A, pipe B, plectane B and pipe C are sequentially coaxially arranged from top to bottom, the square tube is below plectane B and coaxial with plectane B, and the square tube is in pipe C;Described replace beats outer body face provided with deep floor;The base of the square tube is outwards tilted;Hanger is provided with the top of the Buddha's hand;The diameter of the plectane B is more than plectane A;The utility model can operate with the work that sets of steel-pipe pile and concrete square pile, and centre need not be changed to beat, save a large amount of manpower and materials and time, improve operating efficiency, reduce construction cost.
Description
Technical field
The utility model is related to harbour stake platform technical field of construction, more particularly to a kind of novel universal to beat.
Background technology
In the work progress of harbour, influenceed by construction waters, preceding stake platform and the rear stake platform of harbour are used sometimes
Different stakes, conventional stake, which has, occurs steel-pipe pile and concrete square pile alternating in steel-pipe pile and concrete square pile, work progress
Situation about setting, piling needs are used for beating, and for the top that is placed on stake is beaten during piling, pile hammer impact, which is replaced, beats, completion pile sinking work
Make.It is existing often special for beating for beating, when steel-pipe pile and concrete square pile are alternately set, it is necessary to change different replace
Beat, being changed for sounding the night watches wastes time and energy, when the quantity of especially stake is more, can cause the serious reduction of efficiency of construction, add construction
Cost.
The content of the invention
The utility model aims to solve the problem that the deficiencies in the prior art, and provides a kind of novel universal to beat.
The utility model to achieve the above object, using following technical scheme:A kind of novel universal for beating, including Buddha's hand with
For body is beaten, the Buddha's hand is located to beat this body side surface, and the Buddha's hand is a sliding sleeve, and the Buddha's hand is operationally enclosed on beside stake
Location-plate on, it is described for beat body include pipe A, plectane A, pipe B, plectane B, pipe C and square tube, the pipe A, plectane
A, pipe B, plectane B and pipe C are sequentially coaxially arranged from top to bottom, and the square tube is below plectane B and coaxial with plectane B,
The square tube is in pipe C.
Described replace beats outer body face provided with deep floor.
The base of the square tube is outwards tilted.
Hanger is provided with the top of the Buddha's hand.
The diameter of the plectane B is more than plectane A.
The beneficial effects of the utility model are:What the utility model can operate with steel-pipe pile and concrete square pile sets work
Make, centre need not be changed to beat, and save a large amount of manpower and materials and time, improve operating efficiency, reduce construction cost.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is upward view of the present utility model;
In figure:1- Buddha's hands;2- hangers;3- pipes A;4- plectanes A;5- pipes B;6- plectanes B;7- pipes C;8- square tubes;9-
Deep floor;
It is described in detail referring to the drawings below with reference to embodiment of the present utility model.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
As shown in FIG. 1 to 3, a kind of novel universal is for beating, including Buddha's hand 1 and for beating body, and the Buddha's hand 1 is beaten located at replacing
This body side surface, the Buddha's hand 1 is a sliding sleeve, and the Buddha's hand 1 is operationally enclosed on the location-plate beside stake, and described replace beats body
Including pipe A3, plectane A4, pipe B5, plectane B6, pipe C7 and square tube 8, the pipe A3, plectane A4, pipe B5, plectane B6
Sequentially coaxially arranged from top to bottom with pipe C7, the square tube 8 is located at plectane B6 lower sections and, the square tube 8 coaxial with plectane B6
In pipe C7.
Described replace beats outer body face provided with deep floor 9.
The base of the square tube 8 is outwards tilted.
The top of Buddha's hand 1 is provided with hanger 2.
The diameter of the plectane B6 is more than plectane A4.
During work, when setting steel-pipe pile, pipe C7 is enclosed on steel-pipe pile, when setting concrete square pile, and square tube 8 is enclosed on coagulation
In earthwork stake, Buddha's hand 1 is enclosed on the location-plate beside stake, at the top of pile hammer impact pipe A3, completes pile sinking work;Square tube base
Outwards tilt, more successfully can be enclosed on concrete square pile.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model implement not by
The limitation of aforesaid way, if the various improvement that method design of the present utility model and technical scheme are carried out are employed, or without
Improvement directly applies to other occasions, within protection domain of the present utility model.
Claims (5)
1. a kind of novel universal is for beating, including Buddha's hand (1) and for beating body, the Buddha's hand (1) beats this body side surface located at replacing, described
Buddha's hand (1) is a sliding sleeve, and the Buddha's hand (1) is operationally enclosed on the location-plate beside stake, it is characterised in that described replace beats this
Body includes pipe A (3), plectane A (4), pipe B (5), plectane B (6), pipe C (7) and square tube (8), the pipe A (3), plectane
A (4), pipe B (5), plectane B (6) and pipe C (7) are sequentially coaxially arranged from top to bottom, and the square tube (8) is located at plectane B (6)
Lower section and with plectane B (6) coaxially, the square tube (8) is in the pipe C (7).
2. novel universal according to claim 1 is replaced and beaten, it is characterised in that described replace beats outer body face provided with ribs
Plate (9).
3. novel universal according to claim 1 is replaced and beaten, it is characterised in that the base of the square tube (8) is outwards tilted.
4. novel universal according to claim 1 is replaced and beaten, it is characterised in that hanger (2) is provided with the top of the Buddha's hand (1).
5. novel universal according to claim 1 is replaced and beaten, it is characterised in that the diameter of the plectane B (6) is more than plectane A
(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720156004.8U CN206581269U (en) | 2017-02-21 | 2017-02-21 | A kind of novel universal is replaced and beaten |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720156004.8U CN206581269U (en) | 2017-02-21 | 2017-02-21 | A kind of novel universal is replaced and beaten |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206581269U true CN206581269U (en) | 2017-10-24 |
Family
ID=60091475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720156004.8U Active CN206581269U (en) | 2017-02-21 | 2017-02-21 | A kind of novel universal is replaced and beaten |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206581269U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241732A (en) * | 2019-06-03 | 2019-09-17 | 中铁大桥局集团有限公司 | One kind is replaced and beats device |
-
2017
- 2017-02-21 CN CN201720156004.8U patent/CN206581269U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241732A (en) * | 2019-06-03 | 2019-09-17 | 中铁大桥局集团有限公司 | One kind is replaced and beats device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201148614Y (en) | Gas assist vibration punching stone column construction equipment | |
CN206581269U (en) | A kind of novel universal is replaced and beaten | |
CN102425389A (en) | Bore-bottom slag removing method for cast-in-place pipe bore in underground river, slag taking-out barrel and slag-removing blowing system | |
CN205171521U (en) | A device that is used for tubular pile stake core to clear up | |
CN207130765U (en) | A kind of Construction of Civil Engineering retaining wall with greening and discharge structure | |
CN207484538U (en) | Novel building shovels | |
CN206477345U (en) | Auto-drainage control water type slope protection structure | |
CN205617361U (en) | Cast in situ concrete major diameter tubular pile | |
CN208650521U (en) | It can simply pacify and tear formula concrete discharging tumbling barrel open | |
CN203440824U (en) | Wall-protecting mold board for artificially excavating electric pole pit | |
CN203891028U (en) | Supporting structure of reinforced steel sheet piles and core tube bracings in deep foundation pit | |
CN207525739U (en) | A kind of underwater directional vehicle steel pile casting with construction operation platform | |
CN108301405B (en) | The connection structure of assembled steel pipe concrete-pile and reinforced beam | |
CN202644527U (en) | Detachable steel casing of variable-section drilling filling pile | |
CN205636731U (en) | Follow -on steel protects a section of thick bamboo | |
CN201943071U (en) | Implantable steel tube anchor rod with stabs | |
CN206633190U (en) | A kind of electric pole produces material filling system | |
CN206625324U (en) | Easy desilting piping shaft | |
CN109252534A (en) | A kind of foundation pile structure | |
CN205294766U (en) | Run -up jimmy | |
CN207245212U (en) | Novel wall building is shoveled with mud | |
CN108455117A (en) | A kind of not dumping dustbin | |
CN208328981U (en) | A kind of portable retaining wall recessed joint handling implement | |
CN211368346U (en) | Bridge construction bracket constructional device | |
CN204510218U (en) | A kind of simple and easy pile follower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |