- CN206562906U CN206562906U CN201720073909.9U CN201720073909U CN206562906U CN 206562906 U CN206562906 U CN 206562906U CN 201720073909 U CN201720073909 U CN 201720073909U CN 206562906 U CN206562906 U CN 206562906U
- Authority
- CN
- China
- Prior art keywords
- support bar
- shelf
- climbing
- pole
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 230000005540 biological transmission Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000002887 superconductor Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of construction ladder of power construction, including terraced body, the terraced body includes two symmetrically arranged supporting modules, the supporting module includes support bar, pole-climbing is provided with position between two support bars, position in the middle is provided with shelf between two support bars, extension rod is provided with the position of the support bar top surface, six fixed screws are provided between the extension rod and the support bar, the contiguous block of circle is provided with position at the top of the extension rod, fixing axle is connected with position between the contiguous block;The device is provided with shelf by the middle position in construction ladder, the instrument of some needs can be just placed on shelf by such workmen, directly used when needs, while progress carrying construction ladder on shelf can also be placed the tool above, it is not necessary to worry that instrument slides.
Description
Technical field
The utility model is related to a kind of construction ladder of power construction.
Background technology
Electric energy because being easy to change, transmit, control, after the eighties in 19th century, steam power is progressively replaced, as existing
For social material civilization and the technical foundation of spiritual civilization, after 20th century, the production of electric energy mainly by thermal power plant, power station and
Nuclear power station, conditional place is also generated electricity using tide, underground heat and wind energy, and the conveying and distribution of electric energy are main by high and low
Alternating electromotive force network is pressed to realize, the direction developed as power transmission engineering technology, its emphasis is research extra-high voltage(1000000 volts with
On)Ac transmission and HVDC Transmission Technology, form bigger electric power networks;Also to study the technology of superconductor electrical energy transportation simultaneously
Problem, the large-scale power system that 20th century occurred integrates generating, transmission of electricity, power transformation, distribution, all links of electricity consumption organic whole for one
Body, as spatial extent in social materialss production division is most wide, time coordination is strict, the level division of labor extremely complicated entity project system
System.
During power construction, wire typically can be all arranged at overhead position, repairing or monitoring this section
It is accomplished by using aerial device in the wire process in region, the ascending tool such as ladder, but this kind of instrument is often only stepped on
High function, when being repaired or being detected, those instruments do not have local placement, based on above mentioned problem, it is desirable to provide Yi Zhongke
To solve the construction ladder of problem.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of construction ladder of power construction, and the device is by applying
The middle position of work ladder is provided with shelf, and the instrument of some needs can be just placed on shelf by such workmen
It is upper, it is necessary to when directly use, carrying construction ladder is carried out on shelf while can also place the tool above, it is not necessary to worry
Instrument slides.
To solve the above problems, the utility model is adopted the following technical scheme that:
A kind of construction ladder of power construction, including terraced body, the terraced body include two symmetrically arranged supporting modules, institute
Stating supporting module includes support bar, and the support bar is provided with two, and two support bars are symmetrical arranged, the support bar bottom
It is provided with the position in portion at the position between valve rubber, two support bars and is provided with pole-climbing, the pole-climbing is provided with two
More than root, it is welded and fixed between the pole-climbing and the support bar, the pole-climbing is horizontally installed between two support bars
Position at, position in the middle is provided with shelf between two support bars, the shelf arranged on left and right sides is leaned on
Be provided with extension block at the position of nearly bottom, the extension block and the shelf are integral type structure, the support bar it is interior
The kelly for coordinating the extension block is provided with side position, is integral type structure between the kelly and the support bar, it is described
Extension block position in the middle is provided with the neck for coordinating the kelly, and the neck extends transversely through the extension block, the card
Groove top and bottom is provided with block at the position in left side, and the block is integral type structure with extension block, described in two pieces
Fixing bolt is provided with the left surface position of block, the fixing bolt is connected with the kelly, two support bars
Inner side is provided with fix bar at the position at the top of the shelf, and the fix bar is integral type knot with the support bar
Extension rod is provided with structure, the position of the support bar top surface, six are provided between the extension rod and the support bar admittedly
Determine to be provided with the position at the top of screw, the extension rod and be connected with the position between the contiguous block of circle, the contiguous block
Fixing axle.
Preferably, the valve rubber top surface position in the middle is provided with the groove for coordinating the support bar, the support
Bar is arranged in the groove;It is fluted by setting, make support bar that enhanced convenience to be installed.
Preferably, the pole-climbing is that tread plate is provided with square tube, the top side location of the pole-climbing, and the tread plate is horizontal
On the top surface for being arranged on the pole-climbing, the tread plate is integral type structure with the pole-climbing;By being provided with tread plate, it can increase
Plus the frictional force between sole and pole-climbing.
Preferably, it is provided with projection at the front end face position of the shelf, the projection is provided with more than two pieces, described
Projection is integral type structure with the shelf;By being provided with projection, when placing the tool above on shelf, it is not necessary to worry work
Has pulley.
The beneficial effects of the utility model are:The device in the middle position of construction ladder by being provided with shelf, such as
This workmen just can by some needs instrument be placed on shelf, it is necessary to when directly use, while also may be used
To place the tool above progress carrying construction ladder on shelf, it is not necessary to worry that instrument slides, the structure of the present apparatus is relatively simple, into
This is more cheap, is adapted to promote the use of.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only
It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is front view of the present utility model;
Fig. 2 is left view of the present utility model;
Fig. 3 is A enlarged drawing.
Embodiment
Preferred embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings, so that advantage of the present utility model
It can be easier to be readily appreciated by one skilled in the art with feature, so as to make protection domain of the present utility model apparent clear and definite
Define.
Refering to a kind of construction ladder of power construction shown in Fig. 1, Fig. 2 and Fig. 3, including terraced body 1, the terraced body 1 includes
Two symmetrically arranged supporting modules 101, the supporting module 101 includes support bar 102, and the support bar 102 is provided with two
Root, two support bars 102 are symmetrical arranged, and valve rubber 103, two institutes are provided with the position of the bottom of support bar 102
State and pole-climbing 104 be provided with the position between support bar 102, the pole-climbing 104 is provided with more than two, the pole-climbing 104 with
It is welded and fixed between the support bar 102, the pole-climbing 104 is horizontally installed at the position between two support bars 102,
Position in the middle is provided with shelf 2 between two support bars 102, the arranged on left and right sides of shelf 2 is the bottom of close to
Extension block 201 is provided with the position in portion, the extension block 201 is integral type structure, the support bar with the shelf 2
Be provided with the kelly 202 for coordinating the extension block 201 at 102 inner side, the kelly 202 and the support bar 102 it
Between be integral type structure, the position in the middle of extension block 201 is provided with the neck 203 for coordinating the kelly 202, the card
Groove 203 extends transversely through the extension block 201, and the top and bottom of neck 203 is provided with block at the position in left side
204, the block 204 is to be provided with integral type structure, the left surface position of two pieces of blocks 204 admittedly with extension block 201
Determine bolt 205, the fixing bolt 205 is connected with the kelly 202, two inner sides of support bar 102 are put close to described
Fix bar 206 is provided with the position at the top of thing plate 2, the fix bar 206 is integral type structure, institute with the support bar 102
Extension rod 105 is provided with the position for stating the top surface of support bar 102, is provided between the extension rod 105 and the support bar 102
The contiguous block 107 of circle, the contiguous block 107 are provided with six fixed screws 106, the position at the top of extension rod 105
Between position at be connected with fixing axle 108.
A preferred embodiment in the utility model, the top surface position in the middle of valve rubber 103 is provided with cooperation
The groove of the support bar 102(It is not shown), the support bar 102 is arranged in the groove;It is fluted by setting, make branch
Strut installs enhanced convenience.
A preferred embodiment in the utility model, the pole-climbing 104 is square tube, the top side location of the pole-climbing 104
Place is provided with tread plate 109, and the tread plate 109 is horizontally installed on the top surface of the pole-climbing 104, the tread plate 109 with
The pole-climbing 104 is integral type structure;By being provided with tread plate, the frictional force between sole and pole-climbing can be increased.
Projection 207 is provided with a preferred embodiment in the utility model, the front end face position of the shelf 2,
The projection 207 is provided with more than two pieces, and the projection 207 is integral type structure with the shelf 2;It is convex by being provided with
Block, when placing the tool above on shelf, it is not necessary to worry instrument pulley.
The beneficial effects of the utility model are:The device in the middle position of construction ladder by being provided with shelf, such as
This workmen just can by some needs instrument be placed on shelf, it is necessary to when directly use, while also may be used
To place the tool above progress carrying construction ladder on shelf, it is not necessary to worry that instrument slides, the structure of the present apparatus is relatively simple, into
This is more cheap, is adapted to promote the use of.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, the utility model can also on the premise of the utility model spirit and scope are not departed from
There are various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model will
Protection domain is asked to be defined by appended claims and its equivalent.
Claims (4)
1. a kind of construction ladder of power construction, it is characterised in that:Including terraced body, the terraced body includes two symmetrically arranged branch
Hold mode block, the supporting module includes support bar, and the support bar is provided with two, and two support bars are symmetrical arranged, institute
It is provided with the position for stating support bar bottom at the position between valve rubber, two support bars and is provided with pole-climbing, it is described to climb
Bar is provided with more than two, is welded and fixed between the pole-climbing and the support bar, and the pole-climbing is horizontally installed on described in two
At position between support bar, position in the middle is provided with shelf, the shelf between two support bars
Arranged on left and right sides is provided with extension block at the position of bottom, and the extension block is integral type structure with the shelf, described
The kelly for coordinating the extension block is provided with the inner side of support bar, is integral type between the kelly and the support bar
Structure, the extension block position in the middle is provided with the neck for coordinating the kelly, and the neck extends transversely through the extension
Block, the neck top and bottom is provided with block at the position in left side, and the block is integral type structure with extension block,
Fixing bolt is provided with the left surface position of two pieces of blocks, the fixing bolt is connected with the kelly, two institutes
State and be provided with fix bar on the inside of support bar at the position at the top of the shelf, the fix bar is one with the support bar
Extension rod is provided with body formula structure, the position of the support bar top surface, is provided between the extension rod and the support bar
It is provided with position at the top of six fixed screws, the extension rod at the position between the contiguous block of circle, the contiguous block
It is connected with fixing axle.
2. the construction ladder of power construction according to claim 1, it is characterised in that:Position in the middle of the valve rubber top surface
The place of putting is provided with the groove for coordinating the support bar, and the support bar is arranged in the groove.
3. the construction ladder of power construction according to claim 1, it is characterised in that:The pole-climbing is square tube, described to climb
Tread plate is provided with the top side location of bar, the tread plate is horizontally installed on the top surface of the pole-climbing, the tread plate with
The pole-climbing is integral type structure.
4. the construction ladder of power construction according to claim 1, it is characterised in that:The front end face position of the shelf
Place is provided with projection, and the projection is provided with more than two pieces, and the projection is integral type structure with the shelf.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720073909.9U CN206562906U (en) | 2017-01-21 | 2017-01-21 | A kind of construction ladder of power construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720073909.9U CN206562906U (en) | 2017-01-21 | 2017-01-21 | A kind of construction ladder of power construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206562906U true CN206562906U (en) | 2017-10-17 |
Family
ID=60028972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720073909.9U Expired - Fee Related CN206562906U (en) | 2017-01-21 | 2017-01-21 | A kind of construction ladder of power construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206562906U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114135217A (en) * | 2021-10-13 | 2022-03-04 | 福建海电运维科技有限责任公司 | Telescopic ladder for boarding |
-
2017
- 2017-01-21 CN CN201720073909.9U patent/CN206562906U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114135217A (en) * | 2021-10-13 | 2022-03-04 | 福建海电运维科技有限责任公司 | Telescopic ladder for boarding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105271010B (en) | From climbing crane | |
CN204780563U (en) | Gate -type steel of installing hydroelectric power generation system constructs bridge | |
CN206562906U (en) | A kind of construction ladder of power construction | |
CN206233852U (en) | A kind of Portable lifting transmission platform | |
CN201466574U (en) | Device for isoelectrically replacing insulator and accessory of iron tower of transmission line | |
CN204597415U (en) | A kind of safety high-pressure Electric wire support | |
CN105932560A (en) | Power distribution cabinet convenient to repair | |
CN205792359U (en) | Telescopic device of solar generating with wind-power electricity generation | |
CN206712336U (en) | Shaft tower cable platform work protective cradle | |
CN110190551A (en) | A kind of route cleaning and maintenance equipment used for transmission line | |
CN204676932U (en) | The solar airflow generating sunlight booth that braced structures is stable | |
CN208587000U (en) | Novel enclosure based on ultra-high-tension power transmission line | |
CN207829439U (en) | High-altitude maintenance safety device | |
CN207625501U (en) | A kind of solar power plant's photovoltaic panel pedestal | |
CN206753473U (en) | A kind of anti-tip insulating ladder of substation equipment maintenance and repair operation | |
CN206922686U (en) | A kind of very useful solar power plant of photovoltaic green-house | |
CN205348931U (en) | Novel steel pylons base | |
CN206225848U (en) | Bridge-type high-voltage board installs suspension and support | |
CN205681021U (en) | A kind of instrument exempting from lifting replacing lightning arrester base porcelain vase | |
CN204571798U (en) | The special installation ladder of a kind of dynamometer instrument case | |
CN215895630U (en) | High-efficient reminding device in electric power engineering construction site danger area | |
CN204938709U (en) | A kind of ceiling mount bracket of Novel movable rotor | |
CN212258868U (en) | Adjustable photovoltaic board installing support based on photovoltaic power plant uses | |
CN206947102U (en) | A kind of transformer being easily installed | |
CN216584023U (en) | A supplementary erection equipment for electric power engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171017 Termination date: 20180121 |
|
CF01 | Termination of patent right due to non-payment of annual fee |