CN206556460U - A kind of concrete air blast open cooling tower - Google Patents

A kind of concrete air blast open cooling tower Download PDF

Info

Publication number
CN206556460U
CN206556460U CN201621483170.0U CN201621483170U CN206556460U CN 206556460 U CN206556460 U CN 206556460U CN 201621483170 U CN201621483170 U CN 201621483170U CN 206556460 U CN206556460 U CN 206556460U
Authority
CN
China
Prior art keywords
water
cooling tower
air
open cooling
filler assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621483170.0U
Other languages
Chinese (zh)
Inventor
贺颂钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU LAXUN TECHNOLOGY EXPLOIT Co Ltd
Original Assignee
GUANGZHOU LAXUN TECHNOLOGY EXPLOIT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU LAXUN TECHNOLOGY EXPLOIT Co Ltd filed Critical GUANGZHOU LAXUN TECHNOLOGY EXPLOIT Co Ltd
Priority to CN201621483170.0U priority Critical patent/CN206556460U/en
Application granted granted Critical
Publication of CN206556460U publication Critical patent/CN206556460U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of concrete air blast open cooling tower, including tower body, blower fan, water-distributing device, filler assembly and water collection device, tower body includes hollow first chamber, and tower body is provided with air inlet and air outlet, water-distributing device and filler assembly are set in turn in first chamber from top to bottom, and blower fan is blown via air inlet into first chamber, and air inlet is connected by filler assembly with air outlet, water-distributing device is used to spray hot water to filler assembly, and water collection device is covered in air outlet;Damp-heat air can be converted into heated dry air to eliminate fog by the concrete air blast open cooling tower, and water collection device recycles moisture, so as to reach the requirement of environmental protection.

Description

A kind of concrete air blast open cooling tower
Technical field
The utility model is related to a kind of cooling device, more particularly to a kind of concrete air blast open cooling tower.
Background technology
With China's industry and Development of Urbanization, the generation of fog causes very big pressure for environmental protection, then One important development direction of environmental protection is turned into using various types of cooling towers and cooling technology.
Cooling tower produces steam simultaneously by water and air contact to carry out heat exchange, and the steam of generation is from air outlet row Go out, so as to reduce air themperature in tower, be finally reached and disperse the heat of industry generation to reduce the device of water temperature.Traditional cooling Cold dry air in use, is pumped into tower body and the shape after carrying out heat exchange with the moisture film on filler assembly by tower by blower fan Discharged into damp-heat air, and from the air outlet of tower body, but the damp-heat air that heat exchange is produced forms fog outside cooling tower, So as to cause very big pressure to environmental protection.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of concrete air blast open type cooling Tower, damp-heat air can be converted into heated dry air to eliminate fog by it, so as to reach the requirement of environmental protection.
The purpose of this utility model is realized using following technical scheme:
A kind of concrete air blast open cooling tower, including tower body, blower fan, water-distributing device, filler assembly and water collection device, tower body Including hollow first chamber, and tower body is provided with air inlet and air outlet, and water-distributing device and filler assembly are set successively from top to bottom It is placed in first chamber, blower fan is blown via air inlet into first chamber, and air inlet is connected by filler assembly with air outlet, Water-distributing device is used to spray hot water to filler assembly, and water collection device is covered in air outlet.
It is preferred that, the water-distributing device includes water inlet pipe and several shower nozzles connected with water inlet pipe.
It is preferred that, the filler assembly includes some packing sheets, and each packing sheet surface is respectively provided with woven design shape microgroove, and respectively fills out Web surface is provided with several outlet passes, and each packing sheet is respectively provided with some raised and some depressions, projection and the phase of each packing sheet The depression of adjacent packing sheet forms vent passages with merging.
It is preferred that, in addition to baffle plate, baffle plate one end is fixedly connected on tower body, and the other end is abutted with filler assembly, tower body, fills out Material component and baffle plate enclose to form second chamber, and water-distributing device is located in second chamber.
It is preferred that, in addition to microprocessor, condensate tank of dehumidifier, overflow pipe and full water valve, overflow pipe and first chamber Bottom is connected, and full water valve is used for the break-make for controlling overflow pipe, and level switch and full water valve are connected with microprocessor signals.
It is preferred that, in addition to outlet pipe and outlet valve, outlet pipe are connected with water collection device, and outlet valve is used to control outlet pipe Break-make.
It is preferred that, the blower fan is centrifugal fan.
It is preferred that, in addition to it is arranged at the maintenance door of tower body.
It is preferred that, the air inlet is arranged at the side wall of tower body, and air outlet is arranged at opposite side wall corresponding with the side wall.
It is preferred that, the air inlet is arranged at the side wall of tower body, and air outlet is arranged at the roof of tower body.
Compared with prior art, the beneficial effects of the utility model are:
By spray equipment by heat water-spraying to filler assembly, simultaneously because cold dry air is delivered to filler assembly by blower fan, Heat exchange is carried out with hot water, so as to reduce the temperature of hot water, final damp-heat air absorbs moisture via water collection device so that damp and hot sky Gas becomes heated dry air and from air outlet discharge, will not form fog, and water collection device recycles moisture, beneficial to environmental protection.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the first embodiment of concrete air blast open cooling tower of the utility model;
Fig. 2 is a kind of top view of the first embodiment of concrete air blast open cooling tower of the utility model;
Fig. 3 is a kind of side view of the first embodiment of concrete air blast open cooling tower of the utility model;
Fig. 4 is a kind of structural representation of the second embodiment of concrete air blast open cooling tower of the utility model;
Fig. 5 is a kind of top view of the second embodiment of concrete air blast open cooling tower of the utility model;
Fig. 6 is a kind of structural representation of the filler assembly of concrete air blast open cooling tower of the utility model;
Fig. 7 is a kind of side view of the filler assembly of concrete air blast open cooling tower of the utility model;
In figure:1st, tower body;2nd, water-distributing device;3rd, filler assembly;4th, blower fan;5th, water collection device;6th, full water valve;7th, outlet valve; 8th, maintenance door;9th, spraying zone;21st, shower nozzle;22nd, water inlet pipe;31st, packing sheet;311st, vent passages;23rd, air inlet;24th, air-out Mouthful.
Embodiment
Below, with reference to accompanying drawing and embodiment, the utility model is described further:
As shown in Fig. 1~7, a kind of concrete air blast open cooling tower, including tower body 1, blower fan 4, water-distributing device 2, filler Component 3 and water collection device 5, tower body 1 include hollow first chamber, and tower body 1 is provided with air inlet 23 and air outlet 24, water-distributing device 2 and filler assembly 3 be set in turn in from top to bottom in first chamber, blower fan 4 is blown via air inlet 23 into first chamber, is entered Air port 23 is connected by filler assembly 3 with air outlet 24, and water-distributing device 2 is used to spray hot water, the envelope of water collection device 5 to filler assembly 3 It is placed on air outlet 24.
Tower body 1 is preferably to be formed by concreting, and tower body 1 includes hollow first chamber, and first chamber can be used for Water-distributing device 2 and filler assembly 3 are accommodated, while being convenient for repairing and changing parts;Water-distributing device 2 is located at filler assembly 3 top, and the formation spraying zone 9 between water-distributing device 2 and filler assembly 3, water-distributing device 2 spray hot water to filler assembly 3, Hot water enters filler assembly 3 via spraying zone 9 and flowed downward, and moisture film is formed on the surface of filler assembly 3;Blower fan 4 will be dry and cold Air is sent into first chamber via air inlet 23, the moisture film on cold dry air and filler assembly 3 is carried out heat exchange, moisture film with Cold dry air cool after heat exchange and become damp-heat air leaving filler assembly 3, and tower body 1 is left via air outlet 24;Together When air outlet 24 is covered in due to water collection device 5, therefore when damp-heat air passes through water collection device 5, water collection device 5 will absorb damp and hot sky Moisture in gas, heated dry air is become by damp-heat air, and final heated dry air leaves tower body 1 via air outlet 24, therefore will not Fog is produced, harmful effect will not be produced to environment;Meanwhile, water collection device 5 can be by the moisture absorption Posterior circle in damp-heat air Recycle, it is more environmentally-friendly beneficial to water-saving and emission-reducing.
As shown in Figure 1 and Figure 4, water-distributing device 2 includes water inlet pipe 22 and several shower nozzles 21 connected with water inlet pipe 22, Hot water flows to each shower nozzle 21 via water inlet pipe 22, and flows to filler assembly 3 by spraying zone 9, it is possible to achieve to filler assembly 3 Make large range of heat water-spraying.
As shown in Figure 6 and Figure 7, filler assembly 3 includes some packing sheets 31, and it is thin that each surface of packing sheet 31 is respectively provided with woven design shape Line, and the surface of each packing sheet 31 is provided with several outlet pass (not shown), each packing sheet 31 is provided with some raised and some Depression, the depression of the raised and adjacent packing sheet 31 of each packing sheet 31, which is matched somebody with somebody, to be merged to form vent passages 311;Water-distributing device 2 via The hot water that each shower nozzle 21 sprays is covered with each surface of packing sheet 31 along each outlet pass, and the woven design shape microgroove on each surface of packing sheet 31 can So that hot water forms moisture film with each surface of packing sheet 31 and will not splashed down, so that hot water can fully be contacted with air, to increase The heat transfer effect of strong filler assembly 3, each vent passages 311 have cooperatively formed the side alveolate texture of filler assembly 3.
In order to fully be cooled to the hot water sprayed out by water-distributing device 2, the concrete air blast open cooling tower is also wrapped Baffle plate (not shown) is included, baffle plate one end is fixedly connected on tower body 1, and the other end is abutted with filler assembly 3, tower body 1, filler assembly 3 Enclose to form second chamber with baffle plate, water-distributing device 2 is located in second chamber, and second chamber can spray out water-distributing device 2 Hot water formation enclose guiding, allow the hot water that spray goes out completely into filler assembly 3, to carry out sufficient heat exchange, carry High workload efficiency.
As shown in Figure 1 and Figure 4, the concrete air blast open cooling tower also includes microprocessor (not shown), water level detecting Device (not shown), overflow pipe (not shown) and full water valve 6, overflow pipe are connected with the bottom of first chamber, and full water valve 6 is used to control The break-make of overflow pipe processed, level switch and full water valve 6 are connected with microprocessor signals;Condensate tank of dehumidifier is used to detect the The height of water level and microprocessor is sent the signal in one chamber, after microprocessor receives the signal and handled Signal is sent to full water valve 6, full water valve 6 is opened or is closed;For example when condensate tank of dehumidifier detects water level less than setting During value, send the signal to after microprocessor, microprocessor processes to the transmission signal of full water valve 6, close full water valve 6;Work as water When level detecting apparatus detects water level higher than setting value, send the signal to after microprocessor, microprocessor processes to full water valve 6 Signal is sent, full water valve 6 is opened, ponding unnecessary in first chamber is discharged from overflow pipe, to prevent first chamber inner product Dilutional hyponatremia and the progress for influenceing heat exchange.
Meanwhile, in order to recycle the water of the collection of water collection device 5, the concrete air blast open cooling tower also includes outlet pipe (not shown) and outlet valve 7, outlet pipe are connected with water collection device 5, and outlet valve 7 is used for the break-make for controlling outlet pipe.
As shown in Figure 1, Figure 2, Fig. 4 and Fig. 5, blower fan 4 is preferably centrifugal fan, and noise is low and easy to maintenance;For the ease of right The concrete air blast open cooling tower is repaired, and maintenance door 8 is offered in the side wall of tower body 1.
As shown in figure 1, as first embodiment of the present utility model, air inlet 23 is arranged at the side wall of tower body 1, air outlet 24 are arranged at opposite side wall corresponding with the side wall.
As shown in figure 4, as second embodiment of the present utility model, air inlet 23 is arranged at the side wall of tower body 1, air outlet 24 are arranged at the roof of tower body 1, can be achieved to apply the concrete air blast open cooling tower in similar underfloor vent pipe, building Sinking melt pit etc. needs the scene of side wall air intake and roof air-out;In order to which damp-heat air preferably is oriented into going out for the roof of tower body 1 Air port, is provided with air guide structure (not shown), the air guide structure is used for will be damp and hot in first chamber close to the side of air outlet Air is guided to air outlet.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various It is corresponding to change and deformation, and all these change and deformation should all belong to the protection of the utility model claim Within the scope of.

Claims (10)

1. a kind of concrete air blast open cooling tower, it is characterised in that:Including tower body, blower fan, water-distributing device, filler assembly and receipts Hydrophone, tower body includes hollow first chamber, and tower body is provided with air inlet and air outlet, and water-distributing device and filler assembly are from upper Under be set in turn in first chamber, blower fan is blown via air inlet into first chamber, and air inlet is by filler assembly with going out Air port is connected, and water-distributing device is used to spray hot water to filler assembly, and water collection device is covered in air outlet.
2. concrete air blast open cooling tower according to claim 1, it is characterised in that:The water-distributing device includes water inlet Pipe and several shower nozzles connected with water inlet pipe.
3. concrete air blast open cooling tower according to claim 1, it is characterised in that:The filler assembly includes some Packing sheet, each packing sheet surface is respectively provided with woven design shape microgroove, and each packing sheet surface is provided with several outlet passes, and each packing sheet is equal Some raised and some depressions are set, and the depression of the raised and adjacent packing sheet of each packing sheet, which is matched somebody with somebody, to be merged to form vent passages.
4. according to any described concrete air blast open cooling tower of claims 1 to 3, it is characterised in that:Also include baffle plate, gear Plate one end is fixedly connected on tower body, and the other end is abutted with filler assembly, and tower body, filler assembly and baffle plate enclose to form the second chamber Room, water-distributing device is located in second chamber.
5. the concrete air blast open cooling tower according to any one of claims 1 to 3, it is characterised in that:Also include micro- place Device, condensate tank of dehumidifier, overflow pipe and full water valve are managed, overflow pipe is connected with the bottom of first chamber, full water valve is used to control to overflow The break-make of water pipe, level switch and full water valve are connected with microprocessor signals.
6. the concrete air blast open cooling tower according to any one of claims 1 to 3, it is characterised in that:Also include water outlet Pipe and outlet valve, outlet pipe are connected with water collection device, and outlet valve is used for the break-make for controlling outlet pipe.
7. concrete air blast open cooling tower according to claim 1, it is characterised in that:The blower fan is centrifugal wind Machine.
8. the concrete air blast open cooling tower according to any one of claims 1 to 3, it is characterised in that:Also include setting In the maintenance door of tower body.
9. concrete air blast open cooling tower according to claim 1, it is characterised in that:The air inlet is arranged at tower body Side wall, air outlet is arranged at opposite side wall corresponding with the side wall.
10. concrete air blast open cooling tower according to claim 1, it is characterised in that:The air inlet is arranged at tower The side wall of body, air outlet is arranged at the roof of tower body.
CN201621483170.0U 2016-12-31 2016-12-31 A kind of concrete air blast open cooling tower Active CN206556460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621483170.0U CN206556460U (en) 2016-12-31 2016-12-31 A kind of concrete air blast open cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621483170.0U CN206556460U (en) 2016-12-31 2016-12-31 A kind of concrete air blast open cooling tower

Publications (1)

Publication Number Publication Date
CN206556460U true CN206556460U (en) 2017-10-13

Family

ID=60359394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621483170.0U Active CN206556460U (en) 2016-12-31 2016-12-31 A kind of concrete air blast open cooling tower

Country Status (1)

Country Link
CN (1) CN206556460U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106766998A (en) * 2016-12-31 2017-05-31 广州览讯科技开发有限公司 A kind of concrete air blast open cooling tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106766998A (en) * 2016-12-31 2017-05-31 广州览讯科技开发有限公司 A kind of concrete air blast open cooling tower

Similar Documents

Publication Publication Date Title
CN103938483B (en) A kind of paper humidifying equipment on paper machine
CN206037754U (en) Accuse temperature water conservation fog dispersal device
CN106288855A (en) Axial-flow type air blast crossing current open cooling tower
CN205505784U (en) Take water conservation fog dispersal haze counterflow cooling tower of air distribution window
CN105651074A (en) Water-saving fog and haze removal type counter flow cooling tower with air distribution windows
CN206001971U (en) A kind of demisting water collection device used for cooling tower and demisting cooling tower
CN206556460U (en) A kind of concrete air blast open cooling tower
CN106288858A (en) A kind of ground pit type mixes earth cooling tower
CN207703026U (en) A kind of reverse-flow cooling tower geomantic omen matching enhanced heat exchange system
CN206479059U (en) A kind of concrete air blast open cooling system for subway tunnel
CN103924474B (en) A kind of paper humidifying equipment
CN201803605U (en) Polygonal counter flow cooling tower
CN206160759U (en) Metal packing subassembly cooling tower
CN207753100U (en) A kind of curing chamber of accumulator plate
CN206073752U (en) Axial-flow type air blast crossing current open cooling tower
CN106766998A (en) A kind of concrete air blast open cooling tower
CN106270380B (en) Foamed plastic model drying room
CN106197063B (en) Centrifugal air blast crossing current closed cooling tower
CN106766992A (en) A kind of concrete air blast open cooling system for subway tunnel
CN206160760U (en) Pit type mixes earth cooling tower
CN106288856A (en) Metal packing assembly cooling tower
CN207350632U (en) A kind of energy saving template pipe indirect evaporative cooling handpiece Water Chilling Units
CN204678572U (en) Based on evaporative cooling and heat pipe, heat pump united air-conditioner set
CN112226236A (en) Flue gas dedusting and whitening system applied to wet quenching tower
CN208012406U (en) A kind of backflow-type closed heat source tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant