CN206556242U - Hot-water boiler - Google Patents

Hot-water boiler Download PDF

Info

Publication number
CN206556242U
CN206556242U CN201720254575.5U CN201720254575U CN206556242U CN 206556242 U CN206556242 U CN 206556242U CN 201720254575 U CN201720254575 U CN 201720254575U CN 206556242 U CN206556242 U CN 206556242U
Authority
CN
China
Prior art keywords
burner hearth
boiler
heating coil
water
ash bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720254575.5U
Other languages
Chinese (zh)
Inventor
张耀峰
王亚萍
何慧琴
董学农
许可鑫
刘阳
尹世莉
王俐斐
马光祖
赵元宝
杨荣国
蔡艳红
沈奕彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle nuclear-plant Nanjing Co., Ltd
Original Assignee
CHINA POWER EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA POWER EQUIPMENT Co Ltd filed Critical CHINA POWER EQUIPMENT Co Ltd
Priority to CN201720254575.5U priority Critical patent/CN206556242U/en
Application granted granted Critical
Publication of CN206556242U publication Critical patent/CN206556242U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Abstract

The utility model discloses a kind of hot-water boiler, including chain-type coal stove, ash bucket, burner hearth, water inlet pipe, heating coil, drainpipe, heat absorbing sheet, blowing pipe, flue adapter, air preheater and ash bucket, the ash bucket is arranged at the lower section of the chain-type coal stove, the lower end of the burner hearth is arranged on the chain-type coal stove, the water inlet pipe is connected with one end of the heating coil, the heating coil is distributed in the side in the burner hearth, the heat absorbing sheet is distributed in the top in burner hearth, the heat absorbing sheet is connected with heating coil, the bottom side of the burner hearth is flue adapter, the air preheater is arranged at the top of the flue adapter, the ash bucket is arranged at the flue adapter bottom.Compared with prior art, the utility model can more effectively improve thermal energy conversion efficiency by setting the combination of heat absorbing sheet and heating coil, set blowing pipe to be convenient to clean inside, with the value promoted the use of.

Description

Hot-water boiler
Technical field
The utility model is related to a kind of boiler, more particularly to a kind of hot-water boiler.
Background technology
Hot-water boiler includes electric hot water, oil-fired water-boiler, gas-fired water heating boiler and coal-fired hot-water boiler etc., hot water Boiler is exactly the boiler for producing hot water, refers to the heat energy or other heat energy (such as electric energy, solar energy discharged using fuel combustion Deng) water is heated to a kind of thermal hardware of rated temperature.In the prior art, the species of hot-water boiler is various, and function respectively has thousand Autumn, in line with excelsior spirit, it is necessary to update and innovate.
Utility model content
The purpose of this utility model is that provides a kind of hot-water boiler to solve the above problems.
The utility model is achieved through the following technical solutions above-mentioned purpose:
The utility model includes chain-type coal stove, ash bucket, burner hearth, water inlet pipe, heating coil, drainpipe, heat absorbing sheet, soot blowing Pipe, flue adapter, air preheater and ash bucket, the ash bucket are arranged at the lower section of the chain-type coal stove, the burner hearth Lower end is arranged on the chain-type coal stove, and the water inlet pipe is connected with one end of the heating coil, the heating coil point The side in the burner hearth is distributed in, the heat absorbing sheet is distributed in the top in burner hearth, and the heat absorbing sheet is connected with heating coil, The bottom side of the burner hearth is flue adapter, and the air preheater is arranged at the top of the flue adapter, the ash discharge Bucket is arranged at the flue adapter bottom.
The beneficial effects of the utility model are:
The utility model is a kind of hot-water boiler, compared with prior art, and the utility model is by setting heat absorbing sheet with adding The combination of hot coil, can more effectively improve thermal energy conversion efficiency, set blowing pipe to be convenient to clean inside, with popularization The value used.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1- chain-types coal stove, 2- ash buckets, 3- burner hearths, 4- water inlet pipes, 5- heating coils, 6- drainpipes, 7- heat absorptions Piece, 8- blowing pipes, 9- flue adapters, 10- air preheaters, 11- ash buckets.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Figure 1:The utility model includes chain-type coal stove 1, ash bucket 2, burner hearth 3, water inlet pipe 4, heating coil 5, row Water pipe 6, heat absorbing sheet 7, blowing pipe 8, flue adapter 9, air preheater 10 and ash bucket 11, the ash bucket 2 are arranged at the chain The lower section of bar formula coal stove 1, the lower end of the burner hearth 3 is arranged on the chain-type coal stove 1, the water inlet pipe 4 and the heating One end connection of coil pipe 5, the heating coil 5 is distributed in the side in the burner hearth 3, and the heat absorbing sheet 7 is distributed in burner hearth 3 Top, the heat absorbing sheet 7 is connected with heating coil 5, and the bottom side of the burner hearth 3 is flue adapter 9, and the air is pre- Hot device 10 is arranged at the top of the flue adapter 9, and the ash bucket 11 is arranged at the bottom of flue adapter 9.
The layout of boiler single not heated drum, lateral arrangement, a diameter of 1400mm of drum, wall thickness is 18mm, cylinder Straight part length is 10020mm, uses material for Q245R.The people of one 300 × 400 is respectively provided with the end socket of drum two ends Used for maintenance in hole.Operated during boiler operatiopn for full water, backwater introduces pipe and backwater point by drum front portion water inlet header through backwater Pipe arrangement enters drum.Water by heating introduces drum by drum rear portion drum centerline, and front and rear part is by dividing plate in drum Separate, and leave boiler internal water circulation channel, hot water draws drum at the top of drum through collector pipe and hot water fairlead.By pot The hot water of cylinder out enters passage rear wall lower header, water outlet header is entered after further being heated through Flag pattern heat surface, externally output 130 DEG C of hot water.The boiler water cycle system is divided into two sets:That is the natural water circulation system of burner hearth part and passage rear wall flag formula The forced water circulation system of heating surface.The reliability of water circulation had so both been ensure that, boiler export cigarette temperature has been reduced again, while again The low-temperature corrosion problem in boiler operatiopn has been efficiently controlled, energy-efficient purpose is reached.
The boiler surrounding and midfeather use fin panel casing all-sealed structure, and fin panel casing is by Ф 60 × 3.5 Pipe and 20 × 4 band steel be welded by special equipment, fin panel casing pitch be 80mm.Furnace width 9360mm, Depth 5200mm, the distance that furnace roof highest point leaves grate surface is 11950mm.This boiler is open type chamber structure, without rear arch, Refractory concrete face arch has been built as the arch that catches fire in burner hearth antetheca hypomere, and wall with refractory lining, refracto is laid with hearth biside wall hypomere.Burning The high-temperature flue gas produced afterwards is folded to flue for 180 ° from furnace roof, and flue width is 9360mm, and depth is 2400mm, is arranged in flue There are three groups of flag formula convection heating surfaces, be arranged horizontally, Flag pattern heat surface is made up of Ф 38 × 3.5 pipe.
This boiler is tower structure, and boiler body passes through four supporting-points being welded on left and right sidewall lower header, supporting In boiler body supporting, wherein right anterior branch is held as fixing point, and left front supporting allows free wxpansion to the left, right rear support allow to Free wxpansion afterwards, left back supporting tolerable injury level direction free wxpansion, whole boiler allows upward free wxpansion.
This boiler is totally enclosed film water cold wall structure, and flue gas is completely isolated with the external world, therefore only need to be in membrane wall external application If light thermal-insulating material thick 160mm is that can reach design thermal requirements.Light thermal-insulating material is by being welded on membrane wall fin Round steel, and steel wire are fixed on the outside of membrane wall, and corrugation stove clothing is coated outside insulation material, makes whole boiler physical beauty See, neatly.
This fire grate uses the scale chain grate that Wafangdian Yongning machinery plant produces, and fire grate uses Separate Wind Barn structure, Air distribution is uniform, and wind cabin bottom shoot door uses cast iron shoot door, and good airproof performance is unlikely to deform, and deashing is convenient.The flake type chain Fire grate is reasonable in design, and the accuracy of manufacture requires high, and side seal leaks out few, exchanges fire grate segment convenient.
Welding and water pressure test requirement
1. all parts and components welded with pressure parts (drum, header, pipe), should weld before the water pressure test and finish.
2. welding should examine qualified by following nondestructive inspection requirement before the water pressure test.
1) for the girth joint of header, pipe, pipeline and other pipe fittings, the quantity regulation of ray or ultrasonic examination is such as Under:
A is more than 159mm header when external diameter, and every weld seam 25% is detected a flaw.
B is less than or equal to 159mm header when external diameter, and every fusion length should carry out 10% flaw detection, also can be no less than every 10% selective examination of platform boiler header circumferential weld bar number.
C is less than or equal to 159mm pipe, pipeline and other pipe fittings when external diameter, can exempt to look into.
2) the angle welding ultrasonic examination quantity of through welding structure is provided as follows:
A branch pipes external diameter is more than 219mm, every ultrasonic examination of weld seam 50%.
B branch pipes external diameter is less than or equal to 219mm, but more than 140mm, every ultrasonic examination of weld seam 25% also can be many In the 25% of piece-ups.
3. before water inlet internal cleaning should be carried out to pressure-containing parts such as drum, headers.
4. boiler Hydrostatic test pressure is 2.2Mpa.
5. after the water pressure test, the water in boiler all should be drained in time.
Use condition
1. boiler feedwater quality should meet GB1576《Industrial Boiler water quality》Requirement.
2. domestic part or import partses may be selected in boiler matching subsidiary engine, valve, electric control element.
Safety attachment and instrument:
《Boiler safety technology Supervision Code》In safety attachment and instrument are provided as follows:
1 safety valve:Define the basic demand, setting, other requirement, the choosings of safety valve for installing safety valve of safety valve Released with, the total release of safety valve of steam boiler and determination, drum with the discharge capacity of external safety valve, hot-water boiler safety valve Ability, the set-pressure of safety valve, blowdown of a safety valve, installation, verification etc..This TV station boiler installs two safety valves, and meeting code will Ask;
2. device for pressure measurement:Define it is manometric set, from, verification, install.This TV station boiler installs three pressures altogether Power table, meets regulatory requirements;
3. level measuring is with showing control device:Define its setting, the constructional device of water gage, install.This boiler installing two Individual water-level gauge, installing steam overpressure alarm and interlocking protective device, one of band high and low water alarm, meeting code will Ask;
4. temperature measuring equipment:Define its setting, temperature measuring instrument range.This TV station boiler water cycle system installing two Individual thermometer, other flue-gas temperature measuring points have automatically controlled producer to wear, and meet regulatory requirements;
5. blowdown and jettison gear;The basic demand for defining blowdown and discharging water, this TV station boiler installs three blowoff valves altogether, Meet regulatory requirements;
6. safety guard:Define basic demand, control cyclic steam boiler, CFBB, room combustion pot Stove, ignition procedure control and blowout protection.It is unrelated with this boiler.
General principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (1)

1. a kind of hot-water boiler, it is characterised in that:Including chain-type coal stove, ash bucket, burner hearth, water inlet pipe, heating coil, draining Pipe, heat absorbing sheet, blowing pipe, flue adapter, air preheater and ash bucket, the ash bucket are arranged under the chain-type coal stove Side, the lower end of the burner hearth is arranged on the chain-type coal stove, and the water inlet pipe is connected with one end of the heating coil, institute The side that heating coil is distributed in the burner hearth is stated, the heat absorbing sheet is distributed in the top in burner hearth, and the heat absorbing sheet is with adding Hot coil is connected, and the bottom side of the burner hearth is flue adapter, and the air preheater is arranged at the flue adapter Top, the ash bucket is arranged at the flue adapter bottom.
CN201720254575.5U 2017-03-16 2017-03-16 Hot-water boiler Expired - Fee Related CN206556242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720254575.5U CN206556242U (en) 2017-03-16 2017-03-16 Hot-water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720254575.5U CN206556242U (en) 2017-03-16 2017-03-16 Hot-water boiler

Publications (1)

Publication Number Publication Date
CN206556242U true CN206556242U (en) 2017-10-13

Family

ID=60365705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720254575.5U Expired - Fee Related CN206556242U (en) 2017-03-16 2017-03-16 Hot-water boiler

Country Status (1)

Country Link
CN (1) CN206556242U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108534352A (en) * 2018-03-23 2018-09-14 博瑞特热能设备股份有限公司 The processing method of forced-circulation hot water boiler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108534352A (en) * 2018-03-23 2018-09-14 博瑞特热能设备股份有限公司 The processing method of forced-circulation hot water boiler
CN108534352B (en) * 2018-03-23 2020-11-03 博瑞特热能设备股份有限公司 Processing method of forced circulation hot water boiler

Similar Documents

Publication Publication Date Title
CN203561067U (en) Efficient forced-circulation gas-fired hot water boiler
CN205102104U (en) Overcritical boiler
CN206556242U (en) Hot-water boiler
CN101245912B (en) Fuel oil/gas burner test stove
RU2333429C1 (en) Condensation hot-water boiler for external accomodation
CN205048407U (en) Horizontal full -automatic steam boiler
CN206656493U (en) A kind of corner tube type coal-fired hot-water boiler
CN104501397A (en) Membrane water-wall compound return water condensing type natural gas hot water boiler
CN202719636U (en) Efficient energy-saving stove
CN104456510B (en) A kind of energy-saving steam boiler
CN105546811B (en) A kind of energy-conserving steam boiler for dual purpose
CN206771324U (en) Horizontal internal-combustion wet-back formula boiler
CN206112914U (en) Scum pipe of circulating fluidized bed boiler
CN209355480U (en) A kind of energy-saving hot water boiler
CN213630377U (en) Small-size methyl alcohol once-through boiler mounting structure
CN220229100U (en) Vertical gas boiler with external steam-water separator
CN105716067B (en) A kind of energy-conserving steam boiler for dual purpose
RU218987U1 (en) WATER BOILER
CN217816679U (en) Dry-back type gas-steam boiler
CN210398862U (en) Efficient shale-combustion gas-water pipe steam boiler
CN209639246U (en) A kind of fire tube vertical boiler
CN202419896U (en) Novel water heating device
CN210485661U (en) Heat recovery device for vertical combustion furnace
CN202204143U (en) Vertical type fire and water pipe energy-saving environment-friendly boiler
CN107327826A (en) Horizontal single drum uses fuel boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190805

Address after: No. 99 Wangda Road, Jiangning Binjiang Economic Development Zone, Nanjing City, Jiangsu Province, 210000

Patentee after: Middle nuclear-plant Nanjing Co., Ltd

Address before: 730056 No. 1 Xinhe Road, Xigu District, Lanzhou City, Gansu Province

Patentee before: China Power Equipment Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171013

Termination date: 20200316