CN206554613U - A kind of hollow enclosure member of prefabricated complex fiber cement - Google Patents
A kind of hollow enclosure member of prefabricated complex fiber cement Download PDFInfo
- Publication number
- CN206554613U CN206554613U CN201720082660.8U CN201720082660U CN206554613U CN 206554613 U CN206554613 U CN 206554613U CN 201720082660 U CN201720082660 U CN 201720082660U CN 206554613 U CN206554613 U CN 206554613U
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- groove
- pillar
- penel
- enclosure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of prefabricated hollow enclosure member of complex fiber cement, it is characterized in that, bear down on one line including pillar, curtain wall penel and enclosure wall, the lower end of the pillar is fixedly connected with concrete foundation, some curtain wall penels are arranged between two pillars, and the two ends of curtain wall penel are fixedly connected with the pillar at two ends by neck, it is fixedly connected between each adjacent curtain wall penel by neck, the enclosure wall bear down on one line be arranged in top curtain wall penel top, and the bear down on one lower end of line of enclosure wall is fixedly connected with curtain wall penel by neck.The beneficial effects of the utility model recycle to realize, and construct simple, enclosure wall firmly, while convenient transport.
Description
Technical field
The utility model is related to the enclosure wall construction field of construction site plant area, and in particular to a kind of prefabricated complex fiber cement
Hollow enclosure member and construction method.
Background technology
The enclosure wall of current construction site plant area is generally after the completion of brick enclosure wall, engineering, it is necessary to all remove, and produce big
Measure discarded object, and consumptive material, work consuming.The processes such as " enclosure wall is built by laying bricks or stones ", " removing and transportation " are power consumption process.This practicality is new
Type combination Practical Project, devises a kind of hollow enclosure member of prefabricated complex fiber cement, can be replaced in enclosure wall work progress
Realize that the hollow enclosure member of prefabricated complex fiber cement is reused after brick enclosure wall, and dismounting, the energy is reduced to greatest extent
Consumption, reduces the carrying burden of environment.Although this area has been disclosed for some prefabricated enclosure walls, easy construction degree,
The difficulty of actual use is not all overcome in terms of firmness and transport.
Utility model content
In view of the above-mentioned problems, the purpose of this utility model provides a kind of prefabricated hollow enclosure member of complex fiber cement and applied
Work method, solves the problem of existing brick enclosure wall needs to remove brought in the finished, and construction is simple, enclosure wall firmly,
Convenient transport simultaneously.
The utility model solves the technical scheme that is used of above-mentioned technical problem:A kind of prefabricated complex fiber cement is hollow
Enclosure member, it is characterised in that bear down on one line including pillar, curtain wall penel and enclosure wall, lower end and the concrete foundation of the pillar are consolidated
Fixed connection, some curtain wall penels are arranged between two pillars, and the two ends of curtain wall penel and the pillar at two ends pass through neck
It is fixedly connected, is fixedly connected between each adjacent curtain wall penel by neck, the enclosure wall line that bears down on one is arranged in top
The top of curtain wall penel, and the bear down on one lower end of line of enclosure wall is fixedly connected with curtain wall penel by neck.
Further, two vertical side edges of the pillar are provided with symmetrical rectangular recess, two short sides of the curtain wall penel
Provided with two prominent raised grooves, raised groove is inserted in groove, curtain wall penel is consolidated with pillar by the raised groove and matching grooves
It is fixed.
Further, the lower long edges of the curtain wall penel are provided with groove, and upper long edges are provided with raised groove, adjacent curtain wall penel peace
During dress, make raised groove and matching grooves, raised groove is inserted in groove, neighbouring curtain wall penel is fixed.
Further, the pillar top layer is fiber pea gravel concreten, and internal layer is steel fabric sheet, and root is provided with reinforcing bar embedded part.
Further, the pillar is fixed with concrete foundation by the reinforcement welding of root.
Further, the curtain wall penel top layer is fiber pea gravel concreten, and internal layer is steel fabric sheet.
Further, the bear down on one lower end of line of the enclosure wall is provided with groove, and enclosure wall pressing plate adjacent thereto raised groove matching
Grafting, the enclosure wall bear down on one line outer layer material be fiber pea gravel concreten, it is interior match somebody with somebody distributing bar skeleton.
A kind of method of the hollow enclosure member construction enclosure wall of prefabricated complex fiber cement using described in above-mentioned any one,
It is characterised in that it includes following steps:
Step 1:First construct concrete foundation, and reserved steel embedded part;
Step 2:Pillar and curtain wall penel are made on request and finished;
Step 3:Install after pillar, adjustment perpendicularity, the steel embedded part of pillar root and the steel slugging of concrete foundation
It is fixed;
Step 4:Curtain wall penel is installed successively to height is required, curtain wall penel short side raised groove inserts pillar side rectangular recess,
The adjacent long side groove of curtain wall penel, the mutual socket connection of raised groove simultaneously;
Step 4:Enclosure wall is installed to bear down on one line, raised groove and the curtain wall penel of curtain wall penel bear down on one the groove grafting of line;
Step 5:According to above-mentioned steps move in circles install it is adjacent across enclosure wall assembling, until meet require enclosure wall it is long
Degree.
The utility model has the advantage of:
1st, prefabricated enclosure member is manufactured using composite, and top layer is fiber pea gravel concreten, and internal layer is steel fabric sheet,
Both intensity is ensure that, weight is alleviated again;
2nd, curtain wall penel and pillar is direct and curtain wall penel directly uses socket connection, it is convenient to construct, and shortens the duration, and tear open
Dress is convenient;
3rd, enclosure wall uses several curtain wall penel grafting in the vertical, reduces the size of single curtain wall penel, convenient transport;
4th, pillar reserved steel bar embedded part, is fixedly connected, it is ensured that the jail of enclosure wall with concrete foundation by the way of welding
Soundness.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, describe below
In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness
On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is front view of the present utility model.
Fig. 2 is the profile in 1-1 directions in Fig. 1.
Fig. 3 is the profile in 2-2 directions in Fig. 1.
Fig. 4 is the profile in 3-3 directions in Fig. 1.
Wherein:1st, pillar;2nd, enclosure wall bears down on one line;3rd, curtain wall penel;4th, concrete foundation.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described
Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, sheet
The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality
Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outer " are, based on orientation shown in the drawings or position relationship, to be only
Described for the ease of description the utility model and simplifying, rather than to indicate or imply that signified device or element must have specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
A kind of prefabricated hollow enclosure member of complex fiber cement as depicted, two vertical side edges of pillar 1 provided with pair
The rectangular recess of title, two short sides of curtain wall penel 3, will be convex provided with two prominent raised grooves, the raised groove and matching grooves
In tongue and groove insertion groove, curtain wall penel 3 is fixed with pillar 1, general construction adjusts the quantity of curtain wall penel 3 according to the height of enclosure wall
With the height of pillar 1, the height of usual pillar 1 is matched with the integral multiple of curtain wall penel 3, using three curtain wall penels 3 in the present embodiment
Cumulative, two ends are fixedly connected by groove and raised groove with pillar 1;Adjacent curtain wall penel 3 is directly also by groove and raised groove
Socket connection, top is closed by the enclosure wall line 2 that bears down on one, and the bear down on one lower end of line 2 of enclosure wall is provided with groove, and enclosure wall adjacent thereto
The raised groove matching grafting of pressing plate.The top layer of pillar 1 is fiber pea gravel concreten, and internal layer is steel fabric sheet, and root is buried provided with reinforcing bar
Part.The top layer of curtain wall penel 3 is fiber pea gravel concreten, and internal layer is steel fabric sheet.Enclosure wall bear down on one line 2 outer layer material be fiber microlith
Concrete, it is interior to match somebody with somebody distributing bar skeleton.The size of groove is 50mm × 50mm.
A kind of method of the hollow enclosure member construction enclosure wall of prefabricated complex fiber cement using described in above-mentioned any one,
It is characterised in that it includes following steps:
Step 1:First construction concrete foundation 4, and reserved steel embedded part;
Step 2:Pillar 1 and curtain wall penel 3 are made on request and finished;
Step 3:Install after pillar 1, adjustment perpendicularity, the steel embedded part of the root of pillar 1 is welded with the steel embedded part of concrete foundation 4
Connect fixation;
Step 4:Curtain wall penel 3 is installed successively to height is required, the short side raised groove of the curtain wall penel 3 insertion side rectangle of pillar 1 is recessed
Groove, while the long side groove of adjacent curtain wall penel 3, the mutual socket connection of raised groove;
Step 4:Enclosure wall is installed to bear down on one line 2, raised groove and the curtain wall penel 3 of curtain wall penel 3 bear down on one the groove grafting of line;
Step 5:According to above-mentioned steps move in circles install it is adjacent across enclosure wall assembling, until meet require enclosure wall it is long
Degree.
Finally it should be noted that:Various embodiments above is only limited to illustrate the technical solution of the utility model, rather than to it
System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole
Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical scheme of type.
Claims (7)
1. a kind of hollow enclosure member of prefabricated complex fiber cement, it is characterised in that bear down on one including pillar, curtain wall penel and enclosure wall
Line, the lower end of the pillar is fixedly connected with concrete foundation, and some curtain wall penels are arranged between two pillars, and are enclosed
The two ends of wallboard are fixedly connected with the pillar at two ends by neck, are fixedly connected between each adjacent curtain wall penel by neck, institute
State enclosure wall bear down on one line be arranged in top curtain wall penel top, and enclosure wall bears down on one the lower end of line and curtain wall penel passes through card
Groove is fixedly connected.
2. a kind of prefabricated hollow enclosure member of complex fiber cement according to claim 1, it is characterised in that the pillar
Two vertical side edges be provided with symmetrical rectangular recess, two short sides of the curtain wall penel are provided with two prominent raised grooves, institute
Raised groove and matching grooves are stated, raised groove is inserted in groove, curtain wall penel is fixed with pillar.
3. a kind of prefabricated hollow enclosure member of complex fiber cement according to claim 1, it is characterised in that the enclosure wall
The lower long edges of plate are provided with groove, and upper long edges are provided with raised groove, when adjacent curtain wall penel is installed, make raised groove and groove
Match somebody with somebody, raised groove is inserted in groove, neighbouring curtain wall penel is fixed.
4. a kind of prefabricated hollow enclosure member of complex fiber cement according to claim 1, it is characterised in that the pillar
Top layer is fiber pea gravel concreten, and internal layer is steel fabric sheet, and root is provided with reinforcing bar embedded part.
5. a kind of prefabricated hollow enclosure member of complex fiber cement according to claim 4, it is characterised in that the pillar
Fixed with concrete foundation by the reinforcement welding of root.
6. a kind of prefabricated hollow enclosure member of complex fiber cement according to claim 1, it is characterised in that the enclosure wall
Plate top layer is fiber pea gravel concreten, and internal layer is steel fabric sheet.
7. a kind of prefabricated hollow enclosure member of complex fiber cement according to claim 1, it is characterised in that the enclosure wall
The bear down on one lower end of line is provided with groove, and enclosure wall pressing plate adjacent thereto raised groove matching grafting, the enclosure wall bears down on one the outer of line
Layer material is fiber pea gravel concreten, interior to match somebody with somebody distributing bar skeleton.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720082660.8U CN206554613U (en) | 2017-01-20 | 2017-01-20 | A kind of hollow enclosure member of prefabricated complex fiber cement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720082660.8U CN206554613U (en) | 2017-01-20 | 2017-01-20 | A kind of hollow enclosure member of prefabricated complex fiber cement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206554613U true CN206554613U (en) | 2017-10-13 |
Family
ID=60009831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720082660.8U Active CN206554613U (en) | 2017-01-20 | 2017-01-20 | A kind of hollow enclosure member of prefabricated complex fiber cement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206554613U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760940A (en) * | 2017-01-20 | 2017-05-31 | 天津住总建筑集团有限公司 | A kind of hollow enclosure member of prefabricated complex fiber cement and construction method |
-
2017
- 2017-01-20 CN CN201720082660.8U patent/CN206554613U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760940A (en) * | 2017-01-20 | 2017-05-31 | 天津住总建筑集团有限公司 | A kind of hollow enclosure member of prefabricated complex fiber cement and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760940A (en) | A kind of hollow enclosure member of prefabricated complex fiber cement and construction method | |
CN105569224B (en) | Concrete filled steel tube edge constraint overlaps monoblock type shear wall and preparation and installation method | |
CN207419711U (en) | Steel plate shear force wall and the connection structure of steel bar girder floor plates | |
CN106088327B (en) | The production method of assembling frame column based on 3D printing | |
CN207245719U (en) | A kind of prefabricated assembled tunnel structure in tunnel bottom | |
CN110359631A (en) | Secondary structure Constructional Col-umn Construction method | |
CN110080287A (en) | A kind of assembled flat-top has the open cutting construction method of column underground structure | |
CN110359487A (en) | A kind of fabricated construction side wall prefabricated component and its with arch sheet connecting structure | |
CN107090908A (en) | A kind of new vertical prefabricated components joint connecting method | |
CN110080294A (en) | A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN207110083U (en) | Assembled architecture system | |
CN209556195U (en) | Fabricated Beam-Slab connection structure | |
CN206554613U (en) | A kind of hollow enclosure member of prefabricated complex fiber cement | |
CN208472972U (en) | A kind of steel bar girder plate end connecting joint structure | |
CN206722216U (en) | A kind of prefabricated girder of laminated floor slab | |
CN110359488A (en) | A kind of fender member of assembled underground structure and its connecting structure with arch sheet | |
CN202466913U (en) | Concrete overlapping plate connected by 180 DEG bent reinforcing steel anchor within span | |
CN110080288A (en) | A kind of open cutting construction method of assembled vault greatly across no column underground structure | |
CN206418775U (en) | A kind of arm support and concrete spraying machine | |
CN115853287A (en) | Forward and reverse combined construction method for large-span roof building in narrow site | |
CN205917862U (en) | Connected node on basis | |
CN205382595U (en) | Integral shear force wall of steel pipe concrete edge constraint coincide | |
CN209975745U (en) | Connection structure of assembled prefabricated component | |
CN114482344A (en) | Cast-in-place concrete sandwich outer wall construction method capable of improving construction efficiency |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 300300 8 Ping Ying Road, Dongli District, Tianjin Co-patentee after: BEIJING FENGFANG ENGINEERING AND CONSTRUCTION CO., LTD. Patentee after: Tianjin General Group Co., Ltd. Address before: 300300 Binying Road No. 8, Dongli District, Tianjin 5032-39, Binhai Commission. Co-patentee before: BEIJING FENGFANG ENGINEERING AND CONSTRUCTION CO., LTD. Patentee before: Total Group Co.,Ltd that builds is lived in Tianjin |