Section bar docks waterproof construction and glass sunlight house
Technical field
The utility model is related to technical field of buildings, more particularly to a kind of glass sunlight house.
Background technology
Improved with the living standard of people, the application of portable glass sunlight house is more and more extensive, be common in only house, swimming
Pond, dining room, greenhouse, exhibition room or closing balcony, so that people can enjoy from outdoor sunlight indoors.Glass sunlight house is general by aluminium
Alloy profile is assembled into aluminum alloy frame, and aluminum alloy frame is made up of facade framework and top surface frame two parts, facade framework by
The crossbeam and column of interconnection are constituted, and transparent or semitransparent glass is inlayed in each framework with daylighting.
A kind of existing telescopic glass sunlight house receives much concern, and it is made up of multigroup telescopic mobile door leaf unit, in sun
The situation that light room is opened, door leaf unit is located remotely from each other and is stacked, and situation about being closed in glass sunlight house, door leaf unit is then mutual
Docking closure forms sealing state.Therefore, the waterproof seal under the section bar docking convenience and closure state of door leaf unit
Seem particularly significant, the use of glass sunlight house will be directly affected.The leakproof of existing glass sunlight house is aqueous to depend on silica gel mostly, in type
Connection between connection, plane skylight and the framework of material and section bar, it is a large amount of to use silica gel strip and live gluing so as to waterproof.One
The silica gel waterproof effect that a little quality cause anxiety is very poor, easily occurs rotting or degumming by the immersion of prolonged rainwater, causes sunlight
Room leak.
Therefore, it is necessary to provide a kind of simple in construction, waterproof seal good section bar docking waterproof construction and glass sunlight house,
To overcome disadvantages described above.
Utility model content
A purpose of the present utility model is to provide a kind of section bar docking waterproof construction, its have multiple waterproof measure with
Ensure that the docking between the good waterproof seal between two section bars of docking, section bar avoids gluing to reduce erector
Skill.
Another purpose of the present utility model is to provide a kind of glass sunlight house, and it has multiple waterproof measure to ensure docking
Two section bars between good waterproof seal, the docking between section bar avoids gluing to reduce mounting process.
To realize object above, the utility model provides a kind of section bar docking waterproof construction, including the first section bar, Second-Type
Material, the first docking section being connected with first section bar and the second docking section being connected with second section bar, described first
Docking section and second docking section connect relatively, high-order to low level by what is docked, first docking section and second docking
First seal, second seal and the 3rd seal, at least a portion of first docking section are set respectively between portion
With at least a portion the first cavity of formation of second docking section and the second cavity, it is close that first cavity is located at described first
Between sealing and the second seal, second cavity is located between the second seal and the 3rd seal.
It is preferred that first cavity has convex globoidal, the convex globoidal is located at the lower section of the first seal.
It is preferred that the second seal abuts with the convex globoidal and is located at the lower section of the convex globoidal.
It is preferred that the low level of second cavity has cancave cambered surface, the cancave cambered surface is abutted with the 3rd seal.
It is preferred that first docking section includes bottom plate and the flank positioned at the bottom plate both sides, the bottom plate and two
The flank forms receiving space to house at least a portion and the second seal of second docking section.
It is preferred that second docking section includes bottom wall and the docking chamber being connected with the bottom wall, the docking chamber is received
Hold in the receiving space of second docking section.
It is preferred that flank described in one, the docking chamber, the first seal and the second seal constitute described the
One cavity.
It is preferred that flank described in one, the docking chamber, the second seal and the 3rd seal constitute described the
Two cavitys.
It is preferred that the first seal is arranged between flank described in one and the bottom wall, the 3rd seal is set
It is placed between another flank and the bottom wall.
It is preferred that the second seal is arranged between the bottom plate and the docking chamber.
The utility model provides a kind of glass sunlight house, including section bar docking waterproof construction, and section bar docking waterproof construction includes
First section bar, the second section bar, the first docking section being connected with first section bar and be connected with second section bar second
Docking section, first docking section and second docking section are relative to be connect, high-order to low level by what is docked, first docking section
First seal, second seal and the 3rd seal, first docking are set respectively between second docking section
At least a portion in portion and at least a portion of second docking section the first cavity of formation and the second cavity, first cavity
Between the first seal and the second seal, second cavity is located at the second seal and described the
Between three seals.
Compared with prior art, section bar of the present utility model docks waterproof construction on the direction of current by a high position to low level
Multiple waterproof measure is provided with, the waterproof seal between two butted section bars is can effectively ensure that, the problem of solving butt leakage,
Moreover, the utility model avoids carrying out gluing in butted section bars, mounting process is reduced, realizes that portable is installed.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only
It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the side view that section bar of the present utility model docks waterproof construction.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Section bar docking waterproof construction of the present utility model is applied to building for movable building such as glass sunlight house, is particularly suitable for use in and stretches
In door leaf docking in contracting formula packaged type glass sunlight house, between its two section bar that there is multiple waterproof measure to ensure docking
Docking between good waterproof seal, section bar avoids gluing to reduce mounting process.
As shown in figure 1, section bar docking waterproof construction 100 includes the first section bar 110, the second section bar 120 and is arranged at
There is multi layer waterproof structure between first section bar 110 and the second section bar 120, the multi layer waterproof structure multi layer waterproof measure to protect
Demonstrate,prove the waterproof seal between the first section bar 110 and the second section bar 120.
Specifically, the first docking section 131 and the first section bar 110 are connected, and the second docking section 132 is connected with the first section bar 110.
More specifically, the first docking section 131 and the first section bar 110 are connected by snap fit, such as it is formed with the first docking section 131
Engaging is convex, and slot is formed on the outer of the first section bar 110, with engaging convex be engaged.Conversely, can be in the first docking section 131
Engaging is formed on upper formation slot, the first section bar 110 convex to be fastened with slot.To ensure that engaging is stable, the first docking
The section bar 110 of portion 131 and first can be engaged in upper lower edge or surrounding edge.Correspondingly, the second docking section 132 and the second section bar
120 are connected by snap fit, such as are formed with the second docking section 132 and engage convex, formation card on the outer of the second section bar 120
Groove is closed, with engaging convex be engaged.Card is formed on slot, the second section bar 120 conversely, can be formed on the second docking section 132
Close convex to be fastened with slot.To ensure that engaging is stable, the second docking section 132 and the second section bar 120 can be in upper lower edges or four
All edges are engaged.By engaging the connected mode of buckle so that the processing between section bar and butted section bars installs more convenient.
The docking section 132 of first docking section 131 and second connects relatively, and multi layer waterproof structure formation is in the first docking section
131 and second between docking section 132, specifically, high-order to low level, the docking section of the first docking section 131 and second by what is docked
First seal 141, the seal 143 of second seal 142 and the 3rd are set respectively between 132, and the first docking section 131 is extremely
A few part and at least a portion the first cavity 151 of formation of the second docking section 132 and the second cavity 152, the first cavity 151
Between first seal 141 and second seal 142, the second cavity 152 is located at the seal of second seal 142 and the 3rd
Between 143.That is, the high position by docking sets gradually first seal 141, the first cavity 151, second seal to low level
142nd, the second cavity 152 and the 3rd seal 143 are so as to form multi layer waterproof structure.Below to the first docking section 131, second
Docking section 132 and multi layer waterproof structure are described in detail.
As illustrated, first docking section 131 includes bottom plate 1311 and the flank 1312 positioned at the both sides of bottom plate 1311, should
The flank 1312 of bottom plate 1311 and two forms receiving space to house at least a portion of the second docking section 132.Second docking section 132
The docking chamber 1322 being connected including bottom wall 1321 and with bottom wall 1321, the docking chamber 1322 is housed in the second docking section 132
In receiving space.Specifically, when the first docking section 131 and the second docking section 132 are docked, docking chamber 1322 is located at two flanks 1312
Between be housed in, and two flanks 1312 are located at high-order and low level respectively.First seal 141 is arranged in the side of a high position
Between the wing 1312 and bottom wall 1321, specifically, first seal 141 is connected by way of engaging with flank 1312, and can be with
Flank 1312 is moved.It is preferred that flank 1312 has exposed cancave cambered surface 1314, the cancave cambered surface 1314 is located at the height of docking location
Position.Moreover, the cancave cambered surface 1314 is connected with the roof flow-guiding structure 160 of the first section bar 110, so as to effectively guide rainwater.In addition,
Multiple raised ripple glazes can be set in cambered surface on the roof flow-guiding structure 160, to buffer the impact of rainwater.
Second seal 142 is arranged on the joint between bottom plate 1311 and docking chamber 1322, specifically, second sealing
Part 142 can by way of engaging with docking chamber 1322 be connected, and can with docking chamber 1322 move.The He of first docking section 131
After second docking section 132 is by first seal 141 and the sealing docking of second seal 142, the first cavity 151 is formed.That is,
One cavity 151 covered by being enclosed positioned at high-order flank 1312, docking chamber 1322, first seal 141 and second seal 142 and
Into.Specifically, first cavity 151 has the convex globoidal 1511 for being located at the lower section of first seal 141, and the convex globoidal 1511 is by right
The outer wall for connecing chamber 1322 is provided.When rainwater inevitably enters in the first cavity 151, rainwater can be along the convex globoidal 1511 row
Walk.Second seal 142 and the convex globoidal 1511 be adjacent and lower section positioned at convex globoidal 1511.
3rd seal 142 is arranged between the flank 1312 of low level and bottom wall 1321, alternatively, the 3rd sealing
Part 142 is connected with flank 1312, and can be moved with flank 1312.The docking section 132 of first docking section 131 and second passes through second
After the sealing docking of the seal 142 of seal 142 and the 3rd, the second cavity 152 is formed.That is, the second cavity 152 is by positioned at a high position
Docking chamber 1322, second seal 142 and the seal 143 of flank 1312 and the 3rd positioned at low level enclose to cover and form.It is specific
Ground, second cavity 152 has the cancave cambered surface 1521 positioned at low level, and the cancave cambered surface 1521 is abutted with the 3rd seal 142.Specifically
Ground, the cancave cambered surface 1521 is provided by the outer wall of flank 1312.
The waterproof effect of multi layer waterproof structure of the present utility model is as follows:When roof flow-guiding structure 160 of the rainwater through section bar
After water conservancy diversion, during the cancave cambered surface 1314 for the flank 1312 for flowing to the first docking section 131, it can effectively stop a large amount of current, docking is stable
First seal 141 can effectively prevent rainwater flow into the first cavity 151.When inevitably rainwater enters the first cavity 151
When interior, because the high-order bootable rainwater of convex globoidal 1511 that is located in the first cavity 151 is drained from the inwall cambered surface, so as to rise
To water-proof function.If the hypervolia in first cavity 151, rainwater from inwall cambered surface overflow when, due to second seal 142
Sealing function, water resistance is further ensured that.Again even so, if the sealing function of second seal 142 it is bad and
Cause there is a small amount of water to enter the second cavity 152, ensure that the sealing of the second cavity 152 is prevented due to the presence of the 3rd seal 143
It is aqueous.As can be seen here, section bar docking waterproof construction of the present utility model is provided with many on the direction of current by a high position to low level
Weight waterproof measure, can effectively ensure that the waterproof seal between two butted section bars, the problem of solving butt leakage, moreover, this
Utility model avoids carrying out gluing in butted section bars, reduces mounting process, realizes that portable is installed.
It should be noted that the shape of the section bar in the utility model is not limited by accompanying drawing, the docking waterproof construction
Suitable between any two section bars for thering is docking to require.The section bar is particularly suitable for use in the use of Telescopic moving formula glass sunlight house,
Other concrete structures of glass sunlight house are well known to those skilled in the art, herein without being described in detail.
The utility model is described above in association with most preferred embodiment, but the utility model is not limited to the above and taken off
The embodiment shown, and the various modifications carried out according to essence of the present utility model, equivalent combinations should be covered.