Section bar docks waterproof construction and glass sunlight house
Technical field
The present invention relates to technical field of buildings, more particularly to a kind of glass sunlight house.
Background technology
As the living standard of people is improved, the application of portable glass sunlight house is more and more extensive, is common in only house, swimming
Pond, dining room, greenhouse, exhibition room or closing balcony, so that people can be enjoyed indoors from outdoor sunlight.Glass sunlight house is typically by aluminium
Alloy profile is assembled into aluminum alloy frame, and aluminum alloy frame is made up of facade framework and top surface frame two parts, facade framework by
The crossbeam being connected with each other and column are constituted, and transparent or semitransparent glass is inlayed in each framework with daylighting.
A kind of existing telescopic glass sunlight house receives much concern, and it is made up of multigroup telescopic mobile door leaf unit, in sun
The situation that light room is opened, door leaf unit is located remotely from each other and is stacked, and in the situation of glass sunlight house closure, door leaf unit is then mutual
Docking closure forms sealing state.Therefore, the waterproof seal under the section bar docking convenience and closure state of door leaf unit
Seem particularly significant, the use of glass sunlight house will be directly affected.The leakproof of existing glass sunlight house is aqueous to depend on silica gel mostly, in type
The connection of material and section bar, the connection between plane skylight and framework, in a large number using silica gel strip and live gluing so as to waterproof.One
The silica gel waterproof effect that a little quality cause anxiety is very poor, easily occurs rotting or degumming through the immersion of prolonged rainwater, causes sunlight
Room leak.
Therefore, it is necessary to the good section bar docking waterproof construction of a kind of simple structure, waterproof seal and glass sunlight house are provided,
To overcome disadvantages described above.
The content of the invention
It is an object of the present invention to provide a kind of section bar docks waterproof construction, there is multiple waterproof measure to ensure for it
Good waterproof seal between two section bars of docking, the docking between section bar avoids gluing so as to reduce mounting process.
Further object is that providing a kind of glass sunlight house, it has multiple waterproof measure to ensure the two of docking
Good waterproof seal between individual section bar, the docking between section bar avoids gluing so as to reduce mounting process.
To realize object above, the present invention provides a kind of section bar and docks waterproof construction, including the first section bar, the second section bar,
The first docking section being connected with first section bar and the second docking section being connected with second section bar, first docking
Portion and second docking section are relative to be connect, by the high position docked to low level, first docking section and second docking section it
Between be respectively provided with first seal, second seal and the 3rd seal, at least a portion of first docking section and institute
At least a portion for stating the second docking section forms the first cavity and the second cavity, and first cavity is located at the first seal
And the second seal between, second cavity is located between the second seal and the 3rd seal.
It is preferred that first cavity has convex globoidal, the convex globoidal is located at the lower section of the first seal.
It is preferred that the second seal is adjoined and positioned at the lower section of the convex globoidal with the convex globoidal.
It is preferred that the low level of second cavity has cancave cambered surface, the cancave cambered surface is adjacent with the 3rd seal.
It is preferred that first docking section includes base plate and the flank positioned at the base plate both sides, the base plate and two
The flank forms receiving space to house at least a portion and the second seal of second docking section.
It is preferred that second docking section includes diapire and the docking chamber being connected with the diapire, the docking chamber is received
Hold in the receiving space of second docking section.
It is preferred that flank described in, the docking chamber, the first seal and the second seal constitute described the
One cavity.
It is preferred that flank described in, the docking chamber, the second seal and the 3rd seal constitute described the
Two cavitys.
It is preferred that the first seal is arranged between flank described in one and the diapire, the 3rd seal sets
It is placed between another flank and the diapire.
It is preferred that the second seal is arranged between the base plate and the docking chamber.
The present invention provides a kind of glass sunlight house, including section bar docking waterproof construction, and the section bar docking waterproof construction includes first
The first docking section that section bar, the second section bar connect with first section bar and second docking of being connected with second section bar
Portion, first docking section and second docking section are relative to be connect, by the high position docked to low level, first docking section and institute
State and first seal, second seal and the 3rd seal are respectively provided between the second docking section, first docking section
At least a portion of at least a portion and second docking section forms the first cavity and the second cavity, and first cavity is located at
Between the first seal and the second seal, second cavity is located at the second seal and described 3rd close
Between sealing.
Compared with prior art, section bar of the invention docks waterproof construction and is arranged by a high position to low level on the direction of current
There is multiple waterproof measure, can effectively ensure that the waterproof seal between two butted section bars, solve the problems, such as butt leakage, and
And, the present invention avoids carrying out gluing in butted section bars, reduces mounting process, realizes that portable is installed.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the side view that the section bar of the present invention docks waterproof construction.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
The section bar docking waterproof construction of the present invention is applied to building for movable building such as glass sunlight house, is particularly suited for telescopic
In door leaf docking in packaged type glass sunlight house, it is good between two section bars for docking to ensure that it has multiple waterproof measure
Waterproof seal, the docking between section bar avoids gluing so as to reduce mounting process.
As shown in figure 1, the section bar docking waterproof construction 100 includes the first section bar 110, the second section bar 120 and is arranged at
There is multi layer waterproof structure between first section bar 110 and the second section bar 120, the multi layer waterproof structure multi layer waterproof measure to protect
Demonstrate,prove the waterproof seal between the first section bar 110 and the second section bar 120.
Specifically, the first docking section 131 and the first section bar 110 connect, and the second docking section 132 is connected with the first section bar 110.
More specifically, the first docking section 131 and the first section bar 110 are connected by snap fit, such as it is formed with the first docking section 131
Engaging is convex, and on the outer of the first section bar 110 slot is formed, and is engaged with convex with engaging.Conversely, can be in the first docking section 131
Upper formation slot, forms engaging convex to fasten with slot on the first section bar 110.To ensure that engaging is stable, the first docking
The section bar 110 of portion 131 and first can be engaged in upper lower edge or surrounding edge.Correspondingly, the second docking section 132 and the second section bar
120 are connected by snap fit, such as be formed with the second docking section 132 and engage convex, formation card on the outer of the second section bar 120
Groove is closed, is engaged with convex with engaging.Conversely, slot can be formed on the second docking section 132, card is formed on the second section bar 120
Close convex to fasten with slot.To ensure that engaging is stable, the second docking section 132 and the second section bar 120 can be in upper lower edges or four
All edges are engaged.The processing between section bar and butted section bars is caused to install more convenient by engaging the connected mode of buckle.
The docking section 132 of first docking section 131 and second connects relatively, and the multi layer waterproof structure is formed in the first docking section
131 and second between docking section 132, specifically, by the high position docked to low level, the docking section of the first docking section 131 and second
First seal 141, the seal 143 of second seal 142 and the 3rd are respectively provided between 132, the first docking section 131 is extremely
At least a portion of a few part and the second docking section 132 forms the first cavity 151 and the second cavity 152, the first cavity 151
Between first seal 141 and second seal 142, the second cavity 152 is located at the seal of second seal 142 and the 3rd
Between 143.That is, by the high position docked to low level, set gradually first seal 141, the first cavity 151, second seal
142nd, the second cavity 152 and the 3rd seal 143 are so as to forming multi layer waterproof structure.Below to the first docking section 131, second
Docking section 132 and multi layer waterproof structure are described in detail.
As illustrated, first docking section 131 includes base plate 1311 and the flank 1312 positioned at the both sides of base plate 1311, should
1311 and two flank of base plate 1312 forms receiving space to house at least a portion of the second docking section 132.Second docking section 132
Including diapire 1321 and the docking chamber 1322 being connected with diapire 1321, the docking chamber 1322 is housed in the second docking section 132
In receiving space.Specifically, when the first docking section 131 and the second docking section 132 are docked, docking chamber 1322 is located at two flanks 1312
Between be housed in, and two flanks 1312 are located at respectively high-order and low level.First seal 141 is arranged in the side of a high position
Between the wing 1312 and diapire 1321, specifically, first seal 141 is connected by way of engaging with flank 1312, and can be with
Flank 1312 is moved.It is preferred that flank 1312 has the cancave cambered surface 1314 for exposing, the cancave cambered surface 1314 is located at the height of docking location
Position.And, the cancave cambered surface 1314 is connected with the roof flow-guiding structure 160 of the first section bar 110, so as to effectively guide rainwater.In addition,
The ripple glaze of multiple projections can be set in the cambered surface on the roof flow-guiding structure 160, to buffer the impact of rainwater.
Second seal 142 is arranged on the joint between base plate 1311 and docking chamber 1322, specifically, second sealing
Part 142 can be connected by way of engaging with docking chamber 1322, and can be moved with docking chamber 1322.The He of first docking section 131
Second docking section 132 forms the first cavity 151 after first seal 141 and the sealing docking of second seal 142.That is,
One cavity 151 covered by enclosing positioned at high-order flank 1312, docking chamber 1322, first seal 141 and second seal 142 and
Into.Specifically, first cavity 151 has the convex globoidal 1511 positioned at the lower section of first seal 141, and the convex globoidal 1511 is by right
The outer wall for connecing chamber 1322 is provided.When rainwater is inevitably entered in the first cavity 151, rainwater can be along the convex globoidal 1511 row
Walk.Second seal 142 and the convex globoidal 1511 are adjacent and positioned at the lower section of convex globoidal 1511.
3rd seal 142 is arranged between the flank 1312 of low level and diapire 1321, alternatively, the 3rd sealing
Part 142 is connected with flank 1312, and can move with flank 1312.The docking section 132 of first docking section 131 and second passes through second
After the sealing docking of the seal 142 of seal 142 and the 3rd, the second cavity 152 is formed.That is, the second cavity 152 is by positioned at a high position
Docking chamber 1322, second seal 142 and the seal 143 of flank 1312 and the 3rd positioned at low level enclose to cover and form.It is specific
Ground, second cavity 152 has the cancave cambered surface 1521 positioned at low level, and the seal 142 of cancave cambered surface 1521 and the 3rd is adjoined.Specifically
Ground, the cancave cambered surface 1521 is provided by the outer wall of flank 1312.
The waterproof effect of the multi layer waterproof structure of the present invention is as follows:When the water conservancy diversion of roof flow-guiding structure 160 of rainwater Jing section bars
Afterwards, stream to the flank 1312 of the first docking section 131 cancave cambered surface 1314 when, can effectively stop a large amount of current, dock stable the
One seal 141 can effectively prevent rainwater from flowing into the first cavity 151.When inevitably rainwater is entered in the first cavity 151,
It is anti-so as to play due to draining from the inwall cambered surface positioned at the high-order bootable rainwater of convex globoidal 1511 in first cavity 151
Water function.If the hypervolia in first cavity 151, rainwater from inwall cambered surface overflow when, it is close due to second seal 142
Envelope is acted on, and water resistance is further ensured that.Again even so, cause if the sealing function of second seal 142 is bad
There is a small amount of water to enter the second cavity 152, the sealing water proofing property of the second cavity 152 is ensured due to the presence of the 3rd seal 143.
As can be seen here, section bar of the invention docking waterproof construction is provided with multiple waterproof and arranges on the direction of current by a high position to low level
Apply, can effectively ensure that the waterproof seal between two butted section bars, solve the problems, such as butt leakage, and, the present invention is avoided
Gluing is carried out in butted section bars, mounting process is reduced, realizes that portable is installed.
It should be noted that the shape of the section bar in the present invention is not limited by accompanying drawing, the docking waterproof construction is suitable for
Between any two section bars for having docking to require.The section bar is particularly suited for the use of Telescopic moving formula glass sunlight house, sunlight
Other concrete structures in room are well known to those skilled in the art, and here is not described in detail.
Above in association with most preferred embodiment, invention has been described, but the invention is not limited in enforcement disclosed above
Example, and modification, equivalent combinations that various essence of the invention are carried out should be covered.