CN206554074U - A kind of piles set into rock structure - Google Patents
A kind of piles set into rock structure Download PDFInfo
- Publication number
- CN206554074U CN206554074U CN201720068083.7U CN201720068083U CN206554074U CN 206554074 U CN206554074 U CN 206554074U CN 201720068083 U CN201720068083 U CN 201720068083U CN 206554074 U CN206554074 U CN 206554074U
- Authority
- CN
- China
- Prior art keywords
- reaming
- stake
- prefabricated pile
- rock
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A kind of piles set into rock structure, it is related to filling pile structure, including prefabricated pile, also include stake reaming, stake reaming is located in rock stratum, and prefabricated pile is arranged in a reaming and diameter is smaller than stake counter bore diameter, provided with some pieces of fixation steel plates in stake reaming, fixation steel plate is uniformly connected to around prefabricated pile, is cast with stake reaming above the concrete basis of parcel prefabricated pile and fixation steel plate, rock stratum covered with soil layer.This programme provides a kind of piles set into rock structure, and manufacturing process is simple, construction technology is easy, short construction period;Cost is low, quality is high, and load-carrying properties are excellent.
Description
Technical field
The utility model is related to bored concrete pile, more particularly to a kind of piles set into rock structure.
Background technology
With the quickening and the development of auto industry of various regions urbanization process, Basement pit supporting increasingly becomes construction
The key technology of engineering, bored concrete pile is used as the primary structural member that support pile is pattern foundation pit supporting structure.In Supporting Structure of Deep Foundation Pit in City
In, the geological conditions of upper soil horizon, bottom competent bed is frequently encountered, it is necessary to which the bored concrete pile of solid rock can be embedded in by being formed.
The existing technique for being capable of embedding rock mainly has following several:A, impact drilled as holes, rock mass is hammered into powder using weight very big iron hammer
End, pore-forming of slagging tap is circulated by mud;B, artificial digging pile, after rock stratum is loosened using blasting method, manually using pneumatic pick, spade
Slag tap pore-forming;C, rotary digging drilled as holes, are equipped with the special roller drill of rock mass by rock mass coring pore-forming.
Authorization Notice No. discloses a kind of piles set into rock for CN203625893U Chinese utility model, including periphery
Reinforcement cage skeleton and internal bored concrete pile, the bored concrete pile include top concrete timber pile and the correspondence bottom of correspondence upper soil horizon
Multiple bottom miniature steel pipe piles of rock stratum, the bottom miniature steel pipe pile is made up of inner concrete stake and outside build-in steel pipe,
The top of the bottom miniature steel pipe pile is stretched into the top concrete timber pile and the top concrete timber pile forms one
Structure.The piles set into rock whether structure or all not simple enough, a kind of simpler embedding rock filling of the utility model offer of constructing
Note pilework.
Utility model content
The purpose of this utility model is to provide a kind of piles set into rock structure, and construction technology is simple, filling pile structure letter
It is single, short construction period.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of piles set into rock structure,
Including prefabricated pile, in addition to stake reaming, stake reaming is located in rock stratum, and prefabricated pile is arranged in a reaming and diameter is more straight than stake reaming
Footpath is small, and provided with some pieces of fixation steel plates in stake reaming, fixation steel plate is uniformly connected to around prefabricated pile, is cast with stake reaming
Wrap up above the concrete basis of prefabricated pile and fixation steel plate, rock stratum covered with soil layer.
By using above-mentioned technical proposal, because rock stratum hardness is high, common piles set into rock construction technology is difficult, the duration
It is long, and the reliability of bored concrete pile is not good, and stake reaming is bored in rock stratum, the diameter range of stake reaming is big, reduces to pore size
Requirement;Overlying soil can reduce the depth of a reaming above rock stratum, so as to reduce boring work amount;Prefabricated pile expands with stake
Fixation steel plate and pour concrete basis are set between hole, the stability of prefabricated pile is further increased.
It is preferred that, prefabricated pile bottom is provided with circumferentially distributed neck, and one end of fixation steel plate is goed deep into neck, the other end
It is resisted against a reaming inwall.
By using above-mentioned technical proposal, fixation steel plate is connected on prefabricated pile, on the one hand easy to connect and firm, another
Aspect makes prefabricated pile have simple structure, and technique is simpler during stake processed.
It is preferred that, prefabricated pile is reserved slip casting passage and extended at the top of prefabricated pile provided with least two reserved slip casting passages
To neck bottom, the through hole of reserved slip casting passage is communicated with fixation steel plate.
By using above-mentioned technical proposal, when pour concrete is basic, it might have some solid impurities and infiltrate in concrete,
Or concrete is filled up completely with a reaming and produces defect, causes to connect unreliable between rock stratum, prefabricated pile and soil layer, toward in advance
Stay the connection of cast grouting further between reinforcement prefabricated pile, concrete basis, fixation steel plate in slip casting passage so that bored concrete pile is more steady
Gu, improve the bearing capacity and quality of stake.
It is preferred that, reserve and slip casting steel pipe is provided with slip casting passage.
By using above-mentioned technical proposal, the quality for setting slip casting steel pipe to improve prefabricated pile in slip casting passage is reserved, is reduced
The defect that prefabricated pile is produced when manufacturing, reinforcement structure intensity, so that bored concrete pile has firm, reliable bearing capacity.
It is preferred that, the depth of stake reaming is between 0.5d ~ 1.5d of prefabricated pile, d is prefabricated pile diameter.
By using above-mentioned technical proposal, on the one hand the depth of stake reaming can reduce drilling in above-mentioned number range
Difficulty, on the other hand can ensure the steadiness of bored concrete pile again.
It is preferred that, between 1.5d ~ 2d of a diameter of prefabricated pile of stake reaming, d is prefabricated pile diameter.
By using above-mentioned technical proposal, the diameter of stake reaming is arranged in above-mentioned number range, on the one hand can be reduced
The difficulty that requirement during drilling to bore dia is caused, on the other hand can pour into a mould appropriate concrete so that concrete it is basic with it is prefabricated
Strong bonded between stake, rock stratum, soil layer.
It is preferred that, concrete basis is slag concrete.
By using above-mentioned technical proposal, slag concrete has good heat endurance, water stability, it is possible to increase concrete basis
Durability, reduce construction costs, save natural resources.
To sum up, a kind of piles set into rock structure described in the utility model, manufacturing process is simple, construction technology is easy, apply
The work cycle is short;Cost is low, quality is high, and load-carrying properties are excellent.
Brief description of the drawings
Fig. 1 is the overall schematic of piles set into rock;
Fig. 2 is the rock stratum partial schematic diagram of piles set into rock;
Fig. 3 is stake reaming schematic diagram;
The enlarged drawing that Fig. 4 is part A in Fig. 3;
Fig. 5 is prefabricated pile structural representation;
The enlarged drawing that Fig. 6 is part B in Fig. 5.
Reference:1st, prefabricated pile;2nd, stake reaming;201st, neck;202nd, slip casting passage is reserved;3rd, fixation steel plate;301、
Through hole;4th, concrete basis;5th, soil layer;6th, slip casting steel pipe;7th, rock stratum.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Fig. 1 ~ 2,5 ~ 6, a kind of piles set into rock structure, including prefabricated pile 1, the bottom of prefabricated pile 1 is provided with circumferentially
Four clamp bar slots 201 of distribution, prefabricated pile 1 is provided with two reserved slip casting passages 202, and reserved slip casting passage 202 is pushed up from prefabricated pile 1
Portion extends to the bottom of neck 201, reserves and slip casting steel pipe 6 is provided with slip casting passage 202.
Piles set into rock structure also includes the stake reaming 2 being located in rock stratum 7, and prefabricated pile 1 is arranged in a reaming 2 and diameter
It is smaller than the diameter of stake reaming 2.The a diameter of d of prefabricated pile 1, the depth of stake reaming 2 is 0.5d, a diameter of 1.5d of stake reaming 2.
As shown in Fig. 2 ~ 4, provided with four pieces of fixation steel plates 3 in stake reaming 2, one end of fixation steel plate 3 is connected to neck 201
Interior, the other end is resisted against the inwall of a reaming 2.The slip casting steel pipe 6 being communicated with fixation steel plate 3 in reserved slip casting passage 202
Through hole 301.The concrete basis 4 of parcel prefabricated pile 1 and fixation steel plate 3 is cast with stake reaming 2, concrete basis 4 is slag concrete.Rock stratum 7
Top is covered with soil layer 5.
Get out a reaming 2 during construction in rock stratum 7 first;Fixation steel plate 3 is put into a reaming 2;Prefabricated pile 1 is put into
Stake reaming 2 is interior and fixation steel plate 3 is connected in the neck 201 of prefabricated pile 1;The pour concrete basis 4 into stake reaming 2;Again in rock
7 top overlying soil 5 of layer;Cast concrete mortar in most backward slip casting steel pipe 6.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (7)
1. a kind of piles set into rock structure, including prefabricated pile(1), it is characterised in that:Also include stake reaming(2), stake reaming(2)Position
In rock stratum(7)It is interior, prefabricated pile(1)It is arranged on a reaming(2)Interior and diameter is than stake reaming(2)Diameter is small, stake reaming(2)Inside it is provided with
Some pieces of fixation steel plates(3), fixation steel plate(3)Uniformly it is connected to prefabricated pile(1)Around, stake reaming(2)Inside it is cast with parcel
Prefabricated pile(1)And fixation steel plate(3)Concrete basis(4), rock stratum(7)Top is covered with soil layer(5).
2. a kind of piles set into rock structure according to claim 1, it is characterised in that:The prefabricated pile(1)Bottom is provided with
Circumferentially distributed neck(201), fixation steel plate(3)One end go deep into neck(201)Interior, the other end is resisted against a reaming(2)
Inwall.
3. a kind of piles set into rock structure according to claim 2, it is characterised in that:The prefabricated pile(1)Provided with extremely
Few two reserved slip casting passages(202), reserve slip casting passage(202)From prefabricated pile(1)Top extends to neck(201)Bottom,
Fixation steel plate(3)On be communicated with reserved slip casting passage(202)Through hole(301).
4. a kind of piles set into rock structure according to claim 3, it is characterised in that:The reserved slip casting passage(202)
It is interior to be provided with slip casting steel pipe(6).
5. a kind of piles set into rock structure according to claim 1, it is characterised in that:The stake reaming(2)Depth be
Prefabricated pile(1)0.5d ~ 1.5d between, d is prefabricated pile(1)Diameter.
6. a kind of piles set into rock structure according to claim 1, it is characterised in that:The stake reaming(2)It is a diameter of
Prefabricated pile(1)1.5d ~ 2d between, d is prefabricated pile(1)Diameter.
7. a kind of piles set into rock structure according to claim 1, it is characterised in that:The concrete basis(4)For slag concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720068083.7U CN206554074U (en) | 2017-01-19 | 2017-01-19 | A kind of piles set into rock structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720068083.7U CN206554074U (en) | 2017-01-19 | 2017-01-19 | A kind of piles set into rock structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206554074U true CN206554074U (en) | 2017-10-13 |
Family
ID=60358296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720068083.7U Expired - Fee Related CN206554074U (en) | 2017-01-19 | 2017-01-19 | A kind of piles set into rock structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206554074U (en) |
-
2017
- 2017-01-19 CN CN201720068083.7U patent/CN206554074U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210292987A1 (en) | Construction method for pouring concrete in karst cave | |
CN203625893U (en) | Rock-embedded cast-in-place pile | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN100434597C (en) | Construction method of immersed tube club-footed bored concrete pile | |
CN104612143B (en) | Composite pile constructed in drilled hole structure under a kind of solution cavity/soil cave geological conditions | |
CN112392400B (en) | Hole forming construction process for slope protection pile in complex geological environment | |
CN100564695C (en) | The job practices of carrier pile | |
CN110344400A (en) | The hard rock pore-forming construction technology of churning driven opportunity | |
CN102182399B (en) | Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag | |
CN108643214A (en) | It is a kind of to backfill miscellaneous native composite foundation structure and its construction method | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN102071687B (en) | Drilled pile casing preparation method | |
CN104131566B (en) | A kind of basement is without the construction method of horizontal support foundation ditch | |
CN203654272U (en) | Lateral friction boring filling pile for isolation pile | |
CN105133641A (en) | Thin-wall continuous-wall-type foundation reinforcing structure and method | |
CN210086280U (en) | Expanded footing soil anchor rod-precast concrete composite iron tower foundation structure | |
CN104372793A (en) | Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method | |
CN206554074U (en) | A kind of piles set into rock structure | |
CN206721875U (en) | A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod | |
CN102220760B (en) | Method for casting deep inverted T-shaped pile | |
CN109113054A (en) | A kind of reclaimation area complex geological condition cast-in-situ bored pile multimachine combined construction method | |
CN202000367U (en) | Novel drilled pile casing | |
CN208379624U (en) | A kind of miscellaneous native composite foundation structure of backfill | |
CN101629470B (en) | Drilling construction method for dry rock-socketed bored pile | |
CN207295465U (en) | Open cut rock anchor combination foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No.11 paper lane, Qinhuai District, Nanjing, Jiangsu 210001 Patentee after: Zhongzhe International Engineering Design Co.,Ltd. Address before: 210016 room 2602, building 01, 300 Zhongshan East Road, Qinhuai District, Nanjing City, Jiangsu Province Patentee before: NANJING CHISAGE INTERNATIONAL ENGINEERING DESIGN Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171013 Termination date: 20220119 |