CN112392400B - Hole forming construction process for slope protection pile in complex geological environment - Google Patents

Hole forming construction process for slope protection pile in complex geological environment Download PDF

Info

Publication number
CN112392400B
CN112392400B CN202011170867.3A CN202011170867A CN112392400B CN 112392400 B CN112392400 B CN 112392400B CN 202011170867 A CN202011170867 A CN 202011170867A CN 112392400 B CN112392400 B CN 112392400B
Authority
CN
China
Prior art keywords
layer
pile
hole
soil layer
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011170867.3A
Other languages
Chinese (zh)
Other versions
CN112392400A (en
Inventor
李武光
马跃
李金树
齐宝廷
王晨宇
鲁阳
谭华锋
刘志杰
吉邵昃
魏伟
冯紫昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Uni Construction 1st Development And Construction Co ltd
Original Assignee
Beijing Uni Construction 1st Development And Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Uni Construction 1st Development And Construction Co ltd filed Critical Beijing Uni Construction 1st Development And Construction Co ltd
Priority to CN202011170867.3A priority Critical patent/CN112392400B/en
Publication of CN112392400A publication Critical patent/CN112392400A/en
Application granted granted Critical
Publication of CN112392400B publication Critical patent/CN112392400B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The application relates to a complex geological environment slope protection pile pore-forming construction process, which belongs to the technical field of foundation construction and comprises the following steps: dividing the poor stratum layer into N layers; drilling holes layer by layer, pouring plain concrete into the drilled holes, and performing secondary drilling on a concrete layer after the strength of the plain concrete meets the requirement to form pile holes at the layer position; and (5) cleaning holes, and preparing for the next pile-forming construction. This application utensil adopts the method pore-forming of concrete layering dado, has avoided adopting the problem that the hole collapses appears easily when traditional mode pore-forming, and especially has more obvious effect under the condition of groundwater in the miscellaneous fill layer.

Description

Hole forming construction process for slope protection pile in complex geological environment
Technical Field
The application relates to the field of foundation construction, in particular to a hole forming construction process for a slope protection pile in a complex geological environment.
Background
With the construction development of urban high-rise buildings, the corresponding deep foundation pit excavation and supporting technology is correspondingly improved. Under the condition that the effective width working face of the foundation pit slope is not enough, the edge of the foundation pit is supported by adopting a slope protection pile mode, so that the slope collapse is prevented. The revetment piles are also called row piles, and usually adopt a drilling machine to form holes at one time.
However, due to the influence of human activities, the foundation of many engineering constructions is often not an undisturbed soil layer but a miscellaneous filling soil after backfilling. The soil is often loose due to different filler materials, greatly different particle sizes and different pore sizes among particles. When carrying out the bank protection stake pore-forming in miscellaneous fill layer, though have higher pore-forming efficiency, the in-process pore wall of drilling collapses easily, and the stability of the pore wall after the pore-forming is relatively poor, and the soil block that drops can cause the problem of mixed dregs in the bank protection stake body of pile under the in-process of putting steel reinforcement cage and concreting.
Disclosure of Invention
In order to avoid the problem that the pore wall collapses after among the bank protection stake pore-forming process and the pore-forming, this application provides a complicated geological environment bank protection stake pore-forming construction technology.
On the one hand, the application provides a complicated geological environment protects stake pore-forming construction technology adopts following technical scheme:
a hole forming construction process for a slope protection pile in a complex geological environment comprises the following steps:
s1, dividing the poor stratum layer into N layers from top to bottom according to the thickness of the poor stratum; measuring and setting out, and determining the positions and construction serial numbers of all slope protection pile holes; the rotary drilling rig is in place, N +1 rotary drilling bits are prepared and labeled, the diameters of the rotary drilling bits are reduced according to sequential increase, and the rotary drilling bits with the diameters sequentially reduced are adopted for drilling during drilling;
s2, forming a first soil layer pile hole, drilling in a first soil layer by using a rotary drilling bit to form a first drill hole, pouring plain concrete into the first drill hole to form a first concrete layer, drilling on the first concrete layer by using a rotary drilling rig after the strength of the plain concrete meets the requirement, wherein the drilling depth is not less than the thickness of the first concrete layer, so that a pile hole in the first soil layer is formed, and a first layer of protective wall is formed around the pile hole;
s3, forming holes in pile holes of 2-N soil layers, wherein N is not less than 2, continuously drilling to form a drill hole of a lower soil layer after the pile holes of the upper soil layer are formed by using a rotary drilling bit, pouring plain concrete into the drill hole to form a concrete layer, drilling on the concrete layer by using the rotary drilling bit after the strength of the plain concrete meets the requirement, and the drilling depth is not less than the thickness of the concrete layer;
constructing layer by layer from the second soil layer to the Nth soil layer, drilling on the concrete layer by using a rotary drilling bit after the strength of plain concrete in the Nth soil layer meets the requirement, and continuing to drill downwards after the rotary drilling bit penetrates through the concrete layer until the designed depth is reached;
and S4, cleaning holes, finishing hole forming operation of the slope protection pile, and lowering a reinforcement cage to perform post pile forming construction.
Through adopting above-mentioned technical scheme, adopt successive layer drilling in bad ground, pour, the mode of secondary drilling, can enough guarantee not take place to collapse at the pore wall of the in-process top soil layer of drilling downwards, also can guarantee that the pore wall in whole stake hole is the concrete dado of pouring behind the pore-forming, thereby make and form the pile-forming in-process and transfer the steel reinforcement cage in the later stage and do not have when pouring the pile body miscellaneous fill piece and fall into the stake downthehole, no sediment soil is mixed in the pile body, guarantee the quality of pouring of pile body.
Preferably, when the hole is drilled in the Nth soil layer, the depth of the rotary drill bit into the lower normal stratum is not less than 500mm.
By adopting the technical scheme, after the concrete layer is poured on the drilled hole on the Nth layer, the junction of the poor stratum and the normal stratum is filled with concrete, and the pile hole at the junction can form a stable retaining wall.
Preferably, in S3, when the drill hole of the lower soil layer is subjected to plain concrete pouring, the liquid level of the concrete is 100 to 150mm higher than the bottom surface of the upper soil layer.
By adopting the technical method, an overlapping section can be formed between the concrete retaining walls of the upper soil layer and the lower soil layer, particles of the soil layer or underground water are blocked, and the phenomenon that the underground water enters the pile hole to influence the later pile-forming operation construction is avoided.
Preferably, the thickness of each layer is 1 to 1.5m when the layer division is performed.
By adopting the technical scheme, the rotary drilling rig is easier to drill and construct every time.
On the other hand, the application provides a complicated geological environment protects stake pore-forming construction technology adopts following technical scheme:
a hole forming construction process for a slope protection pile in a complex geological environment comprises the following steps:
s1, dividing the poor stratum layer into N layers from top to bottom according to the thickness of the poor stratum; measuring and setting out, and determining the positions and construction serial numbers of all slope protection pile holes; placing the rotary drilling rig in place, preparing N +1 rotary drilling bits and marking, reducing the diameters of the rotary drilling bits according to sequential increase, and drilling by adopting the rotary drilling bits with the sequentially reduced diameters during drilling;
s2, forming a first soil layer pile hole, drilling in a first soil layer by using a rotary drilling bit to form a first drill hole, and then putting a first protective cylinder, wherein the outer diameter of the first protective cylinder is smaller than the diameter of the first drill hole, so that a space is formed between the outer wall of the first protective cylinder and the wall of the first drill hole; then plain concrete is poured between the first casing and the hole wall of the first drill hole to form a first layer of retaining wall; when the strength of the plain concrete meets the requirement, the first pile casings are recovered, and pile holes of a first soil layer are formed between the first layer of retaining walls;
s3, forming holes in pile holes of 2-N soil layers, wherein N is not less than 2, drilling to form a drill hole of a lower soil layer after the pile holes of the upper soil layer are formed by using a rotary drilling bit, then placing a protective cylinder, and reserving a space between the outer wall of the protective cylinder and the wall of the drill hole; pouring plain concrete between the pile casing and the wall of the drilled hole, recovering the pile casing after the strength of the plain concrete meets the requirement and the pile casing is formed,
constructing layer by layer from the second soil layer to the Nth soil layer, recovering the Nth pile casing after the strength of the plain concrete in the Nth soil layer meets the requirement, and then continuing to drill downwards by using a rotary drilling bit until the design depth is reached;
s4, cleaning holes, completing hole forming operation of the slope protection pile, and putting down a reinforcement cage for post pile forming construction;
the diameters of all the pile casings are reduced from top to bottom in sequence.
By adopting the technical scheme, the modes of drilling, lowering the pile casing, pouring concrete and recovering the pile casing layer by layer are adopted in the bad stratum to form the concrete retaining wall of each layer of pile hole, so that the problem of hole collapse in the hole forming process is solved, and the stability of the pile hole in the later pile forming process is also ensured.
Preferably, in S3, the bottom end of the lower casing is inserted into the lower soil layer for 100-150mm, and the top end of the lower casing is 100-120mm higher than the bottom surface of the upper soil layer.
By adopting the technical method, concrete is prevented from flowing into the pile hole from the lower part of the pile casing when the concrete is poured, and meanwhile, the upper concrete retaining wall and the lower concrete retaining wall can be overlapped.
Preferably, the outer walls of all the casings are coated with a release agent.
By adopting the technical method, the friction force between the pile casing and the concrete layer is reduced, and the pile casing is convenient to lift and recover.
In a third aspect, the application provides a complex geological environment slope protection pile hole forming construction process which adopts the following technical scheme:
a hole forming construction process for a slope protection pile in a complex geological environment comprises the following steps:
s1, dividing the position of a poor stratum into N layers from top to bottom according to the thickness of the poor stratum; measuring and setting out, and determining the positions and construction serial numbers of all slope protection pile holes; placing the rotary drilling rig in place, preparing N +1 rotary drilling bits and marking, reducing the diameters of the rotary drilling bits according to sequential increase, and drilling by adopting the rotary drilling bits with the sequentially reduced diameters during drilling;
s2, forming a first soil layer pile hole, drilling in a first soil layer by using a rotary drilling bit to form a first drill hole, then putting a first protective cylinder, attaching the outer wall of the first protective cylinder to the hole wall of the first drill hole, and enabling the first protective cylinder to play a role of temporary wall protection;
s3, forming holes in pile holes of 2 nd-N soil layers, wherein N is not less than 2, drilling to form a drill hole of a lower soil layer after the pile holes of the upper soil layer are formed by utilizing a rotary drilling bit, then putting down a protective cylinder, attaching the outer wall of the protective cylinder to the wall of the drill hole,
constructing layer by layer from the second soil layer to the Nth soil layer, and after the pile casing of the Nth layer is completely lowered, continuing to drill downwards by using a rotary drilling bit until the design depth is reached;
and S4, cleaning holes, finishing hole forming operation of the slope protection pile, and lowering a reinforcement cage to perform post pile forming construction.
By adopting the technical method, the temporary protective wall of the pile hole of the revetment pile is formed in the bad stratum by adopting the modes of drilling and lowering the protective tube layer by layer, so that hole collapse is avoided, and after the reinforcement cage is lowered at the later stage, pile forming operation is carried out by adopting the modes of grouting layer by layer and recovering the protective tube layer by layer.
Preferably, in S3, the bottom end of the lower casing is inserted into the lower soil layer for 100-150mm, and the top end of the lower casing is 100-120mm higher than the bottom surface of the upper soil layer.
By adopting the technical method, an overlapped part is formed between the pile casings of the upper soil layer and the lower soil layer, the hole walls are completely blocked, and underground water and soil layer particles are prevented from falling into pile holes.
Preferably, the undesirable formation is a miscellaneous fill layer.
By adopting the technical method, as the ingredients of the miscellaneous fill layer are complex and the compactness is poor, hole collapse is easy to occur by adopting the traditional hole forming mode, and the problem of difficult hole forming caused by the development of underground water is easier, and the problem of hole collapse of miscellaneous fill can be effectively solved by adopting the construction method.
To sum up, the part that miscellaneous bank filling layer was passed in slope protection stake hole of this application adopts the method pore-forming of concrete layering dado, has avoided appearing the problem of collapsing the hole when adopting traditional mode pore-forming easily, and especially to the effect under the condition that has groundwater in the miscellaneous bank filling layer more obvious.
Drawings
Fig. 1 is a flowchart of a complex geological environment slope protection pile hole forming construction process according to a first embodiment of the application;
FIG. 2 is a construction structure diagram of the complex geological environment slope protection pile hole-forming construction process;
fig. 3 is a flowchart of a complex geological environment slope protection pile hole forming construction process according to the second embodiment of the present application;
FIG. 4 is a flowchart of a complex geological environment slope protection pile hole forming construction process according to a third embodiment of the present application;
fig. 5 is a construction structure diagram of a hole forming construction process of a complex geological environment slope protection pile according to a third embodiment of the present application.
Description of reference numerals: 1. a miscellaneous fill layer; 2. the first layer of protective wall.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses a hole forming construction process for a slope protection pile in a complex geological environment. In the hole forming process of the slope protection pile in the embodiment, the mixed filling layer 1 with the thickness of 10m needs to pass through, and underground water appears in the mixed filling layer 1. Because the components of the miscellaneous fill layer 1 are complex and the compactness is poor, hole collapse easily occurs by adopting a traditional hole forming mode, and the problem of difficult hole forming is easily caused by the development of underground water, thereby affecting the progress of engineering.
Example one
Referring to fig. 1 and 2, the hole forming construction process of the slope protection pile in the complex geological environment comprises the following steps;
s1, dividing to-be-formed soil layer position of slope protection pile
The layer position division is carried out according to the thickness of the miscellaneous fill layer 1, the miscellaneous fill layer 1 with the thickness of 10m is divided into N layers from top to bottom according to the thickness of 1.5m of each layer, the thickness of the N layers is 7,1-6 layers in the embodiment is 1.5m, and the thickness of the lowest layer is 1m.
And measuring and setting out, determining the position of the pile hole of the slope protection pile on the ground, marking the serial number, and drilling according to the sequence of the serial number during hole forming operation.
In this embodiment, a dry hole forming method is adopted. The drilling machine is in place, the drilling machine adopts rotary drilling bits, the number of the rotary drilling bits is 8, the rotary drilling bits are marked according to the sequence of 1-8, and the diameters of the rotary drilling bits are reduced according to the increase of the sequence.
S2, forming holes in pile holes of first soil layer
S21, forming holes in a first soil layer
And (3) installing the No. 1 rotary drilling bit on the rotary drilling rig, vertically drilling 1.5m downwards on the surface of the miscellaneous fill layer 1 to reach the top surface of a second soil layer to form a first drilling hole, wherein the length of the first drilling hole is equal to the thickness of the first soil layer.
S22, pouring concrete
Plain concrete is poured into the first drill hole, and in the embodiment, C20 concrete is adopted as the plain concrete. Plain concrete is filled in the first drilled hole and the holes on the hole wall are filled to form a first concrete layer. And waiting for plain concrete solidification after the plain concrete pouring is finished.
S23, pile hole forming
And when the strength of the plain concrete reaches more than 10MP and meets the standard of concrete retaining walls, drilling at the center of the first concrete layer by using a No. 2 rotary drilling bit, wherein a pile hole of the first concrete layer is formed by the drilling depth of 1.5m, and a first layer of retaining wall 2 is formed around the pile hole.
S3, forming a hole in the n-th soil layer pile hole (n is two to six)
Continuously drilling downwards after the pile hole of the upper layer soil layer is formed by using an n number rotary drilling bit, wherein the drilling depth is 1.5m, and the drilling depth reaches the top surface of the lower layer soil layer to form an nth drilled hole; and pouring plain concrete into the nth drilled hole, wherein the liquid level of the plain concrete is 100mm higher than the bottom surface of the upper soil layer to form an nth concrete layer. And waiting for plain concrete solidification after the plain concrete pouring is finished. The overlapping section with the length of 100mm exists between the upper concrete layer and the lower concrete layer, so that seamless combination between the upper concrete layer and the lower concrete layer is ensured, underground water in miscellaneous filling soil is blocked, and the phenomenon that the underground water enters a pile hole to influence later-stage pile-forming operation construction is avoided.
And when the strength of the plain concrete reaches more than 10MP and meets the standard of concrete wall protection, drilling at the center of the nth concrete layer by using an n +1 number rotary drilling bit, wherein a pile hole of the nth concrete layer is formed at the drilling depth of 1.5m, and the nth wall protection is formed around the pile hole.
And repeating the steps from the second soil layer to the sixth soil layer by layer until a pile hole in the sixth soil layer is formed by drilling with the No. 7 rotary drilling bit.
During the drilling process, the centers of all the drill holes and the pile holes are ensured to be positioned on the same vertical straight line.
S4, forming holes in pile holes of seventh soil layer
S41, forming holes in the seventh soil layer
And (4) continuing drilling downwards when the No. 7 rotary drilling bit is used for drilling to the top surface of the seventh soil layer until the seventh soil layer is drilled and then the undisturbed soil layer or rock stratum below is drilled by 500mm, and stopping drilling to form a seventh drilled hole.
S42, pouring concrete
And pouring plain concrete into the seventh drilled hole, wherein the liquid level of the plain concrete is 100mm higher than the bottom surface of the pile hole of the sixth soil layer, so as to form a seventh concrete layer. And after the plain concrete pouring is finished, waiting for the plain concrete to be solidified. The seventh concrete layer penetrated 100mm into the underlying formation. Because the concrete layer is poured downwards into the undisturbed soil layer or the rock stratum, the hole wall strength of the junction of the miscellaneous fill layer and the lower stratum is ensured.
S43, pile hole forming
And when the strength of the plain concrete reaches more than 10MP and meets the standard of the concrete retaining wall, drilling at the center of the seventh concrete layer by using a No. 8 rotary drilling bit until the plain concrete reaches the designed depth.
The diameter of the pile hole of all the layers is reduced from top to bottom layer by layer.
S5, cleaning the hole
And (4) cleaning holes, finishing hole forming operation of the slope protection piles, and lowering the reinforcement cage to perform pile forming construction in the later period.
Through adopt successive layer drilling in miscellaneous fill soil layer, pour, the mode of secondary drilling, can enough guarantee not take place to collapse at the pore wall on the in-process top soil layer of drilling downwards, also can guarantee that the pore wall in whole stake hole is the concrete dado that pours after the pore-forming, thereby it falls into the stake downthehole to make to become the stake in-process in the later stage and transfer the steel reinforcement cage and do not have miscellaneous fill piece when pouring the pile body, no dregs soil mixes in the pile body, guarantee the quality of pouring of pile body.
Meanwhile, the concrete retaining wall can also block underground water in the miscellaneous filling soil, so that the influence of the underground water entering the pile hole on pile forming construction is avoided.
Example two
Referring to fig. 2 and 3, the hole forming construction process of the slope protection pile in the complex geological environment comprises the following steps;
s1, dividing horizon of soil layer to be formed into holes of slope protection piles
And performing layer position division according to the thickness of the miscellaneous fill layer 1, dividing the miscellaneous fill layer 1 with the thickness of 10m into 7 layers from top to bottom according to the thickness of 1.5m of each layer, wherein the thicknesses of 1-6 layers are 1.5m, and the thickness of the lowest layer is 1m.
And measuring and setting out, determining the position of the pile hole of the slope protection pile on the ground, marking the serial number, and drilling according to the sequence of the serial number during hole forming operation.
In this embodiment, a dry hole forming method is adopted. The drilling machine is in place, the drilling machine adopts rotary drilling bits, the number of the rotary drilling bits is 8, the rotary drilling bits are marked according to the sequence of 1-8, and the diameters of the rotary drilling bits are reduced according to the increase of the sequence.
S2, forming holes in pile holes of first soil layer
S21, forming holes in a first soil layer
And (3) installing the No. 1 rotary drilling bit on the rotary drilling rig, vertically drilling 1.5m downwards on the surface of the miscellaneous fill layer 1 to reach the top surface of a second soil layer to form a first drilling hole, wherein the length of the first drilling hole is equal to the thickness of the first soil layer.
S22, lowering the first protective sleeve
And putting a first protective cylinder in the first drill hole, wherein the bottom end of the first protective cylinder is inserted into the second soil layer by 100mm. In this example, the release agent was applied to the outer walls of all the casing. The outer diameter of the first casing is smaller than the first bore diameter so as to form a space between the outer wall of the first casing and the wall of the first bore.
S23, pouring concrete
Plain concrete, in this embodiment, C20 concrete, is poured between the first casing and the hole wall of the first borehole. And forming a first layer of protective wall 2 after the plain concrete is solidified. The strength of the plain concrete reaches more than 10 MP.
S24, recovery of pile casings
And lifting the first pile casings, wherein pile holes of a first soil layer are formed between the first layer of protective walls 2.
S3, forming a hole in the n-th soil layer pile hole (n is two to six)
Drilling by using an n number rotary drilling bit after the pile hole of the upper layer soil layer is formed, wherein the drilling depth is 1.5m and reaches the top surface of the lower layer soil layer to form an nth drilled hole; and (5) putting the nth casing into the nth drilling hole. The top end of the nth casing is 100mm higher than the bottom surface of the upper soil layer, and the bottom end of the nth casing is inserted into the lower soil layer for 100mm. The outer diameter of the nth casing is smaller than the diameter of the nth bore hole so as to form a space between the outer wall of the nth casing and the wall of the nth bore hole.
And pouring plain concrete between the nth casing and the hole wall of the nth drill hole. And forming the nth layer of protective wall after the concrete is solidified. The strength of the plain concrete reaches more than 10 MP.
And lifting the nth pile casing, wherein pile holes in the nth soil layer are formed between the nth protective walls.
And repeating the steps from the second soil layer to the sixth soil layer by layer.
S4, forming holes in pile holes of seventh soil layer
S41, forming holes in the seventh soil layer
And (4) drilling downwards from the top surface of the seventh soil layer by using a No. 7 rotary drilling bit until the seventh soil layer is drilled and then the original soil layer or the rock stratum below the seventh soil layer is drilled by 500mm, and stopping drilling to form a seventh drilled hole.
S42, lowering the seventh protective sleeve
And (5) putting a seventh pile casing in the seventh drilled hole, wherein the top end of the seventh pile casing is 100mm higher than the bottom surface of the upper soil layer. The outer diameter of the seventh casing is smaller than the diameter of the seventh bore hole so that a space is formed between the outer wall of the seventh casing and the wall of the bore hole.
S43, pouring concrete
And pouring plain concrete between the first pile casing and the hole wall of the first drill hole, and forming a seventh layer of retaining wall after the plain concrete is solidified. The strength of the plain concrete reaches more than 10 MP.
S44, recovery of protective cylinder
And lifting the seventh pile casing, wherein pile holes of a seventh soil layer are formed between the seventh protecting walls.
And after the pile hole of the seventh soil layer is formed, drilling by using a No. 8 rotary drilling bit until the pile hole reaches the designed depth.
The diameter of the pile hole of all soil layers is reduced from top to bottom layer by layer. The diameters of all the pile casings are reduced from top to bottom layer by layer.
S5, cleaning the hole
And (4) cleaning holes, finishing hole forming operation of the slope protection pile, and lowering a reinforcement cage to perform pile forming construction in the later period.
The mode of drilling, placing the pile casing, pouring concrete and recovering the pile casing layer by layer is adopted in the miscellaneous filling layer to form the concrete retaining wall of each layer of pile hole, so that the problem of hole collapse in the hole forming process is solved, and the stability of the pile hole in the post pile forming process is also ensured.
According to the first embodiment and the second embodiment of the application, the pile hole of the slope protection pile penetrates through the miscellaneous fill layer, and is formed by adopting a concrete layering wall protection method, so that the problem that hole collapse easily occurs when the hole is formed by adopting a traditional mode is avoided, and particularly, the effect under the condition that underground water exists in the miscellaneous fill layer is more obvious.
EXAMPLE III
Referring to fig. 4 and 5, the hole forming construction process of the slope protection pile in the complex geological environment comprises the following steps;
s1, dividing to-be-formed soil layer position of slope protection pile
The layer position division is carried out according to the thickness of the miscellaneous fill layer 1, the miscellaneous fill layer 1 with the thickness of 10m is divided into N layers from top to bottom according to the thickness of 1.5m of each layer, the thickness of the N layers is 7,1-6 layers in the embodiment is 1.5m, and the thickness of the lowest layer is 1m.
And measuring and setting out, determining the position of the pile hole of the slope protection pile on the ground, marking the serial number, and drilling according to the sequence of the serial number during hole forming operation.
In this embodiment, a dry hole forming method is adopted. The drilling machine is in place, the drilling machine adopts rotary drilling bits, the number of the rotary drilling bits is 8, the rotary drilling bits are marked according to the sequence of 1-8, and the diameters of the rotary drilling bits are reduced according to the increase of the sequence.
S2, forming holes in pile holes of first soil layer
S21, forming holes in a first soil layer
And (3) installing the No. 1 rotary drilling bit on the rotary drilling rig, vertically drilling 1.5m downwards on the surface of the miscellaneous fill layer 1 to reach the top surface of a second soil layer to form a first drilling hole, wherein the length of the first drilling hole is equal to the thickness of the first soil layer.
S22, lowering the first protective sleeve
And putting a first protective cylinder in the first drill hole, wherein the bottom end of the first protective cylinder is inserted into the second soil layer by 100mm. The outer wall of the first casing is attached to the hole wall of the first drilled hole. Pile holes of a first soil layer are formed in the first pile casings, and the first pile casings play a role in temporary wall protection.
S3, forming a hole in the n-th soil layer pile hole (n is two to six)
Drilling by using an n number rotary drilling bit after the pile hole of the upper layer soil layer is formed, wherein the drilling depth is 1.5m and reaches the top surface of the lower layer soil layer to form an nth drilled hole; and (5) putting the nth casing into the nth drilling hole. The top end of the nth casing is 100mm higher than the bottom surface of the upper soil layer and is attached to the inner wall of the upper casing, and the bottom end of the nth casing is inserted into the lower soil layer by 100mm. The outer wall of the nth casing is attached to the hole wall of the nth drill hole. Pile holes of the nth soil layer are formed in the nth pile casing, and the nth pile casing plays a role of temporary wall protection.
And repeating the steps from the second soil layer to the sixth soil layer by layer.
S4, forming holes in pile holes of seventh soil layer
S41, forming holes in the seventh soil layer
And (4) drilling downwards from the top surface of the seventh soil layer by using a No. 7 rotary drilling bit until the seventh soil layer is drilled and then the original soil layer or the rock stratum below the seventh soil layer is drilled by 500mm, and stopping drilling to form a seventh drilled hole.
S42, lowering the seventh protective sleeve
And (5) placing a 7 th protective cylinder in the seventh drilled hole, wherein the top end of the 7 th protective cylinder is 100mm higher than the bottom surface of the upper soil layer. The outer wall of the 7 th protective cylinder is attached to the hole wall of the 7 th drilled hole. Pile holes of a 7 th soil layer are formed in the 7 th pile casings, and the 7 th pile casings play a role of temporary wall protection.
And after the pile hole of the seventh soil layer is formed, drilling by using a No. 8 rotary drilling bit until the pile hole reaches the designed depth.
The diameters of all the pile casings are reduced from top to bottom layer by layer.
S5, cleaning the hole
And (4) cleaning holes, finishing hole forming operation of the slope protection pile, and lowering a reinforcement cage to perform pile forming construction in the later period.
The temporary retaining wall of the pile hole of the slope protection pile is formed by drilling and lowering the retaining cylinder layer by layer in the miscellaneous fill layer, so that hole collapse is avoided, and pile forming operation is performed by adopting a mode of grouting layer by layer and recovering the retaining cylinder layer by layer after a reinforcement cage is lowered at the later stage.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (1)

1. The hole forming construction process for the slope protection pile in the complex geological environment is characterized by comprising the following steps of:
s1, dividing the poor stratum layer into N layers from top to bottom according to the thickness of the poor stratum; measuring and setting out, and determining the positions and construction serial numbers of all slope protection pile holes; placing the rotary drilling rig in place, preparing N +1 rotary drilling bits and marking, reducing the diameters of the rotary drilling bits according to sequential increase, and drilling by adopting the rotary drilling bits with the sequentially reduced diameters during drilling;
s2, forming a first soil layer pile hole, drilling in a first soil layer by using a rotary drilling bit to form a first drill hole, and then putting a first protective cylinder, wherein the outer diameter of the first protective cylinder is smaller than the diameter of the first drill hole, so that a space is formed between the outer wall of the first protective cylinder and the wall of the first drill hole; then plain concrete is poured between the first casing and the hole wall of the first drill hole to form a first layer of retaining wall; when the strength of the plain concrete meets the requirement, recovering the first pile casings, wherein pile holes of a first soil layer are formed between the first layer of retaining walls;
s3, forming holes in pile holes of 2-N soil layers, wherein N is not less than 2, drilling to form a drill hole of a lower soil layer after the pile holes of the upper soil layer are formed by using a rotary drilling bit, then placing a protective cylinder, and reserving a space between the outer wall of the protective cylinder and the wall of the drill hole; the outer walls of all the protective cylinders are coated with a release agent; pouring plain concrete between the pile casing and the wall of the drilled hole, recovering the pile casing after the strength of the plain concrete meets the requirement and the pile casing is formed,
constructing layer by layer from the second soil layer to the Nth soil layer, recovering the Nth pile casing after the strength of the plain concrete in the Nth soil layer meets the requirement, and then continuing to drill downwards by using a rotary drilling bit until the design depth is reached;
the bottom end of the downward casing is inserted into the lower soil layer for 100-150mm, and the top end of the downward casing is 100-120mm higher than the bottom surface of the upper soil layer;
s4, cleaning holes, completing hole forming operation of the slope protection pile, and putting down a reinforcement cage for post pile forming construction;
the diameters of all the casings are reduced from top to bottom in sequence.
CN202011170867.3A 2020-10-28 2020-10-28 Hole forming construction process for slope protection pile in complex geological environment Active CN112392400B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011170867.3A CN112392400B (en) 2020-10-28 2020-10-28 Hole forming construction process for slope protection pile in complex geological environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011170867.3A CN112392400B (en) 2020-10-28 2020-10-28 Hole forming construction process for slope protection pile in complex geological environment

Publications (2)

Publication Number Publication Date
CN112392400A CN112392400A (en) 2021-02-23
CN112392400B true CN112392400B (en) 2023-04-11

Family

ID=74598283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011170867.3A Active CN112392400B (en) 2020-10-28 2020-10-28 Hole forming construction process for slope protection pile in complex geological environment

Country Status (1)

Country Link
CN (1) CN112392400B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960625B (en) * 2021-02-28 2023-12-15 江西基业科技集团有限公司 Construction method of multi-section expanding concrete filling pile
CN113638405B (en) * 2021-09-26 2022-11-08 中择德霖建设有限公司 Soft foundation road reinforcing construction device and construction method
CN114293907A (en) * 2021-12-29 2022-04-08 云南建投第五建设有限公司 Pile foundation pore-forming construction method under boulder water-out stratum condition
CN114875899B (en) * 2022-06-11 2024-05-31 一山(北京)岩土工程有限公司 Hard stratum pore-forming pile-forming construction process
CN115679971A (en) * 2022-10-17 2023-02-03 山东大学 Karst area bored pile hole forming and concrete pouring method
CN115680007A (en) * 2022-12-10 2023-02-03 中建七局交通建设有限公司 Pile group construction method suitable for complex geology of mountain area

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4221487B2 (en) * 1999-07-30 2009-02-12 三谷セキサン株式会社 Method of preventing biting in medium digging method and pile hole digging rod for medium digging
JP4103105B2 (en) * 2001-02-16 2008-06-18 三谷セキサン株式会社 Pile hole wall kneading equipment
CN102677658B (en) * 2012-04-25 2015-10-28 北京市三一重机有限公司 hole pile construction method
CN107268608A (en) * 2017-06-06 2017-10-20 中铁十九局集团轨道交通工程有限公司 Building waste earth-boring stake forming hole method
CN107513994A (en) * 2017-08-21 2017-12-26 重庆建工住宅建设有限公司 One kind segmentation becomes supporting rotary digging stake and its construction method without leave

Also Published As

Publication number Publication date
CN112392400A (en) 2021-02-23

Similar Documents

Publication Publication Date Title
CN112392400B (en) Hole forming construction process for slope protection pile in complex geological environment
CN107524142A (en) A kind of holing with slurry wall protection cast-in-place pile construction method
CN107023002A (en) Down-the-hole impacts churning composite pile pile making method
AU2021106928A4 (en) Construction method for excavation of deep pit with triaxial mixing pile waterstop curtains and rotary bored cast-in-place pile supports
CN102286984A (en) Water-stop curtain and construction method thereof
CN104612143A (en) Bored composite pile structure under karst cave/soil cave geological condition
CN106638640A (en) Modular coffer construction method for concrete without subsealing in the geologic condition of stratum
CN106400782A (en) Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN112663600A (en) Construction method of cast-in-situ bored pile for water-rich sandy stratum
CN107724383A (en) Rotary digging cast-in-place pile construction method
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN112281829A (en) Composite pile foundation structure and construction method thereof
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN107268608A (en) Building waste earth-boring stake forming hole method
CN112761076A (en) Lock catch steel pipe pile cofferdam applied to water level change condition and construction method
CN102535490A (en) Method for dewatering foundation pit by using bored cast-in-place pile
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN112761166A (en) Construction method for shallow foundation pit of combined support of piles and pre-grouting steel pipes based on SMW (soil mixing wall) construction method
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN106149745A (en) A kind of truss type steel tube grouting pile basis and construction method thereof
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN110984126B (en) Construction method for pre-reinforcing and then forming hole of easy-collapse stratum into cast-in-place pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant