CN206553109U - Derrick crane fast-assembling platform structure and derrick crane - Google Patents
Derrick crane fast-assembling platform structure and derrick crane Download PDFInfo
- Publication number
- CN206553109U CN206553109U CN201720292856.XU CN201720292856U CN206553109U CN 206553109 U CN206553109 U CN 206553109U CN 201720292856 U CN201720292856 U CN 201720292856U CN 206553109 U CN206553109 U CN 206553109U
- Authority
- CN
- China
- Prior art keywords
- derrick crane
- supporter
- horizontal axis
- assembling platform
- platform structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 4
- 238000000034 method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
This application discloses a kind of derrick crane fast-assembling platform structure and derrick crane, derrick crane fast-assembling platform structure includes a bearing, it is formed at derrick crane top, the bearing includes two supporting plates being set up in parallel, a horizontal axis body and a supporter are formed between two supporting plates, the supporter is located at the lower section that the horizontal axis body deviates from derrick crane one end, the horizontal axis body, an installing space is formed between supporter and two supporting plates, also include a coupler body, it is formed at platform bottom, the coupler body coordinates the horizontal axis body connection, the support body supports are in the coupler body bottom.The utility model has the advantage of by coupler body, horizontal axis body, supporter cooperation, the support to platform is realized, and due to the installing space formed between horizontal axis body, supporter and two supporting plates, can facilitate and platform is installed and dismantled, operate very simple, Stability Analysis of Structures, firmly.
Description
Technical field
The application is related to a kind of derrick crane platform, more particularly to a kind of derrick crane fast-assembling platform structure.
Background technology
The connection of existing derrick crane platform often complex operation, not only takes time and effort, and structural soundness is not good,
Usually allow operating personnel to run into numerous difficulties, cause claim for eot, cause user to avenge a grievance.
Utility model content
The purpose of this utility model is to provide a kind of derrick crane fast-assembling platform structure, of the prior art to overcome
It is not enough.
To achieve the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of derrick crane fast-assembling platform structure, including a bearing, is formed at tower
Heavy-duty machine top, the bearing includes being formed with a horizontal axis body and a support between two supporting plates being set up in parallel, two supporting plates
Body, the supporter is located at the lower section that the horizontal axis body deviates from derrick crane one end, the horizontal axis body, supporter and two
An installing space, in addition to a coupler body are formed between supporting plate, platform bottom is formed at, the coupler body coordinates the trunnion axis
Body is connected, and the support body supports are in the coupler body bottom.
It is preferred that, in above-mentioned derrick crane fast-assembling platform structure, the supporter is a horizontal supporting shaft, is formed
Between two supporting plate, the coupler body bottom is formed with hook and slot, and the horizontal supporting shaft coordinates the hook and slot support platform.
It is furthermore preferred that in above-mentioned derrick crane fast-assembling platform structure, in addition to a bayonet lock, the bayonet lock penetrates institute
State two supporting plates and coupler body.
It is preferred that, in above-mentioned derrick crane fast-assembling platform structure, the supporter is a support column.
It is preferred that, in above-mentioned derrick crane fast-assembling platform structure, protruded out upwards at the top of the derrick crane
First guard rail, the table top has protruded out the second guard rail upwards.
It is furthermore preferred that in above-mentioned derrick crane fast-assembling platform structure, first guard rail and the second guard rail
Between connected with iron chains.
The embodiment of the present application also discloses a kind of derrick crane, including above-mentioned derrick crane fast-assembling platform structure.
Compared with prior art, advantage of the present utility model is:By coupler body, horizontal axis body, supporter cooperation, it is real
Now to the support of platform, and due to the installing space formed between horizontal axis body, supporter and two supporting plates, it can facilitate to flat
Platform is installed and dismantled, operate very simple, Stability Analysis of Structures, firmly.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show derrick crane fast-assembling platform structure in the utility model second embodiment and installs starting figure;
Fig. 2 show derrick crane fast-assembling platform structure installation process figure in the utility model second embodiment;
Fig. 3 show derrick crane fast-assembling platform structure installation figure in the utility model second embodiment;
Fig. 4 show derrick crane fast-assembling platform structure installation figure in the utility model first embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Detailed description, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole implementation
Example.Based on the embodiment in the utility model, those of ordinary skill in the art institute on the premise of creative work is not made
The every other embodiment obtained, belongs to the scope of the utility model protection.
With reference to shown in Fig. 1-4, derrick crane fast-assembling platform structure, including a bearing 2, it is formed at derrick crane 1 and pushes up
End, bearing 2 includes being formed with a horizontal supporter of axis body 21 and one between two supporting plates 22 being set up in parallel, two supporting plates 22
23, supporter 23 is located at the lower section that horizontal axis body 21 deviates from the one end of derrick crane 1, horizontal axis body 21, supporter 23 and two
An installing space 24, in addition to a coupler body 3 are formed between fagging 22, the bottom of platform 4 is formed at, coupler body 3 coordinates horizontal axis body
21 connections, supporter 23 is supported in the bottom of coupler body 3.
By coupler body, horizontal axis body, supporter cooperation, realize support to platform, and due to horizontal axis body, support
The installing space formed between body and two supporting plates, can facilitate and platform is installed and dismantled, and operate very simple, and structure is steady
It is fixed, firm.
Further, supporter 23 is a horizontal supporting shaft, is formed between two supporting plates 22, the bottom of coupler body 3 is formed with
Hook and slot, horizontal supporting shaft coordinates hook and slot support platform 4.Also include a bayonet lock 5, bayonet lock 5 penetrates two supporting plates 22 and coupler body 3.
In such as Fig. 4, first embodiment, supporter is using the horizontal supporting shaft being formed between two supporting plates, using hook and slot
Cooperation with horizontal supporting shaft realize it is integrally-built firm, and install, dismantle it is very convenient.
The effect of bayonet lock is to be further ensured that the firm of structure, it is ensured that will not position between platform and derrick crane
Move.
Further, supporter 23 is a support column.
In such as Fig. 1-3, second embodiment, supporter uses the form of support column, simple and reliable for structure.
It is certainly not limited to the form using above-mentioned supporter, it would however also be possible to employ the form of other supporters, should all belongs to
Scope of the present application.
Further, the top of derrick crane 1 has protruded out the first guard rail 11 upwards, and the top of platform 4 has protruded out the upwards
Two guard rails 41.Connected between first guard rail 11 and the second guard rail 41 with iron chains.
The effect of guard rail be operator operation when ensure safety, the effect of iron chains be when flat top is excessive be
Ensure the safety of structure, safety measures taken, naturally it is also possible to take other measures belong to scope of the present application.
Relative, a kind of derrick crane, including above-mentioned derrick crane fast-assembling platform structure.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those
Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Also there is other identical element in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art
For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as the protection domain of the application.
Claims (7)
1. a kind of derrick crane fast-assembling platform structure, it is characterised in that including a bearing, is formed at derrick crane top,
The bearing includes being formed with a horizontal axis body and a supporter, the branch between two supporting plates being set up in parallel, two supporting plates
Support body be located at the horizontal axis body deviate from derrick crane one end lower section, the horizontal axis body, supporter and two supporting plates it
Between be formed with an installing space, in addition to a coupler body, be formed at platform bottom, the coupler body coordinates the horizontal axis body connection,
The support body supports are in the coupler body bottom.
2. derrick crane fast-assembling platform structure according to claim 1, it is characterised in that the supporter is a level
Support shaft, is formed between two supporting plate, and the coupler body bottom is formed with hook and slot, and the horizontal supporting shaft coordinates the hook
Groove support platform.
3. derrick crane fast-assembling platform structure according to claim 2, it is characterised in that described also including a bayonet lock
Bayonet lock penetrates two supporting plate and coupler body.
4. derrick crane fast-assembling platform structure according to claim 1, it is characterised in that the supporter is a support
Post.
5. derrick crane fast-assembling platform structure according to claim 1, it is characterised in that at the top of the derrick crane
The first guard rail is protruded out upwards, the table top has protruded out the second guard rail upwards.
6. derrick crane fast-assembling platform structure according to claim 5, it is characterised in that first guard rail and
Connected between two guard rails with iron chains.
7. a kind of derrick crane, includes any described derrick crane fast-assembling platform structures of claim 1-6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720292856.XU CN206553109U (en) | 2017-03-24 | 2017-03-24 | Derrick crane fast-assembling platform structure and derrick crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720292856.XU CN206553109U (en) | 2017-03-24 | 2017-03-24 | Derrick crane fast-assembling platform structure and derrick crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206553109U true CN206553109U (en) | 2017-10-13 |
Family
ID=60015820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720292856.XU Expired - Fee Related CN206553109U (en) | 2017-03-24 | 2017-03-24 | Derrick crane fast-assembling platform structure and derrick crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206553109U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109734004A (en) * | 2018-12-27 | 2019-05-10 | 山东大汉建设机械股份有限公司 | A kind of the tower crane platform and its installation method of easy disassembly |
-
2017
- 2017-03-24 CN CN201720292856.XU patent/CN206553109U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109734004A (en) * | 2018-12-27 | 2019-05-10 | 山东大汉建设机械股份有限公司 | A kind of the tower crane platform and its installation method of easy disassembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204589793U (en) | A kind of bridge pad | |
CN204552050U (en) | A kind of anchor ear bearing frame and scaffolding platform assembly | |
CN203617636U (en) | Vertical face connecting piece of cable ladder | |
CN206553109U (en) | Derrick crane fast-assembling platform structure and derrick crane | |
CN205062829U (en) | Steel pipe lattice formula tower crane basis | |
CN205421989U (en) | Welding H shaped steel supports reinforcing apparatus | |
CN203335094U (en) | Tunnel lining hinge type steel end mold device | |
CN102359109A (en) | Static pile press for narrow site and ultra-short side pile distance construction | |
CN206872228U (en) | A kind of cage fixture mechanism | |
CN103293452B (en) | Insulating ladder Withstand test device | |
CN205709134U (en) | A kind of portable power cable and wire de-reeling | |
CN205088798U (en) | Two -way sliding support node of H shaped steel roof beam with two -way limit function | |
CN204983435U (en) | A lift strutting arrangement for various coil of strip die mould | |
CN208519318U (en) | A kind of slidably concrete pump pipe pump line support | |
CN207920026U (en) | A kind of removable climbing frame of finishing | |
CN208430766U (en) | Vertical rod connection structure for scaffold | |
CN204826588U (en) | Elevator shaft protection operation platform | |
CN103072279B (en) | Wind driven generator blade web positioning device | |
CN107945653A (en) | A kind of electric power tower Sign Board fixing bracket | |
CN205116881U (en) | Movable pole switch hoisting support | |
CN218231637U (en) | Universal rotary limiting device | |
CN204958190U (en) | Condenser water box assembles specialized tool | |
CN204780623U (en) | Large -tonnage girder steel hydraulic pressure synchronization of jacking up construction equipment | |
CN211712448U (en) | Track hoisting tool | |
CN209957213U (en) | Balance steel beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171013 |
|
CF01 | Termination of patent right due to non-payment of annual fee |