CN206540539U - A kind of subgrade settlement monitoring system - Google Patents

A kind of subgrade settlement monitoring system Download PDF

Info

Publication number
CN206540539U
CN206540539U CN201720247453.3U CN201720247453U CN206540539U CN 206540539 U CN206540539 U CN 206540539U CN 201720247453 U CN201720247453 U CN 201720247453U CN 206540539 U CN206540539 U CN 206540539U
Authority
CN
China
Prior art keywords
main body
embankment
embankment main
settlement
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720247453.3U
Other languages
Chinese (zh)
Inventor
孙学军
彭申凯
钱申春
刘晓晗
崔健
沈维成
李绍鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN201720247453.3U priority Critical patent/CN206540539U/en
Application granted granted Critical
Publication of CN206540539U publication Critical patent/CN206540539U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a kind of subgrade settlement monitoring system, including power supply, control centre and set embankment main body on the ground, inclinometer pipe is equipped with the ground on embankment main body both sides, the side slope on embankment main body both sides is distributed with multiple observation stakes, embankment main body top end face is provided with single point settlement gage and hydraulic type laminated settlement meter, embankment bottom part body is provided with Section type settlement instrument, soil pressure cell is provided with embankment main body, the power supply is powered to above-mentioned all appts, and above-mentioned all appts with control centre's data cube computation, the top surface two ends of embankment main body are equipped with guardrail, gutter is equipped with the ground on embankment main body both sides, the ground being connected with embankment bottom part body is preset with some cement mixing piles, energy comprehensive monitoring subgrade soil state, effectively solve the problems, such as the roadbed reclamation and control residual settlement during filling construction, it can determine that the best opportunity of pavement construction, save the duration, ensure the construction quality of highway simultaneously.

Description

A kind of subgrade settlement monitoring system
Technical field
The utility model belongs to highway monitoring system field, and in particular to a kind of subgrade settlement monitoring system.
Background technology
For roadbed, how the easy development trend for observing deformation exactly is a vital link, this for Further optimization is instructed to set juice, the works schedule of each layer of structure of reckoning forecast, speeding up the work, there have to be extremely important Meaning.By carrying out field monitoring to roadbed, it can effectively solve the problems, such as that the roadbed reclamation during filling construction is remained with control Remaining sedimentation, and the best opportunity of pavement construction is can determine, so as to ensure the construction quality of highway.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of subgrade settlement monitoring system, Can comprehensive monitoring subgrade soil state, effective roadbed reclamation and control residual settlement solved the problems, such as during filling construction, energy The best opportunity of pavement construction is determined, the duration is saved, while ensureing the construction quality of highway.
To achieve the above object, the utility model major technique solution is to provide a kind of subgrade settlement monitoring system, Including power supply, control centre and embankment main body on the ground is set, inclinometer pipe, embankment are equipped with the ground on embankment main body both sides The side slope on main body both sides is distributed with multiple observation stakes, and embankment main body top end face is provided with single point settlement gage and hydraulic type delaminating deposition Instrument, embankment bottom part body, which is provided with Section type settlement instrument, embankment main body, is provided with soil pressure cell, and the power supply is supplied to above-mentioned all appts Electricity, and above-mentioned all appts with control centre's data cube computation.
The top surface two ends of the embankment main body are equipped with guardrail, increase the current safety of the top surface of embankment main body.
Gutter is equipped with the ground on the embankment main body both sides, increases the water resistant ability of embankment main body.
The ground being connected with embankment bottom part body is preset with some cement mixing piles, increases the anti-settling of embankment main body Ability.
The inclinometer pipe is embedded in the horizontal displacement that inside soil body is observed in underground, the sedimentation position of the single point settlement gage measurement soil body Move, hydraulic type laminated settlement meter measure the soil body delaminating deposition or protuberance, Section type settlement instrument measurement section the soil body sedimentation or Protuberance, soil pressure cell measurement soil pressure, the real-time data transmission obtained by above-mentioned apparatus measures is to control centre for related monitoring people Member is to roadbed situation control in all directions and prediction.
The single point settlement gage by sedimentation plate, electrical measurement displacement transducer, measuring staff, metal hose, grout pipe, anchor head, threeway, Water pipe, straight-through, backfill, cement mortar and bottom anchor head composition, single point settlement gage use the existing product in market.
The hydraulic type laminated settlement meter is prior art, is visited by water proof wire, synthetic resin, band aperture dividing plate and hydraulic pressure Survey device composition.
The utility model beneficial effect:
1st, roadbed is monitored using a variety of monitoring projects, comprehensive monitoring subgrade soil state.
2nd, the roadbed reclamation and control residual settlement during filling construction are effectively solved the problems, such as.
3rd, the best opportunity of pavement construction is determined, the duration is saved, while ensureing the construction quality of highway.
Brief description of the drawings
Fig. 1 is the sectional drawing of the embodiment of the utility model one;Wherein part A is the connection status of single point settlement gage, part B For the connection status of hydraulic type laminated settlement meter;
Fig. 2 is the single point settlement gage structure chart in Fig. 1 embodiments;
Fig. 3 is the hydraulic type laminated settlement meter structure chart in Fig. 1 embodiments;
In figure:1. inclinometer pipe;2. observe stake;3. guardrail;4. single point settlement gage;5. hydraulic type laminated settlement meter;6. section Sedimentometer;7. gutter;8. soil pressure cell;9. cement mixing pile;10. embankment main body;11. settle plate;12. electrical measurement displacement sensing Device;13. measuring staff;14. metal hose;15. grout pipe;16. anchor head;17. threeway;18. water pipe;19. it is straight-through;20. backfill; 21. cement mortar;22. bottom anchor head;23. water proof wire;24. synthetic resin;25. band aperture dividing plate;26. hydraulic pressure detector;27. Ground;28. side slope.
Embodiment
Present embodiment emphasis illustrates the design feature and effect that the utility model is related to, and coordinates accompanying drawing to describe in detail such as Under:
As shown in figure 1, a kind of subgrade settlement monitoring system, including power supply (not shown), control centre (are not shown in figure Go out) and the embankment main body 10 that is located on ground 27, inclinometer pipe 1, embankment main body 10 are equipped with the ground on the both sides of embankment main body 10 The side slope 28 on both sides is distributed with multiple observation stakes 2, and the top end face of embankment main body 10 is heavy provided with single point settlement gage 4 and hydraulic type layering Instrument 5 drops, and the bottom of embankment main body 10, which is provided with Section type settlement instrument 6, embankment main body 10, is provided with soil pressure cell 8, and the power supply is to above-mentioned All appts are powered, and above-mentioned all appts with control centre's data cube computation.
The top surface two ends of the embankment main body 10 are equipped with guardrail 3, the current safety of the top surface of increase embankment main body 10.
Gutter 7, the water resistant ability of increase embankment main body 10 are equipped with the ground on the both sides of embankment main body 10.
The ground 27 being connected with the bottom of embankment main body 10 is preset with some cement mixing piles 9, increase embankment main body 10 Anti-settling ability.
The inclinometer pipe 1 is embedded in the horizontal displacement that inside soil body is observed in underground, and single point settlement gage 4 measures the sedimentation of the soil body Displacement, hydraulic type laminated settlement meter 5 measures the delaminating deposition or protuberance of the soil body, and Section type settlement instrument 6 measures the heavy of the soil body of section Drop is swelled, and the measurement soil pressure of soil pressure cell 8, the real-time data transmission obtained by above-mentioned apparatus measures is supervised to control centre for related Survey personnel are to roadbed situation control in all directions and prediction.
As shown in Fig. 2 single point settlement gage 4 is by sedimentation plate 11, electrical measurement displacement transducer 12, measuring staff 13, metal hose 14, filling Slurry pipe 15, anchor head 16, threeway 17, water pipe 18, straight-through 19, backfill 20, cement mortar 21 and bottom anchor head 22 are constituted, single-point sedimentation Meter 4 uses the existing product in market.
As shown in figure 3, hydraulic type laminated settlement meter 5 is prior art, by water proof wire 23, synthetic resin 24, band aperture Dividing plate 25 and hydraulic pressure detector 26 are constituted.
The utility model is monitored using a variety of monitoring projects to roadbed, comprehensive monitoring subgrade soil state, effectively solution Certainly the roadbed reclamation problem during filling construction and control residual settlement, determine the best opportunity of pavement construction, save the duration, Ensure the construction quality of highway simultaneously.

Claims (4)

1. a kind of subgrade settlement monitoring system, including power supply, control centre and the embankment main body (10) that is located on ground (27), its It is characterised by, inclinometer pipe (1) is equipped with the ground on embankment main body (10) both sides, the side slope (28) on embankment main body (10) both sides is Multiple observation stakes (2) are distributed with, embankment main body (10) top end face is provided with single point settlement gage (4) and hydraulic type laminated settlement meter (5), Embankment main body (10) bottom, which is provided with Section type settlement instrument (6), embankment main body (10), is provided with soil pressure cell (8), and the power supply is to upper All appts are stated to power, and above-mentioned all appts with control centre's data cube computation.
2. subgrade settlement monitoring system according to claim 1, it is characterised in that the top surface two of the embankment main body (10) End is equipped with guardrail (3).
3. subgrade settlement monitoring system according to claim 1, it is characterised in that the ground on embankment main body (10) both sides Gutter (7) is equipped with face.
4. subgrade settlement monitoring system according to claim 1, it is characterised in that described to connect with embankment main body (10) bottom The ground (27) connect is preset with some cement mixing piles (9).
CN201720247453.3U 2017-03-14 2017-03-14 A kind of subgrade settlement monitoring system Active CN206540539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720247453.3U CN206540539U (en) 2017-03-14 2017-03-14 A kind of subgrade settlement monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720247453.3U CN206540539U (en) 2017-03-14 2017-03-14 A kind of subgrade settlement monitoring system

Publications (1)

Publication Number Publication Date
CN206540539U true CN206540539U (en) 2017-10-03

Family

ID=59942440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720247453.3U Active CN206540539U (en) 2017-03-14 2017-03-14 A kind of subgrade settlement monitoring system

Country Status (1)

Country Link
CN (1) CN206540539U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107767625A (en) * 2017-10-23 2018-03-06 山西省交通科学研究院 A kind of highway goaf subgrade stability monitoring and pre-warning system and method
CN107941197A (en) * 2017-11-20 2018-04-20 重庆交通职业学院 System is monitored and controlled in layer distributed remote rail subgrade settlement deformation in real time

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107767625A (en) * 2017-10-23 2018-03-06 山西省交通科学研究院 A kind of highway goaf subgrade stability monitoring and pre-warning system and method
CN107941197A (en) * 2017-11-20 2018-04-20 重庆交通职业学院 System is monitored and controlled in layer distributed remote rail subgrade settlement deformation in real time

Similar Documents

Publication Publication Date Title
CN103758084B (en) A kind of ecological riverway interlocking type building block and construct the construction that protects bank
CN101962928A (en) Construction method for processing aeolian sand roadbed base through impacting and grinding
CN105274922B (en) A kind of antiskid key steel-pipe pile composite construction and method for repairing landslide roadbed
CN102425082A (en) Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN206540539U (en) A kind of subgrade settlement monitoring system
CN103758139B (en) Vegetation type anchor rod ecological bag and bank protecting method thereof
CN203284708U (en) Subgrade structure of deep-layer loose and soft soil region
CN208219326U (en) A kind of high-speed railway Karst Subgrade construction having warning function
CN108333109A (en) A kind of concrete structure internal fissure monitoring device and method
CN202247575U (en) Structure for strengthening roadbed in high-speed railway station turnout area with highly developed karst
CN208363066U (en) A kind of soft soil foundation high roadbed Sand roadbed stability monitoring system
CN102937439A (en) Subway interval tunnel settlement observation method and device
CN201724934U (en) Facility for field observation of runoff plot
CN102183781A (en) Mountain landslide supervision method
CN202562470U (en) Buried type foundation settlement observing device
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN205776266U (en) Prestressing combination method High Slope on Expressway supporting construction
CN218622163U (en) Measuring device for simultaneously detecting foundation settlement and roadbed compression deformation
CN102839660A (en) Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN207007108U (en) A kind of long range roadbed continuous modification monitoring device
CN206635824U (en) Pit retaining monitoring system
CN202850007U (en) Shallow stratum multipoint settlement real-time monitoring device
CN203869691U (en) Highway subgrade settlement determination device
CN115030236A (en) Dynamic monitoring and control method for tunnel multi-step slope-pressing foot type slag abandoning field
CN115110511A (en) Automatic monitoring devices is subsided on breakwater shore protection foundation top layer and layering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant