CN206538123U - A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled - Google Patents

A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled Download PDF

Info

Publication number
CN206538123U
CN206538123U CN201720239100.9U CN201720239100U CN206538123U CN 206538123 U CN206538123 U CN 206538123U CN 201720239100 U CN201720239100 U CN 201720239100U CN 206538123 U CN206538123 U CN 206538123U
Authority
CN
China
Prior art keywords
ear
plate
ear plate
plates
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720239100.9U
Other languages
Chinese (zh)
Inventor
张迎飞
张泽鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Source Machinery Engineering Co Ltd
Original Assignee
Henan Source Machinery Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Source Machinery Engineering Co Ltd filed Critical Henan Source Machinery Engineering Co Ltd
Priority to CN201720239100.9U priority Critical patent/CN206538123U/en
Application granted granted Critical
Publication of CN206538123U publication Critical patent/CN206538123U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型公开了一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,所述耳板抱箍件由两块背板件和用于连接两块背板件的高强螺栓件构成,上述两块背板件对称分布在上述结构柱的前后两侧,结构柱的左右两侧分别设置有至少三根高强螺栓件,所述高强螺栓件的两端分别固定连接至上述两块背板件上,高强螺栓件用于连接两块背板件,其中一块背板件上设置有至少一组耳板,该结构件整体设计合理,工作稳定性强,具有很好的实用,扶墙耳板抱箍件制造成本低,适应性广泛,可配合不同直径尺寸的结构柱,施工步骤简单,扶墙耳板抱箍件可回收重复使用,有效解决了现有技术中存在的问题,易于推广应用。

The utility model discloses a recyclable tower lifting non-pre-embedded ear plate hoop for supporting walls. The ear plate hoop is composed of two back plate parts and a high-strength arm for connecting the two back plate parts. The above two backboards are symmetrically distributed on the front and rear sides of the structural column, and at least three high-strength bolts are respectively arranged on the left and right sides of the structural column, and the two ends of the high-strength bolts are fixedly connected to the above two On one back panel, high-strength bolts are used to connect two back panels, one of which is provided with at least one set of lugs, the overall design of the structure is reasonable, the working stability is strong, and it is very practical. The buttress ear plate hoop has low manufacturing cost and wide adaptability. It can be matched with structural columns of different diameters and sizes. The construction steps are simple. The buttress ear plate hoop can be recycled and reused, which effectively solves the problems existing in the prior art. , easy to popularize and apply.

Description

一种可循环使用的塔式起重非预埋扶墙耳板抱箍件A recyclable ear plate hoop for non-embedded buttress walls in tower cranes

技术领域technical field

本实用新型涉及建筑施工扶墙构件的技术领域,具体的说一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,特别涉及其机械连接结构。The utility model relates to the technical field of buttress wall components in building construction, in particular to a recyclable tower lifting non-embedded buttress ear plate hoop, in particular to its mechanical connection structure.

背景技术Background technique

民建住宅建筑物的施工中,塔式起重机需要通过拉杆实现与建筑物外墙的扶墙连接,该施工过程需要预先在建筑物外墙内预埋用于连接耳板的预埋件,该耳板预埋件只能一次性使用,在施工过程中随着施工高度的增加,需要要不断重复的造成浪费,而且,在施工完成后,还需对预埋件进行后续处理,进一步增加了施工难度和施工成本。In the construction of civil residential buildings, the tower crane needs to be connected with the buttress wall of the building's outer wall through the pull rod. The ear plate embedded parts can only be used once. During the construction process, as the construction height increases, it needs to be repeated repeatedly to cause waste. Moreover, after the construction is completed, the embedded parts need to be processed later, which further increases Construction difficulty and construction cost.

发明内容Contents of the invention

本实用新型的目的在于提供一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,针对民建住宅建筑物的施工中的结构特性,设计的出了可回收重复使用的耳板抱箍件,利用建筑物自身的结构柱实现塔式起重机与建筑物之间的扶墙连接。The purpose of this utility model is to provide a recyclable tower lifting non-embedded buttress wall ear plate hoop. Aiming at the structural characteristics of the construction of civil residential buildings, a recyclable and reusable hoop is designed. The ear plate hoop is used to realize the buttress connection between the tower crane and the building by using the structural column of the building itself.

为了实现上述目的,本实用新型的技术方案为:一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,它包括结构柱,所述耳板抱箍件由两块背板件和用于连接两块背板件的高强螺栓件构成,上述两块背板件对称分布在上述结构柱的前后两侧,结构柱的左右两侧分别设置有至少三根高强螺栓件,所述高强螺栓件的两端分别固定连接至上述两块背板件上,高强螺栓件用于连接两块背板件,其中一块背板件上设置有至少一组耳板,该组耳板由上耳板和下耳板构成,上耳板和下耳板均垂直于上述背板件设置,上耳板和下耳板呈上下对称分布,上耳板和下耳板均设置有销孔。In order to achieve the above purpose, the technical solution of the utility model is: a recyclable tower lifting non-embedded buttress wall ear plate hoop, which includes a structural column, and the ear plate hoop is composed of two back It is composed of plate parts and high-strength bolts for connecting two backboard parts. The two backboard parts are symmetrically distributed on the front and back sides of the above-mentioned structural column, and at least three high-strength bolt parts are respectively arranged on the left and right sides of the structural column. The two ends of the high-strength bolt parts are respectively fixedly connected to the above two backboard parts. The high-strength bolt parts are used to connect the two backboard parts. At least one set of ear plates is arranged on one of the back plate parts. The upper ear plate and the lower ear plate are composed of the upper ear plate and the lower ear plate, which are arranged perpendicular to the above-mentioned back plate. The upper ear plate and the lower ear plate are symmetrically distributed up and down, and both the upper ear plate and the lower ear plate are provided with pin holes.

本实用新型公开了一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,该结构件整体设计合理,工作稳定性强,具有很好的实用,扶墙耳板抱箍件制造成本低,适应性广泛,可配合不同直径尺寸的结构柱,施工步骤简单,扶墙耳板抱箍件可回收重复使用,有效解决了现有技术中存在的问题,易于推广应用。The utility model discloses a recyclable tower lifting non-pre-embedded buttress wall ear plate hoop. The manufacturing cost of the part is low, the adaptability is wide, and it can be matched with structural columns of different diameters and sizes. The construction steps are simple, and the ear plate hoop parts of the buttress wall can be recycled and reused, which effectively solves the problems existing in the prior art and is easy to popularize and apply.

附图说明Description of drawings

图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型扶墙端连接板结构示意图。Fig. 2 is a structural schematic diagram of the connecting plate at the end of the supporting wall of the utility model.

图3为本实用新型具体实施的一结构示意图。Fig. 3 is a structural schematic diagram of a specific implementation of the utility model.

其中:in:

1、结构柱;1. Structural column;

2、背板件;2. Back panel;

3、高强螺栓件;3. High-strength bolts;

4、上耳板;4. Upper ear plate;

5、下耳板;5. Lower ear plate;

6、销孔;6. Pin hole;

7、上连接板;7. Upper connecting plate;

8、下连接板;8. Lower connecting plate;

9、螺栓孔;9. Bolt holes;

10、侧板焊接件;10. Welding parts of side plate;

11、塔吊标注节;11. Tower crane marking section;

12、扶墙连杆。12. Supporting wall connecting rod.

具体实施方式detailed description

下面参照附图,对本实用新型进一步进行描述;Below with reference to accompanying drawing, the utility model is further described;

本实用新型公开了一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,它包括结构柱1,其区别于现有技术在于:所述耳板抱箍件由两块背板件2和用于连接两块背板件2的高强螺栓件3构成,上述两块背板件2对称分布在上述结构柱1的前后两侧,结构柱1的左右两侧分别设置有至少三根高强螺栓件3,背板件2的两侧靠近边缘处分别开设有用于配合高强螺栓件3的螺栓孔9,所述高强螺栓件3的两端分别固定连接至上述两块背板件2的螺栓孔9上,高强螺栓件3用于连接两块背板件2,其中一块背板件2上设置有至少一组耳板,该组耳板由上耳板4和下耳板5构成,上耳板4和下耳板5均垂直于上述背板件2设置,上耳板4和下耳板5呈上下对称分布,上耳板4和下耳板5均设置有销孔6。The utility model discloses a recyclable tower lifting non-embedded buttress wall ear plate hoop, which includes a structural column 1, which is different from the prior art in that the ear plate hoop consists of two The back plate part 2 and the high-strength bolt part 3 used to connect the two back plate parts 2 are composed. The above two back plate parts 2 are symmetrically distributed on the front and rear sides of the above-mentioned structural column 1, and the left and right sides of the structural column 1 are respectively provided with At least three high-strength bolts 3, the two sides of the back plate 2 near the edge are respectively provided with bolt holes 9 for matching the high-strength bolts 3, and the two ends of the high-strength bolts 3 are respectively fixedly connected to the above two back plates 2, the high-strength bolts 3 are used to connect two backboard parts 2, and one of the backboard parts 2 is provided with at least one set of lugs, and the set of lugs consists of upper lugs 4 and lower lugs 5 Composition, the upper ear plate 4 and the lower ear plate 5 are arranged perpendicular to the above-mentioned back plate 2, the upper ear plate 4 and the lower ear plate 5 are symmetrically distributed up and down, and the upper ear plate 4 and the lower ear plate 5 are both provided with pin holes 6 .

在具体实施时,所述结构柱1为混凝土柱或钢柱。In specific implementation, the structural column 1 is a concrete column or a steel column.

在具体实施时,上述其中一块背板件2上设置有两组耳板,两组耳板呈左右对称分布,其中,两块对称分布的上耳板4之间横向设置有一块上连接板7,该上连接板7用于连接两块上耳板4,两块对称分布的下耳板5之间横向设置有一块下连接板8,该下连接板8用于连接两块下耳板5。During specific implementation, two groups of ear plates are arranged on one of the above-mentioned back plate parts 2, and the two groups of ear plates are symmetrically distributed left and right, wherein an upper connecting plate 7 is arranged laterally between the two symmetrically distributed upper ear plates 4 , the upper connecting plate 7 is used to connect two upper ear plates 4, and a lower connecting plate 8 is arranged transversely between the two symmetrically distributed lower ear plates 5, and the lower connecting plate 8 is used to connect two lower ear plates 5 .

在具体实施时,为了增强两块背板件2之间的围合强度,两块背板件2之间可设置有两块侧板焊接件10,两块侧板焊接件10分别位于结构柱1的左右两侧,侧板焊接件10的一侧垂直于一背板件2表面设置,侧板焊接件10的另一侧垂直于另一背板件2表面设置,侧板焊接件10与背板件2之间可通过焊接方式固定连接。In specific implementation, in order to enhance the enclosure strength between the two back panels 2, two side panel welds 10 can be arranged between the two back panels 2, and the two side panel welds 10 are respectively located on the structural column On the left and right sides of 1, one side of the side plate welding part 10 is arranged perpendicular to the surface of a back plate part 2, and the other side of the side plate welding part 10 is arranged perpendicular to the surface of another back plate part 2, and the side plate welding part 10 and The back plate parts 2 can be fixedly connected by welding.

在具体实施时,为了配合不同直径的结构柱1尺寸,上述高强螺栓件3的杆体为多段式伸缩结构,可由多节副杆构成,副杆之间依次首尾连接,相邻的副杆之间可通过定位螺母实现相互固定,实现高强螺栓件3的长度调节,用于配合不同直径的结构柱。In actual implementation, in order to match the size of the structural column 1 with different diameters, the rod body of the above-mentioned high-strength bolt 3 is a multi-section telescopic structure, which can be composed of multiple sub-rods. The mutual fixation can be realized through the positioning nuts, and the length adjustment of the high-strength bolts 3 can be realized, which is used to match structural columns with different diameters.

在具体实施时,如图3中所示,塔吊标注节11通过扶墙连杆12与背板件上的耳板连接。实现塔吊标准节与建筑物结构柱1之间的扶墙施工。In a specific implementation, as shown in FIG. 3 , the tower crane marking section 11 is connected to the ear plate on the back plate through the buttress connecting rod 12 . Realize the buttress construction between the standard section of the tower crane and the structural column 1 of the building.

以上内容是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型具体实施只局限于上述这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本实用新型的保护范围。The above content is a further detailed description of the utility model in combination with specific preferred embodiments, and it cannot be assumed that the specific implementation of the utility model is limited to the above descriptions. For a person of ordinary skill in the technical field to which the utility model belongs, without departing from the concept of the utility model, some simple deduction or substitutions can also be made, which should be regarded as belonging to the protection scope of the utility model.

Claims (2)

1.一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,它包括结构柱(1),其特征在于:所述耳板抱箍件由两块背板件(2)和用于连接两块背板件(2)的高强螺栓件(3)构成,上述两块背板件(2)对称分布在上述结构柱(1)的前后两侧,结构柱(1)的左右两侧分别设置有至少三根高强螺栓件(3),所述高强螺栓件(3)的两端分别固定连接至上述两块背板件(2)上,高强螺栓件(3)用于连接两块背板件(2),其中一块背板件(2)上设置有至少一组耳板,该组耳板由上耳板(4)和下耳板(5)构成,上耳板(4)和下耳板(5)均垂直于上述背板件(2)设置,上耳板(4)和下耳板(5)呈上下对称分布,上耳板(4)和下耳板(5)均设置有销孔(6),上述其中一块背板件(2)上设置有两组耳板,两组耳板呈左右对称分布,其中,两块对称分布的上耳板(4)之间横向设置有一块上连接板(7),该上连接板(7)用于连接两块上耳板(4),两块对称分布的下耳板(5)之间横向设置有一块下连接板(8),该下连接板(8)用于连接两块下耳板(5)。1. A recyclable ear plate hoop for non-embedded buttress walls in tower cranes, which includes a structural column (1), characterized in that: the ear hoop is composed of two back plates (2 ) and high-strength bolts (3) used to connect two backboard parts (2), the above two backboard parts (2) are symmetrically distributed on the front and rear sides of the above structural column (1), and the structural column (1) At least three high-strength bolts (3) are respectively arranged on the left and right sides of the frame, and the two ends of the high-strength bolts (3) are respectively fixedly connected to the above-mentioned two backplates (2), and the high-strength bolts (3) are used for Connect two back plate parts (2), one of the back plate parts (2) is provided with at least one set of ear plates, the set of ear plates is composed of upper ear plate (4) and lower ear plate (5), the upper ear plate (4) and the lower ear plate (5) are set perpendicular to the above-mentioned back plate (2), the upper ear plate (4) and the lower ear plate (5) are symmetrically distributed up and down, and the upper ear plate (4) and the lower ear plate (5) are provided with pin holes (6), and one of the above-mentioned back plate parts (2) is provided with two sets of ear plates, and the two sets of ear plates are symmetrically distributed on the left and right, among which, two symmetrically distributed upper ear plates (4 ) is provided with an upper connecting plate (7) horizontally, the upper connecting plate (7) is used to connect two upper lug plates (4), and a horizontally disposed between two symmetrically distributed lower lug plates (5) A lower connecting plate (8), which is used to connect two lower ear plates (5). 2.根据权利要求1所述的一种可循环使用的塔式起重非预埋扶墙耳板抱箍件,其特征在于:所述结构柱(1)为混凝土柱或钢柱。2. A recyclable ear plate hoop for non-embedded buttress wall for tower crane according to claim 1, characterized in that: the structural column (1) is a concrete column or a steel column.
CN201720239100.9U 2017-03-13 2017-03-13 A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled Expired - Fee Related CN206538123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720239100.9U CN206538123U (en) 2017-03-13 2017-03-13 A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720239100.9U CN206538123U (en) 2017-03-13 2017-03-13 A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled

Publications (1)

Publication Number Publication Date
CN206538123U true CN206538123U (en) 2017-10-03

Family

ID=59942359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720239100.9U Expired - Fee Related CN206538123U (en) 2017-03-13 2017-03-13 A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled

Country Status (1)

Country Link
CN (1) CN206538123U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182646A (en) * 2022-01-17 2022-03-15 浙江交工集团股份有限公司 Wall spare is held up to assembled and adjustable ladder cage of length

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182646A (en) * 2022-01-17 2022-03-15 浙江交工集团股份有限公司 Wall spare is held up to assembled and adjustable ladder cage of length
CN114182646B (en) * 2022-01-17 2024-03-22 浙江交工集团股份有限公司 Assembled ladder cage buttress with adjustable length

Similar Documents

Publication Publication Date Title
CN203499229U (en) Operating platform for construction of elevator shaft
CN202627475U (en) Scaffold wall connecting member
CN207890939U (en) Tower crane attachment device connects anchor ear
CN103334541A (en) Steel rib-steel pipe concrete combination column
CN206538123U (en) A kind of non-pre-buried sustaining wall otic placode anchor ear part of the tower lifting that can be recycled
CN205397789U (en) Be used for construction elevator to attach wall pull rod overlength subassembly
CN205397790U (en) A subassembly that is used for construction elevator to attach wall pull rod overlength
CN209413002U (en) One kind can have enough to meet the need the pre-buried worm screw of concrete taper
CN203834906U (en) Triangular operation platform used for capital construction slope face
CN207974557U (en) A kind of concrete hanging top lengthening connection structure
CN207003970U (en) A kind of building scaffold being easily installed
CN206385464U (en) A kind of pre- pressure rack instrument of sand cylinder
CN206053269U (en) Bamboo and iron mixed scaffolding for construction
CN203684075U (en) Box-shaped steel bridge pier with root portion provided with stiffening energy dissipation wall plates
CN206834548U (en) A kind of three-level distribution box support
CN205116854U (en) Coal scuttle is portable platform for aggregate erection
CN205348731U (en) Core section of thick bamboo reinforcing bar post is from promoting formula operation platform
CN204728493U (en) A kind of concrete beam and girder steel sidepiece have just connect dry type syndeton
CN104499596B (en) Truss-restrained type buckling-restrained brace
CN106996160A (en) A kind of steel construction assembled wallboard
CN201943428U (en) Enclosing shelter in building construction
CN206917061U (en) A kind of steel construction assembled wallboard
CN207597852U (en) Lower suspension centre structure
CN203296368U (en) Front supporting mechanism for fixing steel wire rope of hanging basket
CN216787413U (en) Reinforcing steel bar processing shed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

CF01 Termination of patent right due to non-payment of annual fee