CN206531711U - A kind of steel reinforced concrete tests bar reinforcement positioning device - Google Patents

A kind of steel reinforced concrete tests bar reinforcement positioning device Download PDF

Info

Publication number
CN206531711U
CN206531711U CN201720244043.3U CN201720244043U CN206531711U CN 206531711 U CN206531711 U CN 206531711U CN 201720244043 U CN201720244043 U CN 201720244043U CN 206531711 U CN206531711 U CN 206531711U
Authority
CN
China
Prior art keywords
reinforcing bar
gag lever
lever post
rubber ring
experiment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720244043.3U
Other languages
Chinese (zh)
Inventor
周佳
李鹏
李振
刘贤
周原
张帝
高洁
张环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201720244043.3U priority Critical patent/CN206531711U/en
Application granted granted Critical
Publication of CN206531711U publication Critical patent/CN206531711U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model patent is related to a kind of steel reinforced concrete experiment bar reinforcement positioning device.The device mainly includes the gag lever post at top, reinforced hole, device outer wall, the rubber ring of bottom and the screw for fixing rubber ring.Reinforcing bar bottom is embedded in wooden template;Reinforcing bar upper end is placed in reinforced hole;Reinforcing bar is located at the center of test specimen when the gag lever post on top can effectively ensure that casting concrete, it is ensured that do not occur bias, and can be by the space casting concrete of top gag lever post, so as to improve the accuracy of experiment.The rubber ring of bottom can clamp test piece mould, prevent it from sliding.The present apparatus is reasonable in design, and reinforcing bar is effectively fixed on to the center of test specimen, improves the accuracy of experiment, with good application value and economic benefit, and the research reinforcing bar that is particularly suitable for use in is tested with concrete binding slip property.

Description

A kind of steel reinforced concrete tests bar reinforcement positioning device
Technical field
The utility model is related to a kind of steel reinforced concrete experiment bar reinforcement positioning device, and the structure can be widely used in armored concrete The making of test specimen, the research for the armored concrete bond-slip models that are particularly suitable for use in.
Background technology
Concrete has stable bonding and anchorage effect to reinforcing bar, be concrete and rebar can be work perfectly well as one it is whole The cooperative basic premise of body.Armored concrete test specimen plays key effect to cohesive force measuring accuracy, and test reinforcing bar is with mixing The device of solidifying soil adhesive property is divided to square body and round two kinds of forms.Most of square body is spelled by square wooden template Connect and composition is formed, it is difficult to ensure the accuracy of device, and the position of reinforcing bar is difficult to accurate fixation;Cylinder unit is most to accord with Close to have in reinforcing bar and the form of concrete binding power distribution characteristics, cohesion test both domestic and external and use such a form, generally Using steel and plastic cylindrical device, but how to ensure that reinforcing bar is accurately located at the difficulty that its center position is this device Point.Current existing cylinder unit, using the PVC round tube of cutting as template, and reinforcing bar is carried out using bottom embedding inlay technique Position is fixed, and reinforcing bar bottom is embedded in wooden template, and reinforcing bar top can not then be fixed, in concreting process, it is difficult to Ensure that reinforcing bar is in the center of cylinder;Also have using steel template, but test procedure is cumbersome, while also not economical enough.More than Method is difficult to meet the need for disposable a large amount of test specimens pour, therefore needs badly using new equipment to solve this problem.
The content of the invention
The purpose of this utility model is that providing a kind of steel reinforced concrete tests bar reinforcement positioning device, is mainly used in civil engineering test Middle armored concrete bond-slip properties experiment, the device can be effectively prevented from steel during casting concrete by gag lever post Muscle moves problem, so as to greatly increase the accuracy of experiment, has advantageously accounted for reinforcing bar during researcher experiment eccentric Problem.
A kind of steel reinforced concrete tests bar reinforcement positioning device, is that, by gag lever post, reinforced hole, outer wall, rubber ring and screw are constituted, its It is characterised by that gag lever post is used with reinforced hole to be welded to connect, rubber ring is fixed on outer wall by screw.
As an improvement, the device is provided with a reinforced hole, and it is divided into 20mm, 22mm diameter Type different with 25mm.
As an improvement, the device is provided with 8 gag lever posts, gag lever post is processed using a diameter of 4mm plain bar.
As an improvement, rubber ring is fixed on the outer wall of the device by four screws;
As an improvement, the size of outer wall can make corresponding change according to experiment demand.
The beneficial effects of the utility model:A kind of steel reinforced concrete experiment bar reinforcement positioning device is tested for armored concrete bond-slip Aid, ensures that reinforcing bar is in test specimen centre bit before and after concrete sample is poured using the cooperation of gag lever post and reinforced hole Put;Casting concrete can be by the space in the gag lever post of top, it is ensured that the one-shot forming of test specimen, reduces the error of experiment. To better meet scientific research personnel's experimental implementation demand, reinforced hole can make corresponding change according to the reinforcing bar of different-diameter.
Brief description of the drawings
A kind of steel reinforced concrete experiment bar reinforcement positioning device schematic diagrames of Fig. 1;
A kind of steel reinforced concrete experiment bar reinforcement positioning device design sketch of Fig. 2.
Reference:(1)Gag lever post;(2)Reinforced hole;(3)Outer wall;(4)Rubber ring;(5)Screw.
Embodiment
Referring to Figures 1 and 2, it is described as follows:A kind of embodiment of steel reinforced concrete experiment bar reinforcement positioning device is equal to common mixed Solidifying clay model tool, is first depending on test requirements document and determines outer wall dimension and the size of reinforced hole, secondly intercept 8 4mm of suitable length Plain bar, and its two ends is welded with outer wall with reinforced hole respectively;Rubber ring is fixed followed by four screws In the bottom of device.Finally this device is verified, the reinforcing bar for experiment is put into device check whether it is qualified.
A kind of steel reinforced concrete tests bar reinforcement positioning device, is that, by gag lever post, reinforced hole, outer wall, rubber ring and screw are constituted, its It is characterised by that gag lever post is used with reinforced hole to be welded to connect, rubber ring is fixed on outer wall by screw.
As an improvement, the device is provided with a reinforced hole, and it is divided into 20mm, 22mm diameter Type different with 25mm.
As an improvement, the device is provided with 8 gag lever posts, gag lever post is processed using a diameter of 4mm plain bar.
As an improvement, rubber ring is fixed on the outer wall of the device by four screws;
As an improvement, the size of outer wall can make corresponding change according to experiment demand.

Claims (3)

  1. It is by gag lever post 1. a kind of steel reinforced concrete tests bar reinforcement positioning device(1), reinforced hole(2), outer wall(3), rubber ring(4)And spiral shell Adjusting screw(5)Composition, it is characterised in that:Gag lever post(1)With reinforced hole(2)Using being welded to connect, rubber ring(4)Pass through screw (5)It is fixed on outer wall(3)On.
  2. 2. a kind of steel reinforced concrete experiment bar reinforcement positioning device according to claim 1, it is characterized in that:The device is provided with a reinforcing bar Hole(2), and it is divided into tri- kinds of specification types of 20mm, 22mm and 25mm according to different diameters.
  3. 3. a kind of steel reinforced concrete experiment bar reinforcement positioning device according to claim 1, it is characterized in that:The device is spacing provided with 8 Bar(1), gag lever post(1)Processed using a diameter of 4mm plain bar.
CN201720244043.3U 2017-03-14 2017-03-14 A kind of steel reinforced concrete tests bar reinforcement positioning device Expired - Fee Related CN206531711U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720244043.3U CN206531711U (en) 2017-03-14 2017-03-14 A kind of steel reinforced concrete tests bar reinforcement positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720244043.3U CN206531711U (en) 2017-03-14 2017-03-14 A kind of steel reinforced concrete tests bar reinforcement positioning device

Publications (1)

Publication Number Publication Date
CN206531711U true CN206531711U (en) 2017-09-29

Family

ID=59914617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720244043.3U Expired - Fee Related CN206531711U (en) 2017-03-14 2017-03-14 A kind of steel reinforced concrete tests bar reinforcement positioning device

Country Status (1)

Country Link
CN (1) CN206531711U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331177A (en) * 2018-01-18 2018-07-27 同济大学 The installation fixed structure and construction fixing means of steel reinforced concrete connector and perforation reinforcing bar
CN108593405A (en) * 2018-03-23 2018-09-28 中国建材检验认证集团股份有限公司 A kind of sample preparation device of electrochemistry test for rust preventing ability test specimen
CN108918233A (en) * 2018-09-25 2018-11-30 山东科技大学 A kind of column cap reinforcement positioning device and application method for mold-bagged concrete cylinder bias test
CN111272643A (en) * 2020-04-02 2020-06-12 安徽理工大学 Assembled concrete reinforcement corrosion experiment standard test block locator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331177A (en) * 2018-01-18 2018-07-27 同济大学 The installation fixed structure and construction fixing means of steel reinforced concrete connector and perforation reinforcing bar
CN108593405A (en) * 2018-03-23 2018-09-28 中国建材检验认证集团股份有限公司 A kind of sample preparation device of electrochemistry test for rust preventing ability test specimen
CN108918233A (en) * 2018-09-25 2018-11-30 山东科技大学 A kind of column cap reinforcement positioning device and application method for mold-bagged concrete cylinder bias test
CN111272643A (en) * 2020-04-02 2020-06-12 安徽理工大学 Assembled concrete reinforcement corrosion experiment standard test block locator
CN111272643B (en) * 2020-04-02 2023-04-28 安徽理工大学 Assembled concrete reinforcement corrosion experiment standard test block positioner

Similar Documents

Publication Publication Date Title
CN206531711U (en) A kind of steel reinforced concrete tests bar reinforcement positioning device
CN103837413B (en) Concrete tensile creep testing device and concrete shrinkage stress creep testing method
Guan et al. Fracture parameters of site-cast dam and sieved concrete
CN102519799B (en) Device for testing bonding performance of synthetic fiber and cement based material during plastic stage
CN206614632U (en) A kind of cylindrical reinforced concrete test specimen pours mould
CN201293756Y (en) Device for measuring cement consistency and setting time
CN203432828U (en) Test mold provided with L-shaped regulating damper and used in masonry brick compressive strength tests
CN204945135U (en) A kind of new and improved soil blister shrinkage pick-up unit
CN218036835U (en) Concrete slump detection device
CN207920139U (en) A kind of Axial-compression Column of Reinforced Concrete with ruggedized construction
CN205279925U (en) Accurate positioner of preformed hole is pour to concrete sample
CN203432829U (en) Regulating damper structure improved test mold used in masonry brick compressive strength tests
CN107655740B (en) Device and method for manufacturing test piece capable of testing shear strength of joint surfaces of different anchoring angles
CN213742217U (en) Embedded detachable overhanging scaffold positioning and fastening system
CN213517148U (en) Cement for hydraulic engineering antidetonation detection device that collapses
CN208346789U (en) Concrete pressure cell Embedded installation device
CN211652870U (en) Concrete penetration resistance appearance
CN104989101B (en) Discharging platform construction method
CN211504991U (en) Concrete flexural strength detection equipment
CN207189945U (en) For testing the resistance strain type sensor installation system of pile tube pile strain
CN209211514U (en) Model Pile preparation facilities and Model Pile for similarity model test
CN215414649U (en) Concrete examination mould auxiliary measurement instrument
CN207571136U (en) One kind is easily controllable to plug and pound formula slump measurement device
CN103398932B (en) Roadway low-intensity heat-barrier material permeability performance method for rapidly testing and device
CN105971028B (en) Exchange pillar bond-slip experimental rig and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20180314

CF01 Termination of patent right due to non-payment of annual fee