CN206529834U - A kind of construction of hydro project water-proof drainage device - Google Patents

A kind of construction of hydro project water-proof drainage device Download PDF

Info

Publication number
CN206529834U
CN206529834U CN201720156314.XU CN201720156314U CN206529834U CN 206529834 U CN206529834 U CN 206529834U CN 201720156314 U CN201720156314 U CN 201720156314U CN 206529834 U CN206529834 U CN 206529834U
Authority
CN
China
Prior art keywords
water
sucking mouth
construction
monitoring
storage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720156314.XU
Other languages
Chinese (zh)
Inventor
张岭
张锐
黄大典
秦克
王磊
朱跃龙
曹道权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720156314.XU priority Critical patent/CN206529834U/en
Application granted granted Critical
Publication of CN206529834U publication Critical patent/CN206529834U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction of hydro project water-proof drainage device, including fixed plate, lower water sucking mouth, upper water sucking mouth, controller and monitoring rod, the central position insertion of the fixed plate is provided with monitoring cavity, and the inside of monitoring cavity is provided with monitoring rod, the bottom of the monitoring rod is provided with water quality detection probe, and the top of monitoring rod is provided with water quality monitor, the top of the draining cushion chamber is provided with water storage box by two groups of conduits, and the side of water storage box is provided with draining pump, the upper surface of water storage box is provided with controller below the solar panel.The utility model is relative to conventional waterproof drainage arrangement, there is provided water quality testing meter and water-level instrumentation can accurately detect the water quality situation in hydraulic engineering region and the change of water level, accurate data are provided for engineer, it is easy to the construction of hydraulic engineering, the real-time condition that two groups of water sucking mouths of setting can be according to demand with water level carries out targetedly draining.

Description

A kind of construction of hydro project water-proof drainage device
Technical field
The utility model is related to construction of hydro project apparatus field, specially a kind of construction of hydro project water-proof drainage dress Put.
Background technology
With the development in epoch, the living standard of people is constantly improved, people for hydraulic engineering construction not yet Disconnected innovation and development, during large-scale construction of hydro project, it is often necessary to give water-proof drainage, prevents water from causing with this Influence to construction, while the safety of guaranteed water level is not only wanted during construction of hydro project, while also to understand water at any time Position and the change of water quality, so that engineer makes accurate judgement, traditional water-proof drainage device is in the poor work of response environment Journey, particularly more in some sludge, during the larger situation of current, waterproof type effect is not good, and there are many leaks, it is impossible to The dynamic change situation of water is monitored, in addition, in process of waterproof, general water extraction way can not also meet the requirement of draining, right This using suitable mode, it is necessary to give water-proof drainage.
Utility model content
The purpose of this utility model is to provide a kind of construction of hydro project water-proof drainage device, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the utility model provides following technical scheme:A kind of construction of hydro project water-proof drainage dress Put, including fixed plate, lower water sucking mouth, upper water sucking mouth, controller and monitoring rod, the central position insertion of the fixed plate is provided with Cavity is monitored, and the inside of monitoring cavity is provided with monitoring rod, the bottom of the monitoring rod is provided with water quality detection probe, and prison The fixed plate that the top of measuring staff is provided with the outside of water quality monitor, the monitoring cavity is provided with draining cushion chamber, and draining is slow The both sides for rushing chamber are sequentially installed with water sucking mouth and lower water sucking mouth, the lower water sucking mouth and upper water sucking mouth from top to bottom Motor is installed at heart position, and the output end of motor is provided with rotary blade by shaft coupling, the motor is away from pivoting leaf The side of wheel is provided with suction pump, and suction pump is connected by suction hose with upper water sucking mouth, and the top of the draining cushion chamber leads to Cross two groups of conduits and water storage box is installed, and the side of water storage box is provided with draining pump, the top droop of the water storage box is provided with Two groups of solar panels, and acoustic-optic alarm, the solar cell are installed at the top of solar panel intersection The upper surface of water storage box is provided with controller below plate.
It is preferred that, four angles of the fixed plate bottom are all provided with fixed holdfast.
It is preferred that, the water inlet end of the lower water sucking mouth and upper water sucking mouth is all provided with metal filter screen.
It is preferred that, the rotary blade turn clockwise direction blade be provided with cutting edge.
It is preferred that, water-level instrumentation is installed on the side wall of the monitoring rod.
Compared with prior art, the beneficial effects of the utility model are:The construction of hydro project water-proof drainage device is relative In conventional waterproof drainage arrangement, there is provided water quality testing meter and water-level instrumentation can accurately detect the water in hydraulic engineering region The change of matter situation and water level, accurate data are provided for engineer, are easy to the construction of hydraulic engineering, while the report set Alarm device can send danger early warning with the very first time, improve the security of device, the solar panel of setting can be by too Sun can be converted into electric energy, be used for device, save electric power resource so that device is more environmentally-friendly, and two groups of water sucking mouths of setting can Targetedly draining is carried out with the real-time condition according to demand with water level, while rotary blade can be by debris such as pasture and water under water Crushed, it is to avoid large-scale debris causes to damage to suction pump and device, and then improves the service life of device.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model.
In figure:1- fixed plates;2- monitors cavity;3- suction pumps;4- rotary blades;Water sucking mouth under 5-;6- draining cushion chambers; 7- motors;The upper water sucking mouths of 8-;9- suction hoses;10- water storage boxes;11- acoustic-optic alarms;12- solar panels;13- is controlled Device;14- draining pumps;15- water quality monitors;16- water-level instrumentations;17- monitoring rods;18- water quality detections are popped one's head in.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-2, a kind of embodiment that the utility model is provided:A kind of construction of hydro project water-proof drainage device, Including fixed plate 1, lower water sucking mouth 5, upper water sucking mouth 8, controller 13 and monitoring rod 17, the central position insertion of fixed plate 1 is set There is monitoring cavity 2, and the inside of monitoring cavity 2 is provided with monitoring rod 17, monitoring rod 17 is used for the water for detecting hydraulic engineering region Matter and water level conditions, four angles of the bottom of fixed plate 1 are all provided with fixed holdfast, and the bottom of monitoring rod 17 is provided with water quality inspection Probing first 18, and the top of monitoring rod 17 is provided with water quality monitor 15, the side wall of monitoring rod 17 and is provided with water-level instrumentation 16, the fixed plate 1 in the outside of monitoring cavity 2 is provided with draining cushion chamber 6, and the both sides of draining cushion chamber 6 are pacified successively from top to bottom Equipped with upper water sucking mouth 8 and lower water sucking mouth 5, upper water sucking mouth 8 can accelerate the speed of draining, lower water sucking mouth 5 when water level is higher Draining can be carried out when water level is reduced, the water inlet end of lower water sucking mouth 5 and upper water sucking mouth 8 is all provided with metal filter screen, lower suction The center position of the mouth of a river 5 and upper water sucking mouth 8 is provided with motor 7, and the output end of motor 7 is provided with rotation by shaft coupling Impeller 4, rotary blade 4 turn clockwise direction blade be provided with cutting edge, rotary blade 4 can crush suction weeds and Debris, it is to avoid larger debris enters device interior, and side of the motor 7 away from rotary blade 4 is provided with suction pump 3, and draws water Pump 3 is connected by suction hose 9 with upper water sucking mouth 8, and the top of draining cushion chamber 6 is provided with water storage box 10 by two groups of conduits, and The side of water storage box 10 is provided with draining pump 14, and the top droop of water storage box 10 is provided with two groups of solar panels 12, and too Positive to be provided with acoustic-optic alarm 11 at the top of the intersection of cell panel 12, acoustic-optic alarm 11 can send pre- with the very first time Alert, the upper surface of the lower section water storage box 10 of solar panel 12 is provided with controller 13.
Specifically used mode:In use, fixed plate 1 is fixed in the water in hydraulic engineering region by fixed holdfast, lead to The water quality testing meter 15 and water-level instrumentation 16 crossed inside monitoring rod 17 detect to the water quality and water level of construction area, when Water level is relatively low and when needing draining, the motor 7 and suction pump 3 opened in lower water sucking mouth 5 are drawn water, and are entered when having weeds or debris Fashionable to be crushed by rotary blade 4, the water of extraction is entered in water storage box 10 by draining cushion chamber 6, then passes through draining pump 14 again By the water discharge in water storage box 10, the motor 7 and suction pump 3 that can be opened when water level is too high in upper water sucking mouth 8 are drawn water.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of construction of hydro project water-proof drainage device, including fixed plate (1), lower water sucking mouth (5), upper water sucking mouth (8), control Device (13) and monitoring rod (17), it is characterised in that:The central position insertion of the fixed plate (1) is provided with monitoring cavity (2), and The inside of monitoring cavity (2) is provided with monitoring rod (17), and the bottom of the monitoring rod (17) is provided with water quality detection probe (18), And the fixed plate (1) that the top of monitoring rod (17) is provided with the outside of water quality monitor (15), the monitoring cavity (2) is provided with row Water cushion chamber (6), and the both sides of draining cushion chamber (6) are sequentially installed with water sucking mouth (8) and lower water sucking mouth from top to bottom (5), the center position of the lower water sucking mouth (5) and upper water sucking mouth (8) is provided with motor (7), and the output end of motor (7) Rotary blade (4) is provided with by shaft coupling, side of the motor (7) away from rotary blade (4) is provided with suction pump (3), And suction pump (3) is connected by suction hose (9) with upper water sucking mouth (8), the top of the draining cushion chamber (6) passes through two groups of conduits Water storage box (10) is installed, and the side of water storage box (10) is provided with draining pump (14), the top droop of the water storage box (10) It is provided with the top of two groups of solar panels (12), and solar panel (12) intersection and acoustic-optic alarm is installed (11), the upper surface of water storage box (10) is provided with controller (13) below the solar panel (12).
2. a kind of construction of hydro project water-proof drainage device according to claim 1, it is characterised in that:The fixed plate (1) four angles of bottom are all provided with fixed holdfast.
3. a kind of construction of hydro project water-proof drainage device according to claim 1, it is characterised in that:The lower water sucking mouth (5) and upper water sucking mouth (8) water inlet end all be provided with metal filter screen.
4. a kind of construction of hydro project water-proof drainage device according to claim 1, it is characterised in that:The rotary blade (4) turn clockwise direction blade be provided with cutting edge.
5. a kind of construction of hydro project water-proof drainage device according to claim 1, it is characterised in that:The monitoring rod (17) water-level instrumentation (16) is installed on side wall.
CN201720156314.XU 2017-02-21 2017-02-21 A kind of construction of hydro project water-proof drainage device Expired - Fee Related CN206529834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720156314.XU CN206529834U (en) 2017-02-21 2017-02-21 A kind of construction of hydro project water-proof drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720156314.XU CN206529834U (en) 2017-02-21 2017-02-21 A kind of construction of hydro project water-proof drainage device

Publications (1)

Publication Number Publication Date
CN206529834U true CN206529834U (en) 2017-09-29

Family

ID=59919465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720156314.XU Expired - Fee Related CN206529834U (en) 2017-02-21 2017-02-21 A kind of construction of hydro project water-proof drainage device

Country Status (1)

Country Link
CN (1) CN206529834U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589900A (en) * 2018-03-15 2018-09-28 南安市创培电子科技有限公司 A kind of adjustable construction of hydro project water-proof drainage device
CN109239295A (en) * 2018-10-16 2019-01-18 黑龙江大学 A kind of hydraulic engineering water quality water level monitoring device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589900A (en) * 2018-03-15 2018-09-28 南安市创培电子科技有限公司 A kind of adjustable construction of hydro project water-proof drainage device
CN109239295A (en) * 2018-10-16 2019-01-18 黑龙江大学 A kind of hydraulic engineering water quality water level monitoring device

Similar Documents

Publication Publication Date Title
CN206125340U (en) Novel from electricity generation marine monitoring buoy
CN206529834U (en) A kind of construction of hydro project water-proof drainage device
CN207436013U (en) A kind of reservoir
CN111650103B (en) Floated runoff silt content monitoring devices
CN207336508U (en) A kind of pollution of waterhead degree detection device
CN206768791U (en) Groundwater monitoring, alarm and automatic recharge system on the outside of deep basal pit
CN202417485U (en) Real-time monitoring system for well drilling well kick leakage
CN213779195U (en) Water level monitoring and alarming device for dam
CN212374960U (en) Reverse osmosis seawater desalination automatic monitoring system using turbine type energy recovery device
CN206737104U (en) Sanitary sewage lifting device
CN206495181U (en) A kind of construction of hydro project water-proof drainage device
CN111487389A (en) Surface runoff monitoring devices with adjustable soil and water conservation is used
CN206584239U (en) Integrated prefabricated pumping plant and its compound liquid level detection device
CN214503586U (en) Detector for sewage detection
CN206331286U (en) A kind of sewage disposal monitoring system and its electrical control cubicles
CN211527696U (en) Groundwater dynamic detection device
CN106292753A (en) A kind of underground water level monitor terminal
CN213843214U (en) Adjustable acquisition device for watershed water environment risk early warning
CN204025098U (en) Intelligent hydro powered machine used for cooling tower
CN212301603U (en) Water conservancy monitoring water flow velocity measuring device
CN206571698U (en) A kind of intelligent control submersible pump of new structure
CN206549414U (en) A kind of mixed bed regenerated acid processing system device
CN206410221U (en) A kind of air quality processing unit of the centralized control cabinet being easy for installation and removal and its composition
CN111268764A (en) Reverse osmosis seawater desalination automatic monitoring system using turbine type energy recovery device
CN204458289U (en) A kind of suction pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20180221

CF01 Termination of patent right due to non-payment of annual fee