CN206528909U - A kind of delivery platform - Google Patents
A kind of delivery platform Download PDFInfo
- Publication number
- CN206528909U CN206528909U CN201621430873.7U CN201621430873U CN206528909U CN 206528909 U CN206528909 U CN 206528909U CN 201621430873 U CN201621430873 U CN 201621430873U CN 206528909 U CN206528909 U CN 206528909U
- Authority
- CN
- China
- Prior art keywords
- delivery platform
- connecting rod
- support
- bearing block
- roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rollers For Roller Conveyors For Transfer (AREA)
Abstract
The utility model is related to a kind of nuclear power electrically prefabricated auxiliary equipment, and in particular to a kind of delivery platform for being used to transport material in the electric prefabrication process of nuclear power.In order to solve at present in the electric prefabrication process of nuclear power, the problem of potential safety hazard and low manual operation efficiency to carrying personnel are had by man-handling of materials material, the utility model discloses a kind of delivery platform.The delivery platform includes support frame and roller, wherein the roller is connected by the bearing block positioned at two ends with support frame as described above, and support frame as described above upper end is provided with multiple rollers being parallel to each other.The delivery platform of the utility model, the material that the characteristic that can be rotated freely under the support of bearing block by using roller is pointed on roller carries out rapid transport, operated so as to substitute the artificial carrying to material, it so can not only avoid operating personnel's potential safety hazard present in materials hauling process, and the requirement in handling process to crew numbers can be reduced, improve manual operation efficiency.
Description
Technical field
The utility model is related to a kind of nuclear power electrically prefabricated auxiliary equipment, and in particular to one kind is in the electric prefabrication process of nuclear power
In be used to transport the delivery platform of preformed material.
Background technology
There is substantial amounts of electric utility to need prefabricated processing in Construction of Nuclear Electricity, by electric support it is prefabricated exemplified by, general first
The cutting work station that preformed material is transported to by placing of material field in prefabricated workshop carries out cutting process, secondly will be prefabricated after cutting
Material is transported to polishing station in prefabricated workshop and carries out grinding process again, then preformed material is welded, assembly etc. is grasped
Deal with, will finally complete prefabricated electric support and be transported to job site.It can not only be reduced by using prefabricated mode
To the space hold of job site, and it can effectively improve the operating efficiency of whole electrically support processing and installation process.
However, transhipment in prefabrication process to preformed material at present, mainly by way of multi agent cooperation is carried come
Complete.Wherein after preformed material is transported into prefabricated workshop by placing of material field and preliminary cutting is completed in prefabricated workshop
Transport process in, the size and weight of preformed material are all very big.Therefore multi agent cooperation is needed to carry preformed material, so not only
In the presence of the potential safety hazard to carrying personnel, and a large amount of manpowers are taken, reduce manual operation efficiency.
Utility model content
It is current in the electric prefabrication process of nuclear power in order to solve, existed during by man-handling of materials preformed material to carrier
It is the problem of potential safety hazard and low manual operation efficiency of member, electric for nuclear power the utility model proposes a kind of delivery platform
To the transhipment of preformed material in prefabrication process.The delivery platform, including support frame and roller, support frame as described above include support platform
And supporting leg, the supporting leg is vertical with the support platform to be fixedly connected;The roller passes through the bearing positioned at itself two ends
Seat is connected with the support platform, and the support platform is provided with multiple rollers being parallel to each other.
It is preferred that, the delivery platform also includes buffer cell, and the buffer cell is located at the bearing block and the support
Between platform, and it is detachably connected with the bearing block and the support platform.
It is further preferred that the buffer cell includes upper backup pad, lower supporting plate, keeper and compression piece;On described
Supporting plate is detachably connected with the bearing block, and the lower supporting plate is detachably connected with the support platform;The keeper
Upper end be connected with the upper backup pad, the lower end of the keeper is connected with the lower supporting plate;The compression piece with it is described
Keeper is flexibly connected.
It is further preferred that the keeper includes first connecting rod and second connecting rod, the first connecting rod and described second
Connecting rod is in dry character form structure;The vertical end of the first connecting rod is provided with blind hole, and the vertical end of the second connecting rod is located at described the
In the vertical end of one connecting rod;The compression piece is set in the vertical end of the first connecting rod.
It is further preferred that the upper backup pad and the lower supporting plate are involute slot structure;The first connecting rod and institute
The upper strata horizontal ends for stating second connecting rod are located in the volume groove of the upper backup pad and the lower supporting plate respectively.
It is preferred that, the compression piece selects helical spring.
It is preferred that, the lower end of the supporting leg is provided with bottom plate, and the bottom plate is provided with the through hole for mounting foot bolt.
By mounting foot bolt, support frame as described above is fixed on the ground, so as to mention the delivery platform in the course of the work steady
It is qualitative.
It is preferred that, the lower end of the supporting leg is provided with the universal wheel of strap brake.So can be by the delivery platform to pre-
Preformed material during system carries out the rapid transport between different station, accelerates transport speed, improves turning in prefabrication process
Transport efficiency.
In the electric prefabrication process of nuclear power, substitute and manually carry out to pre- saw lumber by using delivery platform of the present utility model
The transhipment of material, with following beneficial effect:
1st, the characteristic that can be rotated freely under the support of bearing block by using roller in the utility model delivery platform,
Material on roller can be pointed to and carry out rapid transport, and several operating personnel are only needed in transport process be controlled
, operating personnel so can be not only avoided in the potential safety hazard of materials hauling process, and can be reduced in transport process
Requirement to operating personnel's quantity and labor intensity, so as to improve the efficiency of manual work and transhipment preformed material.
2nd, delivery platform of the present utility model, the detachable buffering list by being set between bearing block and support platform
Member, not only can enter row buffering and suction during big part preformed material is transported to the pressure suffered by roller and bearing block
Receive, it is to avoid roller and bearing block are damaged, so as to extend the service life of the delivery platform.And connected using detachable
Connect, it is possible to achieve quick-replaceable is carried out to the buffer cell of failure, so as to ensure in prefabricated processing to the normal of preformed material
Transhipment and transport efficacy.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model delivery platform;
Fig. 2 is the mplifying structure schematic diagram of buffer cell in Fig. 1;
Fig. 3 be in Fig. 2 A-A to diagrammatic cross-section.
Embodiment
Fig. 1 show the structural representation of the utility model delivery platform.The delivery platform includes support frame 1 and roller 2,
Support frame 1 includes support platform 11 and four supporting legs 12.Wherein, support platform 11 is using frame structure and centre is provided with buttress brace
111, so as to strengthen its support strength in the case where controlling the overall weight of support platform 11.Four supporting legs 12 are located at support respectively
Four corners of platform 11, and fixed with the vertical welding of support platform 11, stull 121 is provided between adjacent legs 12, is used
In the support strength and stability of strutting system of strengthening supporting leg 12.Provided with three rollers 2 being parallel to each other, roller in support platform 11
2 are fixedly connected by the bearing block 3 positioned at its own two ends with support platform 11, so can in the support bottom roll 2 of bearing block 3
With flexible rotating of the freedom without jam.
It is preferred that, with reference to shown in Fig. 1, Fig. 2 and Fig. 3, the delivery platform also includes buffer cell 4, and buffer cell 4 is located at axle
Between bearing 3 and support platform 11, for the pressure suffered by roller 2 and bearing block 3 to be absorbed and buffered.Buffer cell
4 include upper backup pad 41, lower supporting plate 42, keeper 43 and compression piece 44.Wherein upper backup pad 41 and lower supporting plate 42 is interior
It is detachably connected between volume slot structure, and upper backup pad 41 and bearing block 3 by bolt, lower supporting plate 42 and support platform 11
Between be detachably connected by bolt.Buffer cell 4 is arranged on bearing block 3 by using detachable connected mode and support is flat
Between platform 11, the buffer cell 4 of failure quickly can be changed in the course of the work, so as to ensure the delivery platform
Normal transport.Keeper 43 includes first connecting rod 431 and second connecting rod 432, and first connecting rod 431 and second connecting rod 432 are in dry word
Shape structure, and the upper strata horizontal ends of first connecting rod 431 and second connecting rod 432 are located in upper backup pad 41 and lower supporting plate 42 respectively
Volume groove in, can along supporting plate length direction slidably.In addition, the vertical end of first connecting rod 431 is provided with blind hole, second
The vertical end of connecting rod 432 is located in the blind hole of the vertical end of first connecting rod 431, it is possible to relative to slide.Compression piece 44 is set in
In the vertical end of first connecting rod 431, and compression piece 44 top and bottom respectively with first connecting rod 431 and second connecting rod 432
The horizontal end in contact of lower floor.
Compression piece 44 is provided with the vertical end of the first connecting rod 431 of blind hole by being set in, not only can be in first connecting rod
431 and the guiding of second connecting rod 432 and the lower compression and stretching, extension stablized of support.And erecting due to head rod 431
Straight end is oriented to using blind hole structure to second connecting rod 432, and thus the maximum compressibility of compression piece 44 can be controlled
System, it is to avoid cause destruction beyond the compression limit of compression piece 44.
In the utility model, compression piece 44 employs helical spring, and prefabricated component is placed into this for absorbing and buffering
Prefabricated component is to the impulsive force produced by roller 2 and bearing block 3 when on delivery platform, so as to be protected to roller 2 and bearing block 3
Shield, increases the service life.In addition it is also possible to which the prefabricated component weight that the dimensional structure and needs for keeper 43 are carried selects it
The compression piece 44 of his structure, such as butterfly spring.
It is preferred that, with reference to shown in Fig. 1, castor 5 is provided with the lower end of supporting leg 12, by setting castor 5, it is possible to achieve this reality
With the free movement of new delivery platform, the preformed material in prefabrication process can so be carried out by the delivery platform different
Rapid transport between station, accelerates transport speed, improves prefabricated whole efficiency.In the utility model, castor 5 uses band
There is the universal wheel of brake, to realize rotating freely and fixed in circumferencial direction.
In addition, the delivery platform that need not be moved for part, can set through hole, for installing ground in the lower end of supporting leg 12
Foot bolt, so that delivery platform be fixedly connected with ground, it is ensured that the stability of delivery platform in the course of the work.Separately
Outside, can be right by setting cushion block below supporting leg 12 when the ground out-of-flatness of the utility model delivery platform fixed position
The height of delivery platform is adjusted.
Can be by placing of material region and prefabricated workshop, and by prefabricated workshop by delivery platform of the present utility model
Cutting work station and polishing station be attached.Wherein, used between placing of material region and prefabricated workshop and pass through lower margin spiral shell
The delivery platform that bolt is fixedly connected with the ground is attached, and can so ensure the stability transported to big part prefabricated component.Pre-
Use the delivery platform provided with Castor structure to be attached between internal cutting station in workshop processed and polishing station, can so improve
The rapidity transported to smallclothes prefabricated component.
In the electric prefabrication process of nuclear power, use the defeated platform of cloud of the present utility model to the transfer operation of preformed material for:
First, the conveying that will be placed on positioned at the preformed material in placing of material region between the prefabricated workshop of connection and placing of material region is put down
On platform, wherein the operation is main hangs the carrying for completing preformed material by the row installed in placing of material region;Secondly, by few
Number operating personnel's control preformed material is moved on roller 2, preformed material is transported into the cutting work station in prefabricated workshop, to pre-
Prepared material carries out cutting operation;Then, by the delivery platform provided with castor 5, the preformed material after cutting is transported to polishing
Station and other stations carry out following process processing.
Claims (8)
1. a kind of delivery platform, it is characterised in that including support frame and roller, support frame as described above includes support platform and support
Leg, the supporting leg is vertical with the support platform to be fixedly connected;The roller passes through the bearing block positioned at itself two ends and institute
Support platform connection is stated, and the support platform is provided with multiple rollers being parallel to each other.
2. delivery platform according to claim 1, it is characterised in that the delivery platform also includes buffer cell, described slow
Rush unit to be located between the bearing block and the support platform, and detachably connect with the bearing block and the support platform
Connect.
3. delivery platform according to claim 2, it is characterised in that the buffer cell includes upper backup pad, lower support
Plate, keeper and compression piece;The upper backup pad is detachably connected with the bearing block, and the lower supporting plate and the support are flat
Platform is detachably connected;The upper end of the keeper is connected with the upper backup pad, the lower end of the keeper and the lower support
Plate is connected;The compression piece is flexibly connected with the keeper.
4. delivery platform according to claim 3, it is characterised in that the keeper includes first connecting rod and second and connected
Bar, the first connecting rod and the second connecting rod are in dry character form structure;The vertical end of the first connecting rod is provided with blind hole, described the
The vertical end of two connecting rods is located in the vertical end of the first connecting rod;The compression piece is set in the vertical end of the first connecting rod
On.
5. delivery platform according to claim 4, it is characterised in that the upper backup pad and the lower supporting plate are curls inward
Slot structure;The upper strata horizontal ends of the first connecting rod and the second connecting rod are located in the upper backup pad and the lower branch respectively
In the volume groove of fagging.
6. the delivery platform according to any one in claim 3-5, it is characterised in that the compression piece selects spiral bullet
Spring.
7. the delivery platform according to any one in claim 1-5, it is characterised in that the lower end of the supporting leg is provided with
Bottom plate, the bottom plate is provided with the through hole for mounting foot bolt.
8. the delivery platform according to any one in claim 1-5, it is characterised in that the lower end of the supporting leg is provided with
The universal wheel of strap brake.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621430873.7U CN206528909U (en) | 2016-12-23 | 2016-12-23 | A kind of delivery platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621430873.7U CN206528909U (en) | 2016-12-23 | 2016-12-23 | A kind of delivery platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206528909U true CN206528909U (en) | 2017-09-29 |
Family
ID=59922327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621430873.7U Active CN206528909U (en) | 2016-12-23 | 2016-12-23 | A kind of delivery platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206528909U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113083557A (en) * | 2021-04-06 | 2021-07-09 | 甘肃省安装建设集团有限公司 | A anticorrosive rust-resistant processing apparatus for pipeline engineering construction pipeline is outside |
-
2016
- 2016-12-23 CN CN201621430873.7U patent/CN206528909U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113083557A (en) * | 2021-04-06 | 2021-07-09 | 甘肃省安装建设集团有限公司 | A anticorrosive rust-resistant processing apparatus for pipeline engineering construction pipeline is outside |
CN113083557B (en) * | 2021-04-06 | 2023-06-30 | 甘肃省安装建设集团有限公司 | A anticorrosive rust-resistant processing apparatus for pipeline engineering construction pipeline is outside |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206528909U (en) | A kind of delivery platform | |
CN104401502A (en) | Flexible installation and storage two-purpose device for large undercarriage | |
CN109318922B (en) | Mobile station trolley | |
CN207016175U (en) | A kind of suitable container corollary system for loading coil | |
CN205869865U (en) | Laborsaving extraction element of cantilever pendulum rod formula | |
CN209684577U (en) | A kind of dual-purpose transfer tooling of the wind electricity blade web of grider | |
CN207986476U (en) | A kind of mining elevator for coal mining | |
CN203639007U (en) | Rotary lifting mast | |
CN203833587U (en) | Automatic discharging device | |
CN214044700U (en) | Special trolley for replacing current transformer of armored switch cabinet | |
CN205524338U (en) | Steel plate transportation vehicle | |
CN205976394U (en) | Convenient low layer construction scaffolding | |
CN209259612U (en) | A kind of feeding device for construction | |
CN204916856U (en) | Large -scale pipe fitting conveyer | |
CN210499981U (en) | Front ring dismounting vehicle for aircraft engine | |
CN203702188U (en) | Tunnel engineering lining steel bar installing support | |
CN210915206U (en) | Lifting platform for assembly type building | |
CN211417644U (en) | Vertical take-off and landing fixed wing unmanned aerial vehicle iron bird test bed | |
CN207418183U (en) | A kind of rolling bed elevator | |
CN203682904U (en) | Electric portal frame | |
CN205220716U (en) | Location is with hydraulic oil top removal handcart | |
CN207551802U (en) | A kind of portable transport equipment for building | |
CN216072879U (en) | Material feeding unit for construction | |
CN221605826U (en) | Underground transport vehicle | |
CN219134180U (en) | Simple multifunctional conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |