CN206528879U - Flue gas of refuse burning processing raw material cabin - Google Patents

Flue gas of refuse burning processing raw material cabin Download PDF

Info

Publication number
CN206528879U
CN206528879U CN201621482227.5U CN201621482227U CN206528879U CN 206528879 U CN206528879 U CN 206528879U CN 201621482227 U CN201621482227 U CN 201621482227U CN 206528879 U CN206528879 U CN 206528879U
Authority
CN
China
Prior art keywords
feed bin
raw material
flue gas
material cabin
refuse burning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621482227.5U
Other languages
Chinese (zh)
Inventor
何承发
李大明
李朝晖
陈凤银
张长乐
汪克春
汪宁
肖杰玉
赵峰娃
考传利
杨长青
裴莹
王虎山
秦宗甲
邱振夏
任明政
温亚菲
鲁朝朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Haihuan Industrial Co ltd
Original Assignee
Anhui Conch Construction Materials Design Institute Co Ltd
Anhui Conch Kawasaki Energy Conservation Equipment Manufacturing Co Ltd
Anhui Conch Kawasaki Engineering Co Ltd
Shanghai Conch Kawasaki Energy Conservation and Environmental Protection Engineering Co Ltd
Wuhu Conch Venture Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Conch Construction Materials Design Institute Co Ltd, Anhui Conch Kawasaki Energy Conservation Equipment Manufacturing Co Ltd, Anhui Conch Kawasaki Engineering Co Ltd, Shanghai Conch Kawasaki Energy Conservation and Environmental Protection Engineering Co Ltd, Wuhu Conch Venture Industrial Co Ltd filed Critical Anhui Conch Construction Materials Design Institute Co Ltd
Priority to CN201621482227.5U priority Critical patent/CN206528879U/en
Application granted granted Critical
Publication of CN206528879U publication Critical patent/CN206528879U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses a kind of flue gas of refuse burning processing raw material cabin, including the feed bin for depositing lime powder and active carbon powder, the upper, middle and lower position of the feed bin inwall is respectively provided with a stuff level switch, and the stuff level switch outputs signal to control system.The storage of powder can be monitored in real time by storing active carbon powder and lime powder using the utility model raw material cabin, and can feed bin environmental aspect be monitored and adjust, so as to the reliable and stable raising raw material for flue gas of refuse burning processing.

Description

Flue gas of refuse burning processing raw material cabin
Technical field
The utility model, which is related in storage facilities field, more particularly to flue gas of refuse burning treatment process, to be used to deposit activity The raw material cabin of charcoal or lime powder.
Background technology
Waste incineration and generating electricity can solve the problems, such as garbage disposal, can also be generated electricity using rubbish, still, current rubbish The problem of burning electricity generation has maximum is then exhaust-gas treatment, if the waste gas after burning can not be handled reasonably, can be caused Air pollution.
Flue gas produced by waste incineration needs to spray lime or activated carbon into exhaust gases passes, with storage pulverized limestone and The container of active carbon powder is mostly with a simple seal storehouse, it is difficult to which material situation in storehouse is monitored, and institute when feeding intake The dust of generation also can produce dust pollution to plant area.
Utility model content
Technical problem to be solved in the utility model is to realize that a kind of storage is safe and reliable, can ensure that fume treatment is supplied The raw material cabin of material demand.
To achieve these goals, the technical solution adopted in the utility model is:Flue gas of refuse burning processing raw material cabin, Including the feed bin for depositing lime powder and active carbon powder, the upper, middle and lower position of the feed bin inwall is respectively provided with a material Bit switch, the stuff level switch outputs signal to control system.
The feed bin inwall is provided with temperature sensor, and nitrogen protection device is provided with nitrogen flow in pipes, nitrogen note Enter pipeline to be connected in feed bin, the temperature sensor output signal is to control system, the control system output control signal To nitrogen protection device.
Pulse blowing type sack cleaner is installed, the pulse blowing type sack cleaner is provided with outside at the top of the feed bin Filter bag is provided with the discharge duct of exhaust, the discharge duct, the tube wall of the discharge duct is provided with film viewing screen.
The storage of powder can be monitored in real time by storing active carbon powder and lime powder using the utility model raw material cabin, and And can feed bin environmental aspect be monitored and adjust, it is former so as to the reliable and stable raising for flue gas of refuse burning processing Material.
Brief description of the drawings
The mark in the content and figure of every width accompanying drawing expression in the utility model specification is briefly described below:
Fig. 1 is raw material cabin structural representation.
Mark in above-mentioned figure is:1st, feed bin;2nd, stuff level switch;3rd, temperature sensor;4th, nitrogen protection device;5th, arteries and veins Rush blowing type sack cleaner.
Embodiment
As shown in figure 1, feed bin 1 is used to store activated carbon and lime, the injector for conveying activated carbon and lime enters Material mouth connects feed bin 1 bottom by pipeline, and activated carbon is fed intake (packed activity by air pressure sending type tank car Geldart-D particle or crane Charcoal) two ways feeding storehouse in and store.
3 stuff level switch 2 are installed, the detection high charge level of stuff level switch 2 on top, middle part stuff level switch 2 is shown in feed bin 1 Low material position, the stuff level switch 2 of foot detects minimum material position, and stuff level switch 2 outputs signal to control system.Stuff level switch 2 should The position from the easy maintenance overhaul in corridor is arranged on, being capable of the live material unloading function of field control case completion by stuff level switch 2. In addition the stock that control system can be provided with communicator, communicator feed bin 1 is delivered to remote monitoring room, and passes through The display of Control Room and warning device prompting staff, facilitate staff that equipment is adjusted.
The inwall of feed bin 1 be provided with temperature sensor 3, nitrogen protection device 4 be provided with nitrogen flow in pipes, nitrogen flow in pipes It is connected in feed bin 1, temperature sensor 3 outputs signal to control system, control system outputs control signals to nitrogen protection dress Put 4.Temperature sensor 3 is to monitor temperature in activated carbon storehouse, when temperature is higher, using nitrogen protection device 4, the storage of nitrogen The standby volume reasonable disposition measured according to activated carbon storehouse.
In order to accurately measure the environment temperature and temperature of charge of feed bin 1, temperature sensor 3 is provided with 4, respectively It is arranged near three stuff level switch, and at the top of feed bin 1, control system shows the temperature letter of each temperature sensor 3 respectively Breath, such staff or automatic temperature-adjusting adjusting device can judge different temperatures biography respectively according to the signal of stuff level switch 2 What sensor 3 was measured is environment temperature or temperature of charge, can be respectively to internal temperature to be regulated.
The top of feed bin 1 is installed by pulse blowing type sack cleaner 5.During activated carbon feed bin 1 is fed, the sky in feed bin 1 Gas is arranged to outdoor by filter bag with the blast pipe with film viewing screen, is pressurizeed with exempt from customs examination activated carbon storehouse.Silo roof sack cleaner is not only Run during receiving activated carbon in activated carbon storehouse, and regular intervals of time is run after activated carbon is received, it is ensured that the gas of feed bin 1 Pressure, and avoid material dust from leaking.
The present invention is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model is implemented not by above-mentioned The limitation of mode, if the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress is employed, or not It is improved by the present invention design and technical scheme directly apply to other occasions, protection domain of the present utility model it It is interior.

Claims (3)

1. flue gas of refuse burning processing raw material cabin, including for depositing the feed bin of lime powder and active carbon powder, its feature It is:The upper, middle and lower position of the feed bin inwall is respectively provided with a stuff level switch, and the stuff level switch outputs signal to control System.
2. flue gas of refuse burning processing raw material cabin according to claim 1, it is characterised in that:The feed bin inwall is set There is temperature sensor, nitrogen protection device is provided with nitrogen flow in pipes, and the nitrogen flow in pipes is connected in feed bin, the temperature Degree sensor outputs signal to control system, and the control system outputs control signals to nitrogen protection device.
3. flue gas of refuse burning processing raw material cabin according to claim 1 or 2, it is characterised in that:At the top of the feed bin Pulse blowing type sack cleaner is installed, the pulse blowing type sack cleaner is provided with the discharge duct being outwards vented, described Filter bag is provided with discharge duct, the tube wall of the discharge duct is provided with film viewing screen.
CN201621482227.5U 2016-12-30 2016-12-30 Flue gas of refuse burning processing raw material cabin Active CN206528879U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621482227.5U CN206528879U (en) 2016-12-30 2016-12-30 Flue gas of refuse burning processing raw material cabin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621482227.5U CN206528879U (en) 2016-12-30 2016-12-30 Flue gas of refuse burning processing raw material cabin

Publications (1)

Publication Number Publication Date
CN206528879U true CN206528879U (en) 2017-09-29

Family

ID=59920682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621482227.5U Active CN206528879U (en) 2016-12-30 2016-12-30 Flue gas of refuse burning processing raw material cabin

Country Status (1)

Country Link
CN (1) CN206528879U (en)

Similar Documents

Publication Publication Date Title
CN201458098U (en) Pulverized coal warehouse
CN200981771Y (en) Blast furnace gas dust removal self-flowing tank car transportation device
CN201634248U (en) Fly-ash storage tank for water-washing pre-treatment system
CN206528879U (en) Flue gas of refuse burning processing raw material cabin
CN209612626U (en) The calcium hydroxide accurate measurement feeding system of consumer waste incineration dry FGD process
CN206508757U (en) Activated carbon injection equipment is used in flue gas of refuse burning processing
CN207418781U (en) System is sprayed using the blast-furnace coal powder system of system negative pressure prevention pulverized coal bin fire
CN103115363A (en) Mini garbage incinerator with integrated burning and fuel gas treatment
CN204979890U (en) Raw coal feed feed bin
CN203372829U (en) Fly ash pneumatic auxiliary feeding combined device
CN102284341A (en) Seal pebble coal discharge device
CN207956750U (en) Intelligent environmental sanitation refuse depot
CN202201518U (en) Pebble coal sealing and discharging device
CN201873336U (en) Pneumatic chute with slag removing device
CN206395360U (en) Flue gas of refuse burning processing dust conveying system
CN210795105U (en) Device for preventing unloading dust and raising dust
CN212150871U (en) Pneumatic conveying equipment for flying ash of hazardous waste incineration system
CN107416373A (en) A kind of incineration of refuse flyash automatic storage unloads grey storehouse
CN204568522U (en) Storehouse top stable equilibrium device
CN103144966A (en) Concentrated phase pneumatic conveying equipment for electrolytic manganese dioxide
CN206980349U (en) A kind of grey storehouse ash-discharging device
CN109456776A (en) A kind of domestic garbage pyrolysis gasification power generation system
CN208532835U (en) A kind of Pulverized Coal Injection System with Fuzzy
CN206872076U (en) A kind of flying dust handling system
CN208603359U (en) A kind of silo bottom Pneumatic ash conveying negative pressure on-line detecting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 241000 Anhui province Wuhu Yijiang District Yijiang South Road dragon fire hillock town

Patentee after: ANHUI CONCH KAWASAKI ENGINEERING Co.,Ltd.

Patentee after: WUHU HAICHUANG INDUSTRIAL Co.,Ltd.

Patentee after: ANHUI CONCH KAWASAKI ENERGY CONSERVATION EQUIPMENT MANUFACTURING Co.,Ltd.

Patentee after: ANHUI CONCH DESIGN & RESEARCH INSTITUTE OF BUILDING MATERIALS Co.,Ltd.

Patentee after: SHANGHAI CONCH KAWASAKI ENERGY SAVING AND ENVIRONMENTAL PROTECTION ENGINEERING CO.,LTD.

Address before: 241000 Anhui province Wuhu Yijiang District Yijiang South Road dragon fire hillock town

Patentee before: ANHUI CONCH KAWASAKI ENGINEERING Co.,Ltd.

Patentee before: WUHU HAICHUANG INDUSTRIAL Co.,Ltd.

Patentee before: ANHUI CONCH KAWASAKI ENERGY CONSERVATION EQUIPMENT MANUFACTURING Co.,Ltd.

Patentee before: ANHUI CONCH DESIGN & Research Institute OF BUILDING MATERIALS

Patentee before: SHANGHAI CONCH KAWASAKI ENERGY SAVING AND ENVIRONMENTAL PROTECTION ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20220610

Address after: 241000 Anhui province Wuhu Yijiang District Yijiang South Road dragon fire hillock town

Patentee after: ANHUI CONCH KAWASAKI ENGINEERING Co.,Ltd.

Patentee after: Wuhu Haihuan Industrial Co.,Ltd.

Patentee after: ANHUI CONCH KAWASAKI ENERGY CONSERVATION EQUIPMENT MANUFACTURING Co.,Ltd.

Patentee after: ANHUI CONCH DESIGN & RESEARCH INSTITUTE OF BUILDING MATERIALS Co.,Ltd.

Patentee after: SHANGHAI CONCH KAWASAKI ENERGY SAVING AND ENVIRONMENTAL PROTECTION ENGINEERING CO.,LTD.

Address before: 241000 Anhui province Wuhu Yijiang District Yijiang South Road dragon fire hillock town

Patentee before: ANHUI CONCH KAWASAKI ENGINEERING Co.,Ltd.

Patentee before: WUHU HAICHUANG INDUSTRIAL Co.,Ltd.

Patentee before: ANHUI CONCH KAWASAKI ENERGY CONSERVATION EQUIPMENT MANUFACTURING Co.,Ltd.

Patentee before: ANHUI CONCH DESIGN & RESEARCH INSTITUTE OF BUILDING MATERIALS Co.,Ltd.

Patentee before: SHANGHAI CONCH KAWASAKI ENERGY SAVING AND ENVIRONMENTAL PROTECTION ENGINEERING CO.,LTD.

TR01 Transfer of patent right