CN206523625U - Multi-epitope electric energy meter on-site calibrator calibrating installation - Google Patents

Multi-epitope electric energy meter on-site calibrator calibrating installation Download PDF

Info

Publication number
CN206523625U
CN206523625U CN201621488091.9U CN201621488091U CN206523625U CN 206523625 U CN206523625 U CN 206523625U CN 201621488091 U CN201621488091 U CN 201621488091U CN 206523625 U CN206523625 U CN 206523625U
Authority
CN
China
Prior art keywords
meter
verification
signal
electric energy
power source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621488091.9U
Other languages
Chinese (zh)
Inventor
张红
郭跃航
岳巍
李霖
朱伟
赵斌
单红红
张宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Emh Energy Measurement Technology Beijing Co ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Marketing Service Center of State Grid Shandong Electric Power Co Ltd
Original Assignee
Measurement Technology (beijing) Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Measurement Technology (beijing) Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Measurement Technology (beijing) Co Ltd
Priority to CN201621488091.9U priority Critical patent/CN206523625U/en
Application granted granted Critical
Publication of CN206523625U publication Critical patent/CN206523625U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本实用新型公开了多表位电能表现场校验仪检定装置,包括控制台和接表台,控制台上设有功率源、仪表和主控电脑,接表台上设有多个检定表箱;主控电脑与功率源连接,功率源与仪表、标准表及检定表箱连接,每个检定表箱内设有误差计算器,标准表与误差计算器连接,误差计算器与主控电脑通信;功率源包括控制器,控制器与信号发生器连接,信号发生器的一路输出与第一信号放大器和第一信号转换器连接,第一信号转换器的输出端一路直接输出电压信号,一路连接第一继电器后连接到信号发生器;信号发生器的另一路输出与第二信号放大器、第二信号转换器及信号处理器连接,信号处理器的输出端一路直接输出电流信号,一路连接第二继电器后连接到信号发生器。

The utility model discloses a verification device for a field calibrator of a multi-meter electric energy meter. ;The main control computer is connected to the power source, the power source is connected to the instrument, the standard meter and the verification meter box, each verification meter box is equipped with an error calculator, the standard meter is connected to the error calculator, and the error calculator communicates with the main control computer ; The power source includes a controller, the controller is connected to the signal generator, one output of the signal generator is connected to the first signal amplifier and the first signal converter, one output terminal of the first signal converter directly outputs a voltage signal, and one is connected to The first relay is then connected to the signal generator; the other output of the signal generator is connected to the second signal amplifier, the second signal converter and the signal processor. After the relay is connected to the signal generator.

Description

多表位电能表现场校验仪检定装置Verification device for multi-surface electric energy meter field calibrator

技术领域technical field

本实用新型涉及电能表现场校验仪技术领域,尤其涉及多表位电能表现场校验仪检定装置。The utility model relates to the technical field of electric energy meter field calibrator, in particular to a verification device for multi-table electric energy meter field calibrator.

背景技术Background technique

电能表属于计量器具,是发电系统、供电系统(含输电、变电、售电等)、用电系统(含企业、居民等)互相间重要的计量器具,对其准确度要求甚高,而电能表现场校验仪(以下简称:现场校验仪)及其检定装置是保证电能表准确度的重要部分。为保证电能表现场检测工作准确、有效的开展,对现场校验仪的检定尤为重要。The electric energy meter belongs to the measuring instrument, which is an important measuring instrument among the power generation system, the power supply system (including power transmission, power transformation, electricity sales, etc.), and the power consumption system (including enterprises, residents, etc.), and its accuracy is very high. The electric energy meter on-site calibrator (hereinafter referred to as: on-site calibrator) and its verification device are important parts to ensure the accuracy of the electric energy meter. In order to ensure the accurate and effective implementation of the on-site testing of electric energy meters, the verification of the on-site calibrator is particularly important.

目前,国外和国内对现场校验仪的检定,均在标准电能表检定装置上进行,没有专门的现场校验仪检定装置,以至于在进行现场校验仪电流钳检定时(即钳表方式),具有很高的不确定度。随着发电、供电、用电系统对电能表现场检定的重视程度增强,现场校验仪的数量也在大量增加,且厂家、规格、制式等不断变换,因此现场校验仪的检定效率越来越重要。同时,随着电子技术的发展和创新,功率源的输出容量、准确性、稳定性都有了较大发展,为更多表位检定系统提供了保障。At present, both foreign and domestic field calibrator verifications are carried out on the standard electric energy meter verification device. ), with a high degree of uncertainty. As power generation, power supply, and electricity systems pay more attention to on-site verification of electric energy meters, the number of on-site calibrators is also increasing significantly, and the manufacturers, specifications, and standards are constantly changing, so the verification efficiency of on-site calibrators is getting higher and higher. more important. At the same time, with the development and innovation of electronic technology, the output capacity, accuracy and stability of the power source have been greatly developed, which provides a guarantee for more epitope detection systems.

实用新型内容Utility model content

本实用新型的目的就是为了解决上述问题,提供了多表位电能表现场校验仪检定装置,实现在同一套检定装置上,对现场校验仪直通式和电流钳式进行准确和稳定的检定,在检定过程中不需要更换接线,且能保证电流钳式检定的一致性。The purpose of this utility model is to solve the above-mentioned problems by providing a verification device for a field calibrator of a multi-meter electric energy meter, which can realize accurate and stable verification of the straight-through type and the current clamp type of the field calibrator on the same set of verification device , there is no need to replace the wiring during the verification process, and the consistency of the current clamp verification can be guaranteed.

为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

多表位电能表现场校验仪检定装置,包括控制台和接表台,所述控制台上设有功率源、仪表、工作指示灯、被检表接线端和主控电脑,所述接表台上设有多个检定表箱;所述主控电脑与功率源连接,所述功率源与仪表、标准表及检定表箱连接,每个检定表箱内设有误差计算器,标准表与误差计算器连接,所述误差计算器与主控电脑通信;The verification device of the multi-meter electric energy meter field calibrator includes a console and a meter connection platform. There are multiple verification meter boxes on the stage; the main control computer is connected to the power source, and the power source is connected to the instrument, the standard meter and the verification meter box. Each verification meter box is equipped with an error calculator, and the standard meter and the verification meter box are connected. The error calculator is connected, and the error calculator communicates with the main control computer;

所述功率源包括控制器,所述控制器与信号发生器连接,信号发生器的一路输出与第一信号放大器和第一信号转换器连接,所述第一信号转换器的输出端一路直接输出电压信号,一路连接第一继电器后连接到信号发生器;The power source includes a controller, the controller is connected to the signal generator, one output of the signal generator is connected to the first signal amplifier and the first signal converter, and one output terminal of the first signal converter directly outputs Voltage signal, one way is connected to the first relay and then connected to the signal generator;

信号发生器的另一路输出与第二信号放大器、第二信号转换器及信号处理器连接,所述信号处理器的输出端一路直接输出电流信号,一路连接第二继电器后连接到信号发生器。The other output of the signal generator is connected with the second signal amplifier, the second signal converter and the signal processor. One output terminal of the signal processor directly outputs a current signal, and one output terminal is connected to the second relay and then connected to the signal generator.

所述控制台上预留有标准表接线端,所述标准表接线端与标准表的接线端子连接。A standard meter connection terminal is reserved on the console, and the standard meter connection terminal is connected to the connection terminal of the standard meter.

所述检定表箱上对外设有电源插座、电流接线端、电压接线端、被检脉冲接收端及电流钳接线铜柱。A power socket, a current terminal, a voltage terminal, a detected pulse receiving terminal and a current clamp wiring copper column are externally arranged on the verification meter box.

所述接表台表面的前侧是放置被检设备的平台,后侧为多个凸出的检定表箱外盒,每个检定表箱外盒的内部设有所述检定表箱,检定表箱外盒的前侧设有能上下抽拉的遮挡板,接表台表面上与所述遮挡板对应的地方设有缝隙,供所述遮挡板穿过。The front side of the surface of the meter-connecting table is a platform for placing the tested equipment, and the rear side is a plurality of protruding verification meter box outer boxes, and the interior of each verification meter box outer box is provided with the verification meter box. A shielding plate that can be pulled up and down is provided on the front side of the box outer box, and a gap is provided on the surface of the connecting table corresponding to the shielding plate for the shielding plate to pass through.

控制台的下面设有箱体,所述箱体内设有所述功率源。A box body is arranged under the console, and the power source is arranged in the box body.

所述仪表设于所述控制台的表面的后侧。The instrument is provided on the rear side of the surface of the console.

所述控制台上还设有与所述功率源连接的用于指示功率源工作与否的工作状态指示灯。The console is also provided with a working status indicator connected to the power source to indicate whether the power source is working or not.

在检定表箱内部,所有的电流接线端串联在一起,所有的电压接线端并联。Inside the verification meter box, all current terminals are connected in series, and all voltage terminals are connected in parallel.

所述标准表采用三相0.01级标准电能表K2006。The standard meter uses a three-phase 0.01-level standard electric energy meter K2006.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1.实现一套装置对标准电能表、现场校验仪(直通式和钳表式)的检定。1. Realize the verification of a set of devices for standard electric energy meters and on-site calibrators (straight-through and clamp meters).

2.保证钳表检定时的准确性和稳定性。2. To ensure the accuracy and stability of clamp meter verification.

3.实现了多只不同规格、不同常数被检表(含标准电能表和现场校验仪)的同时检定。3. Simultaneous verification of multiple meters with different specifications and different constants (including standard electric energy meters and on-site calibrators) has been realized.

4.本装置极大的提高了现场校验仪,尤其是钳表的检定效率,有较好的应用推广前景。4. This device has greatly improved the verification efficiency of the on-site calibrator, especially the clamp meter, and has a good prospect of application and promotion.

附图说明Description of drawings

图1为控制台结构图;Figure 1 is a structural diagram of the console;

图2为接表台结构图;Figure 2 is a structural diagram of the connecting table;

图3为检定表箱结构图;Fig. 3 is a structural diagram of the verification meter box;

图4为具体的电流、电压接线端子连接图;Figure 4 is a specific current and voltage terminal connection diagram;

图5为功率源的电路图;Fig. 5 is the circuit diagram of power source;

其中,1.控制台,2.功率源,3.标准表接线端,4.被检表接线端,5.仪表,6.接表台,7.遮挡板,8.检定表箱,8.1电流钳接线铜柱,8.2.误差计算器,8.3.被检脉冲接收端,8.4电源插座,8.5电流接线端,8.6电压接线端;9.工作指示灯;Among them, 1. Console, 2. Power source, 3. Standard meter terminal, 4. Tested meter terminal, 5. Instrument, 6. Connecting table, 7. Shielding plate, 8. Calibration meter box, 8.1 Current Clamp wiring copper column, 8.2. Error calculator, 8.3. The receiving end of the detected pulse, 8.4 Power socket, 8.5 Current terminal, 8.6 Voltage terminal; 9. Working indicator light;

10.1:控制器;10.2:显示器;10.3:信号发生器;10.41:第一信号放大器;10.42:第二信号放大器;10.51:第一信号转换器;10.52:第二信号转换器;10.61:第一继电器;10.62:第二继电器;10.7:信号处理器。10.1: Controller; 10.2: Display; 10.3: Signal Generator; 10.41: First Signal Amplifier; 10.42: Second Signal Amplifier; 10.51: First Signal Converter; 10.52: Second Signal Converter; 10.61: First Relay ; 10.62: second relay; 10.7: signal processor.

具体实施方式:detailed description:

下面结合附图与实施例对本实用新型做进一步说明:Below in conjunction with accompanying drawing and embodiment the utility model is described further:

如图1-3所示,多表位电能表现场校验仪检定装置,包括控制台1和接表台6,所述控制台上1设有功率源2、仪表5、工作指示灯9、标准表接线端3、被检表接线端4和主控电脑(图中未给出),所述接表台6上设有多个检定表箱8;As shown in Figure 1-3, the multi-meter electric energy meter field calibrator verification device includes a console 1 and a meter connection platform 6, and the console 1 is provided with a power source 2, an instrument 5, a working indicator light 9, Standard meter terminal 3, tested meter terminal 4 and main control computer (not shown in the figure), said table connecting table 6 is provided with a plurality of verification meter boxes 8;

所述主控电脑与功率源2连接,所述功率源2与仪表5、标准表及检定表箱8连接,每个检定表箱8内设有误差计算器8.2,标准表与误差计算器8.2连接,所述误差计算器8.2与主控电脑通信。The main control computer is connected with the power source 2, and the power source 2 is connected with the instrument 5, the standard meter and the verification meter box 8, and each verification meter box 8 is provided with an error calculator 8.2, a standard meter and an error calculator 8.2 connected, the error calculator 8.2 communicates with the main control computer.

如图5所示,所述功率源为三相功率源,包括控制器(CPU)10.1,所述控制器与信号发生器10.3连接,信号发生器10.3的一路输出与第一信号放大器10.41和第一信号转换器10.51连接,所述第一信号转换器10.51的输出端一路直接输出电压信号,一路连接第一继电器10.61(档位选择)后连接到信号发生器;As shown in Figure 5, the power source is a three-phase power source, including a controller (CPU) 10.1, the controller is connected to a signal generator 10.3, and one output of the signal generator 10.3 is connected to the first signal amplifier 10.41 and the first signal amplifier 10.41. A signal converter 10.51 is connected, the output terminal of the first signal converter 10.51 directly outputs a voltage signal one way, and one way is connected to the first relay 10.61 (gear selection) and then connected to the signal generator;

信号发生器的另一路输出与第二信号放大器10.42、第二信号转换器10.52及信号处理器10.7连接,所述信号处理器(滤波等)的输出端一路直接输出电流信号,一路连接第二继电器10.62后连接到信号发生器。The other output of the signal generator is connected to the second signal amplifier 10.42, the second signal converter 10.52 and the signal processor 10.7, and the output terminal of the signal processor (filtering, etc.) directly outputs the current signal one way, and one way is connected to the second relay Connect to the signal generator after 10.62.

每相电都连接有上述的第一信号放大器10.41、第一信号转换器10.51、第一继电器10.61、第二信号放大器10.42、第二信号转换器10.52、信号处理器10.7、第二继电器10.62。三相共用一个控制器。控制器还与显示器10.2连接。Each phase is connected with the above-mentioned first signal amplifier 10.41, first signal converter 10.51, first relay 10.61, second signal amplifier 10.42, second signal converter 10.52, signal processor 10.7, and second relay 10.62. Three phases share one controller. The controller is also connected to the display 10.2.

功率源通过内部的控制器,与外部控制计算机通讯,接收和发送功率源工作指令,输出指令下达后,控制器先将输出指令分解,依次传递给功率源的A、B、C相,各相接收后再次分解指令,依次传递给电压和电流的信号发生器,信号产生后,经过信号放大器,传递给信号转换器,转换为所需的输出信号,如此信号未达到输出要求,则将信号传送至继电器,选择合适的信号输出档位并处理信号,之后将处理好的信号送至信号放大器,依次往下循环传送信号,直至得到符合输出要求的信号。为保证准确和稳定的输出信号,在电流信号转换器和继电器间增加了信号处理器,对电流信号进行处理,包括去除杂散信号等。The power source communicates with the external control computer through the internal controller to receive and send power source work instructions. After the output instructions are issued, the controller first decomposes the output instructions and transmits them to phases A, B, and C of the power source in turn. After receiving, decompose the instruction again, and pass it to the signal generator of voltage and current in turn. After the signal is generated, it passes through the signal amplifier, passes it to the signal converter, and converts it into the required output signal. If the signal does not meet the output requirements, the signal will be transmitted. To the relay, select the appropriate signal output gear and process the signal, and then send the processed signal to the signal amplifier, and transmit the signal in turn, until the signal that meets the output requirements is obtained. In order to ensure an accurate and stable output signal, a signal processor is added between the current signal converter and the relay to process the current signal, including removing stray signals.

所述仪表5包括三相电压表和三相电流表。The instrument 5 includes a three-phase voltmeter and a three-phase ammeter.

所述控制台1上预留有标准表接线端3,所述标准表接线端3与标准表的接线端子连接。A standard meter terminal 3 is reserved on the console 1, and the standard meter terminal 3 is connected to the terminal of the standard meter.

所述检定表箱8上对外设有电源插座8.4、电流接线端8.5、电压接线端8.6、被检脉冲接收端8.3及电流钳接线铜柱8.1。The verification meter box 8 is externally provided with a power socket 8.4, a current terminal 8.5, a voltage terminal 8.6, a pulse receiving terminal 8.3 and a current clamp connection copper column 8.1.

所述接表台6表面的前侧是放置被检设备的平台,后侧为多个凸出的检定表箱外盒,每个检定表箱外盒的内部设有所述检定表箱8,检定表箱外盒的前侧设有能上下抽拉的遮挡板7,接表台表面上与所述遮挡板对应的地方设有缝隙,供所述遮挡板7穿过。The front side of the surface of the meter-connecting table 6 is a platform for placing the tested equipment, and the rear side is a plurality of protruding verification meter box outer boxes, and the inside of each verification meter box outer box is provided with the verification meter box 8, The front side of the test watch case outer box is provided with a shielding plate 7 that can be pulled up and down, and a gap is provided on the surface of the connecting table corresponding to the shielding plate for the shielding plate 7 to pass through.

控制台的下面设有箱体,所述箱体内设有所述功率源2。A box body is arranged under the console, and the power source 2 is arranged in the box body.

所述仪表5设于所述控制台1的表面的后侧。The instrument 5 is arranged on the rear side of the surface of the console 1 .

所述控制台1上还设有与所述功率源2连接的用于指示功率源工作与否的工作状态指示灯。The console 1 is also provided with a working status indicator connected to the power source 2 for indicating whether the power source is working or not.

如图4所示,空心圆表示电流输出端,实心圆表示电流输入端,同心圆表示电压接线端,在检定表箱8内部,所有的电流接线端串联在一起,所有的电压接线端并联。功率源与标准表及控制台的电压接线端都是并联,电流接线端也是串联在一起。其中图4中控制台电流接线端即为标准表预留的接线端,所以标准表的电流输出端与控制台的电流输出端是连接在一起,标准表的电流输入端与控制台的电流输入端是连接在一起。As shown in FIG. 4 , hollow circles represent current output terminals, solid circles represent current input terminals, and concentric circles represent voltage terminals. Inside the verification meter box 8, all current terminals are connected in series, and all voltage terminals are connected in parallel. The voltage terminals of the power source and the standard meter and console are connected in parallel, and the current terminals are also connected in series. Among them, the current terminal of the console in Figure 4 is the terminal reserved for the standard meter, so the current output terminal of the standard meter and the current output terminal of the console are connected together, and the current input terminal of the standard meter and the current input of the console ends are connected together.

本实用新型的目的是为提高现场校验仪检定工作的效率、保证电流直通式检定和电流钳式检定的准确性和稳定性,尤其是电流钳式检定一致性的问题,提供一种电流直通式和电流钳式检定的设备,实现在同一套检定装置上,对现场校验仪直通式和电流钳式进行准确和稳定的检定,在检定过程中不需要更换接线,且能保证电流钳式检定的一致性。The purpose of the utility model is to improve the efficiency of the on-site calibrator verification work, ensure the accuracy and stability of the current through-type verification and the current clamp-type verification, especially the consistency of the current clamp-type verification, and provide a current through-through The equipment for the verification of the straight-through type and the current clamp type of the on-site calibrator can be accurately and stably verified on the same set of verification device. There is no need to replace the wiring during the verification process, and the current clamp type can be guaranteed. Test consistency.

本实用新型与标准表、功率源等互相配合使用,构成现场校验仪检定装置。The utility model is used in conjunction with a standard meter, a power source, etc. to form a verification device for an on-site calibrator.

在充分考虑了检定量和检定效率等要求下,与标准表、功率源等设备共同组成了一套10表位检定装置,同时检定10只不同厂家、不同常数的现场校验仪(包括直通式和电流钳式),准确度达到0.01%,稳定度达到0.005%。外观设计简洁、直观,操作方便,检定效率高。After fully considering the requirements of the test quantity and test efficiency, a set of 10-site test device is formed together with the standard meter, power source and other equipment, and 10 field calibrators (including straight-through type) of different manufacturers and different constants are tested at the same time. and current clamp), the accuracy reaches 0.01%, and the stability reaches 0.005%. The appearance design is simple and intuitive, the operation is convenient and the verification efficiency is high.

1)控制台:一套,放置设备包括:功率源、标准表、仪表5、主控电脑等。1) Console: a set, placed equipment includes: power source, standard meter, instrument 5, main control computer, etc.

功率源和控制台为一体式设计,放置在操作台面右下方,为整套检定装置提供负载输出,是检定装置带载能力和稳定性的重要保证;The power source and the console are designed in one piece, placed on the lower right side of the operating table, providing load output for the entire verification device, which is an important guarantee for the load capacity and stability of the verification device;

标准表位于操作台面右侧,功率源上方,是检定装置准确性的重要保证;The standard meter is located on the right side of the operating table and above the power source, which is an important guarantee for the accuracy of the verification device;

仪表5在操作台面的正中位置,使用6块国际先进的指针表,能准确和直观的显示出装置的三相电压和三相电流输出值,装置具备工作指示灯,显示装置的工作状态。Meter 5 is in the center of the operating table, using 6 internationally advanced pointer meters, which can accurately and intuitively display the three-phase voltage and three-phase current output values of the device. The device is equipped with a working indicator light to display the working status of the device.

控制计算机放置在控制台操作台面左侧。The control computer is placed on the left side of the console operation table.

2)接表台:二套(图中只给出一套),包括:放置被检现场校验仪的台面和相互独立的检定表箱。2) Meter connection table: two sets (only one set is shown in the figure), including: the table for placing the tested field calibrator and the independent verification table box.

考虑到占地面积和方便性等因素后,选择背靠背设计,每个接表台上包括5个检定表箱。After considering factors such as floor space and convenience, a back-to-back design is selected, and each table includes 5 verification table boxes.

3)检定表箱:十套,检定表箱互相独立,每5个检定表箱并排与一套接表台连接在一起(一体式设计),共2套接表台,10套检定表箱。每个检定表箱上包括:3) Verification meter boxes: ten sets, the verification meter boxes are independent of each other, and every 5 verification meter boxes are connected side by side with a set of meter tables (integrated design), a total of 2 sets of meter tables, 10 sets of verification meter boxes. Each verification form box includes:

被检现场校验仪外部电源插座(220V);The external power socket (220V) of the field calibrator under inspection;

电压接线端(A-B-C-N端);Voltage terminals (A-B-C-N terminals);

地线接线端 ground terminal

电流接线端(两套不同范围的端子,一套至12A(max.),一套至120A(max.));Current terminals (two sets of terminals with different ranges, one set up to 12A(max.), one set up to 120A(max.));

电流钳接线铜柱(电流钳式检定,采用直径Φ8或Φ10铜质接线柱,可根据钳口直径互换);Current clamp wiring copper post (current clamp type verification, using copper terminal with a diameter of Φ8 or Φ10, which can be interchanged according to the diameter of the jaw);

误差计算器(显示被检现场校验仪误差值、检定剩余脉冲个数、检定剩余时间等);Error calculator (displays the error value of the field calibrator under inspection, the number of pulses remaining in the verification, the remaining time in the verification, etc.);

被检脉冲接收端(高、低频脉冲,max.200kHz,5-12(24)V脉冲幅值);Receiver of detected pulse (high and low frequency pulse, max.200kHz, 5-12(24)V pulse amplitude);

遮挡板(检定表箱不使用时,遮挡住检定表箱,防潮防尘)。Shielding plate (when the test table box is not in use, cover the test table box to prevent moisture and dust).

使用本实用新型所设计的现场校验仪检定装置:Use the on-site calibrator verification device designed by the utility model:

采用三相0.01级标准电能表K2006作为装置的工作标准,标准表的标准输出脉冲与各检定表箱连接,通过检定表箱上的被检脉冲接收端,接收来自被检现场校验仪的脉冲,由检定表箱上的误差计算器计算出误差值。The three-phase 0.01-level standard electric energy meter K2006 is used as the working standard of the device. The standard output pulse of the standard meter is connected to each verification meter box, and the pulse from the tested field calibrator is received through the tested pulse receiving end on the verification meter box. , the error value is calculated by the error calculator on the test table box.

控制台上具有直通式检定或电流钳式检定的选择按键,能根据检定需要进行操作:There is a selection button for straight-through verification or current clamp verification on the console, which can be operated according to the verification needs:

选择直通式检定时,需要外部接线,功率源输出电流后,先进入标准表的电流输入端,从输出端流出后,进入控制台的电流输入端,再从控制台电流接线端流出,进入第一个检定表箱的电流输入端,再从电流输出端流出,进入第二个检定表箱的输入端,再从输出端流出进行第三个检定表箱的输入端,以此类推,直至从最后一个检定表位的输出端流出,进入功率源电流输入端,此时各检定表箱,功率源、标准表间,电流为串联,电压为并联。When the straight-through type verification is selected, external wiring is required. After the power source outputs current, it first enters the current input terminal of the standard meter, flows out from the output terminal, enters the current input terminal of the console, and then flows out from the current terminal of the console, and enters the second terminal. The current input end of a verification meter box flows out from the current output end, enters the input end of the second verification meter box, and then flows out from the output end to the input end of the third verification meter box, and so on, until from The output end of the last verification meter flows out and enters the current input end of the power source. At this time, each verification meter box, power source, and standard meter, the current is connected in series, and the voltage is connected in parallel.

选择电流钳式检定时,也需要外部接线,电流从功率源流出后,先经过标准表,然后依次经过检定表箱的电流钳接线柱,最终返回功率源电流输入端,此时整条电流回路只经过标准表。When the current clamp type verification is selected, external wiring is also required. After the current flows out of the power source, it first passes through the standard meter, then passes through the current clamp terminal of the verification meter box in turn, and finally returns to the current input terminal of the power source. At this time, the entire current loop Only go through standard tables.

各检定表箱的电流钳接线铜柱采用铜材质,直径Φ8或Φ10,可根据被检电流钳钳口直径更换,铜质接线柱为”门”字形状,外露可见部分进行绝缘处理,保证操作安全,上方横柱为电流钳夹钳处,使电流钳在检定时能垂直穿心,确保检定的准确性、稳定性和一直性。接线柱两侧立柱与电流钳接线铜柱间采用自紧式连接,电流钳接线铜柱通过自身的张力,将铜柱夹紧,还要保证连接端处的导电性,此设计保证检定用接线柱能根据所检定电流钳的大小、钳口直径等,更换合适直径的接线柱,并调整接线柱高度。The current clamp wiring copper column of each verification meter box is made of copper material, with a diameter of Φ8 or Φ10, which can be replaced according to the diameter of the tested current clamp jaw. The copper terminal is in the shape of a "door", and the exposed visible part is insulated to ensure operation. Safety, the upper horizontal column is the clamp of the current clamp, so that the current clamp can pass through the center vertically during the test, ensuring the accuracy, stability and consistency of the test. Self-tightening connection is adopted between the uprights on both sides of the terminal and the copper pole of the current clamp. The copper pole of the current clamp clamps the copper pole through its own tension, and the conductivity at the connection end must be ensured. This design ensures that the wiring for verification According to the size of the verified current clamp and the diameter of the jaw, the terminal can be replaced with a suitable diameter terminal and the height of the terminal can be adjusted.

被检现场校验仪的脉冲通过各检定表箱的被脉冲接收端接收,并在误差计算器内与标准表的标准脉冲进行比较,计算出准确的误差值。The pulse of the tested field calibrator is received by the pulse receiving end of each calibration meter box, and compared with the standard pulse of the standard meter in the error calculator to calculate the accurate error value.

上述虽然结合附图对本实用新型的具体实施方式进行了描述,但并非对本实用新型保护范围的限制,所属领域技术人员应该明白,在本实用新型的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本实用新型的保护范围以内。Although the specific implementation of the utility model has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the utility model. Those skilled in the art should understand that on the basis of the technical solution of the utility model, those skilled in the art do not need to Various modifications or deformations that can be made with creative efforts are still within the protection scope of the present utility model.

Claims (10)

1.多表位电能表现场校验仪检定装置,其特征是,包括控制台和接表台,所述控制台上设有功率源、仪表、工作指示灯、被检表接线端和主控电脑,所述接表台上设有多个检定表箱;所述主控电脑与功率源连接,所述功率源与仪表、标准表及检定表箱连接,每个检定表箱内设有误差计算器,标准表与误差计算器连接,所述误差计算器与主控电脑通信;1. The verification device of the multi-meter electric energy meter field calibrator is characterized in that it includes a console and a meter connection platform, and the console is provided with a power source, an instrument, a working indicator light, a terminal of the meter under test and a main control computer, the table connecting table is provided with a plurality of verification meter boxes; the main control computer is connected with a power source, and the power source is connected with an instrument, a standard meter and a verification meter box, and each verification meter box is provided with an error A calculator, the standard meter is connected to the error calculator, and the error calculator communicates with the main control computer; 所述功率源包括控制器,所述控制器与信号发生器连接,信号发生器的一路输出与第一信号放大器和第一信号转换器连接,所述第一信号转换器的输出端一路直接输出电压信号,一路连接第一继电器后连接到信号发生器;The power source includes a controller, the controller is connected to the signal generator, one output of the signal generator is connected to the first signal amplifier and the first signal converter, and one output terminal of the first signal converter directly outputs Voltage signal, one way is connected to the first relay and then connected to the signal generator; 信号发生器的另一路输出与第二信号放大器、第二信号转换器及信号处理器连接,所述信号处理器的输出端一路直接输出电流信号,一路连接第二继电器后连接到信号发生器。The other output of the signal generator is connected with the second signal amplifier, the second signal converter and the signal processor. One output terminal of the signal processor directly outputs a current signal, and one output terminal is connected to the second relay and then connected to the signal generator. 2.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,所述仪表包括三相电压表和三相电流表。2. The verification device of a multi-meter electric energy meter field calibrator as claimed in claim 1, wherein the meter comprises a three-phase voltmeter and a three-phase ammeter. 3.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,所述控制台上预留有标准表接线端,所述标准表接线端与标准表的接线端子连接。3. The multi-meter electric energy meter field calibrator verification device as claimed in claim 1, is characterized in that, a standard meter terminal is reserved on the console, and the standard meter terminal and the terminal of the standard meter connect. 4.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,所述检定表箱上对外设有电源插座、电流接线端、电压接线端、被检脉冲接收端及电流钳接线铜柱。4. The verification device of a multi-meter electric energy meter field calibrator as claimed in claim 1, wherein a power socket, a current connection terminal, a voltage connection terminal, and a detected pulse receiving terminal are externally provided on the said verification meter box And current clamp wiring copper column. 5.如权利要求1-4任意一项所述的多表位电能表现场校验仪检定装置,其特征是,所述接表台表面的前侧是放置被检设备的平台,后侧为多个凸出的检定表箱外盒,每个检定表箱外盒的内部设有所述检定表箱,检定表箱外盒的前侧设有能上下抽拉的遮挡板,接表台表面上与所述遮挡板对应的地方设有缝隙,供所述遮挡板穿过。5. The verification device of the multi-meter electric energy meter field calibrator as claimed in any one of claims 1-4, wherein the front side of the surface of the meter-connecting table is a platform for placing the tested equipment, and the rear side is A plurality of protruding test case outer boxes, the inside of each test case outer box is provided with said test case, the front side of the test case outer box is provided with a shielding plate that can be pulled up and down, connected to the table surface There is a gap on the top corresponding to the shielding plate for the shielding plate to pass through. 6.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,控制台的下面设有箱体,所述箱体内设有所述功率源。6. The verification device of multi-meter electric energy meter field calibrator as claimed in claim 1, characterized in that, a box body is arranged under the console, and the power source is arranged in the box body. 7.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,所述仪表设于所述控制台的表面的后侧。7. The verification device for a multi-meter electric energy meter field calibrator as claimed in claim 1, wherein the meter is arranged on the rear side of the surface of the console. 8.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,所述控制台上还设有与所述功率源连接的用于指示功率源工作与否的工作状态指示灯。8. The verification device of multi-table electric energy meter field calibrator as claimed in claim 1, characterized in that, the console is also provided with a work indicator connected to the power source for indicating whether the power source is working or not. Status Indicator. 9.如权利要求4所述的多表位电能表现场校验仪检定装置,其特征是,在检定表箱内部,所有的电流接线端串联在一起,所有的电压接线端并联。9. The verification device of a multi-meter electric energy meter field calibrator as claimed in claim 4, wherein, inside the verification meter box, all current terminals are connected in series, and all voltage terminals are connected in parallel. 10.如权利要求1所述的多表位电能表现场校验仪检定装置,其特征是,所述标准表采用三相0.01级标准电能表K2006。10. The verification device of a multi-meter electric energy meter field calibrator according to claim 1, wherein the standard meter is a three-phase 0.01 class standard electric energy meter K2006.
CN201621488091.9U 2016-12-30 2016-12-30 Multi-epitope electric energy meter on-site calibrator calibrating installation Active CN206523625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621488091.9U CN206523625U (en) 2016-12-30 2016-12-30 Multi-epitope electric energy meter on-site calibrator calibrating installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621488091.9U CN206523625U (en) 2016-12-30 2016-12-30 Multi-epitope electric energy meter on-site calibrator calibrating installation

Publications (1)

Publication Number Publication Date
CN206523625U true CN206523625U (en) 2017-09-26

Family

ID=59889483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621488091.9U Active CN206523625U (en) 2016-12-30 2016-12-30 Multi-epitope electric energy meter on-site calibrator calibrating installation

Country Status (1)

Country Link
CN (1) CN206523625U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109459721A (en) * 2018-12-29 2019-03-12 珠海安瑞通电子科技有限公司 A kind of multi-epitope electric energy error meter and high-voltage electric energy meter error testing system
CN109738846A (en) * 2019-01-25 2019-05-10 杭州海兴电力科技股份有限公司 A kind of correction method based on meter active self-correcting
CN109975740A (en) * 2019-05-13 2019-07-05 广东省计量科学研究院(华南国家计量测试中心) A kind of calibrating monitoring system of electric energy meter checking device
CN110109044A (en) * 2019-05-13 2019-08-09 广东省计量科学研究院(华南国家计量测试中心) A kind of in-line calibration system and method for electric energy meter checking device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109459721A (en) * 2018-12-29 2019-03-12 珠海安瑞通电子科技有限公司 A kind of multi-epitope electric energy error meter and high-voltage electric energy meter error testing system
CN109738846A (en) * 2019-01-25 2019-05-10 杭州海兴电力科技股份有限公司 A kind of correction method based on meter active self-correcting
CN109975740A (en) * 2019-05-13 2019-07-05 广东省计量科学研究院(华南国家计量测试中心) A kind of calibrating monitoring system of electric energy meter checking device
CN110109044A (en) * 2019-05-13 2019-08-09 广东省计量科学研究院(华南国家计量测试中心) A kind of in-line calibration system and method for electric energy meter checking device

Similar Documents

Publication Publication Date Title
CN206523625U (en) Multi-epitope electric energy meter on-site calibrator calibrating installation
CN103149546B (en) The field integrated tester of a kind of portable electric energy measuring terminal
CN103645457B (en) A kind of on-site inspection device for electric energy meter
CN104808169A (en) Three-phase electric energy meter field detection device and detection method
CN102621519A (en) Tester for electric energy metering device
CN202563077U (en) Detector for electric energy metering apparatus
CN106990381B (en) Mutual inductor magnetic saturation detection device
CN203299284U (en) Phase detecting device for 10kv switch cabinet
CN203976235U (en) Electric block energy efficiency testing device
CN204330849U (en) A kind of Multi-function experimental virtual instrument
CN106501762A (en) The device and method of through type or jaw type calibrating is carried out to on-site calibrator
CN204882850U (en) A 0. 02 grade of miniature standard electric energy meter that is used for single -phase intelligent ammeter verification system repeatability experimental
CN204855778U (en) A 0. 02 grade of miniature standard electric energy meter for examineing and determine check during directly going into formula three -phase intelligent ammeter verification system
CN211505845U (en) Automatic polarity detection device
CN204855583U (en) Transient state of accurate heavy current rises and flows generating device
CN202548319U (en) Test device of power consumption of electric energy meter
CN204832489U (en) A 0. 02 grade of miniature standard electric energy meter for straightening go into experiment of formula three -phase intelligent ammeter examination system stability
CN204832495U (en) A 0. 05 grade of miniature standard table for straightening go into and check during verification system is shown to formula three -phase
CN204855780U (en) A 0. 02 grade of standard table for inserting system stability is experimental for examination of formula three -phase table
CN203981795U (en) A kind of power acquirer
CN204740339U (en) Class 0.02 miniature standard electric energy meter used for verification of single-phase smart electric energy meter verification device
CN205982611U (en) Intelligent ammeter's electric fast transient burst influence quantity experimental apparatus
CN204855779U (en) A 0. 02 grade of miniature standard electric energy meter for system stability is experimental for examination of single -phase intelligent ammeter
CN205539180U (en) Electric detection means for electric power
CN204855776U (en) A 0. 05 grade of miniature standard electric energy meter for passing through mutual -inductor is checied during inserting measurement of formula three -phase intelligent ammeter electric energy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Wang Yue Central Road Ji'nan City, Shandong province 250002 City No. 2000

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: EMH ENERGY MEASUREMENT TECHNOLOGY (BEIJING) Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: Wang Yue Central Road Ji'nan City, Shandong province 250002 City No. 2000

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee before: EMH ENERGY MEASUREMENT TECHNOLOGY (BEIJING) Co.,Ltd.

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210420

Address after: No. 150, Jinger Road, Daguanyuan, Shizhong District, Jinan City, Shandong Province

Patentee after: Shandong Electric Power Marketing Center

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: EMH ENERGY MEASUREMENT TECHNOLOGY (BEIJING) Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: Wang Yue Central Road Ji'nan City, Shandong province 250002 City No. 2000

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee before: EMH ENERGY MEASUREMENT TECHNOLOGY (BEIJING) Co.,Ltd.

Patentee before: STATE GRID CORPORATION OF CHINA