CN206757027U - Live virtual load calibration equipment based on empty electric current device - Google Patents

Live virtual load calibration equipment based on empty electric current device Download PDF

Info

Publication number
CN206757027U
CN206757027U CN201720390600.2U CN201720390600U CN206757027U CN 206757027 U CN206757027 U CN 206757027U CN 201720390600 U CN201720390600 U CN 201720390600U CN 206757027 U CN206757027 U CN 206757027U
Authority
CN
China
Prior art keywords
port
current
electric energy
zero line
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720390600.2U
Other languages
Chinese (zh)
Inventor
苗长胜
吴维德
向景睿
龙海莲
申杰
罗银康
吴勇
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority to CN201720390600.2U priority Critical patent/CN206757027U/en
Application granted granted Critical
Publication of CN206757027U publication Critical patent/CN206757027U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

It the utility model is related to a kind of live virtual load calibration equipment based on empty electric current device, including several electric energy meters, the electric energy meter includes the first current entry, first electricity outlet, zero line port, including programmable AC power supply, the programmable AC power supply includes voltage port and electric current port, the voltage port includes several FireWire port ports and a zero line port, the FireWire port port quantity is identical with electric energy meter quantity, and each FireWire port port connects a live wire respectively, zero line port connects a zero line, the electric current port includes the second current entry and the second electricity outlet, and connected between the two by a wire and form current loop.By programmable AC power supply control voltage, the value of electric current, dummy load is simulated, the verification to single-phase electric energy is realized with reference to current transformer, the watchcase without opening electric energy meter disconnects voltage x current short circuit piece(Break off relations), lift field electric energy table verifying work efficiency.

Description

Live virtual load calibration equipment based on empty electric current device
Technical field
A kind of virtual load calibration equipment is the utility model is related to, more particularly to a kind of scene void based on empty electric current device is born Lotus calibration equipment.
Background technology
Single-phase electric energy meter largely uses in resident at present, because it has a large capacity and a wide range, numerous producers and model, and Installation and operation environmental complexity diversity, various problems unavoidably occur in the process of running, it is necessary to by special Industry staff carries out field test using Watt-hour meter's field test equipment.Traditional field-checking equipment is with real load check side Based on formula, the normal power electric energy meter at scene is only applicable to, verification mode is single, can only be examined for the existing real load of fixation Test, more comprehensive inspection can not be realized.When onsite user is without power load or smaller power load, or even work can not be carried out Make.Same problem is also run into during analog simulation single-phase electric energy meter running environment, how to be provided for single-phase electric energy meter can Variable load is controlled, how to carry out comprehensive error checking to the single-phase electric energy meter under simulated environment in real time, needs solve Problem.
Referring to Fig. 1, in the checkout procedure using real load check method, power and load measured by electric energy meter and detection table Actual consumption or the power of power supply effective supply are consistent, and the electric current for flowing through ammeter loop is by the electricity on relevant voltage loop Caused current value on load is pressed in, meets Ohm's law.Using single-phase electric energy meter wiring such as Fig. 1 institutes of real load check method Show, access detection table can be verified between load and verified ammeter.The advantages of this real load check method is by school Ammeter can be verified in operation, and shortcoming is that power consumption is big, proof load point is single, in the case of load is less at the scene by Limitation.
And virtual load check addition be specified in specification, it is widely used by ammeter manufacturer and Utilities Electric Co. A kind of Ammeter Test method.The structured flowchart of its verifying attachment is as shown in Figure 2.
The method of calibration does not have actual load, defeated by voltage source independent all the way and current source analog circuit independent all the way Enter power, virtual power source can be exported with separately adjustable voltage and current, and voltage and current frequency is identical, and virtual power source can be with The phase of control voltage and electric current, it is like to have actual electrical appliance in consumption power.Electric energy meter is according to voltage, electric current and phase Position measurement power.Because electric current, voltage separation power are low, therefore more electric energy meters can be verified simultaneously.Its shortcoming is table to be opened Shell disconnects voltage-to-current short circuit piece(Break off relations), it is not easy to implement at operation scene.
The content of the invention
The purpose of this utility model be that provide one kind solve the above problems, use empty electric current device with meet scene or The demand verified under simulated environment using virtual load method of inspection to single-phase electric energy meter, and without frequently opening meter shell of electric energy meter The live virtual load calibration equipment based on empty electric current device.
To achieve these goals, the technical solution adopted in the utility model is such:One kind is based on empty electric current device Live virtual load calibration equipment, including several electric energy meters, the electric energy meter include the first current entry, the first electricity outlet, Zero line port, including programmable AC power supply, the programmable AC power supply include voltage port and electric current port, the voltage port Including several FireWire port ports and a zero line port, the FireWire port port quantity is identical with electric energy meter quantity, and each FireWire port port A live wire is connected respectively, zero line port connects a zero line, and the electric current port includes the second current entry and the second electricity outlet, And connected between the two by a wire and form current loop;
Current loop is provided with the several and one-to-one current transformer of electric energy meter, the current transformer input string Current loop is associated in, output end forms loop, the electric energy meter with the first current entry, the first electricity outlet of corresponding electric energy meter The first current entry also connected one to one with live wire, the zero line port of electric energy meter is connected with zero line.
As preferred:The empty electric current device is current transformer, and its electric current no-load voltage ratio is 1:1.
Compared with prior art, the utility model has the advantage of:Pass through programmable AC power supply control voltage, electric current Value, dummy load is simulated, the verification to single-phase electric energy is realized with reference to current transformer, without opening the watchcase of electric energy meter electricity Piezo-electric stream short circuit piece disconnects(Break off relations), field electric energy table verifying work efficiency is lifted, is 0.05 grade from precision herein Current transformer, it can meet that electric energy meter precision of having good luck is 0.1 grade of requirement.
Brief description of the drawings
Fig. 1 is the real load check method and virtual load check addition schematic diagram of single-phase electric energy meter;
Fig. 2 is the structural representation of virtual load check addition verifying attachment in the prior art;
Fig. 3 is the utility model structure diagram.
In figure:1st, the first current entry;2nd, the first electricity outlet;3rd, the first zero line port;4th, the second zero line port;5th, Two electricity outlets;6th, the second current entry;7th, current transformer.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Embodiment 1:From fig. 1, it can be seen that the advantages of this real load check method, can be verified in operation by school ammeter, Shortcoming is that power consumption is big, proof load point is single, is restricted in the case of load is less at the scene.
As can be seen from Figure 2, the method for calibration does not have actual load, by voltage source independent all the way and current source independent all the way Analog circuit input power, virtual power source can be exported with separately adjustable voltage and current, and voltage and current frequency is identical, virtually Power source can be like to have actual electrical appliance in consumption power with control voltage and the phase of electric current.Electric energy meter is according to electricity Pressure, electric current and phase measurement power.Because electric current, voltage separation power are low, therefore more electric energy meters can be verified simultaneously.Its shortcoming It is that watchcase to be opened disconnects voltage-to-current short circuit piece, that is, breaks off relations, is not easy to implement at operation scene.
As can be seen from Figure 3, a kind of live virtual load calibration equipment based on empty electric current device, including several electric energy meters, it is described Electric energy meter includes the first current entry 1, the first electricity outlet 2, zero line port, in addition to programmable AC power supply, the program control friendship Stream power supply includes voltage port and electric current port, and the voltage port includes several FireWire port ports and a zero line port, the fire Line port number is identical with electric energy meter quantity, and each FireWire port port connects a live wire respectively, and zero line port connects a zero line, institute Stating electric current port includes the second current entry 6 and the second electricity outlet 5, and is connected between the two by a wire and form electric current time Road, current loop are provided with the several and one-to-one current transformer 7 of electric energy meter, the input of current transformer 7 series connection In current loop, output end forms loop, the electric energy meter with the first current entry 1, the first electricity outlet 2 of corresponding electric energy meter The first current entry 1 also connected one to one with live wire, the zero line port of electric energy meter is connected with zero line.
In the present embodiment, the empty electric current device is current transformer 7, and its electric current no-load voltage ratio is 1:1.In addition, electric energy meter Zero line port, be made up of the first zero line port 3, the short circuit of the second zero line port 4.
In the utility model, empty electric current device is used as using current transformer 7, reaches the effect that electric current is isolated with voltage Fruit, while ensure that the measuring accuracy having good luck.Ensure the uniformity with onsite application state, all ammeters realize examination of not breaking off relations Test.
Herein, by programmable AC power supply control voltage, the value of electric current, dummy load is simulated, with reference to current transformer 7 The verification to single-phase electric energy is realized, the watchcase without opening electric energy meter disconnects voltage-to-current short circuit piece(Break off relations), lifting scene Electrical energy meter calibration operating efficiency, it is 0.05 grade of current transformer 7 from precision herein, can meets that electric energy meter is had good luck precision For 0.1 grade of requirement.

Claims (2)

1. a kind of live virtual load calibration equipment based on empty electric current device, including several electric energy meters, the electric energy meter includes the One current entry, the first electricity outlet, zero line port, it is characterised in that:Including programmable AC power supply, the programmable AC power supply Including voltage port and electric current port, the voltage port includes several FireWire port ports and a zero line port, the FireWire port port Quantity is identical with electric energy meter quantity, and each FireWire port port connects a live wire respectively, and zero line port connects a zero line, the electric current Port includes the second current entry and the second electricity outlet, and is connected between the two by a wire and form current loop;
Current loop is provided with the several and one-to-one current transformer of electric energy meter, and the current transformer input is connected on Current loop, the first current entry, the first electricity outlet of output end and corresponding electric energy meter form loop, and the of the electric energy meter One current entry is also connected one to one with live wire, and the zero line port of electric energy meter is connected with zero line.
2. the live virtual load calibration equipment according to claim 1 based on empty electric current device, it is characterised in that:The void Current device is current transformer, and its electric current no-load voltage ratio is 1:1.
CN201720390600.2U 2017-04-14 2017-04-14 Live virtual load calibration equipment based on empty electric current device Expired - Fee Related CN206757027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720390600.2U CN206757027U (en) 2017-04-14 2017-04-14 Live virtual load calibration equipment based on empty electric current device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720390600.2U CN206757027U (en) 2017-04-14 2017-04-14 Live virtual load calibration equipment based on empty electric current device

Publications (1)

Publication Number Publication Date
CN206757027U true CN206757027U (en) 2017-12-15

Family

ID=60612802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720390600.2U Expired - Fee Related CN206757027U (en) 2017-04-14 2017-04-14 Live virtual load calibration equipment based on empty electric current device

Country Status (1)

Country Link
CN (1) CN206757027U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108828498A (en) * 2018-09-03 2018-11-16 海盐星创电子有限公司 A kind of device and its application method for realizing ammeter double loop while loading current
CN108845286A (en) * 2018-09-03 2018-11-20 海盐星创电子有限公司 Calibration equipment while a kind of two current loops of single-phase electric energy meter
CN109001666A (en) * 2018-09-03 2018-12-14 海盐星创电子有限公司 Output device while a kind of realization different electric currents using current transformer
CN112748389A (en) * 2019-10-31 2021-05-04 河南许继仪表有限公司 On-site intelligent single-phase electric energy meter fault diagnosis instrument
CN114089245A (en) * 2021-11-22 2022-02-25 广东电网有限责任公司广州供电局 Meter checking instrument

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108828498A (en) * 2018-09-03 2018-11-16 海盐星创电子有限公司 A kind of device and its application method for realizing ammeter double loop while loading current
CN108845286A (en) * 2018-09-03 2018-11-20 海盐星创电子有限公司 Calibration equipment while a kind of two current loops of single-phase electric energy meter
CN109001666A (en) * 2018-09-03 2018-12-14 海盐星创电子有限公司 Output device while a kind of realization different electric currents using current transformer
CN108845286B (en) * 2018-09-03 2024-01-02 海盐星创电子有限公司 Simultaneous calibration device for two current loops of single-phase electric energy meter
CN112748389A (en) * 2019-10-31 2021-05-04 河南许继仪表有限公司 On-site intelligent single-phase electric energy meter fault diagnosis instrument
CN114089245A (en) * 2021-11-22 2022-02-25 广东电网有限责任公司广州供电局 Meter checking instrument

Similar Documents

Publication Publication Date Title
CN206757027U (en) Live virtual load calibration equipment based on empty electric current device
CN106546938A (en) A kind of anti-DC component of current transformer and test even system
CN103675749A (en) Performance detector of electric energy meter under direct current and even harmonic conditions
CN104569904A (en) Test device for testing direct current and even harmonic influence quantity of electric energy meter
CN108037430A (en) A kind of 10kV distribution transformers three-phase partial discharge test system
CN104237837A (en) Current transformer ratio error and angle error detection system and method
CN201281729Y (en) Grounding resistance tester
CN202563014U (en) Transformer loss measurement control console
CN101504429A (en) Portable on-line measurement instrument for electrician electric bridge drain voltage
WO2015192273A1 (en) Self-adaptive modeling apparatus for three-phase alternating-current electric arc furnace, and simulation algorithm therefor
CN102866378B (en) Voltage or current transformer on-line test device and voltage or current transformer on-line test method
CN202886585U (en) On-line test device for voltage/current transformer
CN106597356A (en) Single-phase electric energy meter power frequency magnetic field influence quantity testing apparatus
CN103954869B (en) Cable power frequency parameter testing device based on PXI system
CN104345218B (en) Three-phase reactor reactance value measuring system and method
CN106501754A (en) The direct current of three-phase electric energy meter and the experimental rig of even-order harmonic influence amount
CN206353202U (en) A kind of calibration equipment of electric energy meter
CN206074797U (en) The assay device of the direct current and even-order harmonic influence amount of three-phase electric energy meter
CN201955466U (en) Multifunctional electric apparatus parameter test instrument
CN104361802B (en) A kind of capacitive apparatus electrical operation analogue means
CN107167754A (en) Portable medium angle of loss criteria check device
CN203894346U (en) Cable power frequency parameter testing apparatus
CN104820199B (en) Large direct current measuring device ripple response performance test system and method
CN204945358U (en) A kind of various dimensions information monitoring instrument for current mutual inductor on site verification
CN207764310U (en) Pipe busbar radio interference tests system and calibration system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20180414

CF01 Termination of patent right due to non-payment of annual fee