CN206520589U - A kind of tire sludge removing device of New-energy electric vehicle - Google Patents

A kind of tire sludge removing device of New-energy electric vehicle Download PDF

Info

Publication number
CN206520589U
CN206520589U CN201720033020.8U CN201720033020U CN206520589U CN 206520589 U CN206520589 U CN 206520589U CN 201720033020 U CN201720033020 U CN 201720033020U CN 206520589 U CN206520589 U CN 206520589U
Authority
CN
China
Prior art keywords
new
electric vehicle
cylinder
energy electric
mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720033020.8U
Other languages
Chinese (zh)
Inventor
陈佳佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cixi Langhua Machinery Technology Co Ltd
Original Assignee
Cixi Langhua Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cixi Langhua Machinery Technology Co Ltd filed Critical Cixi Langhua Machinery Technology Co Ltd
Priority to CN201720033020.8U priority Critical patent/CN206520589U/en
Application granted granted Critical
Publication of CN206520589U publication Critical patent/CN206520589U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model is related to a kind of sludge removing device, more particularly to a kind of New-energy electric vehicle tire sludge removing device.The technical problems to be solved in the utility model be to provide it is a kind of can remove the soil on New-energy electric vehicle tire, traffic accident can be reduced, the tire sludge removing device of the New-energy electric vehicle of the personal safety of people can be protected.In order to solve the above-mentioned technical problem, the utility model provides the tire sludge removing device of such a New-energy electric vehicle, includes the first cylinder, u shapes bar, framework, the first motor, first rotating shaft, transverse slat, support plate, top plate, bearing block, the second motor, the second rotating shaft, reel etc.;The mode being bolted on the ground being provided with ground in groove, groove is provided with the first cylinder.The utility model is removed the soil on New-energy electric vehicle tire by using sand, and the soil on New-energy electric vehicle tire can be removed by having reached, can reduce traffic accident.

Description

A kind of tire sludge removing device of New-energy electric vehicle
Technical field
The utility model is related to a kind of sludge removing device, more particularly to a kind of New-energy electric vehicle tire sludge removing device.
Background technology
New energy:Also known as unconventional energy resource.Refer to the various energy forms outside traditional energy.Refer to and just start to develop Or actively study, need the energy promoted, such as solar energy, geothermal energy, wind energy, ocean energy, biomass energy and nuclear fusion energy Deng.
When New-energy electric vehicle is travelled outside, soil, New energy electric vapour can be stained with New-energy electric vehicle tire Wheel tire is stained with more soil and easily skidded in motion, so as to be easily caused generation traffic accident, and can threaten the people of people Body safety, therefore need badly research and development it is a kind of can remove the soil on New-energy electric vehicle tire, traffic accident, energy can be reduced Enough protect the tire sludge removing device of the New-energy electric vehicle of the personal safety of people.
Utility model content
(1)The technical problem to be solved
The utility model easily skids in motion in order to overcome New-energy electric vehicle tire to be stained with more soil, so that Generation traffic accident is easily caused, and the shortcoming of the personal safety of people, the technical problems to be solved in the utility model can be threatened Be to provide it is a kind of can remove the soil on New-energy electric vehicle tire, traffic accident can be reduced, can protect people's The tire sludge removing device of the New-energy electric vehicle of personal safety.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the utility model provides the clear mud of tire of such a New-energy electric vehicle Device, includes the first cylinder, u shapes bar, framework, the first motor, first rotating shaft, transverse slat, support plate, top plate, bearing block, the second electricity Machine, the second rotating shaft, reel, drawstring, hook, link, the first hollow clamp, the first clamping bar, the second cylinder, connecting rod, the second sky The mode being bolted on the ground being provided with heart clamp, the second clamping bar and the 3rd cylinder, ground in groove, groove is installed Have and be connected with u shape bars on the first cylinder, the expansion link of the first cylinder by way of being welded to connect, the left side top of u shape bars and The mode that the bottom that right hand top is connected with inwall on the right side of framework, framework by way of being welded to connect is bolted is pacified Equipped with the first motor, the output shaft of the first motor is connected with first rotating shaft by shaft coupling, and framework is set for opened type, in framework Equipped with sand, the upper base in groove is placed with transverse slat, the ground of the groove left and right sides by way of being welded to connect Vertical be connected between support plate, the top of two support plates is connected with top plate by way of being welded to connect, the left and right of top plate bottom The mode that both sides are bolted is provided with bearing block, and the mode that the left surface top of right side support plate is bolted is pacified Equipped with the second motor, the output shaft of the second motor is connected with the second rotating shaft by shaft coupling, what the second rotating shaft was connected by interference Mode is connected with the bearing of the bearing block of the left and right sides, and the periphery of the second rotating shaft is provided with reel, and reel is provided with drawstring, drawstring Head end be wound on reel, the end of drawstring, which is connected with hook, hook, is connected with link, and the bottom of link is by being welded to connect Mode be connected with the first hollow clamp, the first clamping bar is provided with the first hollow clamp, the first clamping bar is simultaneously located at the first hollow folder The rear side of pipe, the mode that the trailing flank top of the first hollow clamp is bolted is provided with the second cylinder, the second cylinder Expansion link is connected by way of being welded to connect with the leading flank top of the first clamping bar, and the top on the inside of the first hollow clamp leads to Cross the mode being welded to connect and be connected with connecting rod vertically, it is hollow that the bottom of connecting rod is connected with second by way of being welded to connect The second clamping bar, the second clamping bar and the right side for being located at the second hollow clamp, the second hollow clamp are provided with clamp, the second hollow clamp The mode that the right flank top of inner side is bolted is provided with the 3rd cylinder, and the expansion link of the 3rd cylinder is by being welded to connect Mode be connected with the left surface top of the second clamping bar.
Preferably, also include and multiple puddlers are connected with puddler, first rotating shaft.
Preferably, protective cover is also included, the outside of the first motor is provided with protective cover.
Preferably, slide rail, electronic reel, bracing wire, sliding block, jet pipe, water tank and water pump, the left surface of support plate are also included The mode that middle part is bolted is connected with slidingtype on slide rail, slide rail and is connected with sliding block, and slide rail upper and lower part passes through Bolted mode is connected with electronic reel, is wound with bracing wire between the electronic reel of both sides up and down, slider top is with drawing Line is connected, and slider bottom is connected with bracing wire, and the mode that the right flank bottom of support plate is bolted is connected with water tank, water tank The mode being bolted is connected with water pump, water pump is connected with jet pipe by way of flange is connected, and jet pipe stretches out water tank Outside, jet pipe is connected with sliding block.
Preferably, the making material of support plate is stainless steel.
Preferably, the making material of transverse slat is Q235 steel.
Preferably, drawstring is steel wire rope.
Operation principle:When the soil on New-energy electric vehicle tire to be removed, New-energy electric vehicle is opened to horizontal stroke On plate and make New-energy electric vehicle headstock towards the right side, restarting the second motor rotates counterclockwise the second axle, and the second rotating shaft is inverse Hour hands, which rotate to release drawstring, moves down the first hollow clamp and the first clamping bar, and the first hollow clamp moves down connecting rod Move down therewith, connecting rod moves down the second hollow clamp and the second clamping bar is moved down therewith.When the first hollow clamp The bottom of New-energy electric vehicle front and rear sides is moved downward to the first clamping bar, the second hollow clamp and the second clamping bar are located at new During the bottom of the energy electric vehicle left and right sides, the second motor is closed.Then starting the second cylinder and the 3rd cylinder simultaneously makes The flexible shortening of second cylinder and the 3rd cylinder, the flexible shortening of the second cylinder moves forward the first clamping bar, and such first is empty Heart clamp and the first clamping bar can clamp the front and rear sides of New-energy electric vehicle.The flexible shortening of 3rd cylinder makes the second clamping bar It is moved to the left, such second hollow clamp and the second clamping bar can clamp the left and right sides of New-energy electric vehicle.Then start Second motor makes the second axle rotate clockwise withdrawal drawstring, the first hollow clamp and the first clamping bar is moved up reset, first Hollow clamp and the first clamping bar move up the second hollow clamp of reset and the second clamping bar moves up reset therewith.First is hollow Clamp, the first clamping bar, the second hollow clamp and the second clamping bar move up reset, and New-energy electric vehicle is moved up therewith, After the second hollow clamp and the second clamping bar move up reset, the second motor is closed.Then transverse slat is removed from groove again, The cylinder of subsequent start-up first extends the expansion link of cylinder, and the first cylinder extends the expansion link of cylinder to promote u shapes bar to moving up Dynamic, u shape bars move up framework and moved up therewith.The tire that framework moves up New-energy electric vehicle enters in framework, After the tire of New-energy electric vehicle fully enters framework, the first cylinder is closed.The motor of subsequent start-up first makes first turn Axle is rotated, and the sand that first rotating shaft is rotated in agitation framework makes the soil on the tire of New-energy electric vehicle come off, and makes new energy The tire of source electric car becomes neat and tidy.By the first motor after the soil on New-energy electric vehicle tire is removed totally Close, restarting the first cylinder makes the expansion link of cylinder shorten reset, and the expansion link of the first cylinder, which shortens reset, makes u shapes bar and frame Body moves down reset therewith.Then transverse slat is put back to again, the motor of subsequent start-up second rotates counterclockwise the second axle, makes new energy Source electric car is moved down, when the tire of New-energy electric vehicle is contacted with transverse slat, is closed the second motor, is then opened simultaneously Dynamic second cylinder and the 3rd cylinder make the flexible elongation reset of the second cylinder and the 3rd cylinder decontrol New-energy electric vehicle, so After close the second cylinder and the 3rd cylinder and start the second motor rotate clockwise the second axle, make the first hollow clamp, first Clamping bar, the second hollow clamp and the second clamping bar move up reset.Then turning headstock again makes the headstock of New-energy electric vehicle Towards a left side, aforesaid operations are repeated, after the soil on two other tire of New-energy electric vehicle is removed, above-mentioned started are closed Armamentarium.After the soil on four tires of New-energy electric vehicle is removed, New-energy electric vehicle is opened from transverse slat .Therefore the utility model can remove the soil on New-energy electric vehicle tire, can reduce generation traffic accident, energy Enough protect the personal safety of people.
Because also including puddler, multiple puddlers are connected with first rotating shaft, puddler, which is rotated, can increase stirring Area, so as to accelerate the speed for removing soil.
Because also including protective cover, the outside of the first motor is provided with protective cover, and protective cover can protect the first motor, energy Enough prevent sand from burying the first motor.
Because also including in slide rail, electronic reel, bracing wire, sliding block, jet pipe, water tank and water pump, the left surface of support plate The mode that portion is bolted is connected with slidingtype on slide rail, slide rail and is connected with sliding block, and slide rail upper and lower part passes through spiral shell Tether the mode connect and be connected with electronic reel, be wound with bracing wire, slider top and bracing wire between the electronic reel of both sides up and down Connection, slider bottom is connected with bracing wire, and the mode that the right flank bottom of support plate is bolted is connected with water tank, water tank logical Cross bolted mode and be connected with water pump, water pump and jet pipe is connected with by way of flange is connected, jet pipe is stretched out in water tank, Jet pipe is connected with sliding block, after to the silt displacement of tire, can start water pump, and water pump extracts the water in water tank out, in water tank Water sprayed by jet pipe, and be sprayed on tire, the cleaning treatment of mud can be so carried out to tire, can now be opened Electronic reel positive and negative alternate above and below dynamic is rotated, and so makes bracing wire pull sliding block to move up and down, and sliding block moves up and down being capable of band Dynamic jet pipe moves up and down, and the cleaning treatment of comprehensive mud is carried out to tire with so enabling jet pipe high and low, has been cleaned Bi Hou, closes the armamentarium of above-mentioned startup.
Because the making material of support plate is stainless steel, stainless steel is difficult to get rusty, and can extend the service life of support plate.
Because the making material of transverse slat is Q235 steel, the ability to bear of Q235 steel is big, can extend the service life of transverse slat.
Because drawstring is steel wire rope, the intensity of steel wire rope is high, from heavy and light, stable working, be difficult whole root fracture suddenly, work Reliably.
(3)Beneficial effect
The utility model is removed the soil on New-energy electric vehicle tire by using sand, and having reached to remove Soil on New-energy electric vehicle tire, can reduce traffic accident, can protect the effect of the personal safety of people.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is the of the present utility model first hollow clamp and the first clamping bar right side structural representation.
Fig. 3 is the of the present utility model second hollow clamp and the second clamping bar main structure diagram.
Fig. 4 is second of main structure diagram of the present utility model.
Fig. 5 is the third main structure diagram of the present utility model.
Fig. 6 is the 4th kind of main structure diagram of the present utility model.
Mark in accompanying drawing for:1- ground, 2- grooves, the cylinders of 3- first, 4-u shape bars, 5- frameworks, the motors of 6- first, 7- First rotating shaft, 8- transverse slats, 9- support plates, 10- top plates, 11- bearing blocks, the motors of 12- second, the rotating shafts of 13- second, 14- reels, 15- Drawstring, 16- hooks, 17- links, the hollow clamps of 18- first, the clamping bars of 19- first, the cylinders of 20- second, 21- connecting rods, 22- the Two hollow clamps, the clamping bars of 23- second, the cylinders of 24- the 3rd, 25- puddlers, 26- protective covers, 27- slide rails, the electronic reels of 28-, 29- bracing wires, 30- sliding blocks, 31- jet pipes, 32- water tanks, 33- water pumps.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of tire sludge removing device of New-energy electric vehicle, as shown in figures 1 to 6, include the first cylinder 3, u shapes bar 4, Framework 5, the first motor 6, first rotating shaft 7, transverse slat 8, support plate 9, top plate 10, bearing block 11, the second motor 12, the second rotating shaft 13, Reel 14, drawstring 15, hook 16, link 17, the first hollow clamp 18, the first clamping bar 19, the second cylinder 20, connecting rod 21, the Pass through bolt on the ground 1 being provided with two hollow clamps 22, the second clamping bar 23 and the 3rd cylinder 24, ground 1 in groove 2, groove 2 The mode of connection is provided with the first cylinder 3, the expansion link of the first cylinder 3 and u shapes bar 4, u is connected with by way of being welded to connect The left side top and right hand top of shape bar 4 are connected with framework 5, the bottom of the right side inwall of framework 5 by way of being welded to connect The mode being bolted is provided with the first motor 6, and the output shaft of the first motor 6 is connected with first rotating shaft 7 by shaft coupling, Framework 5 is that opened type is set, and framework 5 is built with sand, and the upper base 1 in groove 2 is placed with transverse slat 8, the left and right sides of groove 2 Ground 1 on be connected with vertically by way of being welded to connect between support plate 9, the top of two support plates 9 by being welded to connect Mode be connected with top plate 10, the mode that the left and right sides of the bottom of top plate 10 is bolted is provided with bearing block 11, right The mode that the left surface top of collateral plate 9 is bolted is provided with the second motor 12, and the output shaft of the second motor 12 passes through Shaft coupling is connected with the second rotating shaft 13, the second rotating shaft 13 by way of interference is connected and the left and right sides bearing block 11 bearing It is connected, the periphery of the second rotating shaft 13 is provided with reel 14, and reel 14 is provided with drawstring 15, and the head end of drawstring 15 is wound on reel 14 On, the end of drawstring 15, which is connected with hook 16, hook 16, is connected with link 17, and the bottom of link 17 passes through the side that is welded to connect Formula, which is connected with the first hollow clamp 18, the first hollow clamp 18, is provided with the first clamping bar 19, and the first clamping bar 19 is simultaneously empty positioned at first The rear side of heart clamp 18, the mode that the trailing flank top of the first hollow clamp 18 is bolted is provided with the second cylinder 20, Leading flank top of the expansion link of second cylinder 20 with the first clamping bar 19 by way of being welded to connect is connected, the first hollow folder The top of the inner side of pipe 18 is connected with connecting rod 21 vertically by way of being welded to connect, and the bottom of connecting rod 21 is by being welded to connect Mode be connected with the second hollow clamp 22, be provided with the second clamping bar 23 in the second hollow clamp 22, the second clamping bar 23 and positioned at the The right side of two hollow clamps 22, the mode that the right flank top of the second hollow inner side of clamp 22 is bolted is provided with the 3rd Cylinder 24, the left surface top of the expansion link of the 3rd cylinder 24 with the second clamping bar 23 by way of being welded to connect is connected.
Also include and multiple puddlers 25 are connected with puddler 25, first rotating shaft 7.
Also include protective cover 26, the outside of the first motor 6 is provided with protective cover 26.
Also include slide rail 27, electronic reel 28, bracing wire 29, sliding block 30, jet pipe 31, water tank 32 and water pump 33, support plate 9 Left surface in the middle part of the mode that is bolted be connected with slidingtype on slide rail 27, slide rail 27 and be connected with sliding block 30, slide rail 27 The mode that upper and lower part is bolted is connected with electronic reel 28, up and down the spaced winding of the electronic reel 28 of both sides There is bracing wire 29, the top of sliding block 30 is connected with bracing wire 29, and the bottom of sliding block 30 is connected with bracing wire 29, and the right flank bottom of support plate 9 passes through Bolted mode, which is connected with the mode being bolted in water tank 32, water tank 32 and is connected with water pump 33, water pump 33, leads to The mode for crossing flange connection is connected with jet pipe 31, and jet pipe 31 is stretched out outside water tank 32, and jet pipe 31 is connected with sliding block 30.
The making material of support plate 9 is stainless steel.
The making material of transverse slat 8 is Q235 steel.
Drawstring 15 is steel wire rope.
Operation principle:When the soil on New-energy electric vehicle tire to be removed, New-energy electric vehicle is opened to horizontal stroke On plate 8 and make New-energy electric vehicle headstock towards the right side, restarting the second motor 12 rotates counterclockwise the second axle, the second rotating shaft 13 rotate counterclockwise by drawstring 15 release move down the first hollow clamping bar 19 of clamp 18 and first, the first hollow clamp 18 to Lower mobile connecting rod 21 is moved down therewith, and it is downward therewith that connecting rod 21 moves down the second hollow clamping bar 23 of clamp 22 and second It is mobile.When the first hollow clamping bar 19 of clamp 18 and first is moved downward to the bottom of New-energy electric vehicle front and rear sides, second When the hollow clamping bar 23 of clamp 22 and second is located at the bottom of the New-energy electric vehicle left and right sides, the second motor 12 is closed.With Starting the second cylinder 20 and the 3rd cylinder 24 simultaneously afterwards makes the flexible shortening of the second cylinder 20 and the 3rd cylinder 24, the second cylinder 20 Flexible shortening move forward the first clamping bar 19, such first hollow clamping bar 19 of clamp 18 and first can clamp new energy electricity The front and rear sides of electrical automobile.The flexible shortening of 3rd cylinder 24 is moved to the left the second clamping bar 23, such second hollow clamp 22 The left and right sides of New-energy electric vehicle can be clamped with the second clamping bar 23.Then starting the second motor 12 makes the second axle clockwise Rotate and withdraw drawstring 15, the first hollow clamping bar 19 of clamp 18 and first is moved up reset, the first hollow clamp 18 and first Clamping bar 19 moves up the second hollow clamping bar 23 of clamp 22 and second of reset and moves up reset therewith.First hollow clamp 18, First clamping bar 19, the second hollow clamping bar 23 of clamp 22 and second move up reset, and New-energy electric vehicle is moved up therewith, After the second hollow clamping bar 23 of clamp 22 and second moves up reset, the second motor 12 is closed.Then again by transverse slat 8 from recessed Groove 2 is removed, and the first cylinder of subsequent start-up 3 extends the expansion link of cylinder, and the first cylinder 3 makes the expansion link of cylinder extend promotion u Shape bar 4 is moved up, and u shapes bar 4 moves up framework 5 and moved up therewith.Framework 5 moves up the wheel of New-energy electric vehicle Tire enters in framework 5, and after the tire of New-energy electric vehicle fully enters framework 5, the first cylinder 3 is closed.Subsequent start-up First motor 6 rotates first rotating shaft 7, and the sand that first rotating shaft 7 is rotated in agitation framework 5 makes the tire of New-energy electric vehicle On soil come off, making the tire of New-energy electric vehicle becomes neat and tidy.Soil on New-energy electric vehicle tire Remove it is clean after the first motor 6 is closed, restart the first cylinder 3 and shorten the expansion link of cylinder and reset, the first cylinder 3 is stretched Contracting bar, which shortens reset, makes u shapes bar 4 and framework 5 move down reset therewith.Then transverse slat 8 is put back to again, the electricity of subsequent start-up second Machine 12 rotates counterclockwise the second axle, moves down New-energy electric vehicle, when tire and the transverse slat 8 of New-energy electric vehicle During contact, the second motor 12 is closed, then starting the second cylinder 20 and the 3rd cylinder 24 simultaneously makes the second cylinder 20 and the 3rd gas The flexible elongation of cylinder 24, which resets, decontrols New-energy electric vehicle, is then shut off the second cylinder 20 and the 3rd cylinder 24 and starts the Two motors 12 rotate clockwise the second axle, press from both sides the first hollow clamp 18, the first clamping bar 19, the second hollow clamp 22 and second Bar 23 moves up reset.Then turning headstock again makes the headstock of New-energy electric vehicle towards a left side, aforesaid operations is repeated, by new energy After soil on two other tire of source electric car is removed, above-mentioned started armamentarium is closed.Work as New energy electric After soil on four tires of automobile is removed, New-energy electric vehicle is opened from transverse slat 8.Therefore the utility model can The soil on New-energy electric vehicle tire is removed, generation traffic accident can be reduced, the personal safety of people can be protected.
Because also including puddler 25, multiple puddlers 25 are connected with first rotating shaft 7, puddler 25, which is rotated, to be added Big stirring area, so as to accelerate the speed for removing soil.
Because also including protective cover 26, the outside of the first motor 6 is provided with protective cover 26, and protective cover 26 can protect first Motor 6, can prevent sand from burying the first motor 6.
Because also including slide rail 27, electronic reel 28, bracing wire 29, sliding block 30, jet pipe 31, water tank 32 and water pump 33, The mode being bolted in the middle part of the left surface of support plate 9 is connected with slidingtype on slide rail 27, slide rail 27 and is connected with sliding block 30, sliding The mode that the upper and lower part of rail 27 is bolted is connected with electronic reel 28, up and down the electronic reel 28 of both sides it Between be wound with bracing wire 29, the top of sliding block 30 is connected with bracing wire 29, and the bottom of sliding block 30 is connected with bracing wire 29, the right flank bottom of support plate 9 The mode being bolted is connected with the mode being bolted in water tank 32, water tank 32 and is connected with water pump 33, water pump 33 On be connected with jet pipe 31 by way of flange is connected, jet pipe 31 is stretched out in water tank 32, and jet pipe 31 is connected with sliding block 30, when to taking turns After the silt displacement of tire, water pump 33 can be started, water pump 33 extracts the water in water tank 32 out, and the water in water tank 32 passes through jet pipe 31 Spray, and be sprayed on tire, the cleaning treatment of mud can be so carried out to tire, can now start above and below it is electronic The positive and negative alternate of reel 28 is rotated, and so makes bracing wire 29 pull sliding block 30 to move up and down, and sliding block 30, which moves up and down, can drive spray Pipe 31 moves up and down, and the cleaning treatment of comprehensive mud is carried out to tire with so enabling the high and low of jet pipe 31, has been cleaned Bi Hou, closes the armamentarium of above-mentioned startup.
Because the making material of support plate 9 is stainless steel, stainless steel is difficult to get rusty, and can extend the service life of support plate 9.
Because the making material of transverse slat 8 is Q235 steel, the ability to bear of Q235 steel is big, can extend the use year of transverse slat 8 Limit.
Because drawstring 15 is steel wire rope, the intensity of steel wire rope is high, from heavy and light, stable working, be difficult whole root fracture, work suddenly Make reliable.
Embodiment described above only expresses preferred embodiment of the present utility model, and it describes more specific and detailed, But therefore it can not be interpreted as the limitation to the utility model the scope of the claims.It should be pointed out that for the common of this area For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (7)

1. the tire sludge removing device of a kind of New-energy electric vehicle, it is characterised in that include the first cylinder(3), u shape bars(4)、 Framework(5), the first motor(6), first rotating shaft(7), transverse slat(8), support plate(9), top plate(10), bearing block(11), the second motor (12), the second rotating shaft(13), reel(14), drawstring(15), hook(16), link(17), the first hollow clamp(18), first folder Bar(19), the second cylinder(20), connecting rod(21), the second hollow clamp(22), the second clamping bar(23)With the 3rd cylinder(24), ground Face(1)On be provided with groove(2), groove(2)Interior ground(1)On the mode that is bolted the first cylinder is installed(3), the One cylinder(3)Expansion link on u shape bars are connected with by way of being welded to connect(4), u shape bars(4)Left side top and right side Top is connected with framework by way of being welded to connect(5), framework(5)The mode that the bottom of right side inwall is bolted First motor is installed(6), the first motor(6)Output shaft first rotating shaft is connected with by shaft coupling(7), framework(5)It is spacious Mouth formula is set, framework(5)Built with sand, groove(2)Interior upper base(1)It is placed with transverse slat(8), groove(2)Left and right two The ground of side(1)On be connected with support plate vertically by way of being welded to connect(9), two support plates(9)Top between pass through The mode being welded to connect is connected with top plate(10), top plate(10)The mode that the left and right sides of bottom is bolted is provided with Bearing block(11), right side support plate(9)The mode that is bolted of left surface top the second motor is installed(12), the second electricity Machine(12)Output shaft the second rotating shaft is connected with by shaft coupling(13), the second rotating shaft(13)With a left side by way of interference is connected The bearing block of right both sides(11)Bearing be connected, the second rotating shaft(13)Periphery be provided with reel(14), reel(14)It is provided with Drawstring(15), drawstring(15)Head end be wound on reel(14)On, drawstring(15)End be connected with hook(16), hook(16)On It is connected with link(17), link(17)Bottom the first hollow clamp is connected with by way of being welded to connect(18), first is empty Heart clamp(18)Inside it is provided with the first clamping bar(19), the first clamping bar(19)And positioned at the first hollow clamp(18)Rear side, first is empty Heart clamp(18)The mode that is bolted of trailing flank top the second cylinder is installed(20), the second cylinder(20)It is flexible Bar by way of being welded to connect with the first clamping bar(19)Leading flank top be connected, the first hollow clamp(18)The top of inner side Portion is connected with connecting rod vertically by way of being welded to connect(21), connecting rod(21)Bottom connected by way of being welded to connect It is connected to the second hollow clamp(22), the second hollow clamp(22)Inside it is provided with the second clamping bar(23), the second clamping bar(23)And positioned at the Two hollow clamps(22)Right side, the second hollow clamp(22)The mode that the right flank top of inner side is bolted is provided with 3rd cylinder(24), the 3rd cylinder(24)Expansion link by way of being welded to connect with the second clamping bar(23)Left surface top It is connected.
2. the tire sludge removing device of a kind of New-energy electric vehicle according to claim 1, it is characterised in that also include Puddler(25), first rotating shaft(7)On be connected with multiple puddlers(25).
3. the tire sludge removing device of a kind of New-energy electric vehicle according to claim 2, it is characterised in that also include Protective cover(26), the first motor(6)Outside be provided with protective cover(26).
4. the tire sludge removing device of a kind of New-energy electric vehicle according to claim 3, it is characterised in that also include Slide rail(27), electronic reel(28), bracing wire(29), sliding block(30), jet pipe(31), water tank(32)And water pump(33), support plate(9) Left surface in the middle part of the mode that is bolted be connected with slide rail(27), slide rail(27)Upper slidingtype is connected with sliding block(30), Slide rail(27)The mode that upper and lower part is bolted is connected with electronic reel(28), the electronic coiling of both sides up and down Wheel(28)Between be wound with bracing wire(29), sliding block(30)Top and bracing wire(29)Connection, sliding block(30)Bottom and bracing wire(29)Connection, Support plate(9)The mode that is bolted of right flank bottom be connected with water tank(32), water tank(32)Inside it is bolted Mode is connected with water pump(33), water pump(33)On be connected with jet pipe by way of flange is connected(31), jet pipe(31)Stretch out water Case(32)Outside, jet pipe(31)With sliding block(30)Connection.
5. a kind of tire sludge removing device of New-energy electric vehicle according to claim 4, it is characterised in that support plate(9) Making material be stainless steel.
6. a kind of tire sludge removing device of New-energy electric vehicle according to claim 5, it is characterised in that transverse slat(8) Making material be Q235 steel.
7. a kind of tire sludge removing device of New-energy electric vehicle according to claim 6, it is characterised in that drawstring(15) For steel wire rope.
CN201720033020.8U 2017-01-12 2017-01-12 A kind of tire sludge removing device of New-energy electric vehicle Expired - Fee Related CN206520589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720033020.8U CN206520589U (en) 2017-01-12 2017-01-12 A kind of tire sludge removing device of New-energy electric vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720033020.8U CN206520589U (en) 2017-01-12 2017-01-12 A kind of tire sludge removing device of New-energy electric vehicle

Publications (1)

Publication Number Publication Date
CN206520589U true CN206520589U (en) 2017-09-26

Family

ID=59890737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720033020.8U Expired - Fee Related CN206520589U (en) 2017-01-12 2017-01-12 A kind of tire sludge removing device of New-energy electric vehicle

Country Status (1)

Country Link
CN (1) CN206520589U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108528409A (en) * 2018-06-01 2018-09-14 浙江芊荷科技有限公司 A kind of electric vehicle parts maintained equipment and its application method
CN108725400A (en) * 2018-06-01 2018-11-02 浙江芊荷科技有限公司 A kind of automobile tire intelligent processing machinery and its application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108528409A (en) * 2018-06-01 2018-09-14 浙江芊荷科技有限公司 A kind of electric vehicle parts maintained equipment and its application method
CN108725400A (en) * 2018-06-01 2018-11-02 浙江芊荷科技有限公司 A kind of automobile tire intelligent processing machinery and its application method
CN108725400B (en) * 2018-06-01 2020-10-27 威马汽车科技集团有限公司 Intelligent automobile tire treatment machine and using method thereof

Similar Documents

Publication Publication Date Title
CN106733994A (en) Inboard wall of test tube cleaning device is used in a kind of genetic engineering experiment
CN206552004U (en) A kind of cleaning device of New-energy electric vehicle
CN206520589U (en) A kind of tire sludge removing device of New-energy electric vehicle
CN205988913U (en) A kind of conveyor type auto parts cleaning machine
CN204078026U (en) A kind of self-service environmental protection yacht
CN107511440A (en) A kind of pile foundation reinforcing bar cutter device
CN206287986U (en) A kind of rail vehicle Omnibearing cleaning device
CN207482147U (en) Floating material remove device in a kind of municipal park lake
CN108408825A (en) A kind of sewage disposal device of visible light catalytic
CN206570592U (en) A kind of grey dust remover of energy-saving clothing
CN206090674U (en) Silt remover for hydraulic engineering
CN215284733U (en) Full-automatic computer car washer with sewage treatment recycles mechanism
CN212608708U (en) Ocean engineering cable recovery device
CN219766211U (en) Part cleaning device for mechanical control engineering
CN212153329U (en) Floater water pollution treatment equipment
CN215405963U (en) Water conservancy water and electricity dam water inlet floater fishing device
CN205711928U (en) A kind of for highway dedusting water injector
CN107554711A (en) A kind of water conservancy lake eutrophication water pollution blue-green algae environmental protection cleaning plant
CN205348136U (en) River course clearance ship
CN210108676U (en) Experimental water pool with towing device
CN207130669U (en) A kind of construction of hydro project drainage arrangement
CN208395878U (en) A kind of high efficiency channel cleanout purification device
CN106337495A (en) Cleaning vehicle
CN208600417U (en) A kind of photovoltaic module dedusting and cleaning all-in-one machine
CN209074467U (en) A kind of clean robot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170926

Termination date: 20180112