CN206516960U - The integrated intelligent traction substation of prepackage type - Google Patents

The integrated intelligent traction substation of prepackage type Download PDF

Info

Publication number
CN206516960U
CN206516960U CN201621170827.8U CN201621170827U CN206516960U CN 206516960 U CN206516960 U CN 206516960U CN 201621170827 U CN201621170827 U CN 201621170827U CN 206516960 U CN206516960 U CN 206516960U
Authority
CN
China
Prior art keywords
low
pressure side
cabin
screen
secondary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621170827.8U
Other languages
Chinese (zh)
Inventor
郭勤俭
任雪涛
庄晓明
葛海波
陈林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Original Assignee
CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd filed Critical CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Priority to CN201621170827.8U priority Critical patent/CN206516960U/en
Application granted granted Critical
Publication of CN206516960U publication Critical patent/CN206516960U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the integrated intelligent traction substation of prepackage type; including low-pressure side primary equipment, the low-pressure side secondary device of protection observing and controlling low-pressure side primary equipment for accessing the high-voltage switch gear of high pressure gauze, the main transformer equipment of progress transformation conversion being connected with high-voltage switch gear, is connected with main transformer equipment, wherein low-pressure side primary equipment is integrated is assemblied in low-pressure side primary equipment cabin(1)Interior, low-pressure side secondary device is integrated to be assemblied in low-pressure side secondary device cabin(38)It is interior, low-pressure side primary equipment cabin(1)With low-pressure side secondary device cabin(38)The prefabricated cabin structure being made of nonmetallic high antisepsis composite material, low-pressure side primary equipment cabin(1)With low-pressure side secondary device cabin(38)Using unified cable and interface connection low-pressure side secondary device and low-pressure side secondary device.

Description

The integrated intelligent traction substation of prepackage type
Technical field
Utility model is related to transformer station's topology, and in particular to the integrated intelligent traction substation of prepackage type.
Background technology
Traditional intelligent traction substation is main secondary by high-voltage switch gear, main transformer equipment, low-pressure side primary equipment, low-pressure side Equipment is constituted, wherein low-pressure side primary equipment, low-pressure side secondary device composition mixing overlap joint, and use different factories The product of business, this carrys out very big inconvenience for the integrated belt of system, and this transformer station does not use integration mode processing low-pressure side once Equipment, low-pressure side secondary device, equipment room line are complicated, and signal transmission interference happens occasionally, and the construction week of whole transformer station Phase length is, it is necessary to go through several stages, and equipment purchase stage, system connects design phase, particularly system debug stage, equipment room Incompatibility, cause debugging degree of difficulty increase, therefore, the construction period of whole transformer station is extremely very long.
To solve traditional transformer substation construction cycle length, floor space greatly, the skimble-scamble problem of process Installation standard, Wo Menxu A kind of standardized designs, batch production processing, the transformer station of assembled construction are designed, to realize transformer station's miniaturization, significantly carry High engineering construction efficiency and quality, effectively reduce overall life cycle cost.
Utility model content
Utility model purpose be provide the integrated intelligent traction substation of prepackage type, by plant produced it is prefabricated and Assembled in situ installed for two megastages to build.First and second integrated equipment at utmost realizes large-scale production in factory, integrated tune Examination.Using standardization connection between primary equipment and secondary device, secondary device, the single-ended pre-fabricated electric cables of large-scale application, both-end are pre- The new technologies such as optical cable processed, simplify scene secondary connection, realize " plug and play ".
Utility model is achieved through the following technical solutions:
The integrated intelligent traction substation of prepackage type, includes the high-voltage switch gear and high-voltage switch gear of access high pressure gauze Connect the main transformer equipment for carrying out transformation conversion, the low-pressure side primary equipment being connected with main transformer equipment, protection observing and controlling low-pressure side once The low-pressure side secondary device of equipment, wherein low-pressure side primary equipment are integrated to be assemblied in low-pressure side primary equipment cabin, low-pressure side two Secondary device is integrated to be assemblied in low-pressure side secondary device cabin, and low-pressure side primary equipment cabin and low-pressure side secondary device cabin use non-gold Belong to the prefabricated cabin structure that high antisepsis composite material is made, low-pressure side primary equipment cabin and low-pressure side secondary device cabin are using unified line Cable and interface connection low-pressure side secondary device and low-pressure side secondary device.
The low-pressure side primary equipment cabin is provided with three intervals, three intervals be respectively 2 transformer bays every with 1 one The primary side control device of single-row word arrangement, a control device are provided with secondary device interval, primary equipment interval Include the first PT cabinets, 27.5KV house transformators switch cubicle, right side feeder switch cabinet main transformer low-pressure side switch cubicle, left side feedback successively Wiretap cabinet, the 2nd PT cabinets.
Servant's well, 10KV house transformators switch cubicle, air-conditioning equipment are additionally provided with the equipment interval.
2 transformer bays are every being respectively arranged with 10KV house transformators, 27.5KV house transformators.
The low-pressure side secondary device cabin is provided with 2 intervals, 1 at intervals of line segregation, 1 at intervals of secondary device The secondary side control device that two row distinguish word arrangement, the secondary side control of first row are provided with interval, secondary device interval Equipment is followed successively by:Monitor screen, main transformer protection observing and controlling screen, protection for feed line observing and controlling screen, environmental monitoring screen, net switchboard, optical fiber distributing Frame screen, failure wave-recording screen, standby screen, measuring screen;The secondary side control device of secondary series is followed successively by:Video monitoring screen, high-tension electricity In line on-line monitoring screen, oil chromatography screen, DC power supply panel, alternating current screen, battery screen, standby screen, communication screen, line segregation It is provided with secondary device cable interface.
High-voltage switch gear in the utility model can be AIS/GIS/HGIS switches, switch to high-tension electricity during main transformer equipment low Piezoelectric device, i.e. transformer, generally 4, the system concentrates low-pressure side secondary device and low-pressure side primary equipment point respectively Cloth forms low-pressure side secondary device cabin and low-pressure side primary equipment cabin, low-pressure side secondary device cabin and low-pressure side in a cabin Primary equipment cabin is directly connected by prefabricated cable, using above-mentioned rational layout, said structure is set gradually, by low-pressure side two The set of secondary device centralization into an equipment, we can the structure prefabricated in advance, it is necessary to when, we are directly prefabricated by this Cabin is transported predetermined station and be connected with main transformer equipment network, reaches the technique effect of rapid installation.Meanwhile, according to Above-mentioned layout carries out equipment placement, can reach that the circuit of each equipment room is optimized, and the signal transmission interference between circuit is most It is small, it is rationally distributed, reach cost minimization.
Prefabricated cabin structure includes 2 layers of composite layer, and main framing body, main bone are provided between 2 layers of composite layer Support body includes coating steel pipe skeleton, and rock wool obturator is filled between coating steel pipe skeleton, is installed on coating steel pipe skeleton There is connector, connector is inserted respectively into composite layer into U-shaped, its two ends.
Utility model compared with prior art, has the following advantages and advantages:
The integrated intelligent traction substation of prepackage type is a revolution of transformer substation construction, this transformer substation construction mistake Journey is just as playing with building blocks, by the way that plant produced is prefabricated and assembled in situ was installed for two megastages and built.First and second integrated equipment At utmost realize large-scale production in factory, integrated debugging.Connected between primary equipment and secondary device, secondary device using standardization Connect, the new technology such as the single-ended pre-fabricated electric cables of large-scale application, both-end prefabricated optical cable, simplify scene secondary connection, realize and " insert i.e. With ".With the electric railway traction transformer station of the technology building, traditional traction substation electrical layout, civil engineering are changed Design and Construction Mode, pass through the brand-new construction mode of " standardized designs, batch production processing, assembled construction " so that traction Transformer substation construction complete sets of equipment is strong, small volume, compact conformation, it is safe and reliable to operation, easy to maintenance, can move, and greatly It is big to shorten design and construction period, transformer station's floor space is reduced, transformer station's cost is reduced.Whole station is set up in IEC61850 On the basis of communication specification, peace layered distribution type realizes in intelligent substation the information sharing of intelligent electric equipment room and mutually Operation.It is divided into three layers of station level, wall and process layer on the whole.Station level protects the equipment such as observing and controlling to use with wall IEC61850-8-1 communication protocols;Wall uses IEC61850-9-2 communication protocols with process layer combining unit;Wall with Process layer intelligent terminal uses GOOSE communication protocols;When station level system uses SNTP networks pair, wall and process layer devices During using IEC61588 networks pair.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding utility model embodiment, constitutes one of the application Point, do not constitute the restriction to utility model embodiment.In the accompanying drawings:
Fig. 1 is utility model structural representation.
Fig. 2 is the layout in low-pressure side primary equipment cabin.
Fig. 3 is the layout in low-pressure side secondary device cabin.
Fig. 4 is the structure chart of prefabricated cabin structure.
Mark in accompanying drawing is expressed as:1st, low-pressure side primary equipment cabin;2nd, 10KV house transformators;3rd, servant's well; 4th, 10KV house transformators switch cubicle;5th, the first PT cabinets;6th, 27.5KV house transformators switch cubicle;7th, right side feeder switch cabinet; 8th, main transformer low-pressure side switch cubicle;9th, left side feeder switch cabinet;10th, the 2nd PT cabinets;11st, air-conditioning equipment;12nd, the personal transformations of 27.5KV Device;
21st, monitor screen;22nd, main transformer protection observing and controlling screen;23rd, protection for feed line observing and controlling screen;24th, environmental monitoring screen;25th, net switch Screen;26th, fibre distribution frame screen;27th, failure wave-recording screen;28th, standby screen;29th, measuring screen;30th, video monitoring screen;31st, high-tension electricity Line on-line monitoring screen;32nd, oil chromatography screen;33rd, DC power supply panel;34th, alternating current screen;35th, battery screen;36th, standby screen; 37th, communication screen;38th, low-pressure side secondary device cabin;39th, secondary device cable interface;
41st, composite layer, 42, coating steel pipe skeleton, 43, connector, 44, rock wool obturator.
Embodiment
It is right with reference to embodiment and accompanying drawing for the purpose, technical scheme and advantage of utility model are more clearly understood Utility model is described in further detail, and the exemplary embodiment and its explanation of utility model are only used for explaining practical new Type, is not intended as the restriction to utility model.
Embodiment 1
As shown in Figure 1-Figure 3, the integrated intelligent traction substation of prepackage type, including the height of access high pressure gauze are pressed off Close, the main transformer equipment for carrying out transformation conversion, the low-pressure side primary equipment being connected with main transformer equipment, protection survey are connected with high-voltage switch gear The low-pressure side secondary device of low-pressure side primary equipment is controlled, wherein low-pressure side primary equipment is integrated is assemblied in low-pressure side primary equipment cabin In 1, low-pressure side secondary device is integrated to be assemblied in low-pressure side secondary device cabin 38, low-pressure side primary equipment cabin 1 and low-pressure side two The prefabricated cabin structure that secondary device cabin 38 is made of nonmetallic high antisepsis composite material, low-pressure side primary equipment cabin 1 and low-pressure side Secondary device cabin 38 is using unified cable and interface connection low-pressure side secondary device and low-pressure side secondary device.
The low-pressure side primary equipment cabin 1 is provided with three intervals, three intervals be respectively 2 transformer bays every with 1 The primary side control device of single-row word arrangement is provided with primary equipment interval, primary equipment interval, a secondary control is set It is standby include successively the first PT cabinets 5,27.5KV house transformators switch cubicle 6, the main transformer low-pressure side switch cubicle 8 of right side feeder switch cabinet 7, Left side feeder switch cabinet 9, the 2nd PT cabinets 10.
Servant's well 3,10KV house transformators switch cubicle 4, air-conditioning equipment 11 are additionally provided with the equipment interval.
2 transformer bays are every being respectively arranged with 10KV house transformators 2,27.5KV house transformators 12.
The low-pressure side secondary device cabin 38 is provided with 2 intervals, 1 at intervals of line segregation, 1 sets at intervals of secondary The secondary side control device that two row distinguish word arrangement, the secondary side control of first row are provided with standby interval, secondary device interval Control equipment is followed successively by:Monitor screen 21, main transformer protection observing and controlling screen 22, protection for feed line observing and controlling screen 23, environmental monitoring screen 24, net switchboard 25th, fibre distribution frame screen 26, failure wave-recording screen 27, standby screen 28, measuring screen 29;The secondary side control device of secondary series is successively For:Video monitoring screen 30, high-tension bus-bar on-line monitoring screen 31, oil chromatography screen 32, DC power supply panel 33, alternating current screen 34, storage Secondary device cable interface 39 is provided with battery panel 35, standby screen 36, communication screen 37, line segregation.
High-voltage switch gear in the utility model can be AIS/GIS/HGIS switches, switch to high-tension electricity during main transformer equipment low Piezoelectric device, i.e. transformer, generally 4, the system concentrates low-pressure side secondary device and low-pressure side primary equipment point respectively Cloth is in a cabin, forming low-pressure side secondary device cabin 38 and low-pressure side primary equipment cabin 1, low-pressure side secondary device cabin 38 and low Pressure side primary equipment cabin 1 is directly connected by prefabricated cable, using above-mentioned rational layout, sets gradually said structure, will be low Press side secondary device centralization set into an equipment, we can the structure prefabricated in advance, it is necessary to when, we directly general The prefabricated cabin is transported predetermined station and be connected with main transformer equipment network, reaches the technique effect of rapid installation.
The integrated intelligent traction substation of prepackage type is a revolution of transformer substation construction, this transformer substation construction mistake Journey is just as playing with building blocks, by the way that plant produced is prefabricated and assembled in situ was installed for two megastages and built.First and second integrated equipment At utmost realize large-scale production in factory, integrated debugging.Connected between primary equipment and secondary device, secondary device using standardization Connect, the new technology such as the single-ended pre-fabricated electric cables of large-scale application, both-end prefabricated optical cable, simplify scene secondary connection, realize and " insert i.e. With ".With the electric railway traction transformer station of the technology building, traditional traction substation electrical layout, civil engineering are changed Design and Construction Mode, pass through the brand-new construction mode of " standardized designs, batch production processing, assembled construction " so that traction Transformer substation construction complete sets of equipment is strong, small volume, compact conformation, it is safe and reliable to operation, easy to maintenance, can move, and greatly It is big to shorten design and construction period, transformer station's floor space is reduced, transformer station's cost is reduced.Whole station is set up in IEC61850 On the basis of communication specification, peace layered distribution type realizes in intelligent substation the information sharing of intelligent electric equipment room and mutually Operation.It is divided into three layers of station level, wall and process layer on the whole.Station level protects the equipment such as observing and controlling to use with wall IEC61850-8-1 communication protocols;Wall uses IEC61850-9-2 communication protocols with process layer combining unit;Wall with Process layer intelligent terminal uses GOOSE communication protocols;When station level system uses SNTP networks pair, wall and process layer devices During using IEC61588 networks pair.
As shown in figure 4, prefabricated cabin structure includes 2 layers of composite layer 41, master is provided between 2 layers of composite layer Skeleton body, main framing body includes coating steel pipe skeleton 42, rock wool obturator 44 is filled between coating steel pipe skeleton, zinc-plated Connector 43 is installed, connector is inserted respectively into composite layer into U-shaped, its two ends on steel pipe skeleton.
The prefabricated cabin structure has good anti-seismic performance, heat-insulating property, antiseptic property, sand-proof performance, and it is two layers Meet material layer for nonmetallic composite, prevent Confucian classics corrosion risk, service life was up to 60 years, and whole wall is using sealing Die cavity technology, maximum ensures that internal steel skeleton does not contact oxygen and water.Coating steel pipe skeleton uses grid frame, can resist 12 grades of hurricanes Wind.Gap can be set between main framing body and composite layer, good anti-seismic performance and heat-proof quality can be played, it is incubated Heat-insulating property of the performance relative to 240mm clay tile walls and the adiabatic mortars of 50mm.
Above-described embodiment, purpose, technical scheme and beneficial effect to utility model have carried out entering one Step is described in detail, should be understood that the embodiment that the foregoing is only utility model, is not used to limit in fact It is all within the spirit and principle of utility model with new protection domain, any modification, equivalent substitution and improvements done etc., It should be included within the protection domain of utility model.

Claims (8)

1. the integrated intelligent traction substation of prepackage type, it is characterised in that including access high pressure gauze high-voltage switch gear, with The main transformer equipment of high-voltage switch gear connection progress transformation conversion, the low-pressure side primary equipment being connected with main transformer equipment, protection observing and controlling are low The low-pressure side secondary device of side primary equipment is pressed, wherein low-pressure side primary equipment is integrated is assemblied in low-pressure side primary equipment cabin(1) Interior, low-pressure side secondary device is integrated to be assemblied in low-pressure side secondary device cabin(38)It is interior, low-pressure side primary equipment cabin(1)And low-pressure side Secondary device cabin(38)The prefabricated cabin structure being made of nonmetallic high antisepsis composite material, low-pressure side primary equipment cabin(1)With Low-pressure side secondary device cabin(38)Using unified cable and interface connection low-pressure side secondary device and low-pressure side secondary device.
2. the integrated intelligent traction substation of prepackage type according to claim 1, it is characterised in that the low-pressure side Primary equipment cabin(1)Be provided with three intervals, three intervals be respectively 2 transformer bays every with 1 primary equipment interval, once The primary side control device of single-row word arrangement is provided with equipment interval, a control device includes the first PT cabinets successively (5), 27.5KV house transformator switch cubicles(6), right side feeder switch cabinet(7)Main transformer low-pressure side switch cubicle(8), left side feeder line opens Close cabinet(9), the 2nd PT cabinets(10).
3. the integrated intelligent traction substation of prepackage type according to claim 2, it is characterised in that the equipment room Servant's well is additionally provided with every interior(3), 10KV house transformator switch cubicles(4), air-conditioning equipment(11).
4. the integrated intelligent traction substation of prepackage type according to claim 2, it is characterised in that 2 changes Depressor interval is respectively arranged with 10KV house transformators(2), 27.5KV house transformators(12).
5. the integrated intelligent traction substation of prepackage type according to claim 1, it is characterised in that the low-pressure side Secondary device cabin(38)Be provided with 2 intervals, 1 at intervals of line segregation, 1 at intervals of secondary device interval, secondary device The secondary side control device that two row distinguish word arrangement is provided with interval, the secondary side control device of first row is followed successively by:Prison Control screen(21), main transformer protection observing and controlling screen(22), protection for feed line observing and controlling screen(23), environmental monitoring screen(24), net switchboard(25), light Fine distributing frame screen(26), failure wave-recording screen(27), standby screen(28), measuring screen(29);The secondary side control device of secondary series according to It is secondary to be:Video monitoring screen(30), high-tension bus-bar on-line monitoring screen(31), oil chromatography screen(32), DC power supply panel(33), alternating current Stream screen(34), battery screen(35), standby screen(36), communication screen(37), secondary device cable interface is provided with line segregation (39).
6. the integrated intelligent traction substation of prepackage type according to claim 2, it is characterised in that low-pressure side is once Equipment compartment(1)Four sides be provided with hatch door.
7. the integrated intelligent traction substation of prepackage type according to claim 2, it is characterised in that the low-pressure side Primary equipment cabin(1)Size be respectively:Long 13300mm, width 3300mm, high 3133mm.
8. the integrated intelligent traction substation of prepackage type according to any one in claim 1-7, its feature exists In prefabricated cabin structure includes 2 layers of composite layer(41), main framing body, main framing are provided between 2 layers of composite layer Body includes coating steel pipe skeleton(42), rock wool obturator is filled between coating steel pipe skeleton(44), in coating steel pipe skeleton On connector is installed(43), connector is inserted respectively into composite layer into U-shaped, its two ends.
CN201621170827.8U 2016-10-26 2016-10-26 The integrated intelligent traction substation of prepackage type Active CN206516960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621170827.8U CN206516960U (en) 2016-10-26 2016-10-26 The integrated intelligent traction substation of prepackage type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621170827.8U CN206516960U (en) 2016-10-26 2016-10-26 The integrated intelligent traction substation of prepackage type

Publications (1)

Publication Number Publication Date
CN206516960U true CN206516960U (en) 2017-09-22

Family

ID=59860202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621170827.8U Active CN206516960U (en) 2016-10-26 2016-10-26 The integrated intelligent traction substation of prepackage type

Country Status (1)

Country Link
CN (1) CN206516960U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451168A (en) * 2016-10-26 2017-02-22 成都交大许继电气有限责任公司 Prefabricated intelligent traction substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451168A (en) * 2016-10-26 2017-02-22 成都交大许继电气有限责任公司 Prefabricated intelligent traction substation

Similar Documents

Publication Publication Date Title
CN101508253B (en) Novel power supplying system using electric railway direct feeding system of outdoor modularized electric device
CN106684744A (en) Substation
CN104917086A (en) Outdoor prefabricated transformer substation
CN203911595U (en) Intelligent circuit breaker provided with optical current transformer
CN202978006U (en) Ultrahigh voltage intelligent substation medium-voltage side HGIS power distribution device
CN206516960U (en) The integrated intelligent traction substation of prepackage type
CN104734058B (en) Electronic-control integration device of oil field united station
CN106451168A (en) Prefabricated intelligent traction substation
CN207039041U (en) A kind of modularization preassembled transformer station
CN102361241A (en) Box type transformer station
CN202353052U (en) Vehicle-mounted intensive substation
CN102891439A (en) Medium-voltage side hybrid gas insulated switchgear (HGIS) distribution device for ultrahigh voltage intelligent substation
CN205680993U (en) 66KV indoor intelligent substation modular construction is arranged
CN116231483A (en) Prefabricated cabin type box transformer substation with economic operation function
CN201966525U (en) Ready-package transformer substation
CN205901165U (en) Quick response's real -time looped netowrk cabinet protection device
Zhang et al. Analysis of technology and economy of new generation smart substation
CN113241653A (en) Integrated resonance-eliminating intelligent boosting transformer substation
CN209913283U (en) Module integration, quick plug, portable guarantor's electric system
CN105356345A (en) Combined intelligent box-type transformer station
CN205212246U (en) Intelligent control system of box -type substation
CN204103317U (en) Modular transformer substation
CN200997494Y (en) Indoor double-layer assembled converting station
CN112563957A (en) Prepackage type box-type substation
CN202586129U (en) 110kV combination electric appliance GIS applied to integrated, prefabricated and box type substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant