CN206513372U - A kind of drilling and blasting method point pilot drive structure - Google Patents

A kind of drilling and blasting method point pilot drive structure Download PDF

Info

Publication number
CN206513372U
CN206513372U CN201720148116.9U CN201720148116U CN206513372U CN 206513372 U CN206513372 U CN 206513372U CN 201720148116 U CN201720148116 U CN 201720148116U CN 206513372 U CN206513372 U CN 206513372U
Authority
CN
China
Prior art keywords
drilling
median septum
drive structure
blasting method
country rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720148116.9U
Other languages
Chinese (zh)
Inventor
桑青春
刘佳丽
张男
廉永胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Huatie Engineering Design Group Co Ltd
Original Assignee
China Railway Huatie Engineering Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Huatie Engineering Design Group Co Ltd filed Critical China Railway Huatie Engineering Design Group Co Ltd
Priority to CN201720148116.9U priority Critical patent/CN206513372U/en
Application granted granted Critical
Publication of CN206513372U publication Critical patent/CN206513372U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to a kind of drilling and blasting method point pilot drive structure, including tunnel cross-section, country rock, which is excavated, in tunnel cross-section side forms leading pilot tunnel, supporting construction and median septum are provided with the leading pilot tunnel, the bottom of the supporting construction and median septum is fixed on the country rock that bottom is not excavated by some lock foot anchoring stocks, space is left between the country rock of the median septum and tunnel cross-section opposite side, the width in the space is 30~50cm;The median septum is provided with baffle plate towards the one side in space.The explosion of row pilot tunnel and can lift a rate of advance for the damage of median septum after the utility model is substantially reduced.

Description

A kind of drilling and blasting method point pilot drive structure
Technical field
The utility model is related to constructing tunnel field, and in particular to a kind of drilling and blasting method point pilot drive structure.
Background technology
Pilot tunnel method, is a kind of common method when drilling and blasting method excavates large cross-section tunnel, and a part for first excavated section, which is used as, to be led Hole, then gradually expand the whole section of tunnel excavation.This is larger in tunnel section, due to geological conditions or execution conditions, is adopted When being had any problem with full face tunneling, a kind of construction method based on middle-size and small-size machinery.
Traditional pilot tunnel method is in operation, and median septum is close on the country rock not excavated, can thus there is following ask Topic:Afterwards during the explosion of row pilot tunnel, the median septum as temporary support can be caused damage, influence operation security, in addition in every Wall will also result in certain influence to the excavation of rear row pilot tunnel, reduce a rate of advance.
The U of Publication No. CN 205778879 Chinese utility model patent, discloses a kind of Super-large-section tunnel drilling and blasting method Original position enlarging constructing structure, discloses in mid-board in the specification of this application and does not excavate between country rock, leave certain interval, And filled with cystosepiment, the impact damage caused close to country rock explosion to interim mid-board can be prevented.But the structure is not The a rate of advance of row pilot tunnel after being lifted.
Utility model content
The utility model purpose is:In order to solve the problem of prior art in above-mentioned background technology is present, there is provided one The explosion of row pilot tunnel and can lift point pilot drive structure of a rate of advance for the damage of median septum after kind substantially reducing.
The utility model solves the technical scheme that its technical problem used:
A kind of drilling and blasting method point pilot drive structure, including tunnel cross-section, excavate country rock in tunnel cross-section side and are formed in advance Supporting construction and median septum are provided with pilot tunnel, the leading pilot tunnel, the bottom of the supporting construction and median septum passes through some locks Pin anchor pole is fixed on the country rock that bottom is not excavated, and space is left between the country rock of the median septum and tunnel cross-section opposite side, The width in the space is 30 ~ 50cm;The median septum is provided with baffle plate towards the one side in space.
Preferably, in addition to ruggedized construction, country rock surface of the ruggedized construction in space.
In any of the above-described scheme preferably, the ruggedized construction is gunite concrete.
In any of the above-described scheme preferably, the width in the space is preferably 50cm.
In any of the above-described scheme preferably, the supporting construction includes steel arch beam and gunite concrete.
In any of the above-described scheme preferably, the median septum is stalk formula median septum.
In any of the above-described scheme preferably, the median septum, which includes erecting, sets steelframe and gunite concrete.
In any of the above-described scheme preferably, the thickness of the baffle plate is 10 ~ 20mm.
In any of the above-described scheme preferably, the Weir Plate Thickness is 15mm.
In any of the above-described scheme preferably, the baffle plate is steel plate/composite wood boards.
According to drilling and blasting method of the present utility model point pilot drive structure, median septum does not excavate country rock with tunnel cross-section opposite side Between, space is left, and baffle plate is provided with towards the one side in space in median septum, when rear row pilot tunnel explosion, baffle plate can be big Big scattered explosion reduces damage of the explosion for median septum for the impulsive force of median septum, meanwhile, because the presence in space, drop Low influence of the median septum for rear row pilot drive, lifts a rate of advance;In addition, relative to conventional method, the utility model Structure than the free face of many places one(The face of country rock i.e. in space), after being conducive to during the explosion of row pilot tunnel blasthole laying, subtract Small explosive consumption, reduces cost.
Moreover, baffle plate can also play a part of external mold in median septum gunite concrete, it is to avoid waste concrete.Enter And, when country rock is poor, the ruggedized construction formed using gunite concrete can prevent caving in for space inside country rock, prevent peace The generation of full accident.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the preferred embodiment according to drilling and blasting method of the present utility model point pilot drive structure.
Embodiment
The utility model is described in further detail presently in connection with accompanying drawing.These accompanying drawings are simplified schematic diagram, Only illustrate basic structure of the present utility model in a schematic way, therefore it only shows the composition relevant with the utility model.
As shown in figure 1, a kind of drilling and blasting method point pilot drive structure, including tunnel cross-section, excavate and enclose in tunnel cross-section side Rock 1, which is formed, is provided with supporting construction 3 and median septum 4, the supporting construction 3 and median septum 4 in leading pilot tunnel 2, the leading pilot tunnel 2 Bottom be fixed on by some lock foot anchoring stocks 7 on the country rock 1 not excavated bottom, the median septum 4 and tunnel cross-section opposite side Country rock 1 between leave space 5, the width in the space 5 is 30 ~ 50cm;The median septum 4 is provided with towards the one side in space 5 Baffle plate 6.
It is used as further preferred scheme:Also include ruggedized construction 8, country rock 1 of the ruggedized construction 8 in space 5 Surface.
It is used as further preferred scheme:The ruggedized construction 8 is gunite concrete.
It is used as further preferred scheme:The width in the space 5 is preferably 50cm.
It is used as further preferred scheme:The supporting construction 3 includes steel arch beam and gunite concrete.
It is used as further preferred scheme:The median septum 4 is stalk formula median septum.
It is used as further preferred scheme:The median septum 4, which includes erecting, sets steelframe and gunite concrete.
It is used as further preferred scheme:The thickness of the baffle plate 6 is 10 ~ 20mm.
It is used as further preferred scheme:The thickness of baffle plate 6 is 15mm.
It is used as further preferred scheme:The baffle plate 6 is steel plate/composite wood boards.
Embodiment one:
The method that pilot drive is carried out using an embodiment of the present utility model, is comprised the following steps:
(1), be chosen to be on the country rock 1 of tunnel cross-section, the country rock on the right side of Blasting Excavation forms leading pilot tunnel 2, leading Steel arch-shelf and gunite concrete formation supporting construction 3 are set up in pilot tunnel 2, its bottom lock foot anchoring stock 7 is fixed on bottom and do not excavated Country rock 1 on.
(2)Steelframe is set up in the place for the country rock 50cm not excavated apart from left side, and is set in steelframe towards the one side in space 5 There are the thick steel sheet baffles 6 of 10mm.
(3)Sprayed on toward steelframe gunite concrete formation median septum 4, now baffle plate 6 plays a part of external mold, it is to avoid mixed The waste of soil is coagulated, the bottom of median septum 4 is fixed on the country rock 1 not excavated bottom by lock foot anchoring stock 7.Median septum 4 uses stalk Formula, is different from traditional bent wall, to lift its longitudinal load-bearing ability.
(4)The surface gunite concrete formation ruggedized construction 8 of country rock 1 in toward space 5, this step for country rock it is poor when add Gu country rock, prevents wall damage from triggering security incident, when country rock is preferable, it is convenient to omit the step.
(5)Row pilot tunnel after Blasting Excavation is carried out to left side country rock, the noncontact impact that explosion is produced is by the scattered of baffle plate The impact to median septum 4 is greatly reduced afterwards, it is therefore prevented that explosion for median septum 4 damage, meanwhile, compared to traditional excavation side Method, structure of the present utility model has more a free face than it(The scope of freedom), i.e., country rock 1 be located at space 5 in that face, because This, the arrangement scope of blasthole is wider freer, can also reduce the usage amount of explosive, cost-effective.Meanwhile, because space 5 is deposited Median septum 4 has little to no effect for the excavation of rear row pilot tunnel, can lift the speed of excavation.
Embodiment two,
The method that pilot drive is carried out using another embodiment of the present utility model, is comprised the following steps:
(1), be chosen to be on the country rock 1 of tunnel cross-section, the country rock on the right side of Blasting Excavation forms leading pilot tunnel 2, leading Steel arch-shelf and gunite concrete formation supporting construction 3 are set up in pilot tunnel 2, its bottom lock foot anchoring stock 7 is fixed on bottom and do not excavated Country rock 1 on.
(2)Steelframe is set up in the place for the country rock 30cm not excavated apart from left side, and is set in steelframe towards the one side in space 5 There are the thick wood materials baffle plates 6 of 15mm.The baffle plate of wood materials, compared to the baffle plate of metal material, ensure that sufficient intensity On the premise of, quality is lighter, installs, removes convenient transportation, cost is lower.
(3)Sprayed on toward steelframe gunite concrete formation median septum 4, now baffle plate 6 plays a part of external mold, it is to avoid mixed The waste of soil is coagulated, the bottom of median septum 4 is fixed on the country rock 1 not excavated bottom by lock foot anchoring stock 7.Median septum 4 uses stalk Formula, is different from traditional bent wall, to lift its longitudinal load-bearing ability.
(4)The surface gunite concrete formation ruggedized construction 8 of country rock 1 in toward space 5, this step for country rock it is poor when add Gu country rock, prevents wall damage from triggering security incident, when country rock is preferable, it is convenient to omit the step.
(5)When carrying out row pilot tunnel after Blasting Excavation to left side country rock, point of baffle plate is passed through in the noncontact impact that explosion is produced The impact of median septum 4 is greatly reduced after dissipating, it is therefore prevented that explosion for median septum 4 damage, meanwhile, compared to traditional excavation Method, structure of the present utility model has more a free face than it(The scope of freedom), i.e., country rock 1 be located at space 5 in that face, Therefore, the arrangement scope of blasthole is wider freer, can also reduce the usage amount of explosive, cost-effective.Meanwhile, because space 5 In the presence of median septum 4 has little to no effect for the excavation of rear row pilot tunnel, can lift the speed of excavation.
Embodiment of the present utility model is the foregoing is only, the scope of the claims of the present utility model is not thereby limited, it is every The equivalent structure or equivalent flow conversion made using the utility model specification and accompanying drawing content, or be directly or indirectly used in Other related technical fields, are similarly included in scope of patent protection of the present utility model.

Claims (10)

1. a kind of drilling and blasting method point pilot drive structure, including tunnel cross-section, country rock is excavated in tunnel cross-section side(1)Form leading Pilot tunnel(2), the leading pilot tunnel(2)It is interior to be provided with supporting construction(3)And median septum(4), the supporting construction(3)And median septum (4)Bottom pass through some lock foot anchoring stocks(7)It is fixed on the country rock that bottom is not excavated(1)On, it is characterised in that:The median septum (4)With the country rock of tunnel cross-section opposite side(1)Between leave space(5), the space(5)Width be 30 ~ 50cm;In described Next door(4)Towards space(5)One side be provided with baffle plate(6).
2. a kind of drilling and blasting method point pilot drive structure as claimed in claim 1, it is characterised in that:Also include ruggedized construction(8), The ruggedized construction(8)Located at space(5)Interior country rock(1)Surface.
3. a kind of drilling and blasting method point pilot drive structure as claimed in claim 2, it is characterised in that:The ruggedized construction(8)For Gunite concrete.
4. a kind of drilling and blasting method point pilot drive structure as claimed in claim 1, it is characterised in that:The space(5)Width For 50cm.
5. a kind of drilling and blasting method point pilot drive structure as claimed in claim 1, it is characterised in that:The supporting construction(3)Bag Include steel arch beam and gunite concrete.
6. a kind of drilling and blasting method point pilot drive structure as claimed in claim 1, it is characterised in that:The median septum(4)To be straight Wall median septum.
7. a kind of drilling and blasting method point pilot drive structure as described in claim 1 or 6, it is characterised in that:The median septum(4)Bag Include to erect and set steelframe and gunite concrete.
8. a kind of drilling and blasting method point pilot drive structure as claimed in claim 1, it is characterised in that:The baffle plate(6)Thickness For 10 ~ 20mm.
9. a kind of drilling and blasting method point pilot drive structure as claimed in claim 8, it is characterised in that:The baffle plate(6)Thickness is 15mm。
10. a kind of drilling and blasting method point pilot drive structure as claimed in claim 1, it is characterised in that:The baffle plate(6)For steel Plate/composite wood boards.
CN201720148116.9U 2017-02-18 2017-02-18 A kind of drilling and blasting method point pilot drive structure Active CN206513372U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720148116.9U CN206513372U (en) 2017-02-18 2017-02-18 A kind of drilling and blasting method point pilot drive structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720148116.9U CN206513372U (en) 2017-02-18 2017-02-18 A kind of drilling and blasting method point pilot drive structure

Publications (1)

Publication Number Publication Date
CN206513372U true CN206513372U (en) 2017-09-22

Family

ID=59867717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720148116.9U Active CN206513372U (en) 2017-02-18 2017-02-18 A kind of drilling and blasting method point pilot drive structure

Country Status (1)

Country Link
CN (1) CN206513372U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541711A (en) * 2019-09-03 2019-12-06 山东唐口煤业有限公司 method for strengthening underground chamber brush
CN111379576A (en) * 2020-01-08 2020-07-07 中铁隧道局集团有限公司 Method for connecting primary support and large-diameter pipe shed in shed cover construction
CN114198120A (en) * 2021-12-14 2022-03-18 中铁华铁工程设计集团有限公司 Construction method for treating fault broken zone of shield segment of submarine tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541711A (en) * 2019-09-03 2019-12-06 山东唐口煤业有限公司 method for strengthening underground chamber brush
CN111379576A (en) * 2020-01-08 2020-07-07 中铁隧道局集团有限公司 Method for connecting primary support and large-diameter pipe shed in shed cover construction
CN111379576B (en) * 2020-01-08 2022-05-03 中铁隧道局集团有限公司 Method for connecting primary support and large-diameter pipe shed in shed cover construction
CN114198120A (en) * 2021-12-14 2022-03-18 中铁华铁工程设计集团有限公司 Construction method for treating fault broken zone of shield segment of submarine tunnel

Similar Documents

Publication Publication Date Title
CN105041353B (en) Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN110318770A (en) A kind of hazy start tunneling method of vcehicular tunnel
CN206513372U (en) A kind of drilling and blasting method point pilot drive structure
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN103711135A (en) Anti-slide pile of jointed arch structure
CN101509383A (en) Tunnel footing anchor pouring reinforcement anti bottom expanding method and construction technique
CN105649090A (en) Construction method for support combining steel sheet piles and stirring piles
CN114352358B (en) Dynamic grading control method and system for large deformation of high-ground-stress deep-buried soft rock tunnel
CN105604576A (en) Soft rock stratum underground excavation large-section tunnel construction method and supporting system
CN103643958A (en) Construction method for excavating weak surrounding rock tunnel by hydraulic breaking hammer
CN104061000B (en) Touch wall sinking passage formula tunnel partition wall and method of construction thereof
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN106522236A (en) Structure for shoring of foundation trench and construction method
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN105065004B (en) A kind of Shallow Large Span rock tunnel Portal Section weak blast excavation construction method
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN105821887A (en) Installing method for stand column pile constructed in pebble bed
CN210919066U (en) Fully mechanized caving face coal top down integrated tunneling device
CN204783020U (en) Shallow undercut tunnel construction equipment that buries of large -span
CN204849777U (en) Tilting board double row pile supporting construction that bears down on one
CN110145315A (en) A kind of driving method weakening city shallow tunnel concussion of blasting