CN206512591U CN201720171616.4U CN201720171616U CN206512591U CN 206512591 U CN206512591 U CN 206512591U CN 201720171616 U CN201720171616 U CN 201720171616U CN 206512591 U CN206512591 U CN 206512591U
Authority
CN
China
Prior art keywords
pile
reinforcement cage
pier
integral structure
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720171616.4U
Other languages
Chinese (zh)
Inventor
王有旗
孙青霞
葛国庆
范佰通
窦鸿
张旭海
鲍汝苍
刘国山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201720171616.4U priority Critical patent/CN206512591U/en
Application granted granted Critical
Publication of CN206512591U publication Critical patent/CN206512591U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of pile pier integral structure, is provided with reinforcement cage, and the peg equipped with laterally setting on the side wall of bridge pier bottom, Bored Pile Foundation between Bored Pile Foundation and bridge pier bottom and is also equipped with prestress wire.This kind of pile pier integral structure, its structural strength is high, and shearing resistance, resistance to plucking and flexural capacity are strong, with higher structural strength and wider array of applicability, while suitable for the building of centering type stress.

Description

A kind of pile pier integral structure
Technical field
The utility model is related to the integral structure of Bored Pile Foundation and bridge pier.
Background technology
The integrated structure of existing building infrastructure, its pile foundation and pier, mostly pile foundation elevates above the soil, and first pours ground end Part, above ground portion reserved steel bar cage treats pier bottom insertion after-pouring above ground portion formation suspended deck structure.Such a pile pier structure pressure-bearing Performance is good, the need for being well positioned to meet vertical load building, but for some buildings for needing to bear transverse load, it holds Load performance is then poor, and resistance to plucking and flexural capacity are poor, there is potential safety hazard.
The content of the invention
The utility model aims to provide a kind of pile pier integral structure with good resistance to plucking and flexural capacity, to improve it Structural strength and the scope of application, the need for meeting different buildings.
Pile pier integral structure described in the utility model, including Bored Pile Foundation and bridge pier, the top of Bored Pile Foundation It is above the ground level, and a boundary line that scoops for Bored Pile Foundation is less than ground certain distance, the steel reinforcement cage of foundation pile extends to top by bottom End;The bottom of bridge pier is embedded in Bored Pile Foundation, and is placed in and is scooped in a boundary line, and bridge pier bottom is located at the side wall of the part of subsurface Surface spreads all over the peg crossed out, separately has reinforcement cage, reinforcement cage is arranged at outside the peg of bridge pier bottom, and reinforcement It is above the ground level at the top of cage.
Pile pier integral structure described in the utility model, scoops a boundary line and locates below ground level, and stake top is located at ground On, bridge pier bottom, which is stretched into below ground and is supported on, scoops a boundary line plane, and sets peg and reinforcement cage in bridge pier side wall, After concreting, its pile foundation is combined closely by steel reinforcement cage top section, bridge pier by peg and reinforcement cage with pouring section, from And pile foundation is formd the structure of a monoblock type with bridge pier, its intensity connected has obtained significantly being lifted, and has bridge pier Good resistance to plucking and flexural capacity.
Described pile pier integral structure, the surrounding of the steel reinforcement cage of Bored Pile Foundation is disposed with many prestress wires, The two ends of each prestress wire are strained and fixed at the top and bottom of steel reinforcement cage respectively.Due to arranging prestress steel on steel reinforcement cage Twisted wire, after pile pier is poured and finished, can make it produce prestressing force, so that in bridge pier by level with stretch-draw prestressing force steel strand wires When power produces larger moment of flexure, it can be balanced by prestressing force, so as to further improve the resistance to plucking and anti-folding of bridge pier Ability so that the pile pier integral structure disclosure satisfy that the use requirement of centering type stress, can resist top bridge pier transmission Moment of flexure.
Brief description of the drawings
Fig. 1 is the structural representation of pile pier integral structure.
Fig. 2 is the partial enlarged drawing of pile pier integral structure shown in Fig. 1.
Fig. 3 is the bridge pier of pile pier integral structure shown in Fig. 1 and the structural representation of peg.
Embodiment
A kind of pile pier integral structure, including Bored Pile Foundation 1 and L-shaped bridge pier 2, the top of Bored Pile Foundation is above Ground Face, and a boundary line that scoops for Bored Pile Foundation is less than ground certain distance, the steel reinforcement cage of foundation pile extends to top by bottom;Bridge pier Bottom be embedded in Bored Pile Foundation, and be placed in and scoop in a boundary line, bridge pier bottom is located at the sidewall surfaces time of the part of subsurface The peg 4 that cloth is crossed out, separately there is reinforcement cage 3, and reinforcement cage is arranged at outside the peg of bridge pier bottom, and reinforcement cage Top is above the ground level.
As shown in Figure 1, 2, horizontal line M is above-ground route in figure, horizontal line N to scoop a boundary line, reinforcement cage be arranged at this two Between bar horizontal line, be both installed in Bored Pile Foundation, but with bridge pier bottom connection function so that the structure for improving pile pier is strong Degree;And peg is set in bridge pier bottom, then the bonding strength between reinforcement cage on the one hand can be improved, on the other hand can also Improve shearing resistance, resistance to plucking and the flexural capacity of bridge pier;And the structure of peg and reinforcement cage, then it can further improve its structure strong Degree.
Described pile pier integral structure, the surrounding of the steel reinforcement cage of Bored Pile Foundation 1 is disposed with many prestress wires 5, the two ends of each prestress wire are strained and fixed at the top and bottom of steel reinforcement cage respectively.Due to arranging prestressing force on steel reinforcement cage Steel strand wires, after pile pier is poured and finished, can make it produce prestressing force, so that in bridge pier by water with stretch-draw prestressing force steel strand wires When flat power produces larger moment of flexure, it can be balanced by prestressing force, so as to further improve the resistance to plucking of bridge pier and resist Folding ability so that the pile pier integral structure disclosure satisfy that the use requirement of centering type stress, can resist top bridge pier transmission Moment of flexure.
The periphery of Bored Pile Foundation 1 is provided with steel pile casting 10, and the top protrusion of steel pile casting is above the ground level.In Bored Pile Foundation Interior setting steel pile casting, on the one hand can provide drilled pile aperture protecting effect, on the other hand can be played again in the later stage and give underground work Dress, ground frock, bridge pier lift the function of centre of location Points And lines.

Claims (3)

1. a kind of pile pier integral structure, including Bored Pile Foundation(1)With L-shaped bridge pier(2), it is characterised in that:Bored Pile Foundation Top be above the ground level, and Bored Pile Foundation scoops a boundary line less than ground certain distance, and the steel reinforcement cage of foundation pile prolongs by bottom Extend top;The bottom of bridge pier is embedded in Bored Pile Foundation, and is placed in and is scooped in a boundary line, and bridge pier bottom is located at the part of subsurface Sidewall surfaces spread all over the peg crossed out(4), separately there is reinforcement cage(3), reinforcement cage is arranged at the peg of bridge pier bottom Outside, and be above the ground level at the top of reinforcement cage.
2. pile pier integral structure according to claim 1, it is characterised in that:Bored Pile Foundation(1)Steel reinforcement cage four It is disposed with many prestress wires week(5), the two ends of each prestress wire are strained and fixed at the top of steel reinforcement cage and bottom respectively Portion.
3. pile pier integral structure according to claim 1 or 2, it is characterised in that:Bored Pile Foundation(1)Periphery setting There is steel pile casting(10), the top of steel pile casting, which is protruded, to be above the ground level.
CN201720171616.4U 2017-02-24 2017-02-24 A kind of pile pier integral structure Active CN206512591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720171616.4U CN206512591U (en) 2017-02-24 2017-02-24 A kind of pile pier integral structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720171616.4U CN206512591U (en) 2017-02-24 2017-02-24 A kind of pile pier integral structure

Publications (1)

Publication Number Publication Date
CN206512591U true CN206512591U (en) 2017-09-22

Family

ID=59869420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720171616.4U Active CN206512591U (en) 2017-02-24 2017-02-24 A kind of pile pier integral structure

Country Status (1)

Country Link
CN (1) CN206512591U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806021A (en) * 2017-11-29 2018-03-16 宁波衡华园林建设有限公司 Subaqueous construction of bridge pier method
CN113622454A (en) * 2021-07-28 2021-11-09 济南市市政工程设计研究院(集团)有限责任公司 Ductile earthquake-resistant structure with additional isolation pile casing single pile and single column and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806021A (en) * 2017-11-29 2018-03-16 宁波衡华园林建设有限公司 Subaqueous construction of bridge pier method
CN107806021B (en) * 2017-11-29 2019-06-18 宁波衡华园林建设有限公司 Subaqueous construction of bridge pier method
CN113622454A (en) * 2021-07-28 2021-11-09 济南市市政工程设计研究院(集团)有限责任公司 Ductile earthquake-resistant structure with additional isolation pile casing single pile and single column and construction method

Similar Documents

Publication Publication Date Title
CN105803925B (en) Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN103114669B (en) Ribbed steel bar truss concrete superimposed sheet and construction method thereof
CN105088937B (en) Hollow slab bridge with hinge joint having opposite grooves and building method of hollow slab bridge
CN104233942B (en) Method for enhancing overall stress on assembled type heterotropic pre-stress hollow slab beam bridge
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN207194006U (en) A kind of prefabricated concrete retaining wall
CN103382704B (en) Unbonded prestress of box girder or T-shaped girder, and steel-concrete combined reinforcement structure and construction method
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN105507470B (en) A kind of periphery overlapping overall assembled floor and its construction method
CN106245817A (en) A kind of fabricated shear wall vertical connection structure and installation method thereof
CN105544796A (en) Prefabricated assembly type shear wall and butt joint method thereof
CN106381804B (en) A kind of precast assembly bridge pier and its Joining Technology using U-shaped reinforcement fabrication
CN206512591U (en) A kind of pile pier integral structure
CN205576955U (en) Raft foundation's reinforced structure is displaced into to strip footing
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN101220595A (en) Application method of novel post-tensioned pre-stress soil blocking pile
CN106120542B (en) It can be applied to the assembled pier and its construction technology of seismic fortification intensity upper zone
CN103882797A (en) Composite corrugated steel web box girder and construction technology thereof
CN203890868U (en) Hollow slab bridge with joints with corresponded grooves
CN105951984B (en) A kind of high ductility prefabricated integral frame mid-side node connection structure and construction method
CN106917358A (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN110468998A (en) A kind of assembled RC shear wall structure connected horizontally and its construction method
CN102852279A (en) Prestressed reinforced concrete superposed beam having convex-concave superposed surfaces
CN109778893A (en) Arch bridge combined type base configuration and its construction method
CN105625571B (en) The precast concrete bean column node of strength prestressed muscle in a kind of use

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant