CN206509821U - Electric power tower angle steels blanking buffer unit - Google Patents

Electric power tower angle steels blanking buffer unit Download PDF

Info

Publication number
CN206509821U
CN206509821U CN201720017853.5U CN201720017853U CN206509821U CN 206509821 U CN206509821 U CN 206509821U CN 201720017853 U CN201720017853 U CN 201720017853U CN 206509821 U CN206509821 U CN 206509821U
Authority
CN
China
Prior art keywords
splicing
buffer part
block
electric power
power tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720017853.5U
Other languages
Chinese (zh)
Inventor
蒋立新
朱小明
刘芝豹
高峰
李宇
朱飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HUADIAN STEEL TOWER MANUFACTURING Co Ltd
Original Assignee
JIANGSU HUADIAN STEEL TOWER MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HUADIAN STEEL TOWER MANUFACTURING Co Ltd filed Critical JIANGSU HUADIAN STEEL TOWER MANUFACTURING Co Ltd
Priority to CN201720017853.5U priority Critical patent/CN206509821U/en
Application granted granted Critical
Publication of CN206509821U publication Critical patent/CN206509821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a kind of electric power tower angle steels blanking buffer unit, including:Splicing frame (4), the splicing frame includes splicing block (41) and support (42), the support (42) is connected with the splicing block (41), and positioned at the lower end of the splicing block (41), first buffer part (1), first buffer part (1) is located in the splicing frame (4);Second buffer part (2), second buffer part (2) is located at the downside of the first buffer part (1), and internal positioned at the splicing frame (4);3rd buffer part (3), the 3rd buffer part (3) is located at the lower end of the splicing frame (4), and is fixed on together with the splicing frame (4) on ground.The utility model is used for electric power tower angle steels blanking buffer unit, the noise that angle steel is fallen on splicing frame (4) by tilting trestle can be effectively eliminated, while damage of the angle steel caused by whereabouts, rate of reducing the number of rejects and seconds can also be avoided.

Description

Electric power tower angle steels blanking buffer unit
Technical field
The utility model is related to electric power tower production equipment field, more particularly to electric power tower angle steels blanking buffer unit.
Background technology
As iron tower of power transmission line conveys the rise of voltage class and adapts to the demand of residing psychro-environment, to used in steel tower Specifications of raw materials and grade improve constantly.The Nei Monggol of construction is especially put into 2015 successively since China to river The commencement of works construction such as Hai Miao to Shandong Linyi is seen on Su Taizhou, the Inner Mongol, the wide lifting of leg of angle to 300 millimeters, material grade Lift Q420C grades.In original blanking process, due to producing enormous impact in blanking moment between angle steel and blanking rack Power, is produced compared with lossy, percent defective is continuously increased to angle steel, and the noise that impact is produced produces damage to the hearing of operator Wound, working environment urgently improves.
The content of the invention
In view of the above-mentioned problems of the prior art, the utility model provides electric power tower angle steels blanking buffer unit, should Device can reduce the enormous impact force of blanking moment generation, rate of greatly reducing the number of rejects and seconds, and be nearly free from noise, to operation The hearing of workman is played a protective role, and working environment is also improved.
To achieve these goals, the utility model provides a kind of electric power tower angle steels blanking buffer unit, including:Stirring Frame;Splicing frame, the splicing frame include splicing block and support, the splicing block be located at the tilting trestle lower section, and with it is described Tilting trestle is disposed vertically, and the support is connected with the splicing block, and positioned at the lower end of the splicing block, the support and bottom surface Between be fixedly connected;First buffer part, first buffer part is installed on the splicing frame;Second buffer part, described second Buffer locations are located inside the splicing frame in the downside of the first buffer part;3rd buffer part, the 3rd buffer locations in The lower end of the splicing frame, and be fixed on together with the splicing frame on ground.
, can be with very effective reduction angle steel by setting three layers of buffer part on material-receiving device in the technical scheme The enormous impact force produced between blanking rack in blanking moment, it is to avoid the infringement that angle steel is produced by impact, reduces percent defective, And noise will not be produced during whole angle steel whereabouts, substantially increase the working environment in workshop.
In addition, according to angle steel blanking buffer unit of the present utility model, can also have following technical characteristic:
Further, first buffer part is nylon block, and the nylon block is installed in the splicing block, and the Buddhist nun Imperial block surface is higher than surface 5cm~10cm of the splicing block.
Preferably, open up fluted on the splicing block, the shape of the groove and the outer contour shape of the nylon block It is identical, and the groove is suitable to the receiving nylon block.
Preferably, the nylon block is rectangular parallelepiped structure.
Preferably, the length of the nylon block is 80cm~100cm.
Preferably, rounding is set at described four angles of nylon block.
Further, first buffer part is connected with the splicing block by fastener.
Preferably, first buffer part is bolted with the splicing block, and first buffer part is provided with more Individual first positioning hole, the splicing block is provided with multiple second positioning holes, the multiple first positioning hole and the multiple second Positioning hole is corresponded, the first positioning hole described in the screw bolt passes and second positioning hole.
Further, second buffer part includes band lacing wire and beam, and the band lacing wire is high-tension nylon sheet, its Thickness is 3cm~8cm, and the beam is the rubber blanket that thickness is 5cm~10cm, described to be located at the beam with lacing wire Top.
Further, the 3rd buffer part is rubber blanket, and the thickness of the rubber blanket is 5cm~10cm.
Brief description of the drawings
Fig. 1 is the front view of electric power tower angle steels blanking buffer unit;
Fig. 2 is Fig. 1 top view;
Fig. 3 is Fig. 1 right view;
Fig. 4 is the first buffer part front view;
Fig. 5 is Fig. 4 top view;
Fig. 6 is Fig. 4 left view;
In figure:1. the first buffer part;2. the second buffer part;21. band lacing wire;22. beam;3. the 3rd buffer part;4. connect Bin;41. splicing block;42. support;5. bolt.
Embodiment
Further is made to the electric power tower angle steels blanking buffer unit of the utility model embodiment with reference to Fig. 1 to Fig. 3 Explanation.As shown in figure 1, electric power tower angle steels blanking buffer unit includes:Tilting trestle, splicing frame 4, the first buffer part 1, second are delayed Rush the buffer part 3 of portion 2 and the 3rd.
Specifically, tilting trestle transports angle steel in production line primarily to facilitating, and angle steel transhipment is translated into splicing frame 4 On, splicing frame 4, splicing frame 4 includes splicing block 41 and support 42, and splicing block 41 is square tubular structure, under tilting trestle Side, and be disposed vertically with tilting trestle, support 42 is connected with splicing block 41, and positioned at the lower end of splicing block 41, support 42 and ground Between be fixedly connected;For example, can be connected with bolt 5 between support 42 and ground;First buffer part 1, the first buffer part 1 is pacified Loaded on splicing frame 4;Second buffer part 2, the second buffer part 2 is located at the downside of the first buffer part 1, and inside splicing frame 4; 3rd buffer part 3, the 3rd buffer part 3 is located at the lower end of splicing frame 4, and lower end of the area more than splicing frame 4 of the 3rd buffer part 3 Area, the 3rd buffer part 3 is fixed on together with splicing frame 4 on ground, when angle steel falls into splicing frame 4 by tilting trestle, and three layers are delayed Flushing device plays a part of buffering layer by layer, prevents angle steel from producing enormous impact between splicing frame 4 during whereabouts, causes Angle steel will not be produced ear-piercing loud noise sound by different degrees of loss, the noise pollution in workshop be greatly reduced, to car Between the sense of hearing of master worker play a protective role.
In one embodiment of the present utility model, as shown in Figure 1, Figure 3, the first buffer part 1 is nylon block, nylon block peace Loaded in splicing block 41, and nylon block surface is higher than surface 5cm~10cm of splicing block 41, is so to prevent angle steel under The impulsive force produced during falling is deformed nylon block so that angle steel is in contact with splicing frame 4, while also can effectively subtract Space shared by few nylon block.
Preferably, as shown in Fig. 2 opening up fluted on splicing block 41, the shape of groove and the outer contour shape of nylon block It is identical, and groove is suitable to the receiving nylon block, it is identical with the outer contour shape of nylon block by the way that the shape of groove is opened up into, It can make nylon block effectively and groove match, and it is beautiful, generous.
Preferably, as shown in Fig. 4~Fig. 6, nylon block is rectangular parallelepiped structure, and its tangent plane is 15cm × 15cm pros Shape, so can make nylon block bear enough impulsive forces, while nylon block can also be facilitated to be arranged in splicing block 41.
Preferably, the length of nylon block is 80cm~100cm, and angle steel is fallen on from tilting trestle on splicing frame 4, although nylon The presence of block can reduce the impulsive force between angle steel and splicing frame 4, because buffer unit can not all eliminate impulsive force, Gu Jiao Steel can continue rolling on splicing frame 4, and nylon block sets 80cm~100cm, partly in order to making angle steel unload power, on the other hand Angle steel can be effectively protected, prevents it from producing friction impact between splicing frame 4 and being damaged.
Preferably, as shown in Fig. 2 setting rounding at four angles of nylon block, nylon block and splicing frame 4 can so be prevented The fatigue life of stress concentration, extension splicing frame 4 and nylon block is produced when being in contact.
According to some embodiments of the present utility model, as shown in FIG. 1 to 3, the first buffer part 1 is with splicing block 41 by tight Firmware is connected.For example, the first buffer part 1 is connected with splicing block 41 by bolt 5, the first buffer part 1 is determined provided with multiple first Position hole, splicing block 41 is provided with multiple second positioning holes, and multiple first positioning holes are corresponded with multiple second positioning holes, bolt 5 sequentially pass through the first positioning hole and the second positioning hole, effectively can so fix in a groove nylon block, prevent angle steel from producing Raw impulsive force is crossed ambassador's nylon block and scurried out from groove.
In one embodiment of the present utility model, as shown in figures 1 and 3, the second buffer part 2 is two layers, and one layer is anti- The band lacing wire 21 only worn and torn, band lacing wire is that material is high-tension nylon sheet, and the thickness with lacing wire is 3cm~8cm.Another layer is thickness For 5cm~10cm beam 22, the material of beam 22 is rubber, and the top of the beam 22, angle are located at lacing wire 21 Steel is when falling on splicing frame 4, and impulsive force that can be downward to splicing frame 4 produces frictional force with nylon block is slided, band lacing wire Nylon block can be protected to prevent abrasion, beam can buffer the impulsive force of angle steel whereabouts again.
In one embodiment of the present utility model, as shown in figures 1 and 3, the 3rd buffer part is rubber blanket, rubber blanket Thickness is 5cm~10cm, so can further reduce the impulsive force that angle steel is produced in blanking operation.
In description of the present utility model, it is to be understood that term " upside ", " top ", " inside ", " downside ", etc. The orientation or position relationship of instruction, are for only for ease of description the utility model and simplify description, rather than indicate or imply Shown device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this The limitation of utility model.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or implying relatively important Property or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Person implicitly includes one or more this feature.In description of the present utility model, " multiple " are meant that two or two More than individual, unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, fisrt feature is "above" or "below" second feature Can be that fisrt feature is directly contacted with second feature, or the first and second features pass through intermediary mediate contact.
In the utility model, unless otherwise clearly defined and limited, the art such as term " connected ", " connection ", " fixation " Language should broadly understood, for example, it may be being fixedly connected or being detachably connected, or be integrally formed;Can be machinery Connection;Can be joined directly together, can also be indirectly connected to by intermediary, can be the connection or two of two element internals The interaction relationship of individual element.For the ordinary skill in the art, above-mentioned art can be understood as the case may be Concrete meaning of the language in the utility model.
In the description of specification of the present utility model, reference term " one embodiment ", " some embodiments " etc. are retouched State mean to combine specific features, structure, material or the feature that the embodiment or example describe be contained in it is of the present utility model extremely In few one embodiment or example.In this manual, the schematic representation of above-mentioned term is necessarily directed to identical Embodiment or example.Moreover, specific features, structure, material or the feature of description can be in any one or more implementations Combined in an appropriate manner in example or example.In addition, in the case of not conflicting, those skilled in the art can be by this The feature of not be the same as Example or example and non-be the same as Example or example described in specification is combined and combined.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is Exemplary, it is impossible to it is interpreted as to limitation of the present utility model, one of ordinary skill in the art is in scope of the present utility model It is interior above-described embodiment to be changed, changed, replaced and modification.

Claims (10)

1. a kind of electric power tower angle steels blanking buffer unit, it is characterised in that including:
Tilting trestle;
Splicing frame (4), the splicing frame (4) includes splicing block (41) and support (42), and the splicing block (41) is located at described turn over The lower section of bin, and be disposed vertically with the tilting trestle, the support (42) is connected with the splicing block (41), and positioned at described The lower end of splicing block (41), the support (42) is fixedly connected between ground;
First buffer part (1), first buffer part (1) is installed on the splicing frame (4);
Second buffer part (2), second buffer part (2) is located at the downside of the first buffer part (1), and positioned at the splicing frame (4) it is internal;
3rd buffer part (3), the 3rd buffer part (3) be located at the splicing frame (4) lower end, and with the splicing frame (4) It is fixed on together on ground.
2. electric power tower angle steels blanking buffer unit according to claim 1, it is characterised in that first buffer part (1) it is nylon block, the nylon block is installed in the splicing block (41), and the upper surface of the nylon block is higher than the splicing Upper surface 5cm ~ 10cm of block (41).
3. electric power tower angle steels blanking buffer unit according to claim 2, it is characterised in that on the splicing block (41) Open up fluted, the shape of the groove is identical with the outer contour shape of the nylon block, and the groove is suitable to described in receiving Nylon block.
4. the electric power tower angle steels blanking buffer unit according to Claims 2 or 3, it is characterised in that the nylon block is Rectangular parallelepiped structure.
5. electric power tower angle steels blanking buffer unit according to claim 4, it is characterised in that the length of the nylon block For 80cm ~ 100cm.
6. electric power tower angle steels blanking buffer unit according to claim 4, it is characterised in that described four angles of nylon block Place sets rounding.
7. electric power tower angle steels blanking buffer unit according to claim 1, it is characterised in that first buffer part (1) it is connected between the splicing block (41) by fastener.
8. electric power tower angle steels blanking buffer unit according to claim 7, it is characterised in that first buffer part (1) it is connected with the splicing block (41) by bolt (5), first buffer part (1) is provided with multiple first positioning holes, described Splicing block (41) is provided with multiple second positioning holes, and first positioning hole is corresponded with second positioning hole, the spiral shell Bolt (5) sequentially passes through first positioning hole and second positioning hole.
9. electric power tower angle steels blanking buffer unit according to claim 1, it is characterised in that second buffer part (2) band lacing wire (21) and beam (22) are included, the band lacing wire (21) is high-tension nylon sheet, and its thickness is 3cm ~ 8cm, The beam (22) is the rubber blanket that thickness is 5cm ~ 10cm, and the band lacing wire (21) is located at the upper of the beam (22) Side.
10. electric power tower angle steels blanking buffer unit according to claim 1, it is characterised in that the 3rd buffer part (3) it is rubber blanket, the thickness of the rubber blanket is 5cm ~ 10cm.
CN201720017853.5U 2017-01-06 2017-01-06 Electric power tower angle steels blanking buffer unit Expired - Fee Related CN206509821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720017853.5U CN206509821U (en) 2017-01-06 2017-01-06 Electric power tower angle steels blanking buffer unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720017853.5U CN206509821U (en) 2017-01-06 2017-01-06 Electric power tower angle steels blanking buffer unit

Publications (1)

Publication Number Publication Date
CN206509821U true CN206509821U (en) 2017-09-22

Family

ID=59864462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720017853.5U Expired - Fee Related CN206509821U (en) 2017-01-06 2017-01-06 Electric power tower angle steels blanking buffer unit

Country Status (1)

Country Link
CN (1) CN206509821U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736806A (en) * 2017-01-06 2017-05-31 江苏华电铁塔制造有限公司 A kind of electric power tower angle steels blanking buffer unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736806A (en) * 2017-01-06 2017-05-31 江苏华电铁塔制造有限公司 A kind of electric power tower angle steels blanking buffer unit

Similar Documents

Publication Publication Date Title
CN103619552B (en) Method for producing a tower segment of concrete tower of a wind energy installation
CN206509821U (en) Electric power tower angle steels blanking buffer unit
CN201340987Y (en) Extra-high voltage power transmission line separate wire raiser
CN104875846B (en) Turnover type overhauling platform
CN207061432U (en) A kind of assembly type driven roller
CN108862014A (en) A kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM
CN106736806A (en) A kind of electric power tower angle steels blanking buffer unit
CN208008023U (en) A kind of safety device of automatic grasper device
CN212687385U (en) Loss early warning device for grab bucket pulley steel wire rope
CN206931933U (en) A kind of portable cable Curve drawing instrument
CN207061601U (en) A kind of elevator car overhead sheave
CN208990883U (en) The feeding-distribution device of cone machine
CN206842935U (en) A kind of crane pulley case
CN209493102U (en) A kind of sand material transmission device
CN207322582U (en) A kind of self-locking mechanism of movable grain drying machine
CN206927521U (en) A kind of fixed pulley on building cover board side bar
CN205668871U (en) A kind of crane balance beam
CN207144005U (en) A kind of municipal administration adjustable cover for manhole
CN203807018U (en) Tower crane moment limiter
CN211801567U (en) Feed inlet structure of polycrystalline silicon crusher
CN205661940U (en) Bury formula rubbish compression station
CN207467771U (en) Iron foundry (shop) clay emptying point dust removal machine protective cover
CN204324087U (en) A kind of device storing and draw off iron charge
CN203522037U (en) Steel wire rope fixing device
CN209012332U (en) A kind of sliceable wirerope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

Termination date: 20200106

CF01 Termination of patent right due to non-payment of annual fee