CN206509724U CN201720133717.2U CN201720133717U CN206509724U CN 206509724 U CN206509724 U CN 206509724U CN 201720133717 U CN201720133717 U CN 201720133717U CN 206509724 U CN206509724 U CN 206509724U
Authority
CN
China
Prior art keywords
guide pipe
cylinder
riveting
mounting table
steel cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720133717.2U
Other languages
Chinese (zh)
Inventor
陈巨青
陈义军
李永清
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Berda Auto Control System Co Ltd
Original Assignee
Ningbo Berda Auto Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Berda Auto Control System Co Ltd filed Critical Ningbo Berda Auto Control System Co Ltd
Priority to CN201720133717.2U priority Critical patent/CN206509724U/en
Application granted granted Critical
Publication of CN206509724U publication Critical patent/CN206509724U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model discloses a kind of automobile guy cable riveting press equipment, including preceding guide pipe riveting device, retainer riveting device, rear guide pipe riveting device, steel wire rope threading mechanism, steel cable termina riveting device and conveyer belt;Preceding guide pipe riveting device includes the first frame, preceding guide pipe detent mechanism, preceding guide pipe riveting mechanism and preceding guide pipe ejecting mechanism;Guide pipe riveting device includes the second frame, the rear guide pipe detent mechanism for being arranged on the second frame top, rear guide pipe riveting mechanism, rear guide pipe prestretching inspection body and rear guide pipe ejecting mechanism after lock;Steel wire rope threading mechanism includes the 3rd frame, is arranged on the holder and threader of the 3rd frame top;Steel cable termina riveting device includes the 4th frame, the steel cable termina detent mechanism for being arranged on the 4th frame top, steel cable termina riveting mechanism, joint ejecting mechanism, laser marking machine, barcode machine and oiling machine.The utility model has the advantages that operating efficiency is high.

Description

Automobile guy cable riveting press equipment
Technical field
The utility model is related to automobile guy cable technical field of processing equipment, is especially a kind of automobile guy cable riveting press equipment.
Background technology
Automobile guy cable is widely used in brake, throttle, gearshift of automobile etc..Have a kind of automobile guy cable at present as shown in figure 1, Its structure includes two drag-line bodies and the fixed plate 4 for fixing two drag-line bodies, and drag-line body includes pipe 1, preceding Guide pipe 2, rear guide pipe 3, steel wire rope 5 and steel cable termina 6, wherein the pipe of a drag-line body is provided with retainer, the whole series are drawn Rope has four riveting positions in assembling, and relatively complicated to the assembly process of drag-line at present, each riveting position will be used One equipment, will take the riveting that next step is carried out on other machine, inefficiency after a riveting complete part.
Utility model content
In view of the defect of above-mentioned prior art, the purpose of this utility model is:There is provided one kind can be in an equipment The automobile guy cable riveting press equipment of drag-line assembling is completed, efficiency of assembling is improved.
Technical solution of the present utility model is:Automobile guy cable riveting press equipment, including preceding guide pipe riveting device, retainer Riveting device, rear guide pipe riveting device, steel wire rope threading mechanism and steel cable termina riveting device;
The preceding guide pipe riveting device includes the first frame, is arranged on the preceding guide pipe localization machine of the first frame top Structure, preceding guide pipe riveting mechanism and preceding guide pipe ejecting mechanism;
The retainer riveting device is arranged on the first frame top and on the right side of preceding guide pipe ejecting mechanism;
The rear guide pipe riveting device includes the second frame, is arranged on the rear guide pipe localization machine of the second frame top Structure, rear guide pipe riveting mechanism, rear guide pipe prestretching inspection body and rear guide pipe ejecting mechanism;
The steel wire rope threading mechanism includes the 3rd frame, is arranged on the holder and threader of the 3rd frame top, puts The quantity for putting box is one or two;
The steel cable termina riveting device includes the 4th frame, is arranged on the steel cable termina positioning of the 4th frame top Mechanism, steel cable termina riveting mechanism, joint ejecting mechanism, laser marking machine, barcode machine and oiling machine;
It also include a conveyer belt, the conveyer belt be arranged on the first frame arrayed from left to right, the second frame, 3rd frame and the 4th frame top.
Further, the preceding guide pipe detent mechanism include be arranged on the first frame top the first mounting table and from Left-to-right be successively set on core pulling oiling cylinder on the first mounting table, preceding guide pipe positioning cylinder, preceding guide pipe locating support, Preceding guide pipe mounting table, the first gripping block, the preceding guide pipe positioning cylinder are connected with preceding guide pipe locating support, and described first The outside of gripping block is provided with the first clamping cylinder;The bottom of first gripping block is connected with the first propulsion cylinder, described leading To the bottom of pipe mounting table provided with the first ejection cylinder;
The preceding guide pipe riveting mechanism include the first gas-liquid pressure-boosting machine and be arranged on the first gas-liquid pressure-boosting machine bottom and The first riveting head above preceding guide pipe mounting table;
The preceding guide pipe ejecting mechanism includes being arranged on the first pusher cylinder on rear side of the first mounting table, is arranged on first First lift cylinder of pusher cylinder head, the first push pedal for being arranged on the first pusher cylinder front end and it is arranged on the first push pedal Multiple first lifting arms of front end.
Further, the rear guide pipe detent mechanism include be arranged on the second frame top the second mounting table and from Core pulling cylinder that right-to-left is successively set on the second mounting table, rear guide pipe positioning cylinder, rear guide pipe locating support, after lead To pipe mounting table, the second gripping block, the rear guide pipe positioning cylinder is connected with rear guide pipe locating support, and described second clamps The outside of block is provided with the second clamping cylinder;The bottom of second gripping block is connected with the second propulsion cylinder, the rear guide pipe The bottom of mounting table is provided with the second ejection cylinder;
The rear guide pipe riveting mechanism include the second gas-liquid pressure-boosting machine and be arranged on the second gas-liquid pressure-boosting machine bottom and The second riveting head above rear guide pipe mounting table;
The rear guide pipe ejecting mechanism includes being arranged on the second pusher cylinder on rear side of the second mounting table, is arranged on second Second lift cylinder of pusher cylinder head, the second push pedal for being arranged on the second pusher cylinder front end and it is arranged on the second push pedal Multiple second lifting arms of front end;
The rear guide pipe prestretching inspection body is arranged on the left of the second mounting table, the rear guide pipe prestretching inspection body The first pulling force sensor and the first displacement transducer for detecting cylinder including prestretching and being arranged on prestretching detection cylinder.
Further, place in the holder be sequentially provided with from left to right on the outside of steel wire rope, the threader location hook, Threading pinch roller and rack.
Further, the steel cable termina detent mechanism include be arranged on the 4th frame top the 3rd mounting table and Steel wire rope clamp assembly, rest block, steel cable termina mounting table, steel wire rope on the 3rd mounting table are successively set on from left to right Joint-clamping component, steel cable termina clamp assembly is connected by conduit with oiling machine;Steel wire rope clamp assembly, steel cable termina Mounting table, the bottom of steel cable termina clamp assembly are respectively connected with the 3rd ejection cylinder;
The steel cable termina riveting mechanism includes the 3rd gas-liquid pressure-boosting machine and is arranged on the 3rd gas-liquid pressure-boosting machine bottom And the 3rd riveting head above steel cable termina mounting table;
The steel cable termina ejecting mechanism includes being arranged on the 3rd pusher cylinder on rear side of the 3rd mounting table, is arranged on the 3rd lift cylinder of three pusher cylinder heads, it is arranged on the 3rd push pedal of the 3rd pusher cylinder front end and is arranged on the 3rd and push away Multiple 3rd lifting arms of front edge of board;
The right side of 3rd mounting table is provided with detection cylinder and the second pulling force sensor being arranged on detection cylinder With second displacement sensor.
Using automobile guy cable riveting press equipment provided by the utility model, its advantage is:Can be in an equipment The automobile guy cable riveting press equipment of drag-line assembling is completed, efficiency of assembling is improved.
Brief description of the drawings
Fig. 1 is the structural representation of the automobile guy cable of prior art;
Fig. 2 is overall structure diagram of the present utility model;
Fig. 3 is the schematic front view of preceding guide pipe riveting device and retainer riveting device of the present utility model;
Fig. 4 (is removed leading for the schematic top plan view of preceding guide pipe riveting device and retainer riveting device of the present utility model To pipe riveting mechanism);
Fig. 5 is the schematic front view of rear guide pipe riveting device of the present utility model;
Fig. 6 is the schematic top plan view (guide pipe riveting mechanism after removal) of rear guide pipe riveting device of the present utility model
Fig. 7 is the schematic front view of steel wire rope threading mechanism of the present utility model;
Fig. 8 is the schematic top plan view of steel wire rope threading mechanism of the present utility model;
Fig. 9 is the schematic front view of steel cable termina riveting device of the present utility model;
Figure 10 is the schematic top plan view of steel cable termina riveting device of the present utility model.
Shown in figure:Guide pipe riveting device after guide pipe riveting device before 100-, 200- retainer riveting devices, 300-, Guide pipe after guide pipe before 400- steel wire rope threading mechanisms, 500- steel cable termina riveting devices, 1- pipes, 2-, 3-, 4- is fixed Guide pipe detent mechanism before plate, 5- steel wire ropes, 6- steel cable terminas, the frames of 7- first, 8-, the mounting tables of 81- first, 82- core pullings Guide pipe mounting table before guide pipe locating support, 85- before guide pipe positioning cylinder, 84- before oiling cylinder, 83-, 86- first is pressed from both sides Guide pipe riveting mechanism before tight block, the clamping cylinders of 87- first, the propulsion cylinders of 88- first, the ejection cylinders of 89- first, 9-, 91- the Guide pipe ejecting mechanism before one gas-liquid pressure-boosting machine, 92- the first riveting heads, 10-, 101- the first pusher cylinders, 102- first is lifted Guide pipe detent mechanism after cylinder, the push pedals of 103- first, the lifting arms of 104- first, the frames of 11- second, 12-, 121- second is placed Guide pipe mounting table after guide pipe locating support after guide pipe positioning cylinder after platform, 122- core pulling cylinders, 123-, 124-, 125-, Guide pipe after the clamping cylinders of 126- second, the gripping blocks of 127- second, the propulsion cylinders of 128- second, the ejection cylinders of 129- second, 13- Guide pipe prestretching inspection body after riveting mechanism, 131- the second gas-liquid pressure-boosting machines, 132- the second riveting heads, 14-, the inspection of 141- prestretchings Survey guide pipe ejecting mechanism, the pushers of 151- second after cylinder, the pulling force sensors of 142- first, the displacement transducers of 143- first, 15- Cylinder, the lift cylinders of 152- second, the push pedals of 153- second, the lifting arms of 154- second, the frames of 16- the 3rd, 17- holders, 18- is worn Line machine, 181- location hooks, 182- threading pinch rollers, 183- racks, the frames of 19- the 4th, 20- steel cable termina detent mechanisms, The mounting tables of 201- the 3rd, 202- steel wire rope clamp assemblies, 203- rest blocks, 204- steel cable termina mounting tables, 205- steel wire ropes Joint-clamping component, 206- conduits, the ejection cylinders of 207- the 3rd, 21- steel cable termina riveting mechanisms, the gas-liquid pressure-boostings of 211- the 3rd Machine, the riveting heads of 212- the 3rd, 22- joint ejecting mechanisms, the pusher cylinders of 221- the 3rd, the lift cylinders of 222- the 3rd, 223- the 3rd Push pedal, the lifting arms of 224- the 3rd, 23- laser marking machines, 24- barcode machines, 25- oiling machines, 26- conveyer belts, 27- detection cylinders, The pulling force sensors of 28- second, 29- second displacement sensors.
Embodiment
For it is relatively directly perceived, be fully understood by the technical solution of the utility model, now just combine the utility model accompanying drawing and carry out Nonrestrictive feature description is as follows:
As shown in Fig. 1-Figure 10, automobile guy cable riveting press equipment, including preceding guide pipe riveting device 100, retainer riveting device 200th, rear guide pipe riveting device 300, steel wire rope threading mechanism 400 and steel cable termina riveting device 500;
Preceding guide pipe riveting device 100 includes the first frame 7, is arranged on the preceding guide pipe localization machine at the top of the first frame 7 Structure 8, preceding guide pipe riveting mechanism 9 and preceding guide pipe ejecting mechanism 10;
Retainer riveting device 200 is arranged on the top of the first frame 7 and positioned at the preceding right side of guide pipe ejecting mechanism 10;
Guide pipe riveting device 300 includes the second frame 11, is arranged on the rear guide pipe positioning at the top of the second frame 11 afterwards Mechanism 12, rear guide pipe riveting mechanism 13, rear guide pipe prestretching inspection body 14 and rear guide pipe ejecting mechanism 15;
Steel wire rope threading mechanism 400 includes the 3rd frame 16, is arranged on the holder 17 and threading at the top of the 3rd frame 16 Machine 18, the quantity of holder 17 is one or two;
Steel cable termina riveting device 500 includes the 4th frame 19, is arranged on the steel cable termina at the top of the 4th frame 19 Detent mechanism 20, steel cable termina riveting mechanism 21, joint ejecting mechanism 22, laser marking machine 23, barcode machine 24 and oiling machine 25;
It also includes a conveyer belt 26, and conveyer belt 26 is arranged on the first frame 7, the second frame arrayed from left to right 11st, the 3rd frame 16 and the top of the 4th frame 19.
As shown in Figure 3 and Figure 4, preceding guide pipe detent mechanism 8 includes the first mounting table 81 for being arranged on the top of the first frame 7 And be successively set on core pulling oiling cylinder 82 on the first mounting table 81 from left to right, it is preceding guide pipe positioning cylinder 83, leading To pipe locating support 84, preceding guide pipe mounting table 85, the first gripping block 86, preceding guide pipe positioning cylinder 83 is positioned with preceding guide pipe Support 84 is connected, and the outside of the first gripping block 86 is provided with the first clamping cylinder 87;The bottom of first gripping block 86 is connected with first Propulsion cylinder 88, the bottom of preceding guide pipe mounting table 85 is provided with the first ejection cylinder 89;
Preceding guide pipe riveting mechanism 9 include the first gas-liquid pressure-boosting machine 91 and be arranged on the bottom of the first gas-liquid pressure-boosting machine 91 and The first riveting first 92 positioned at the preceding top of guide pipe mounting table 85;
Preceding guide pipe ejecting mechanism 10 includes being arranged on the first pusher cylinder 101 of the rear side of the first mounting table 81, is arranged on First lift cylinder 102 at the top of the first pusher cylinder 101, be arranged on the first push pedal 103 of the front end of the first pusher cylinder 101 with And it is arranged on multiple first lifting arms 104 of the front end of the first push pedal 103.
During work, head is previously directed to before pipe 2 is placed on guide pipe mounting table 85, and pipe 1 is placed in the first gripping block 86, the One clamping cylinder 87 controls the first gripping block 86 to clamp pipe 1, and the first propulsion cylinder 88 promotes the first gripping block 86 after clamping And drive pipe 1 to insert in preceding guide pipe 2, then guide pipe 2 carries out core pulling before 82 pairs of core pulling oiling cylinder, then the first gas-liquid Supercharger 91 controls the first riveting first 92 to carry out riveting to pipe 1 and preceding guide pipe 2, and first ejects cylinder 89 by riveting after riveting is complete The preceding guide pipe 2 and pipe 1 pressed up push up and complete pre- release step, and then the first lift cylinder 102 works and by One lifting arm 104 up carries the complete preceding guide pipe 2 of riveting and pipe 1 again so that preceding guide pipe 2 and pipe 1 depart from respectively The preceding gripping block 86 of guide pipe mounting table 85 and first, then the first propulsion cylinder 88 work and drive the first push pedal 103 by riveting Complete preceding guide pipe 2 and pipe 1 is shifted onto on conveyer belt 26 and is delivered at the position of retainer riveting device 200, with hand wherein one A retainer is covered on drag-line body, then with retainer riveting device 200 by retainer and the riveting of pipe 1.
As shown in Figure 5 and Figure 6, rear guide pipe detent mechanism 12 includes the second mounting table for being arranged on the top of the second frame 11 121 and be successively set on from right to left on the second mounting table 121 core pulling cylinder 122, rear guide pipe positioning cylinder 123, after Guide pipe locating support 124, rear guide pipe mounting table 125, the second gripping block 127, rear guide pipe positioning cylinder 123 and rear guiding Pipe locating support 124 is connected, and the outside of the second gripping block 127 is provided with the second clamping cylinder 126;The bottom of second gripping block 127 The second propulsion cylinder 128 is connected with, the bottom of rear guide pipe mounting table 125 is provided with the second ejection cylinder 129;
Guide pipe riveting mechanism 13 includes the second gas-liquid pressure-boosting machine 131 and is arranged on the bottom of the second gas-liquid pressure-boosting machine 131 afterwards End and the second riveting first 132 above rear guide pipe mounting table 125;
Guide pipe ejecting mechanism 15 includes being arranged on the second pusher cylinder 151 of the rear side of the second mounting table 121, is arranged on afterwards Second lift cylinder 152 at the top of the second pusher cylinder 151, be arranged on the second push pedal 153 of the front end of the second pusher cylinder 151 with And it is arranged on multiple second lifting arms 154 of the front end of the second push pedal 153;
Guide pipe prestretching inspection body 14 is arranged on the left side of the second mounting table 121, rear guide pipe prestretching inspection body 14 afterwards Including the first pulling force sensor 142 and the first displacement biography that prestretching detects cylinder 141 and is arranged on prestretching detection cylinder 141 Sensor 143.
During work, guide pipe 3 rear first is placed on rear guide pipe mounting table 125, riveting complete preceding guide pipe 2 and pipe 1 It is placed in the second gripping block 127, the second clamping cylinder 126 controls the second gripping block to clamp pipe 1, second promotes gas after clamping Cylinder 128 promotes the second gripping block 127 and driven after the insertion of pipe 1 in guide pipe 3, and then guide pipe 3 enters after 122 pairs of core pulling cylinder Row core pulling, then the second gas-liquid pressure-boosting machine 131 control the second riveting first 132 is to pipe 1 and the progress riveting of rear guide pipe 3, riveting Wan Hou prestretchings inspection body 14 tests to product, inspected it is rear second ejection cylinder 129 by the complete preceding guide pipe 2 of riveting, Guide pipe 3 and pipe 1 up push up the pre- release step of completion afterwards, and then the second lift cylinder 152 works and by the second lifting arm 154 up carry the complete preceding guide pipe 2 of riveting, rear guide pipe 3 and pipe 1 again so that rear guide pipe 3 and pipe 1 take off respectively From the rear gripping block 127 of guide pipe mounting table 125 and second, then the second propulsion cylinder 128 works and drives the second push pedal 153 will The complete rear guide pipe 3 of riveting and pipe 1 are shifted onto on conveyer belt 26 and are delivered at the position of steel wire rope threading mechanism 400.Now, manage The two ends of son 1 have been respectively mounted preceding guide pipe 2 and rear guide pipe 3.
As shown in Figure 7 and Figure 8, steel wire rope 5 is placed in holder 17, the outside of threader 18 is sequentially provided with positioning from left to right Hook 181, threading pinch roller 182 and rack 183.During work, preceding guide pipe 2 is put on rack 183, taken out of holder 17 Play steel wire rope 5 and be placed on location hook 181, guide pipe 2, pipe before then threading pinch roller 182 works and sequentially passes through steel wire rope 5 Son 1 and rear guide pipe 3, the workpiece after wire rope handling is finished, which is removed, to be placed on conveyer belt 26, then is transported to steel cable termina riveting dress Put at 500 positions.
As shown in Figure 9 and Figure 10, steel cable termina detent mechanism 20 is put including being arranged on the 3rd of the top of the 4th frame 19 Steel wire rope clamp assembly 202, rest block 203, the steel wire rope put platform 201 and be successively set on from left to right on the 3rd mounting table Joint mounting table 204, steel cable termina clamp assembly 205, steel cable termina clamp assembly 205 pass through conduit 206 and oiling machine 25 connections;Steel wire rope clamp assembly 205, steel cable termina mounting table 204, the bottom of steel cable termina clamp assembly 205 connect It is connected to the 3rd ejection cylinder 207;
Steel cable termina riveting mechanism 21 includes the 3rd gas-liquid pressure-boosting machine 211 and is arranged on the 3rd gas-liquid pressure-boosting machine 211 Bottom and the 3rd riveting first 212 above steel cable termina mounting table 204;
The ejecting mechanism of steel cable termina 6 includes being arranged on the 3rd pusher cylinder 221 on rear side of the 3rd mounting table, is arranged on the 3rd lift cylinder 222 at the top of three pusher cylinder 221, the 3rd push pedal 223 for being arranged on the front end of the 3rd pusher cylinder 221 and It is arranged on multiple 3rd lifting arms 224 of the front end of the 3rd push pedal 223;
The right side of 3rd mounting table is provided with detection cylinder 27 and the second pulling force sensor being arranged on detection cylinder 27 28 and second displacement sensor 29.
During work, the pipe 1 for being plugged steel wire rope 5 is placed in rest block first, one end of steel wire rope 5 is placed on rope cramp Compressed on tight component 202 and with steel wire rope clamp assembly 202, steel cable termina clamp assembly 205 pushes down steel cable termina 6, Then the 3rd gas-liquid pressure-boosting machine 211 controls the 3rd riveting first 212 to carry out riveting, the complete inspection of riveting to steel wire rope 5 and steel cable termina 6 Survey cylinder 27 and prestretching processing is carried out to steel wire rope 5, steel wire rope 5 is judged by the second pulling force sensor 28 and second displacement sensing Whether qualified, confirm that qualified rear laser marking machine 23 starts mark, barcode machine 24 on pipe 1 and starts printing bar code patch if installing Paper, oiling machine 25 start oiling, and then the 3rd ejection cylinder 207 up pushes up product the pre- release step of completion, then the 3rd liter Sending down abnormally ascending cylinder 222 works and is up carried product again by the 3rd lifting arm 224 so that product departs from steel wire rope clamp assembly 202 and steel cable termina clamp assembly 205, then the 3rd pusher cylinder 221 work and drive the 3rd push pedal 223 to shift product onto On conveyer belt 26, finally packed.
Certainly, it these are only preferred embodiment of the present utility model, it is non-therefore limit to patent of the present utility model Simple modification and the equivalent structure change for it of scope, all utilization the utility model specifications and schema content institute, all should similarly be wrapped It is contained within scope of patent protection of the present utility model.

Claims (5)

1. automobile guy cable riveting press equipment, it is characterised in that:Including preceding guide pipe riveting device, retainer riveting device, rear guide pipe Riveting device, steel wire rope threading mechanism and steel cable termina riveting device;
The preceding guide pipe riveting device includes the first frame, is arranged on the preceding guide pipe detent mechanism, preceding of the first frame top Guide pipe riveting mechanism and preceding guide pipe ejecting mechanism;
The retainer riveting device is arranged on the first frame top and on the right side of preceding guide pipe ejecting mechanism;
The rear guide pipe riveting device include the second frame, be arranged on the rear guide pipe detent mechanism of the second frame top, after Guide pipe riveting mechanism, rear guide pipe prestretching inspection body and rear guide pipe ejecting mechanism;
The steel wire rope threading mechanism includes the 3rd frame, is arranged on the holder and threader of the 3rd frame top;
The steel cable termina riveting device includes the 4th frame, is arranged on the steel cable termina localization machine of the 4th frame top Structure, steel cable termina riveting mechanism, joint ejecting mechanism, laser marking machine, barcode machine and oiling machine;
It also includes a conveyer belt, and the conveyer belt is arranged on the first frame arrayed from left to right, the second frame, the 3rd Frame and the 4th frame top.
2. automobile guy cable riveting press equipment according to claim 1, it is characterised in that:The preceding guide pipe detent mechanism includes The core pulling oiling gas for being arranged on the first mounting table of the first frame top and being successively set on from left to right on the first mounting table Cylinder, preceding guide pipe positioning cylinder, preceding guide pipe locating support, preceding guide pipe mounting table, the first gripping block, the preceding guide pipe are determined Position cylinder is connected with preceding guide pipe locating support, and the outside of first gripping block is provided with the first clamping cylinder;First folder The bottom of tight block is connected with the first propulsion cylinder, and the bottom of the preceding guide pipe mounting table is provided with the first ejection cylinder;
The preceding guide pipe riveting mechanism includes the first gas-liquid pressure-boosting machine and is arranged on the first gas-liquid pressure-boosting machine bottom and is located at The first riveting head above preceding guide pipe mounting table;
The preceding guide pipe ejecting mechanism includes being arranged on the first pusher cylinder on rear side of the first mounting table, is arranged on the first pusher First lift cylinder of cylinder head, the first push pedal for being arranged on the first pusher cylinder front end and it is arranged on the first push pedal front end Multiple first lifting arms.
3. automobile guy cable riveting press equipment according to claim 1, it is characterised in that:The rear guide pipe detent mechanism includes Be arranged on the second mounting table of the second frame top and the core pulling cylinder being successively set on from right to left on the second mounting table, after Guide pipe positioning cylinder, rear guide pipe locating support, rear guide pipe mounting table, the second gripping block, the rear guide pipe positioning gas Cylinder is connected with rear guide pipe locating support, and the outside of second gripping block is provided with the second clamping cylinder;Second gripping block Bottom be connected with the second propulsion cylinder, the bottom of the rear guide pipe mounting table is provided with the second ejection cylinder;
The rear guide pipe riveting mechanism includes the second gas-liquid pressure-boosting machine and is arranged on the second gas-liquid pressure-boosting machine bottom and is located at The second riveting head above guide pipe mounting table afterwards;
The rear guide pipe ejecting mechanism includes being arranged on the second pusher cylinder on rear side of the second mounting table, is arranged on the second pusher Second lift cylinder of cylinder head, the second push pedal for being arranged on the second pusher cylinder front end and it is arranged on the second push pedal front end Multiple second lifting arms;
The rear guide pipe prestretching inspection body is arranged on the left of the second mounting table, and the rear guide pipe prestretching inspection body includes The first pulling force sensor and the first displacement transducer that prestretching detects cylinder and is arranged on prestretching detection cylinder.
4. automobile guy cable riveting press equipment according to claim 1, it is characterised in that:Steel wire rope is placed in the holder, Location hook, threading pinch roller and rack are sequentially provided with from left to right on the outside of the threader.
5. automobile guy cable riveting press equipment according to claim 1, it is characterised in that:The steel cable termina detent mechanism bag Include the rope cramp for being arranged on the 3rd mounting table on the 4th frame top and being successively set on from left to right on the 3rd mounting table Tight component, rest block, steel cable termina mounting table, steel cable termina clamp assembly, steel cable termina clamp assembly pass through conduit It is connected with oiling machine;Steel wire rope clamp assembly, steel cable termina mounting table, the bottom of steel cable termina clamp assembly are respectively connected with 3rd ejection cylinder;
The steel cable termina riveting mechanism includes the 3rd gas-liquid pressure-boosting machine and is arranged on the 3rd gas-liquid pressure-boosting machine bottom and position The 3rd riveting head above steel cable termina mounting table;
The steel cable termina ejecting mechanism, which includes being arranged on the 3rd pusher cylinder on rear side of the 3rd mounting table, be arranged on the 3rd pushes away Expect the 3rd lift cylinder of cylinder head, be arranged on the 3rd push pedal of the 3rd pusher cylinder front end and be arranged on before the 3rd push pedal Multiple 3rd lifting arms at end;
The right side of 3rd mounting table is provided with detection cylinder and the second pulling force sensor and the being arranged on detection cylinder Two displacement transducers.
CN201720133717.2U 2017-02-14 2017-02-14 Automobile guy cable riveting press equipment Withdrawn - After Issue CN206509724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720133717.2U CN206509724U (en) 2017-02-14 2017-02-14 Automobile guy cable riveting press equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720133717.2U CN206509724U (en) 2017-02-14 2017-02-14 Automobile guy cable riveting press equipment

Publications (1)

Publication Number Publication Date
CN206509724U true CN206509724U (en) 2017-09-22

Family

ID=59866483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720133717.2U Withdrawn - After Issue CN206509724U (en) 2017-02-14 2017-02-14 Automobile guy cable riveting press equipment

Country Status (1)

Country Link
CN (1) CN206509724U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736541A (en) * 2017-02-14 2017-05-31 宁波贝尔达汽车控制系统有限公司 Automobile guy cable riveting press equipment
CN108526909A (en) * 2018-04-20 2018-09-14 重庆翔睿捷机械设备有限公司 Glass-frame riser bracing wire fine cut riveting detects all-in-one machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736541A (en) * 2017-02-14 2017-05-31 宁波贝尔达汽车控制系统有限公司 Automobile guy cable riveting press equipment
CN106736541B (en) * 2017-02-14 2019-02-15 宁波贝尔达汽车控制系统有限公司 Automobile guy cable riveting press equipment
CN108526909A (en) * 2018-04-20 2018-09-14 重庆翔睿捷机械设备有限公司 Glass-frame riser bracing wire fine cut riveting detects all-in-one machine

Similar Documents

Publication Publication Date Title
CN107042397B (en) The assembly technology of automobile guy cable
CN106425468B (en) Spring plate automated assembly machine and its operating method
CN105984708B (en) A kind of high efficient full automatic permutation feed material collecting device
CN107336865A (en) A kind of Mobile phone screen film sticking equipment and its method for adhering film
CN106736541A (en) Automobile guy cable riveting press equipment
CN210273771U (en) Stator core lamination height detection and automatic compensation equipment
CN102699682A (en) Full-automatic integrated equipment of bearing compressing and clamp spring assembling
CN206509724U (en) Automobile guy cable riveting press equipment
CN109613726B (en) Control method and control system for automatically plugging liquid crystal display
CN107777367A (en) A kind of automotive drum type braking piece automatic piling accumulates device
CN205465157U (en) Automobile glass riser production line
CN102848178A (en) Placing system for thrusting needle of buzzer
CN205437770U (en) Full automatic assembly check out test set of air outlet among automotive interior
CN107052760A (en) Middle joint pitches needle bearing automatic press mounting equipment
CN106516720A (en) Copper pipe foam feeding method
CN113681285A (en) Check valve assembly test equipment
CN212899427U (en) Needle mounting equipment for needle roller retainer of bearing
CN210781957U (en) Connector assembling machine
CN211102688U (en) Full-automatic all-in-one is cut in coil wire winding spot welding
CN206824532U (en) The conduit riveting device of automobile guy cable
CN105965253B (en) A kind of gearbox mount bracket automatic Model Selection positions urgent frock and its technique
CN107834335A (en) A kind of full-automatic sorting equipment of network connector
CN109361296B (en) ABS motor rotor eccentric shaft press-fitting device
CN106736697A (en) Pipe bend clamping tooling
CN215091805U (en) Mechanism for automatically grabbing bolt and displacing plug

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170922

Effective date of abandoning: 20190215