CN206504986U - A kind of new concrete Anti-leakage instrument - Google Patents
A kind of new concrete Anti-leakage instrument Download PDFInfo
- Publication number
- CN206504986U CN206504986U CN201720176514.1U CN201720176514U CN206504986U CN 206504986 U CN206504986 U CN 206504986U CN 201720176514 U CN201720176514 U CN 201720176514U CN 206504986 U CN206504986 U CN 206504986U
- Authority
- CN
- China
- Prior art keywords
- base
- new concrete
- extension board
- concrete anti
- die trial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of new concrete Anti-leakage instrument, the problem of trouble is installed in the die trial for solving common concrete impervious instrument, its drip irrigation device is, including body, monitor station on body, die trial located at six bases of monitor station upper surface and with base engagement, the die trial includes extension board and die body, the extension board is vertically plugged together in base and fitted each other, the side of the monitor station is hinged with barrier in extension board upper surface and the compression frame of stretching monitor station opposite side, the frame that compresses suspends the balancing weight having positioned at body opposite side in midair away from the one end being hinged by suspension assembly, reach the die trial of concrete impervious instrument purpose easy for installation.
Description
Technical field
The utility model is related to concrete NDT equipment, more particularly to a kind of new concrete Anti-leakage instrument.
Background technology
Concrete is the artificial stone material being widely used in architectural engineering, for some buildings, such as waterwork, under water,
Underground and other architectural engineerings, it is desirable to which building has special anti-permeability performance.And anti-permeability performance refers to used in structures
Material can resist the performance that water and other liquid mediums permeate under pressure.Concrete impervious instrument is mainly used for coagulation
The experiment of native anti-permeability performance and the measure of anti-penetration grade, therefore obtained about the wide of the department such as production, construction, design, teaching and research
It is general to use.Concrete impervious instrument is designed according to hydraulic principle, is pressed with motor run water pump, by pipeline and pressure vessel,
Control valve, die trial seat etc. connection.Pressure enters pressure vessel by water pump output, is then delivered to each sample system and carries out loading examination
Test.Electro connecting pressure gauge and electric control system are housed in pipeline, can by the regulation to the electric contact in electro connecting pressure gauge
So that pressure carries out constant pressure experiment in 0.1-0.4Mpa prescribed limit.
The Chinese utility model profit for now retrieving a Publication No. CN205246494U discloses a kind of concrete impervious
It is provided with instrument, including body, described body above monitor station, described monitor station and is provided with six die trial seats, it is described
The die trial for installing style is fixed with die trial seat, is tightened between the die trial seat and die trial by multiple bolts.
But, in the operating process of impervious test that concrete is carried out using concrete impervious instrument, tester needs
Bolt is screwed repeatedly, it is very inconvenient because six groups of die trials are required for installing and dismantling one by one, it slow down tester's significantly
Testing efficiency.
Utility model content
The purpose of this utility model is to provide a kind of new concrete Anti-leakage instrument, has the advantages that die trial is easy for installation.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of new concrete resists
Ooze instrument, including body, the monitor station on body, six bases located at monitor station upper surface and the examination with base engagement
Mould, the die trial includes extension board and die body, and the extension board is vertically plugged together in base and fitted each other, and the one of the monitor station
Side is hinged with barrier in extension board upper surface and the compression frame of stretching monitor station opposite side, and the compression frame deviates from the one end being hinged
The balancing weight having positioned at body opposite side is suspended in midair by suspension assembly.
By using above-mentioned technical proposal, when needing to install die trial, die trial is plugged together in after base, frame rotation will be compressed
To the upper surface for fitting in extension board, due to the Action of Gravity Field of balancing weight, gravity pulls down compression frame by suspension assembly, in hinge
Connect in the presence of place's fulcrum, firmly die trial and base are compressed, this mounting means need not screw multiple bolts, are conducive to experiment
Personnel's Fast Installation die trial, and after experiment is finished, facilitate testing crew to take out the experiment block in die trial and die trial;And
Balancing weight can be preferably the test block for finishing experiment, convenient materials.
Further setting of the present utility model, the suspension assembly includes being located at two groups of links for compressing frame lower surface, led to
Cross the horizontal supporting plate that hook hook is fixed in the suspension rod of link, is fixed on downrod lower end face and shelved for balancing weight.
By using above-mentioned technical proposal, during it will compress frame rotation, link facilitates testing crew compressing frame
Upper application active force, so as to quickly make the lower surface of compression frame fit in the upper surface of extension board, then by suspension rod and horizontal support
Plate is fixed on link by hook, then balancing weight is placed on horizontal supporting plate, and this mode is easy to testing crew according to examination
The pressure tested is properly added balancing weight, so that the better tightness between die trial and base.
Further setting of the present utility model, the frame that compresses is provided with the rotating shaft being longitudinally arranged, institute away from the side of link
The upper surface for stating monitor station is provided with support, and the support is provided with the axle sleeve for running through and rotating freely for rotating shaft.
By using above-mentioned technical proposal, rotating shaft runs through after axle sleeve, rotated freely in axle sleeve, to realize the hinge for compressing frame
Connect, and in the presence of support, keep the lower surface for compressing frame to fit in the upper surface of each base.
Further setting of the present utility model, the compression frame includes two groups of barrier bars, and the barrier bar fits in extension
The upper surface of plate and the front end or rear end for contacting at die body.
By using above-mentioned technical proposal, barrier bar not only has an effect for compressing extension board and base, and with every
The effect of the front end, rear end of die body is kept off, so that the connection between die trial and base is more stablized, more firmly.
Further setting of the present utility model, the die body is provided with the burnishing surface bonded to each other with barrier bar.
By using above-mentioned technical proposal, burnishing surface adds the contact area of die body and barrier bar, passes through two barriers
The restriction effect of bar, also effectively prevents die trial from being rotated on base, so that the connection between die trial and base is more stablized, more
Firmly.
Further setting of the present utility model, the upper surface of the base is provided with multiple locating dowels, and the extension board is provided with
The positioning hole plugged together for locating dowel.
By using above-mentioned technical proposal, by the way that before compressing frame compression die trial, locating dowel and positioning hole have in advance
Positioning and fixation, are easy to Fast Installation die trial, accelerate the test efficiency of testing crew.
Further setting of the present utility model, the upper end of the locating dowel, which is provided with, is used for the circle of quick and positioning hole alignment
Angle.
By using above-mentioned technical proposal, fillet had both facilitated locating dowel to be directed at positioning hole, and fillet is conducive to locating dowel
Positioning hole is quickly introduced, is easy to Fast Installation die trial.
Further setting of the present utility model, is clamped with sealing between the upper surface of the base and the lower surface of extension board
Circle.
By using above-mentioned technical proposal, sealing ring adds the sealing effectiveness between die trial and base, so that the coagulation
The accuracy of native Anti-leakage instrument is higher.
Further setting of the present utility model, the upper surface of the base is provided with the neck for sealing ring inlay card.
By using above-mentioned technical proposal, neck has restriction effect to sealing ring, in process of the test, effectively prevents close
Seal is moved freely between the upper surface of base and the lower surface of extension board, and then lifts its sealing.
In summary, the utility model has the advantages that:Compared with common concrete impervious instrument, this practicality is new
Die trial is plugged together in after base, compression frame rotated to the upper surface for fitting in extension board, logical when needing to install die trial by type
The Action of Gravity Field of balancing weight is crossed, gravity pulls down compression frame by suspension assembly, in the presence of the fulcrum of hinged place, firmly will examination
Mould and base are compressed, and this mounting means need not screw multiple bolts, are conducive to testing crew Fast Installation die trial, and in examination
Test after finishing, facilitate testing crew to take out the experiment block in die trial and die trial;And balancing weight can be preferably to finish experiment
Test block, convenient materials.Generally speaking the utility model, sound construction, it is easy to make, are easy to materials, and it is convenient to install die trial,
Good airproof performance, test accuracy is high.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is the assembly relation schematic diagram of die trial, sealing ring and base in the present embodiment.
Reference:1st, body;2nd, monitor station;21st, support;22nd, axle sleeve;3rd, base;31st, locating dowel;311st, fillet;
32nd, neck;4th, die trial;41st, extension board;411st, positioning hole;42nd, die body;421st, burnishing surface;5th, frame is compressed;51st, rotating shaft;52nd, every
Pin;6th, suspension assembly;61st, link;62nd, link up with;63rd, suspension rod;64th, horizontal supporting plate;7th, balancing weight;8th, sealing ring.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Embodiment:A kind of new concrete Anti-leakage instrument, as shown in figure 1, including body 1, the monitor station being welded on body 1
2nd, six bases 3 of the upper surface of fixed test platform 2 and with base 3 coordinate die trial 4, die trial 4 include extension board 41 and and
The die body 42 of extension board 41 is shaped in, extension board 41 is vertically plugged together in base 3 and fitted each other, the side hinge of monitor station 2
Barrier is connected in the upper surface of extension board 41 and the compression frame 5 of the stretching opposite side of monitor station 2, frame 5 is compressed and leads to away from the one end being hinged
Cross suspension assembly 6 and suspend the balancing weight 7 having positioned at the opposite side of body 1 in midair.When needing to install die trial 4, die trial 4 is plugged together in base
After 3, frame 5 will be compressed and rotated to the upper surface for fitting in extension board 41, due to the Action of Gravity Field of balancing weight 7, gravity passes through suspension
Component 6 pull down compression frame 5, in the presence of the fulcrum of hinged place, firmly die trial 4 and base 3 are compressed, this mounting means without
Multiple bolts need to be screwed, are conducive to testing crew Fast Installation die trial 4, and after experiment is finished, facilitate testing crew to take out
Experiment block in die trial 4 and die trial 4;And balancing weight 7 can be preferably the test block for finishing experiment, convenient materials.
Suspension assembly 6 includes being welded in two links 61 for compressing the lower surface of frame 5, is fixed in link 61 by linking up with 62 hooks
Suspension rod 63, the horizontal supporting plate 64 for being threadedly connected to the lower surface of suspension rod 63 and supplying balancing weight 7 to shelve, suspension rod 63 are threadedly connected to water
The two ends of flat supporting plate 64, and then facilitate experimenter that horizontal supporting plate 64 is adjusted into horizontality, so that balancing weight 7 is difficult to slide
It is dehydrated flat supporting plate 64.It will compress during frame 5 rotates, link 61 facilitates testing crew application effect on frame 5 is compressed
Power, so as to quickly make the lower surface of compression frame 5 fit in the upper surface of extension board 41, then suspension rod 63 and horizontal supporting plate 64 is led to
Cross hook 62 to be fixed on link 61, then balancing weight 7 be placed on horizontal supporting plate 64, this mode be easy to testing crew according to
The pressure of experiment is properly added balancing weight 7, so that the better tightness between die trial 4 and base 3.
Compress frame 5 and be welded with the rotating shaft 51 being longitudinally arranged away from the side of link 61, the upper surface of monitor station 2 is welded with vertical
To the support 21 of arrangement, three axle sleeves 22 for running through and rotating freely for rotating shaft 51 are welded with support 21, rotating shaft 51 runs through axle
After set 22, rotated freely in axle sleeve 22, being hinged for frame 5 is compressed to realize, and in the presence of support 21, keep compressing frame
5 lower surface fits in the upper surface of each base 3.
Compressing frame 5 includes two groups of barrier bars 52, and barrier bar 52 fits in the upper surface of extension board 41 and contacts at die body 42
Front end or rear end, barrier bar 52 not only has an effect for compressing extension board 41 and base 3, and with barrier die body 42
Front end, the effect of rear end, so that the connection between die trial 4 and base 3 is more stablized, more firmly.
Die body 42 is provided with the burnishing surface 421 bonded to each other with barrier bar 52, and burnishing surface 421 adds die body 42 and barrier bar
52 contact area, by the restriction effect of two barrier bars 52, also effectively prevents die trial 4 from rotating on the base 3, so that die trial
Connection between 4 and base 3 is more stablized, more firmly.
As shown in Fig. 2 the upper surface of base 3 is welded with two locating dowels 31, extension board 41 is provided with to be plugged together for locating dowel 31
Positioning hole 411, before die trial 4 is compressed by compressing frame 5, locating dowel 31 and positioning hole 411, which have, to be pre-positioned and solid
It is set for using, is easy to Fast Installation die trial 4, accelerates the test efficiency of testing crew.
The upper end of locating dowel 31, which is fallen, the fillet 311 being aligned for quick and positioning hole 411, and fillet 311 both facilitates positioning
Post 31 is directed at positioning hole 411, and fillet 311 is conducive to locating dowel 31 to quickly introduce positioning hole 411, is easy to Fast Installation die trial
4。
Sealing ring 8 is clamped between the upper surface of base 3 and the lower surface of extension board 41, sealing ring 8 adds the He of die trial 4
Sealing effectiveness between base 3, so that the accuracy of the concrete impervious instrument is higher.The upper surface of base 3 is provided with for sealing ring 8
The neck 32 of inlay card, neck 32 has restriction effect to sealing ring 8, in process of the test, effectively prevents sealing ring 8 in base 3
Upper surface and extension board 41 lower surface between move freely, and then lift its sealing.
Installation process:Locating dowel 31 is directed at positioning hole 411, so that die trial 4 and base 3 are fixed in advance, then frame 5 will be compressed
Rotation is hooked on link 61 to the upper surface for fitting in extension board 41, and by hook 62, and horizontal supporting plate 64 is adjusted into level simultaneously
After stable, then to addition balancing weight 7 on horizontal supporting plate 64, so that compressing frame 5 compresses die trial 4 and base 3.
Claims (9)
1. a kind of new concrete Anti-leakage instrument, including body (1), the monitor station (2) on body (1), located at monitor station (2)
Six bases (3) of upper surface and the die trial (4) coordinated with base (3), it is characterised in that the die trial (4) includes extension
Plate (41) and die body (42), the extension board (41) vertically plug together in base (3) and fitted each other, and the one of the monitor station (2)
Side is hinged with barrier in extension board (41) upper surface and the compression frame (5) of stretching monitor station (2) opposite side, the compression frame (5)
The balancing weight (7) having positioned at body (1) opposite side is suspended in midair by suspension assembly (6) away from the one end being hinged.
2. a kind of new concrete Anti-leakage instrument according to claim 1, it is characterised in that the suspension assembly (6) includes
Located at compressing two groups of links (61) of frame (5) lower surface, be fixed in the suspension rod (63) of link (61) by linking up with (62) hook, be fixed on
Suspension rod (63) lower surface and the horizontal supporting plate (64) shelved for balancing weight (7).
3. a kind of new concrete Anti-leakage instrument according to claim 2, it is characterised in that the compression frame (5) is away from extension
The side of ring (61) is provided with the rotating shaft (51) being longitudinally arranged, and the upper surface of the monitor station (2) is provided with support (21), the support
(21) it is provided with the axle sleeve (22) for running through and rotating freely for rotating shaft (51).
4. a kind of new concrete Anti-leakage instrument according to claim 1, it is characterised in that the compression frame (5) includes two
Group barrier bar (52), the barrier bar (52) fit in the upper surface of extension board (41) and contact at die body (42) front end or
Rear end.
5. a kind of new concrete Anti-leakage instrument according to claim 4, it is characterised in that the die body (42) be provided with every
Pin (52) burnishing surface (421) bonded to each other.
6. a kind of new concrete Anti-leakage instrument according to claim 1, it is characterised in that the upper surface of the base (3)
Provided with multiple locating dowels (31), the extension board (41) is provided with the positioning hole (411) plugged together for locating dowel (31).
7. a kind of new concrete Anti-leakage instrument according to claim 6, it is characterised in that the upper end of the locating dowel (31)
Provided with the fillet (311) for the alignment of quick and positioning hole (411).
8. a kind of new concrete Anti-leakage instrument according to claim 1, it is characterised in that the upper surface of the base (3)
Sealing ring (8) is clamped between the lower surface of extension board (41).
9. a kind of new concrete Anti-leakage instrument according to claim 8, it is characterised in that the upper surface of the base (3)
Provided with the neck (32) for sealing ring (8) inlay card.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720176514.1U CN206504986U (en) | 2017-02-25 | 2017-02-25 | A kind of new concrete Anti-leakage instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720176514.1U CN206504986U (en) | 2017-02-25 | 2017-02-25 | A kind of new concrete Anti-leakage instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206504986U true CN206504986U (en) | 2017-09-19 |
Family
ID=59841725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720176514.1U Expired - Fee Related CN206504986U (en) | 2017-02-25 | 2017-02-25 | A kind of new concrete Anti-leakage instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206504986U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108918232A (en) * | 2018-09-20 | 2018-11-30 | 中国人民解放军军事科学院国防工程研究院 | A kind of movable type large special anti-leakage detector for water |
CN109060636A (en) * | 2018-09-19 | 2018-12-21 | 江门市建联检测有限公司 | A kind of concrete impervious test equipment |
CN109708936A (en) * | 2018-12-24 | 2019-05-03 | 深圳市恒义建筑技术有限公司 | A kind of sample molding machine and its application method |
-
2017
- 2017-02-25 CN CN201720176514.1U patent/CN206504986U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109060636A (en) * | 2018-09-19 | 2018-12-21 | 江门市建联检测有限公司 | A kind of concrete impervious test equipment |
CN108918232A (en) * | 2018-09-20 | 2018-11-30 | 中国人民解放军军事科学院国防工程研究院 | A kind of movable type large special anti-leakage detector for water |
CN108918232B (en) * | 2018-09-20 | 2023-09-26 | 中国人民解放军军事科学院国防工程研究院 | Portable large-scale special type impervious test device |
CN109708936A (en) * | 2018-12-24 | 2019-05-03 | 深圳市恒义建筑技术有限公司 | A kind of sample molding machine and its application method |
CN109708936B (en) * | 2018-12-24 | 2021-07-06 | 深圳市恒义建筑技术有限公司 | Sample forming machine and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206504986U (en) | A kind of new concrete Anti-leakage instrument | |
CN108548763B (en) | Three-dimensional model test system and method for grouting reinforcement stability under erosion and seepage effects | |
CN109187918B (en) | Direct shear sample device for dry-wet cycle test and use method thereof | |
CN205679468U (en) | A kind of anchor rod drawing test hydraulic support device | |
CN1932169A (en) | Analogue experiment stand for interreaction of tunnel structure, surrounding rock and underground water | |
CN202757828U (en) | Tri-axial test confining pressure device | |
CN105527402A (en) | Three-dimensional model testing apparatus and method for water outburst and mud outburst of deeply-buried long tunnel | |
CN206504985U (en) | A kind of box-like concrete impervious instrument of turn buckle | |
CN113533157B (en) | Variable-opening detachable fracture device for visual experiment | |
CN109374246A (en) | Simulate the experimental rig that crossed beam and column node bears horizontal earthquake action | |
CN109946027A (en) | A kind of duct pieces of shield tunnel seam waterproof method for testing performance | |
CN205192836U (en) | Consider geotechnological triaxial apparatus compression test pressure chamber of soil body off -load | |
CN205620246U (en) | Water tank formula stress control triaxial apparatus based on consolidation apparatus | |
CN104990659A (en) | Expansion soil area slurry balance shield tunnel tunnel-face expansion force test device | |
CN113984318A (en) | Anti-seismic performance detection device and detection method for anti-seismic support and hanger | |
CN107976530A (en) | A kind of device for simulating rock mass Wedge sliding | |
CN209566021U (en) | A kind of clamping device | |
CN110823705A (en) | Indoor pressurization test device and method for bidirectional pressurization large-size concrete test block | |
CN110031324A (en) | Duct pieces of shield tunnel seam waterproof performance test apparatus | |
CN109540491A (en) | A kind of excavator turntable fatigue test program spectrum loading device | |
CN112326945B (en) | Deep roadway surrounding rock tight fracture shear excitation anti-reflection grouting test device and method | |
CN205120323U (en) | Experimental apparatus is sealed to cylinder head | |
CN207689475U (en) | A kind of device of simulation rock mass Wedge sliding | |
CN206208547U (en) | A kind of handrail load test device | |
CN105973675A (en) | Controllable surface roughness artificial rock joint preparation device and application method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170919 Termination date: 20190225 |