CN206503074U - Platform for king-tower - Google Patents

Platform for king-tower Download PDF

Info

Publication number
CN206503074U
CN206503074U CN201621377292.1U CN201621377292U CN206503074U CN 206503074 U CN206503074 U CN 206503074U CN 201621377292 U CN201621377292 U CN 201621377292U CN 206503074 U CN206503074 U CN 206503074U
Authority
CN
China
Prior art keywords
platform
king
platform body
tower
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621377292.1U
Other languages
Chinese (zh)
Inventor
杨益波
郑育林
武向辉
郭永伟
陈义
百顺
吴彦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201621377292.1U priority Critical patent/CN206503074U/en
Application granted granted Critical
Publication of CN206503074U publication Critical patent/CN206503074U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to king-tower technical field of buildings, more particularly, to a kind of platform for king-tower.The platform for being used for king-tower includes:Platform body, pipeline, portable plate, supporting plate, connecting plate;The platform body is made up of armored concrete;Threading passage is provided with the platform body;The pipeline is located in the threading passage;On the platform body, the position corresponding with the threading passage is provided with access hole;Portable plate is provided with the access hole;The portable plate is used to open or close the access hole;The supporting plate is arranged on the lower section of the platform body;The supporting plate is multiple;Multiple supporting plates, along the platform body circumferential direction, are arranged at intervals successively;The connecting plate is arranged on the edge of the platform;One end of the connecting plate is connected with the platform body, and the other end is connected with the supporting plate;The platform body takes the shape of the letter U.The platform for king-tower that the utility model is provided, its service life is longer, and load-bearing is larger.

Description

Platform for king-tower
Technical field
The utility model is related to king-tower technical field of buildings, more particularly, to a kind of platform for king-tower.
Background technology
King-tower refers to the turriform structure of suspension bridge or oblique pull bridge bearing main rope.King-tower is divided into cable-stayed bridge and suspension bridge two Kind.The king-tower of cable-stayed bridge is used for anchoring drag-line, and the king-tower of suspension bridge is used for undertaking main push-towing rope, and two kinds of king-towers are all made by Subjected To Combined Axial Loading And Bending With.King-tower structure has polytype, is mainly selected according to factors such as the arrangement requirement of drag-line, bridge deck width and girder spans. At present, conventional king-tower form has been longitudinally arranged single-column shape and A shapes along bridge, has single-column shape, double columnar form, door along bridge lateral arrangement Formula, battered leg gate-type etc..Platform is provided with king-tower, the platform is arranged on the lower king-post strut of bridge main tower, is connected with bridge floor.
Because bridge is usually used in across mountain valley rivers, construct platform can not only connect two sides as pavement on bridge Traffic, is also used as sightseeing platform and uses.
But, the platform currently used for king-tower is steel construction, and its service life is shorter, and load-bearing is smaller.
Utility model content
The purpose of this utility model is to provide a kind of platform for king-tower, to solve platform present in prior art Service life is shorter, the small technical problem of load-bearing.
The platform for king-tower that the utility model is provided, including:Platform body;Platform body is by armored concrete system Into.
Further, the platform for king-tower also includes guardrail;Guardrail is arranged on the edge of platform body.
Further, the platform for king-tower also includes pipeline;Threading passage is provided with platform body;Pipeline is located in In threading passage.
Further, the platform for king-tower also includes portable plate;On platform body, the position corresponding with threading passage Put, be provided with access hole;Portable plate is provided with access hole;Portable plate is used to open or close access hole.
Further, the platform for king-tower also includes supporting plate;Supporting plate is arranged on the lower section of platform body.
Further, supporting plate is multiple;Multiple supporting plates, along platform body circumferential direction, are arranged at intervals successively.
Further, the platform for king-tower also includes connecting plate;Connecting plate is arranged on the edge of platform;Connecting plate One end is connected with platform body, and the other end is connected with supporting plate.
Further, the platform for king-tower also includes lighting device;Lighting device is arranged on platform body.
Further, the platform for king-tower also includes walkway;Platform body is two;Two platform body intervals Set, the lower king-post strut both sides for being symmetricly set on king-tower;The two ends of walkway are connected with a platform body respectively;People's row Passage is used to be arranged on below bridge floor.
Further, platform body takes the shape of the letter U.
The platform for king-tower that the utility model is provided, it is applied on king-tower, is connected with bridge floor, is mainly used to conduct Pavement connects two sides traffic, is also used as sightseeing platform and uses.Platform for king-tower includes platform body, and it is by reinforcing bar Concrete is made.Concrete is that by binder materials cement, sand, stone and water, and blended materials, additive etc. press certain ratio Example, which is mixed and stirred, to be formed, and as hard as flint after solidification, compression capability is good.In order to give full play to the compression capability of concrete, concrete by Draw in region or corresponding site adds a number of reinforcing bar, two kinds of materials is bonded to an entirety, external force is born jointly.By Upper to understand, the platform for king-tower that the utility model is provided, its service life is longer, and load-bearing is larger.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
The structural representation for the platform for king-tower that Fig. 1 provides for the utility model embodiment;
The structural representation for the platform for king-tower that Fig. 2 provides for another embodiment of the utility model;
The top view for the platform for king-tower that Fig. 3 provides for the utility model embodiment.
Reference:
1- platform bodies;2- guardrails;3- pipelines;
4- threading passages;5- lower king-post struts;6- portable plates;
7- access holes;8- supporting plates;9- connecting plates;
10- lighting devices;11- walkways.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outer " are, based on orientation shown in the drawings or position relationship, to be only Described for the ease of description the utility model and simplifying, rather than to indicate or imply that signified device or element must have specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
The structural representation for the platform for king-tower that Fig. 1 provides for the utility model embodiment, as shown in figure 1, this reality The platform for king-tower of example offer is provided, including:Platform body 1;Platform body 1 is made up of armored concrete.
The platform for king-tower that the present embodiment is provided, it is applied on king-tower, is connected, is mainly used to as people with bridge floor Trade connects two sides traffic, is also used as sightseeing platform and uses.Platform for king-tower includes platform body 1, and it is by reinforcing bar Concrete is made.Concrete is that by binder materials cement, sand, stone and water, and blended materials, additive etc. press certain ratio Example, which is mixed and stirred, to be formed, and as hard as flint after solidification, compression capability is good.In order to give full play to the compression capability of concrete, concrete by Draw in region or corresponding site adds a number of reinforcing bar, two kinds of materials is bonded to an entirety, external force is born jointly.
From the foregoing, it will be observed that the platform for king-tower that the utility model is provided, it is lasted a long time, and load-bearing is larger.
As shown in figure 1, on the basis of above-described embodiment, further, the platform for king-tower also includes guardrail 2;Shield Column 2 is arranged on the edge of platform body 1.
Wherein, edge of the guardrail 2 along platform body 1 is continuously set, its bottom and the anchor connection of platform body 1, left and right The guardrail 2 at two ends and bridge floor pavement is welded.The structure type of guardrail 2 can be a variety of, for example, post and beam guardrail 2, reinforcing bar are mixed Solidifying cob wall formula expands column, combined type guard bar 2 etc..
The material of guardrail 2 can be a variety of, for example, stainless steel or armored concrete etc..
In the present embodiment, guardrail 2 is set in the edge of platform body 1, when people's walking is on platform body 1, the energy of guardrail 2 Enough play a part of protecting pedestrian.
The structural representation for the platform for king-tower that Fig. 2 provides for another embodiment of the utility model, as shown in Fig. 2 On the basis of upper embodiment, further, the platform for king-tower also includes pipeline 3;Threading is provided with platform body 1 to lead to Road 4;Pipeline 3 is located in threading passage 4.
Wherein, pipeline 3 is power pipeline, placed side by side in threading passage 4, can so facilitate staff's observation inspection Repair.Pipeline 3 selects anticorrosive, low temperature resistant, cold resistant weather material, for example:High voltage power cable protection pipe.Threading passage 4, Along the horizontal direction of platform body 1, it is applied on platform body 1.
Centre position that threading passage 4 can be arranged in platform body 1, it is arranged in platform body 1 away from guardrail 2 one The position of side is arranged in platform body 1 close to the position of guardrail 2.It is preferred that threading passage 4 is arranged on platform body 1 The interior position away from the side of guardrail 2.After platform is arranged on the lower king-post strut 5 of king-tower, the side is connected with lower king-post strut 5.Using During, when staff overhauls, walk on the one hand can not be influenceed, on the other hand can be prevented in work progress, Construction tool and other items drops from the edge of platform body 1.
Threading passage 4 can be one, or more than two multiple.It is preferred that threading passage 4 is two or more It is multiple, multiple threading passages 4 are arranged at intervals successively, and a pipeline 3 is worn in each passage, and this set can be by pipeline 3 It is evenly distributed, do not collide and rub mutually.In maintenance, staff being capable of the clearer discovery problem of pipeline 3.
In the present embodiment, pipeline 3 is worn in threading passage 4, facilitates staff to overhaul, and play protection pipeline 3 Effect.
The top view for the platform for king-tower that Fig. 3 provides for the utility model embodiment, as shown in Figure 2 and Figure 3, upper On the basis of embodiment, further, the platform for king-tower also includes portable plate 6;On platform body 1, with the phase of threading passage 4 Corresponding position, is provided with access hole 7;Portable plate 6 is provided with access hole 7;Portable plate 6 is used to open or close access hole 7.
Wherein, access hole 7 is arranged on the corresponding surface of threading passage 4, and openings of sizes can be passed through for staff, its Shape can be to be a variety of, such as:Rectangle or circle etc..
Cat ladder, cat ladder and the interior welds of threading passage 4 can be configured inside access hole 7, in use, convenient work Personnel at access hole 7 under in threading passage 4.
Portable plate 6 is connected with platform body 1, and its upper face is provided with handle, and handle can be one, or two Above multiple.Preferably, handle is two, in use, staff's both hands are facilitated together firmly to draw portable plate 6 Rise.
The connected mode of portable plate 6 and platform body 1 can be it is a variety of, for example:Portable plate 6 is removable with platform body 1 Unload connection.Portable plate 6 is arranged on the top of access hole 7, and two ends edge is provided with locker.In use, work Personnel open locker, hold handle, and by the pull-up of portable plate 6, expose access hole 7.
Portable plate 6 can also be connected with platform body 1 to rotate.Portable plate 6 is arranged in the top of access hole 7, its one side Handle is provided with, one end is provided with locker, and the other end is rotated with platform body 1 by rotational structure and is connected.Using Cheng Zhong, staff opens locker, holds handle, by the pull-up of portable plate 6 and rotates, and exposes access hole 7.
The material of portable plate 6 can be to be a variety of, such as:Steel plate, cement plate, cast iron plate etc..
In the present embodiment, access hole 7 is arranged on platform body 1, corresponding with threading passage 4, is easy to staff to enter Enter into the passage of pipeline 3 maintenance pipeline 3.The top of access hole 7 is provided with portable plate 6, in use, and staff needs to beat Portable plate 6 is opened, exposes access hole 7, then into threading passage 4.Portable plate 6 can prevent rainwater dust storm from being made to pipeline 3 Into damage, it can also play a part of protecting pedestrian.
As shown in Fig. 2 on the basis of above-described embodiment, further, the platform for king-tower also includes supporting plate 8; Supporting plate 8 is arranged on the lower section of platform body 1.
Wherein, supporting plate 8 is made up of armored concrete.
The cross sectional shape of supporting plate 8 is trapezoidal, and a trapezoidal waist is connected with the one side of platform body 1, and trapezoidal upper The edge of bottom and bottom respectively with platform body 1 is concordant.When on king-tower, trapezoidal bottom and the lower king-post strut 5 of king-tower Anchor connection, upper bottom is connected with the edge of platform body 1.
In the present embodiment, to increase the rigidity of platform body 1, supporting plate 8 is increased in the downside of platform body 1.Supporting plate 8 The weight of pedestrian in deadweight and platform body 1 for support platform body 1.
As shown in Fig. 2 on the basis of above-described embodiment, further, supporting plate 8 is multiple;Multiple supporting plates 8, edge The circumferential direction of platform body 1, is arranged at intervals successively.
Wherein, spacing distance is identical between multiple supporting plates 8.
In the present embodiment, circumferential direction of multiple supporting plates 8 along platform body 1 is arranged at intervals, and this set method can be with Make the uniform force of supporting plate 8, preferably play supporting role.
As shown in Fig. 2 on the basis of above-described embodiment, further, the platform for king-tower also includes connecting plate 9; Connecting plate 9 is arranged on the edge of platform;One end of connecting plate 9 is connected with platform body 1, and the other end is connected with supporting plate 8.
Wherein, the material of connecting plate 9 can be to be a variety of, such as:Hot rolled chord plate or sheet material.It is preferred that the material of connecting plate 9 Expect for hot rolled chord plate.Hot rolled chord plate has fixed specification, and its main specifications is:Thickness 6-24mm, width 150-350mm, Length 8,9 meters of scales, material are Q235B, Q345B.Hot rolled chord plate specification span is closeer, and yardstick is accurate, compared with sheet material, section Expense, man-hour and the steel consumption of shearing are saved, so as to greatly reduce cost.
In the present embodiment, connecting plate 9 is arranged on the edge of platform, and its one end is connected with platform body 1, the other end and branch Fagging 8 is connected, and plays a part of connecting transition.
As shown in Fig. 2 on the basis of above-described embodiment, further, the platform for king-tower also includes lighting device 10;Lighting device 10 is arranged on platform body 1.
Wherein, lighting device 10 can have polytype, for example:Non-polarized lamp, Metal halogen lamp, fluorescent lamp etc..
Lighting device 10 can be different type, for example:Lighting device 10 can be street lamp.Street lamp is arranged on platform body 1 upper surface, close to edge.This setup can concentrate on light source the top of platform body 1, and being arranged on edge can Facilitate walk.The lamp stand of street lamp can also be to be a variety of, such as:It is conical lamp stand, polygon lamp stand, straight-bar, square pole, many Bar (double-rod, 3 bars or 4 bars etc.) etc..
Lighting device 10 can be light bar.Light bar is arranged on the edge of platform body 1 or the outside of guardrail 2, and light bar is more soft It is soft, it can be set with curved, and against weather is strong, service life length, use safety.This setup is not take up platform sheet The position of the upper surface of body 1, facilitates walk, and pedestrian can also be avoided directly to touch lighting device 10, it is ensured that safety, and The effect viewed and admired with decoration.
Lighting device 10 can also be floor-lamp.Floor-lamp is also known as underground lamp or hides floor-lamp, and floor-lamp inlays company with platform body 1 Connect.Can use LED energy-conserving light sources, surface be stainless steel polishing or aluminium alloy panel, use water joint, silica gel sealing ring with And safety glass.Floor-lamp is waterproof, dust-proof, anticreep and corrosion-resistant, landscape can be made more beautiful, pedestrian passes through safer.In addition, When lighting device 10 is floor-lamp, drainage arrangement should be set below light fixture, to ensure that draining is unobstructed, light fixture bottom needs to pad upper broken Stone.
In the present embodiment, lighting device 10 is set on platform body 1, comfortable and safe vision can be provided for pedestrian Environment, it is ensured that pedestrian can see the form of road, the situation on road surface, have clear;When pedestrian meets, it is convenient for people to hand over Stream, and can effectively prevent criminal activity.
As shown in figure 1, on the basis of above-described embodiment, further, the platform for king-tower also includes walkway 11;Platform body 1 is two;Two platform bodies 1 are arranged at intervals, the both sides of lower king-post strut 5 for being symmetricly set on king-tower;People's row The two ends of passage 11 are connected with a platform body 1 respectively;Walkway 11 is used to be arranged on below bridge floor.
Wherein, walkway 11 includes the stair of two stair and a cross-bridges direction along the bridge.Along the bridge The edge anchor connection of stair respectively with two platform bodies 1, the stair in cross-bridges direction are used to be arranged on below bridge floor, with two Individual stair anchor connection along the bridge.
The edge of walkway 11 is provided with railing, plays a part of protecting pedestrains safety.
In addition, should still be provided with lighting device 10 on walkway 11.In the case of daytime, the light below bridge floor Line is also inadequate, sets lighting device 10 to ensure that pedestrian sees the form of road, the situation on road surface, has clear, And it is convenient for people to exchange.
In the present embodiment, two platform bodies 1 are arranged at intervals, the both sides of lower king-post strut 5 for being symmetricly set on king-tower, two Platform body 1 conveniently allows pedestrian to see the different landscape in both sides.The two ends of walkway 11 connect with a platform body 1 respectively Connect, walkway 11 is used to be arranged on below bridge floor.When pedestrian wants to reach the platform body of opposite side from the platform body 1 of side When 1, it can be gone to from the edge of platform body 1 of side along walkway 11 on the platform body 1 of opposite side.It is this to set Two platform bodies 1 of pedestrian's dealing can be facilitated by putting, and bridge deck traffic will not be had undesirable effect.
As shown in figure 3, on the basis of above-described embodiment, further, platform body 1 takes the shape of the letter U.
Wherein, platform body 1 is used for the outside of lower king-post strut 5 for being arranged on king-tower, and lower king-post strut 5 is arranged on the inside of U-shaped, and with Two side wall connections of platform body 1.The end of U-shaped is connected with bridge floor.
In the present embodiment, the connection for being provided for strengthening platform body 1 and lower king-post strut 5 and bridge floor of U-shaped platform body 1, Ensure the safety of pedestrian.Meanwhile, the area for being designed to expand platform body 1 of U-shaped can carry more pedestrians.
Finally it should be noted that:Various embodiments above is only limited to illustrate the technical solution of the utility model, rather than to it System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (4)

1. a kind of platform for king-tower, it is characterised in that including:Platform body, pipeline, portable plate, supporting plate, connecting plate;
The platform body is made up of armored concrete;Threading passage is provided with the platform body;The pipeline is located in In the threading passage;On the platform body, the position corresponding with the threading passage is provided with access hole;The inspection Portable plate is provided with repairing mouthful;The portable plate is used to open or close the access hole;The supporting plate is arranged on described flat The lower section of playscript with stage directions body;The supporting plate is multiple;Multiple supporting plates, along the platform body circumferential direction, are spaced successively Set;The connecting plate is arranged on the edge of the platform;One end of the connecting plate is connected with the platform body, another End is connected with the supporting plate;The platform body takes the shape of the letter U.
2. the platform according to claim 1 for king-tower, it is characterised in that also including guardrail;
The guardrail is arranged on the edge of the platform body.
3. the platform according to claim 1 for king-tower, it is characterised in that also including lighting device;
The lighting device is arranged on the platform body.
4. the platform according to claim 1 for king-tower, it is characterised in that also including walkway;The platform sheet Body is two;
Two platform bodies are arranged at intervals, the lower king-post strut both sides for being symmetricly set on king-tower;The two of the walkway End is connected with a platform body respectively;The walkway is used to be arranged on below bridge floor.
CN201621377292.1U 2016-12-14 2016-12-14 Platform for king-tower Active CN206503074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621377292.1U CN206503074U (en) 2016-12-14 2016-12-14 Platform for king-tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621377292.1U CN206503074U (en) 2016-12-14 2016-12-14 Platform for king-tower

Publications (1)

Publication Number Publication Date
CN206503074U true CN206503074U (en) 2017-09-19

Family

ID=59844035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621377292.1U Active CN206503074U (en) 2016-12-14 2016-12-14 Platform for king-tower

Country Status (1)

Country Link
CN (1) CN206503074U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215323A (en) * 2021-12-27 2022-03-22 广州地铁设计研究院股份有限公司 Civil engineering and mechanical-electrical integration assembly type maintenance platform and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215323A (en) * 2021-12-27 2022-03-22 广州地铁设计研究院股份有限公司 Civil engineering and mechanical-electrical integration assembly type maintenance platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN104652290B (en) Steel truss beam bridge Horizontal Swing Construction method
CN101476294B (en) Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower
CN108374319A (en) A kind of through tied arch bridge structural unit and arch bridge structure and its construction method
CN101736691A (en) Fiber reinforce plastic (FRP) ribbing folded plate-concrete combined bridge deck
CN106088478A (en) Tilt strength steel concrete cylinder construction method
CN101725271B (en) Rapid construction method of reinforced concrete chimney
CN105781099A (en) Movable combined type one-sided large template structure and construction method thereof
CN103290784A (en) Arched beam combination bridge lifting construction method
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
CN206503074U (en) Platform for king-tower
CN106592438B (en) Twin shaft pier and middle binder truss move integrally construction method
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN208328705U (en) Multi-joint pier operating platform
CN103806373A (en) Stay cable anchor system of cable-stayed assembly type road steel bridge
CN109958134A (en) A kind of suspension type deep basal pit stair activity
CN206538685U (en) Twin shaft pier and middle binder truss move integrally system
CN205934687U (en) Antinode worker roof beam - steel concrete roof - external prestress combination T type simple beam
CN206512607U (en) Steel truss beam bolt applies stubborn operating platform
CN205329550U (en) Suspension bridge catwalk system
CN207484941U (en) A kind of closed cover of the outer builder's jack of architectural engineering
CN207553565U (en) A kind of crosshead of truss
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN207143754U (en) A kind of across highway adhesion type protection canopy of continuous beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant