CN206496196U - A kind of gas gathering station gas gathering system of full sledge dressization - Google Patents
A kind of gas gathering station gas gathering system of full sledge dressization Download PDFInfo
- Publication number
- CN206496196U CN206496196U CN201720143191.6U CN201720143191U CN206496196U CN 206496196 U CN206496196 U CN 206496196U CN 201720143191 U CN201720143191 U CN 201720143191U CN 206496196 U CN206496196 U CN 206496196U
- Authority
- CN
- China
- Prior art keywords
- sledge
- gas
- station
- outlet
- heating furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model belongs to a kind of high-pressure gas collection station gas gathering system technical field, and in particular to a kind of gas gathering station gas gathering system of full sledge dressization, including the sledge that enters the station, heating furnace sledge, general mechanism sledge, separate measurement is prized, personal gas sledge, emptying liquid-separation sledge, outer defeated metering sledge, corrosion inhibiter injects sledge, service cylinder sledge, release flare, generator, the sledge that enters the station is sequentially connected with heating furnace sledge, general mechanism sledge, separate measurement is prized, outer defeated metering sledge and service cylinder sledge, gas sledge one end connection heating furnace sledge of using by oneself, the other end, which is sequentially connected with, releases flare and emptying liquid-separation sledge, corrosion inhibiter injection sledge one end connection separate measurement sled, other end connection service cylinder sledge, and enter the station sledge, general mechanism sledge, separate measurement is prized and gas sledge of using by oneself, emptying liquid-separation sledge and service cylinder sledge are all connected with emptying house steward to overcome technique block in the prior art more, and site operation is needed equipment, valve, pipe fitting etc. is first transported to station, then according to design document organizing construction, there is long construction period, organize and coordinate difficulty big, investment cost is high, the problems such as floor space is big, can save cost, reduce and take up an area, Accelerating The Construction progress.
Description
Technical field
The utility model belongs to a kind of high-pressure gas collection station gas gathering system technical field, and in particular to a kind of collection of full sledge dressization
Gas station gas gathering system.
Background technology
With expanding economy, country is increasing to the demand of the energy, as the natural gas of clean energy resource, development speed
Very fast.As the surface construction part of the construction of natural gas fields, construction scale is big, builds station quantity many.Newly《The People's Republic of China (PRC)
Law on Environmental Protection》After promulgation, gas field production is built, environmental protection proposes higher requirement.
Gas gathering station undertakes the important function of " hinge " in gas field collection is defeated, first receive upstream well site carry out gas, by gas collection,
Heating, throttling, metering, transfer to treatment plant.Gas gathering station has the functions such as gas collection, heating, throttling, separation, metering, pigging, simultaneously
Generator, heating furnace, torch etc. in gas gathering station station are provided and set cushion gas, conventional gas gathering station according to gas collection technique, gas field component, open
Adopt that mode is unusual to have ten Yu Ge technical modules areas.By taking gas field of pacifying the border region as an example, technology is conveyed using moisture, well site is come
Gas is heated, throttles, separate, measuring Hou Waishu purification plants, and the recovered water isolated is accessed in fluid reservoir after flash distillation, using vapour
Car roping to treatment plant is uniformly processed, Nei You11Ge technical modules area of standing:Enter the station area's module, heating oven module, general mechanism module,
Separator zone module, personal gas area module, wiper receiving and delivery bay module, flash distillation point flow container area module, recovered water liquid storage tank field mould
Block, spark arrester platform area module, metering Wai Shu areas module, alchol-injection pump room and 1 auxiliary production district:Rack room, power distribution station, generating
Computer room etc., because technique block is more, site operation needs equipment, valve, pipe fitting etc. to be first transported to station, then according to design
File organization is constructed, and be there are problems that long construction period, is organized and coordinated that difficulty is big, investment cost is high, floor space, with gas field
Fast Construction, low cost development are not suitable with.
Utility model content
The purpose of this utility model be overcome in the prior art technique block it is many, site operation need equipment, valve, pipe
Part etc. is first transported to station, then according to design document organizing construction, there is long construction period, organizes and coordinates that difficulty is big, investment
It is costly, the problems such as floor space is big.
Therefore, the utility model provides a kind of gas gathering station gas gathering system of full sledge dressization, including the sledge that enters the station, heating furnace
Sledge, general mechanism sledge, separate measurement sled, personal gas sledge, emptying liquid-separation sledge, outer defeated metering sledge, corrosion inhibiter injection sledge, service cylinder sledge,
Release flare, generator, the described sledge that enters the station be sequentially connected with heating furnace sledge, general mechanism sledge, separate measurement sled, it is outer it is defeated metering sledge and
Service cylinder sledge, described personal gas sledge one end connection heating furnace sledge, the other end, which is sequentially connected with, releases flare and emptying liquid-separation sledge, institute
The corrosion inhibiter injection sledge one end connection separate measurement sled stated, other end connection service cylinder sledge, the described sledge that enters the station, general mechanism sledge,
Separate measurement is prized and gas sledge of using by oneself, emptying liquid-separation sledge and service cylinder sledge are all connected with being vented house steward.
The described sledge that enters the station is including enter the station sledge air inlet, sledge gas outlet of entering the station, enter the station sledge drain, and heating furnace sledge includes adding
Hot stove sledge air inlet, heating furnace sledge gas outlet, the fuel gas inlet of heating furnace sledge first, the outlet of heating furnace sledge fuel gas, heating furnace
The fuel gas inlet of sledge second, general mechanism sledge includes general mechanism sledge air inlet, general mechanism sledge gas outlet, the outlet of general mechanism sledge, exchange
Sledge drain is closed, separate measurement sled includes separate measurement sled air inlet, separate measurement and prizes mouth, separate measurement sled drain, first
Alcohol corrosion inhibiter entrance, personal gas sledge goes out including personal gas sledge import, personal gas sledge outlet, personal gas sledge drain, gas sledge of using by oneself
Gas port, emptying liquid-separation sledge includes emptying liquid-separation sledge air inlet, emptying liquid-separation sledge gas outlet, and outer defeated metering sledge includes outer defeated metering sledge
Air inlet, outer defeated metering sledge outlet, corrosion inhibiter injection sledge include corrosion inhibiter injection sledge first outlet, corrosion inhibiter injection sledge second and gone out
Mouthful, service cylinder sledge includes service cylinder sledge air inlet, service cylinder sledge gas outlet, service cylinder sledge drain, service cylinder sledge corrosion inhibiter note
Entrance, releases flare including fuel gas inlet of releasing flare, import of dropping a hint of releasing flare, generator includes generator fuel gas
Import, the described sledge air inlet that enters the station is connected with carrying out gas pipeline, and sledge gas outlet of entering the station is connected with heating furnace sledge air inlet, and enter the station sledge
Drain is connected with emptying house steward, and described heating furnace sledge gas outlet is connected with general mechanism sledge air inlet, and heating furnace sledge first fires
Material gas import connection fuel gas comes pipeline, the personal gas sledge import of heating furnace sledge fuel gas outlet connection, the fuel of heating furnace sledge second
The personal gas sledge outlet of gas import connection, described general mechanism sledge gas outlet is connected with separate measurement sled air inlet, and general mechanism sledge goes out
Mouthful with separate measurement prize mouth converge after with it is outer it is defeated measure sledge air inlet be connected, general mechanism sledge drain be vented house steward be connected,
Described separate measurement sled drain is connected with emptying house steward, and methanol corrosion inhibiter entrance connects with corrosion inhibiter injection sledge first outlet
Connect, described personal gas sledge drain is connected with emptying house steward, personal gas sledge gas outlet respectively with fuel gas inlet of releasing flare
With generator fuel gas import connection, described emptying liquid-separation sledge air inlet is connected with emptying house steward, emptying liquid-separation sledge gas outlet
Import of dropping a hint is connected with releasing flare, and described outer defeated metering sledge outlet is connected with cylinder sledge air inlet of serving a ball, described service
Cylinder sledge gas outlet is connected with external transport pipeline, and service cylinder sledge drain is connected with being vented house steward, serve a ball cylinder sledge corrosion inhibiter inlet and
Corrosion inhibiter injection sledge second outlet is connected.
The gas gathering station gas gathering system of described full sledge dressization also includes accessory system, described accessory system is switchgear house,
Rack room, air compressor house.
The described sledge that enters the station, heating furnace sledge, general mechanism sledge, separate measurement sled, personal gas sledge, emptying liquid-separation sledge, outer defeated meter
Amount sledge, corrosion inhibiter injection sledge, service cylinder sledge are equipped with instrument junction box or distribution box.
Described corrosion inhibiter injection sledge is portable sledge assembling structure.
Described generator is gas electricity generator.
The beneficial effects of the utility model:The gas gathering station gas gathering system for this full sledge dressization that the utility model is provided, bag
Include the sledge that enters the station, heating furnace sledge, general mechanism sledge, separate measurement sled, personal gas sledge, emptying liquid-separation sledge, outer defeated metering sledge, corrosion inhibiter note
Enter sledge, service cylinder sledge, release flare, generator, the described sledge that enters the station is sequentially connected with heating furnace sledge, general mechanism sledge, separate measurement
Sled, outer defeated metering sledge and service cylinder sledge, described personal gas sledge one end connection heating furnace sledge, the other end, which is sequentially connected with, releases flare
With emptying liquid-separation sledge, described corrosion inhibiter injection sledge one end connection separate measurement sled, the other end connects service cylinder sledge, and described enters
Stand sledge, general mechanism sledge, separate measurement sled and gas sledge of using by oneself, emptying liquid-separation sledge and service cylinder sledge be all connected be vented house steward, therefore, should
The gas gathering station gas gathering system of full sledge dressization saves cost, reduces occupation of land, Accelerating The Construction progress.
Brief description of the drawings
The utility model is described in further details below with reference to accompanying drawing.
Fig. 1 is the structural representation of the gas gathering station gas gathering system of full sledge dressization.
Description of reference numerals:1 enter the station sledge, 1-1 enter the station sledge air inlet, 1-2 enter the station sledge gas outlet, 1-3 enter the station sledge drain,
2 heating furnace sledges, 2-1 heating furnace sledges air inlet, 2-2 heating furnace sledges gas outlet, the first fuel gas inlet of 2-3 heating furnaces sledge, 2-4 add
Hot stove sledge fuel gas outlet, the second fuel gas inlet of 2-5 heating furnaces sledge, 3 general mechanism sledges, 3-1 general mechanism sledges air inlet, 3-2 are total
Machine-operated sledge gas outlet, the outlet of 3-3 general mechanisms sledge, 3-4 general mechanism sledges drain, 4 separate measurements sled, the sled air inlet of 4-1 separate measurements
Mouth, 4-2 separate measurements prize mouth, 4-4 separate measurements sled drain, 4-3 methanol corrosion inhibiter entrance, 5 personal gas sledges, 5-1 and used by oneself
The import of gas sledge, the personal gas sledge outlets of 5-2, the personal gas sledge drains of 5-4,5-3 personal gas sledge gas outlet, 6 emptying liquid-separation sledges, 6-2
It is emptying liquid-separation sledge air inlet, 6-1 emptying liquid-separation sledges gas outlet, defeated metering sledge outside 7, defeated metering sledge air inlet outside 7-1, defeated outside 7-2
Measure sledge outlet, 8 corrosion inhibiter injection sledge, 8-1 corrosion inhibiter injection sledge first outlet, 8-2 corrosion inhibiter injection sledge second outlet, 9 hairs
Ball cylinder sledge, 9-1 service cylinder sledges air inlet, 9-2 service cylinder sledges gas outlet, 9-3 service cylinder sledges drain, 9-4 service cylinder sledge inhibitions
Agent inlet, 10 release flare, release flare fuel gas inlet, 10-2 of 10-1 releases flare import, 11 switchgear houses, 12 of dropping a hint
Rack room, 13 generators, the import of 13-1 generator fuel gas, 14 emptying house stewards, 15 air compressor houses.
Embodiment
Embodiment 1:
As shown in figure 1,
Embodiment 2:A kind of gas gathering station gas gathering system of full sledge dressization, including the sledge 1 that enters the station, heating furnace sledge 2, general mechanism sledge 3,
Separate measurement sled 4, personal gas sledge 5, emptying liquid-separation sledge 6, outer defeated metering sledge 7, corrosion inhibiter injection sledge 8, service cylinder sledge 9, emptying fire
Torch 10, generator 13, the described sledge 1 that enters the station are sequentially connected with heating furnace sledge 2, general mechanism sledge 3, separate measurement sled 4, outer defeated metering sledge
7 connect heating furnace sledge 2 with service cylinder sledge 9, described personal one end of gas sledge 5, and the other end is sequentially connected with release flare 10 and emptying
Divide liquid sledge 6, described corrosion inhibiter injection sledge 8 one end connection separate measurement prizes 4, and the other end connects cylinder sledge 9 of serving a ball, and described enters the station
Sledge 1, general mechanism sledge 3, separate measurement sled 4 and personal gas sledge 5, emptying liquid-separation sledge 6 and service cylinder sledge 9 are all connected with being vented house steward 14;
The described sledge 1 that enters the station is including enter the station sledge air inlet 1-1, the sledge gas outlet 1-2 that enters the station, enter the station sledge drain 1-3, and heating furnace sledge 2 is wrapped
Include heating furnace sledge air inlet 2-1, heating furnace sledge gas outlet 2-2, the first fuel gas inlet of heating furnace sledge 2-3, heating furnace sledge fuel
Gas outlet 2-4, heating furnace sledge the second fuel gas inlet 2-5, general mechanism sledge 3 include general mechanism sledge air inlet 3-1, general mechanism sledge and gone out
Gas port 3-2, general mechanism sledge outlet 3-3, general mechanism sledge drain 3-4, separate measurement sled 4 include separate measurement sled air inlet 4-1,
Separate measurement prizes a mouthful 4-2, separate measurement sled drain 4-4, methanol corrosion inhibiter entrance 4-3, and gas sledge 5 of using by oneself includes personal gas sledge
Import 5-1, personal gas sledge outlet 5-2, personal gas sledge drain 5-4, personal gas sledge gas outlet 5-3, emptying liquid-separation sledge 6 include putting
Space division liquid sledge air inlet 6-2, emptying liquid-separation sledge gas outlet 6-1, outer defeated metering sledge 7 includes outer defeated metering sledge air inlet 7-1, outer defeated
Sledge outlet 7-2 is measured, corrosion inhibiter injection sledge 8 includes corrosion inhibiter injection sledge first outlet 8-1, corrosion inhibiter injection sledge second outlet 8-
2, service cylinder sledge 9 includes service cylinder sledge air inlet 9-1, service cylinder sledge gas outlet 9-2, service cylinder sledge drain 9-3, service cylinder sledge
Corrosion inhibiter inlet 9-4, release flare 10 include release flare fuel gas inlet 10-1, release flare the import 10-2 that drops a hint,
Generator 13 is connected including generator fuel gas import 13-1, the described sledge air inlet 1-1 that enters the station with carrying out gas pipeline, and the sledge that enters the station goes out
Gas port 1-2 is connected with heating furnace sledge air inlet 2-1, and the sledge drain 1-3 that enters the station is connected with emptying house steward 14, described heating furnace sledge
Gas outlet 2-2 is connected with general mechanism sledge air inlet 3-1, and heating furnace sledge the first fuel gas inlet 2-3 connection fuel gas carrys out pipeline, plus
The personal personal gas sledge of gas sledge import 5-1, heating furnace sledge the second fuel gas inlet 2-5 connection of hot stove sledge fuel gas outlet 2-4 connections
5-2 is exported, described general mechanism sledge gas outlet 3-2 is connected with separate measurement sled air inlet 4-1, and general mechanism sledge outlet 3-3 is with dividing
Prize after a mouthful 4-2 converges and be connected with outer defeated metering sledge air inlet 7-1 from metering, general mechanism sledge drain 3-4 and emptying house steward 14
It is connected, described separate measurement sled drain 4-4 is connected with emptying house steward 14, and methanol corrosion inhibiter entrance 4-3 injects with corrosion inhibiter
Sledge first outlet 8-1 connections, described personal gas sledge drain 5-4 is connected with emptying house steward 14, gas outlet 5-3 points of gas sledge of using by oneself
It is not connected with the fuel gas inlet 10-1 and generator fuel gas import 13-1 that releases flare, described emptying liquid-separation sledge air inlet 6-
2 are connected with emptying house steward 14, and emptying liquid-separation sledge gas outlet 6-1 is connected with the import 10-2 that drops a hint of releasing flare, and described is outer defeated
Metering sledge outlet 7-2 is connected with service cylinder sledge air inlet 9-1, and described service cylinder sledge gas outlet 9-2 is connected with external transport pipeline, sends out
Ball cylinder sledge drain 9-3 is connected with emptying house steward 14, and service cylinder sledge corrosion inhibiter inlet 9-4 injects sledge second outlet with corrosion inhibiter
8-2 is connected.
Carry out gas and sequentially pass through the sledge 1 that enters the station, heating furnace sledge 2, general mechanism sledge 3, switch after the throttling of general mechanism sledge 3 through flow
Valve, goes separate measurement sledge 4 to carry out two-phase flow measurement all the way, measures the gas-liquid completed and enters outer defeated metering sledge 7 together with remaining carrys out gas
Metering, after through serve a ball cylinder sledge 9 outside it is defeated;From the sledge 1 that enters the station, general mechanism sledge 3, separate measurement sledge 4, personal gas sledge 5, service cylinder sledge 9
That comes drops a hint, and enters emptying liquid-separation sledge 6 through being vented house steward, and the gas phase by separation is measured to torch through ultrasonic flowmeter fires
Burn;Personal gas is first passed through heating furnace sledge 2 by source of the gas and heated, the laggard personal pressure regulation of gas sledge 5, separation, used to heating furnace sledge etc.
Gas point is supplied.
It is an advantage of the invention that:Full sledge dressization, high-pressure gas collection station gas gathering system is made up of 9 skid bodys, each sledge and oneself into being
System, greatly simplifies yard flow and equipment, simplifies based process and place hardening.It is preferred that high-efficiency appliance, is invested more conventional
Gas gathering station reduces 3%~8%;Construction period was can be controlled in 20~30 days, and construction period shortens half;According to horizontal layout,
The more conventional gas gathering station of floor space reduces 40%;Valve is integrated on sledge, and sledge is debugged in factory-assembled, scene process pipelines
Connection, saves the time of a large amount of in-site installations and debugging;Each sledge into sledge business by being responsible for after sale, and technical staff and level are reduced, side
Just production management;Presentation quality:Each sledge is box, outside only reserved pipeline interface;Electric instrument cable gauge is installed, and pipeline is horizontal flat
Vertically, overall appearance.
Embodiment 2
As shown in figure 1, on the basis of embodiment 1, the gas gathering station gas gathering system of described full sledge dressization also includes auxiliary
System, described accessory system is switchgear house 11, rack room 12, air compressor house 15;Each sledge accessory system, passes through electricity of powering respectively
Cable is powered for each sledge distribution box, signal transmission and control is carried out by instrument cable and instrument wind is provided for each instrumentation.
The described sledge 1 that enters the station, heating furnace sledge 2, general mechanism sledge 3, separate measurement sled 4, personal gas sledge 5, emptying liquid-separation sledge 6,
Outer defeated metering sledge 7, corrosion inhibiter injection sledge 8, service cylinder sledge 9 are equipped with instrument junction box or distribution box.
The described sledge 1 that enters the station includes the equipment such as block valve, temperature, pressure detection, emptying gate valve that enter the station, and unstripped gas will be entered
Stand progress pressure and temp detection, overload alarm, promptly control is blocked, the need for meeting gas collection technique.Instrument wiring is set on sledge
The face of case 1, realizes that station control system carries out the operation such as signal acquisition, control to temperature, pressure transmitter, valve on sledge etc., and be sledge
Body power supply for electrical equipment.
Described heating furnace sledge 2 includes body of heater (built-in coil pipe), pressure regulation valve group etc., and fuel can be adjusted by adjuster and is helped
Air quantity is fired, temperature automatic adjustment is reached.There is the face of control cabinet 1 on sledge, realize the behaviour such as detection signal is acquired, monitoring temperature is adjusted
Make.
Described general mechanism sledge 3 includes Angle Throttle Valves, temperature transmitter, pressure transmitter etc..Instrument wiring is set on sledge
The face of case 1, is detected and teletransmission to natural gas temperature pressure after throttling, the detection of header temperature, pressure and teletransmission.
The separate measurement sledge 4 includes horizontal separator, pressure transmitter, orifice flowmeter, mass flowmenter, regulation
Valve, pneumatic ball valve, safety valve etc., main realize are separated to carrying out gas, and gas, the oil phase separated is individually measured, gas after metering,
Outer defeated after liquid mixing, separator sets safety relief facility.The electric tracing that the face of establishing electronic box 1 provides pipeline on sledge is powered, on sledge
If instrument junction box 1 realizes in face that coherent detection data are uploaded and liquid automatic control.
The fuel gas sledge 5 includes coalescing separator, pressure transmitter, intelligent flow meter, pressure-regulating valve, pneumatic ball valve
Deng, fuel gas after separation, pressure regulation, metering to heating furnace, release flare and generator.Safety relief facility, sledge are set on sledge
The upper face of establishing electronic box 1 is that the electric tracing of pipeline is powered on sledge, set on sledge the face of instrument junction box 1 realize coherent detection data upload and
Automatically control.
The emptying liquid-separation sledge 6 includes emptying liquid-separation pot, pressure transmitter, magnetic double level gauge, torch gas supersonic flow
Gauge, condensation oil pump, pneumatic ball valve etc..Emptying house steward 14 comes after gas carries out gas-liquid separation through emptying liquid-separation pot through ultrasonic flow
Meter metering is to torch 10, and the liquid isolated is outer after being pressurized through condensation oil pump to transport to gathering line.The face of establishing electronic box 1 is sledge on sledge
The electric tracing of upper condensation oil pump and pipeline is powered, if the face of instrument junction box 1 realizes that coherent detection data are uploaded and automatically controlled.
Outer defeated metering sledge 7 includes ball valve, orifice flowmeter etc..For gas metering, outer defeated.Instrument junction box is set on sledge
Realize that coherent detection data are uploaded and automatically controlled in 1 face.
The corrosion inhibiter (methanol) injection sledge 8 include corrosion inhibiter (methanol) storage tank, note corrosion inhibiter (methanol) pump, flowmeter,
Filter etc., for for methanol or corrosion inhibiter are pressurized through pump, injecting pipeline, the pry device is portable sledge assembling structure, can be with
When urgency call.The face of establishing electronic box 1 is powered for note corrosion inhibiter (methanol) pump on sledge, and the face of instrument junction box 1 is set on sledge and realizes correlation
Detection data are uploaded and automatically controlled.
The service cylinder sledge 9 includes pig launcher, pneumatic ball valve, insulating joint etc..Come outside gas to transport to for receiving
Downstream station, with pigging function, to natural gas filling corrosion inhibiter access function in external transport pipeline.The face of instrument junction box 1 is set on sledge
Realize that coherent detection data are uploaded and automatically controlled.
Stabilized power source is provided for whole station electrical equipment in the switchgear house 11, passes through power cable and each equipment distribution box phase
Even.
The rack room 12 includes rack, communication cabinet of yard control system etc., and control system of standing realizes whole station signal monitoring
And control;Communication cabinet realizes that signal superior control system is transmitted.
The generator 13 is gas electricity generator, and urgent electricity consumption is provided for yard.
The present invention operation principle be:
Full sledge dressization, the sledge 1 that will enter the station, heating furnace sledge 2, general mechanism sledge 3, separate measurement sled 4, personal gas sledge 5, emptying liquid-separation
Sledge 6, outer defeated metering sledge 7, methanol (corrosion inhibiter injection) sledge 8, the skid body of service cylinder sledge 9 constitute a high-pressure gas collection station gas gathering system,
Each sledge and self-organizing system, carry out gas and sequentially pass through the sledge 1 that enters the station, heating furnace sledge 2, general mechanism sledge 3, through stream after the throttling of general mechanism sledge 3
Journey switching valve, goes separate measurement sledge 4 to carry out two-phase flow measurement all the way, measures the gas-liquid completed and enters outer defeated meter together with remaining carrys out gas
Amount sledge 7 measure, after through serve a ball cylinder sledge 9 outside it is defeated;From the sledge 1 that enters the station, general mechanism sledge 3, separate measurement sledge 4, personal gas sledge 5, service
Cylinder sledge 9 is dropped a hint, and enters emptying liquid-separation sledge 6 through being vented house steward, the gas phase by separation through ultrasonic flowmeter measure to
Torch burning;Personal gas is first passed through heating furnace sledge 2 by source of the gas and heated, the laggard personal pressure regulation of gas sledge 5, separation, to heating furnace
Sledge etc. is supplied with gas point, stand it is interior be additionally provided with switchgear house 11, rack room 12, air compressor house 15, be each sledge accessory system, pass through respectively
Service cable is powered for each sledge distribution box, signal transmission and control is carried out by instrument cable and is provided for each instrumentation
Instrument wind.
Exemplified as above is only for example, not constituting to protection domain of the present utility model to of the present utility model
Limitation, it is every to be belonged to the same or analogous design of the utility model within protection scope of the present invention.
Claims (5)
1. a kind of gas gathering station gas gathering system of full sledge dressization, it is characterised in that:Including the sledge that enters the station (1), heating furnace sledge (2), exchange
Close sledge (3), separate measurement sled (4), personal gas sledge (5), emptying liquid-separation sledge (6), outer defeated metering sledge (7), corrosion inhibiter injection sledge
(8), service cylinder sledge (9), release flare (10), generator (13), the described sledge that enters the station (1) is sequentially connected with heating furnace sledge (2), total
Machine-operated sledge (3), separate measurement sled (4), outer defeated metering sledge (7) and service cylinder sledge (9), described personal gas sledge (5) one end connection
Heating furnace sledge (2), the other end, which is sequentially connected with, releases flare (10) and emptying liquid-separation sledge (6), described corrosion inhibiter injection sledge (8) one
End connection separate measurement sled (4), other end connection service cylinder sledge (9), the described sledge that enters the station (1), general mechanism sledge (3), separation meter
Amount sled (4) and personal gas sledge (5), emptying liquid-separation sledge (6) and service cylinder sledge (9) are all connected with emptying house steward (14).
2. the gas gathering station gas gathering system of full sledge dressization as claimed in claim 1, it is characterised in that:The described sledge that enters the station (1) bag
Include the sledge air inlet (1-1) that enters the station, sledge gas outlet (1-2) of entering the station, enter the station sledge drain (1-3),
Heating furnace sledge (2) includes heating furnace sledge air inlet (2-1), heating furnace sledge gas outlet (2-2), the fuel gas of heating furnace sledge first
Import (2-3), heating furnace sledge fuel gas outlet (2-4), the fuel gas inlet of heating furnace sledge second (2-5),
General mechanism sledge (3) include general mechanism sledge air inlet (3-1), general mechanism sledge gas outlet (3-2), general mechanism sledge outlet (3-3),
General mechanism sledge drain (3-4),
Separate measurement sled (4) includes separate measurement sled air inlet (4-1), separate measurement and prizes mouth (4-2), separate measurement sled emptying
Mouth (4-4), methanol corrosion inhibiter entrance (4-3),
Personal gas sledge (5) include personal gas sledge import (5-1), personal gas sledge outlet (5-2), personal gas sledge drain (5-4), from
With gas sledge gas outlet (5-3),
Emptying liquid-separation sledge (6) includes emptying liquid-separation sledge air inlet (6-2), emptying liquid-separation sledge gas outlet (6-1),
Outer defeated metering sledge (7) includes outer defeated metering sledge air inlet (7-1), outer defeated metering sledge outlet (7-2),
Corrosion inhibiter injection sledge (8) includes corrosion inhibiter injection sledge first outlet (8-1), corrosion inhibiter injection sledge second outlet (8-2),
Cylinder sledge (9) of serving a ball includes service cylinder sledge air inlet (9-1), service cylinder sledge gas outlet (9-2), service cylinder sledge drain (9-
3), service cylinder sledge corrosion inhibiter inlet (9-4),
Release flare (10) include releasing flare fuel gas inlet (10-1), import (10-2) of dropping a hint of releasing flare,
Generator (13) includes generator fuel gas import (13-1),
The described sledge air inlet (1-1) that enters the station is connected with carrying out gas pipeline, and enter the station sledge gas outlet (1-2) and heating furnace sledge air inlet
(2-1) is connected, and the sledge drain (1-3) that enters the station is connected with emptying house steward (14),
Described heating furnace sledge gas outlet (2-2) is connected with general mechanism sledge air inlet (3-1), the fuel gas inlet of heating furnace sledge first
(2-3) connection fuel gas carrys out pipeline, the personal gas sledge import (5-1) of heating furnace sledge fuel gas outlet (2-4) connection, heating furnace sledge the
The personal gas sledge outlet (5-2) of two fuel gas inlets (2-5) connection,
Described general mechanism sledge gas outlet (3-2) and separate measurement sled air inlet (4-1) are connected, general mechanism sledge outlet (3-3) and
Separate measurement prize mouth (4-2) converge after with it is outer it is defeated measure sledge air inlet (7-1) be connected, general mechanism sledge drain (3-4) is with putting
Empty house steward (14) is connected,
Described separate measurement sled drain (4-4) is connected with emptying house steward (14), methanol corrosion inhibiter entrance (4-3) and corrosion inhibiter
Sledge first outlet (8-1) connection is injected,
Described personal gas sledge drain (5-4) is connected with emptying house steward (14), personal gas sledge gas outlet (5-3) respectively with emptying
Torch fuel gas inlet (10-1) and generator fuel gas import (13-1) connection,
Described emptying liquid-separation sledge air inlet (6-2) is connected with emptying house steward (14), emptying liquid-separation sledge gas outlet (6-1) and emptying
Torch drop a hint import (10-2) be connected,
Described outer defeated metering sledge outlet (7-2) is connected with service cylinder sledge air inlet (9-1),
Described service cylinder sledge gas outlet (9-2) is connected with external transport pipeline, service cylinder sledge drain (9-3) and emptying house steward (14)
It is connected, service cylinder sledge corrosion inhibiter inlet (9-4) is connected with corrosion inhibiter injection sledge second outlet (8-2).
3. the gas gathering station gas gathering system of full sledge dressization as claimed in claim 1, it is characterised in that:The collection of described full sledge dressization
Gas station gas gathering system also includes accessory system, and described accessory system is switchgear house (11), rack room (12), air compressor house
(15)。
4. the gas gathering station gas gathering system of full sledge dressization as claimed in claim 1, it is characterised in that:The described sledge that enters the station (1) plus
Hot stove sledge (2), general mechanism sledge (3), separate measurement sled (4), personal gas sledge (5), emptying liquid-separation sledge (6), outer defeated metering sledge (7),
Corrosion inhibiter injection sledge (8), service cylinder sledge (9) are equipped with instrument junction box or distribution box.
5. the gas gathering station gas gathering system of full sledge dressization as claimed in claim 1, it is characterised in that:Described corrosion inhibiter injection sledge
(8) it is portable sledge assembling structure, generator (13) is gas electricity generator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720143191.6U CN206496196U (en) | 2017-02-17 | 2017-02-17 | A kind of gas gathering station gas gathering system of full sledge dressization |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720143191.6U CN206496196U (en) | 2017-02-17 | 2017-02-17 | A kind of gas gathering station gas gathering system of full sledge dressization |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206496196U true CN206496196U (en) | 2017-09-15 |
Family
ID=59804738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720143191.6U Active CN206496196U (en) | 2017-02-17 | 2017-02-17 | A kind of gas gathering station gas gathering system of full sledge dressization |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206496196U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106870946A (en) * | 2017-02-17 | 2017-06-20 | 西安长庆科技工程有限责任公司 | A kind of high-pressure gas collection station gas gathering system of full sledge dressization |
CN110285323A (en) * | 2019-05-16 | 2019-09-27 | 中石化石油工程技术服务有限公司 | Natural gas line based on SCADA system standardizes integration module |
-
2017
- 2017-02-17 CN CN201720143191.6U patent/CN206496196U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106870946A (en) * | 2017-02-17 | 2017-06-20 | 西安长庆科技工程有限责任公司 | A kind of high-pressure gas collection station gas gathering system of full sledge dressization |
CN110285323A (en) * | 2019-05-16 | 2019-09-27 | 中石化石油工程技术服务有限公司 | Natural gas line based on SCADA system standardizes integration module |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201723984U (en) | Gas leakage positioning experiment device | |
CN202073552U (en) | Automatic oil-gas metering device | |
CN203656576U (en) | Pressure regulating and metering platform for fuel gas | |
CN206496196U (en) | A kind of gas gathering station gas gathering system of full sledge dressization | |
CN203907219U (en) | Natural gas collecting all-in-one integrated device | |
CN106870946A (en) | A kind of high-pressure gas collection station gas gathering system of full sledge dressization | |
CN105569121A (en) | Intelligent water feed pipeline system with pressure flow monitoring recording and teletransmission function | |
CN203230404U (en) | Salt cavern gas storage is annotated and is adopted defeated sled device of gas collection | |
CN203656580U (en) | Automatic gas odorization device | |
CN204164669U (en) | Intelligent gas adds smelly system | |
CN105065908A (en) | Sulfur-contained natural gas collection integrated device | |
CN204964306U (en) | Testing platform of gas heater circulation pressure boost function | |
CN208794440U (en) | A kind of air preheater temperature control shunting device | |
CN203867522U (en) | Electromagnetic heater for oil well outlet | |
CN205504461U (en) | Small -size on -vehicle formula moves vaporizing station | |
CN201925715U (en) | LNG (liquefied natural gas) skid-mounted gas supply device | |
CN2535679Y (en) | Liquid-mmedium lifting auto-control mixed gas device made from ligt hydrocarbon oil | |
CN202901839U (en) | Unattended operation pressure regulating box system | |
CN104295899A (en) | 8-well-type heating and separating integrated device | |
CN203907218U (en) | Natural gas collecting all-in-one integrated device | |
CN205279228U (en) | Utilize solar water heater to store hot water heating room | |
CN204026146U (en) | A kind of 8 well formula heating isolation integral integrated devices | |
CN109611690B (en) | Well group falls back pressure metering device | |
CN204901343U (en) | It annotates pure integration device to contain sulphur natural gas | |
CN204879446U (en) | Contain sulphur natural gas gas collection integration device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |