CN206495134U - Steel reinforced concrete combines upright column joint on tubular arch bridge arch - Google Patents
Steel reinforced concrete combines upright column joint on tubular arch bridge arch Download PDFInfo
- Publication number
- CN206495134U CN206495134U CN201720172950.1U CN201720172950U CN206495134U CN 206495134 U CN206495134 U CN 206495134U CN 201720172950 U CN201720172950 U CN 201720172950U CN 206495134 U CN206495134 U CN 206495134U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel case
- case
- arch
- ribbed stiffener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Upright column joint, including tubular arch are combined the utility model discloses steel reinforced concrete on a kind of tubular arch bridge arch, the steel case on tubular arch is arranged on, described steel case is connected with tubular arch, the top of tubular arch is at least part of to be arranged in steel case;In pier stud shaped steel insertion steel case, steel case ribbed stiffener is set, and steel case ribbed stiffener is vertically arranged with pier stud shaped steel, steel case ribbed stiffener is provided with connection jack in steel case, pier stud shaped steel is connected by connecting jack with steel case ribbed stiffener, and pier stud shaped steel is with pier stud shaped steel by being connected to kerve steel;Cast pier base concrete in steel case.While the utility model improves the intensity after steel case is cast in itself using steel case ribbed stiffener, also using steel case ribbed stiffener, kerve steel is further connected to pier stud shaped steel, the utility model annexation is simple, constructing operation is time saving, laborsaving, it is cost-effective while improving the reliability of the fastness of connection, stability and connection.
Description
Technical field
The utility model is related to bridge construction device, and steel reinforced concrete combines upright column joint on specifically a kind of tubular arch bridge arch.
Background technology
CFST Arch Bridge is generally ribbed arch bridge, is formed per rib by two panels concrete-filled steel tube truss connecting structure.Bridge floor
Connected between arch rib part above and deck structure using suspension rod, and between the arch rib part and deck structure below bridge floor then
Connected by the upper steel pipe post of arch.
Steel pipe post joint is typically included in the bearing beam that two steel tube of main chord levels of arch rib are fixedly connected on arch, and fixed
It is arranged on seat under the spandrel column on the bearing beam.Using steel-mixed combining structure of strip case more than current bearing beam, or by arch rib it
Arch springing be rolled into reinforced concrete box again thereon plus concrete pad beam structure, both combining structures are complicated, and need to be
Bridge construction site operation, constructs also relatively complicated, connection reliability is poor.
Utility model content
The technical problems to be solved in the utility model is to provide steel reinforced concrete on a kind of tubular arch bridge arch and combines upright column joint, should
Device, provided with steel case ribbed stiffener and to kerve steel, strengthens the bulk strength of steel case, makes pier stud shaped steel and steel in steel case in steel case
Case connection is more firm, and stability is good, and connection reliability is high.
In order to solve the above technical problems, the utility model is adopted the following technical scheme that:
Steel reinforced concrete combines upright column joint, including tubular arch on a kind of tubular arch bridge arch, is arranged on the steel case on tubular arch, described
Steel case be connected with tubular arch, the top of tubular arch is at least part of to be arranged in steel case;Pier stud shaped steel inserts steel case
It is interior, steel case ribbed stiffener is set, and steel case ribbed stiffener is vertically arranged with pier stud shaped steel, steel case ribbed stiffener is provided with connection jack in steel case,
Pier stud shaped steel is connected by connecting jack with steel case ribbed stiffener, and pier stud shaped steel is with pier stud shaped steel by being connected to kerve steel;
Cast pier base concrete in steel case.
Using the utility model of above-mentioned technical proposal, compared with prior art, its advantage is:
By setting steel case ribbed stiffener in steel case, the same of the intensity after steel case is cast in itself is improved using steel case ribbed stiffener
When, fixation also is attached to pier stud shaped steel using steel case ribbed stiffener;Kerve steel is entered to advance to pier stud shaped steel in addition, also utilizing
One step is connected, and the utility model annexation is simple, and constructing operation is time saving, laborsaving, cost-effective to improve simultaneously
The reliability of the fastness of connection, stability and connection.
Further, preferred scheme of the present utility model is:
The size of described steel case ribbed stiffener is corresponding to the cavity of steel case, and steel case ribbed stiffener is provided with steam vent.Above-mentioned setting,
Make steel case and steel case ribbed stiffener more closely sealed, so as to improve the intensity after the casting of steel case.
Periphery of the described steam vent along steel case ribbed stiffener is arranged at intervals.By setting steam vent, it is ensured that concrete is poured into
Density, prevent air be full of form bubble in steel case.
The part that described pier stud shaped steel is inserted into steel case is provided with WELDING STUDS.A diameter of 22mm that WELDING STUDS is preferably used,
The center spacing of WELDING STUDS should be not less than 15cm.By setting WELDING STUDS, can further it improve in pier stud shaped steel and steel case
The stability of concrete connection.
The part being arranged at the top of the inwall and tubular arch of described steel case in steel case is equipped with WELDING STUDS.Above-mentioned setting,
Make the connection of steel case and tubular arch more firm, more stable.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 be in Fig. 1 A-A to profile;
Fig. 3 is B-B direction profile in Fig. 1;
Fig. 4 is steel chamber interior wall WELDING STUDS arrangement schematic diagram;
Fig. 5 is that WELDING STUDS arranges schematic diagram on tubular arch in the range of pier base;
Description of reference numerals:1- tubular archs;2- steel casees;3- steel case ribbed stiffeners;4- WELDING STUDSs;5- pier stud shaped steel;
6- is to kerve steel;7- steam vents.
Embodiment
With reference to embodiment, the utility model is further illustrated.
Referring to Fig. 1, a kind of upper steel reinforced concrete combination upright column joint of tubular arch Bridge 1 arch, by tubular arch 1, is arranged on tubular arch 1
Steel case 2 is constituted;Steel case 2 is connected with tubular arch 1, and the top of tubular arch 1 is at least part of to be arranged in steel case 2;Pier stud
In the insertion steel of shaped steel 5 case 2, steel case ribbed stiffener 3 is set, and steel case ribbed stiffener 3 is vertically arranged with pier stud shaped steel 5, and steel case adds in steel case 2
Strength rib 3 is connected provided with connection jack, pier stud shaped steel 5 by connecting jack with steel case ribbed stiffener 3, pier stud shaped steel 5 and pier stud shaped steel 5
By being connected to kerve steel 6;Cast pier base concrete in steel case 2.
The size of steel case ribbed stiffener 3 is corresponding to the cavity of steel case 2, and steel case ribbed stiffener 3 is provided with steam vent 7.Above-mentioned setting, makes
Steel case 2 and steel case ribbed stiffener 3 are more closely sealed, so as to improve the intensity after steel case 2 is cast.
Periphery of the steam vent 7 along steel case ribbed stiffener 3 is arranged at intervals.By setting steam vent 7, it is ensured that it is close that concrete is poured into
Reality, prevents air is full of in steel case 2 from forming bubble.
The part that pier stud shaped steel 5 is inserted into steel case 2 is provided with WELDING STUDS 4.A diameter of 22mm that WELDING STUDS 4 is preferably used, cuts
The center spacing of power nail 4 should be not less than 15cm.By setting WELDING STUDS 4, can further it improve in pier stud shaped steel 5 and steel case 2
Concrete connection stability.
The part that the inwall of steel case 2 and the top of tubular arch 1 are arranged in steel case 2 is equipped with WELDING STUDS 4.Above-mentioned setting, makes
The connection of steel case 2 and tubular arch 1 is more firm, more stable.
Embodiment of the present utility model, but protection not limited to this of the present utility model are the foregoing is only, it is any
Those skilled in the art the thinkable change being equal with the technical program technical characteristic or replacement, all cover this
Within the protection domain of utility model.
Claims (5)
1. steel reinforced concrete combines upright column joint, including tubular arch on a kind of tubular arch bridge arch, the steel case on tubular arch, its feature are arranged on
It is:Described steel case is connected with tubular arch, and the top of tubular arch is at least part of to be arranged in steel case;Pier stud shaped steel
Insert in steel case, steel case ribbed stiffener is set in steel case, steel case ribbed stiffener is vertically arranged with pier stud shaped steel, steel case ribbed stiffener is provided with company
Jointing holes, pier stud shaped steel is connected by connecting jack with steel case ribbed stiffener, and pier stud shaped steel is with pier stud shaped steel by connecting to kerve steel
Connect fixation;Cast pier base concrete in steel case.
2. steel reinforced concrete combines upright column joint on tubular arch bridge arch according to claim 1, it is characterised in that:Described steel case adds
The size of strength rib is corresponding to the cavity of steel case, and steel case ribbed stiffener is provided with steam vent.
3. steel reinforced concrete combines upright column joint on tubular arch bridge arch according to claim 2, it is characterised in that:Described steam vent
It is arranged at intervals along the periphery of steel case ribbed stiffener.
4. steel reinforced concrete combines upright column joint on tubular arch bridge arch according to claim 1, it is characterised in that:Described pier stud type
The part that steel is inserted into steel case is provided with WELDING STUDS.
5. steel reinforced concrete combines upright column joint on tubular arch bridge arch according to claim 1, it is characterised in that:Described steel case
The part being arranged at the top of inwall and tubular arch in steel case is equipped with WELDING STUDS.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720172950.1U CN206495134U (en) | 2017-02-25 | 2017-02-25 | Steel reinforced concrete combines upright column joint on tubular arch bridge arch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720172950.1U CN206495134U (en) | 2017-02-25 | 2017-02-25 | Steel reinforced concrete combines upright column joint on tubular arch bridge arch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206495134U true CN206495134U (en) | 2017-09-15 |
Family
ID=59806877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720172950.1U Active CN206495134U (en) | 2017-02-25 | 2017-02-25 | Steel reinforced concrete combines upright column joint on tubular arch bridge arch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206495134U (en) |
-
2017
- 2017-02-25 CN CN201720172950.1U patent/CN206495134U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926427B (en) | Pier beam transition connecting construction | |
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN204152080U (en) | Embedded outsourcing U-shaped steel-concrete composite beam | |
CN208455883U (en) | A kind of assembled architecture constructional column | |
CN104213645B (en) | H section steel girder-column minor axis connecting top and bottom angle steel node and preparing method of H section steel girder-column minor axis connecting top and bottom angle steel node | |
CN209163218U (en) | A kind of novel concrete-filled steel square tubular column reinforced using cross floor | |
CN108179818A (en) | Stiffened column and steel beam connecting joint with closing steel plate hoop | |
CN207846685U (en) | Stiffened column and steel beam connecting joint with closing steel plate hoop | |
CN206495134U (en) | Steel reinforced concrete combines upright column joint on tubular arch bridge arch | |
CN103726613A (en) | Novel fabricated concrete column | |
CN205955008U (en) | Basement roof arch without beam pile cap node that is all -trans | |
CN111395548A (en) | Reinforced steel column and ECC concrete combined joint and construction method thereof | |
CN208815673U (en) | The connecting joint structure of square steel tube concrete column and reinforced beam | |
CN207244633U (en) | Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam | |
CN214996503U (en) | Reinforced concrete beam and concrete filled steel tube column connecting structure | |
CN109853537A (en) | A kind of prestressed pile and its construction method | |
CN105839791B (en) | A kind of supporting bilateral plate node of overhanging cover board | |
CN105863073B (en) | Coupled column and base node structure and its construction method with horizontal anti-seismic performance | |
CN108678424A (en) | A kind of the steel latticework support device and method for supporting of super-heavy component | |
CN211690803U (en) | Novel rigid connection structure of H-shaped steel beam and concrete shear wall | |
CN207633583U (en) | A kind of connection structure of prefabricated post and prefabricated partition wall | |
CN206844303U (en) | A kind of house frame of light section steel structure and light floor assembly system | |
CN206784589U (en) | Reinforced steel pipe beam column built from concrete and connecting joint structure | |
CN206887965U (en) | A kind of pattern foundation pit supporting structure | |
CN205935234U (en) | Support bayonet beam column and support two curb plate nodes of U type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |