CN206488616U - A kind of energy-saving tunnel cave produced for coal gangue baked brick - Google Patents
A kind of energy-saving tunnel cave produced for coal gangue baked brick Download PDFInfo
- Publication number
- CN206488616U CN206488616U CN201621390522.8U CN201621390522U CN206488616U CN 206488616 U CN206488616 U CN 206488616U CN 201621390522 U CN201621390522 U CN 201621390522U CN 206488616 U CN206488616 U CN 206488616U
- Authority
- CN
- China
- Prior art keywords
- air
- air channel
- section
- blower fan
- kiln body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/60—Production of ceramic materials or ceramic elements, e.g. substitution of clay or shale by alternative raw materials, e.g. ashes
Landscapes
- Furnace Details (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
The utility model discloses a kind of energy-saving tunnel cave produced for coal gangue baked brick, including matrix, described matrix is provided with kiln body, the inside of kiln body is divided into preheating section, bakes section and cooling section, Zhu Re roads are prefabricated with the middle part of the inner bottom surface of kiln body, the both sides in Zhu Re roads are provided with slide rail, bake and the first air channel and the second air channel are provided with the kiln body wall of section, and the first air channel and the second air channel replace and be equidistantly positioned.The gas that this energy-saving tunnel cave for being used for coal gangue baked brick production is sprayed using the first air outlet being obliquely installed will bake intersegmental part air flow, simultaneously, because the air-out direction of the first air outlet between adjacent is intersecting or deviates from, so that the flow direction moment for baking intersegmental part air changes, the gas of flowing make it that the air themperature for baking each region of section is all identical, allow each region fired brick temperature it is identical, effectively prevent because of the reason for temperature and caused by fired brick sintering quality problem.
Description
Technical field
The utility model is related to the tunnel cave technical field baked bricks, specially a kind of to be used for what coal gangue baked brick was produced
Energy-saving tunnel cave.
Background technology
Gangue shale clinker bricks are mainly that raw material carries out high temperature sintering system using shale and gangue, with intensity it is high,
Insulation, it is heat-insulated the features such as, be the best substitute of conventional clay solid brick, meet China's building energy conservation and materials for wall and reform work
The relevant policies of work, in addition to energy-conservation, Economization on land, also very significantly, waste is made full use of emission reduction effect, environmental pollution is reduced, carried
High constructure heat preservation and insulation, in heating districts, porous brick building can save energy more than 30% in the winter time, because it has well
Thermal and insulating performance so that thickness of wall body reduce, building usable floor area 1.13%, coal gangue baked brick tunnel cave can be increased
Widest application has been obtained in brickmaking industry, technical comparative maturity, but in coal gangue baked brick sintering process, tunnel
The air flow property baked in section of kiln is poor so that each regional temperature for baking intersegmental part has differences, so as to influence fired brick
Sintering quality.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect to be used for coal gangue baked brick life there is provided one kind
The energy-saving tunnel cave of production, by setting the first air outlet and the first air inlet to coordinate in section in baking for kiln body, enhancing is baked
Air flow property in section so that the temperature for baking each region in section is identical, can be with so as to improve the sintering quality of fired brick
The problem of effectively solving in background technology.
To achieve the above object, the utility model provides following technical scheme:It is a kind of to be used for what coal gangue baked brick was produced
Energy-saving tunnel cave, including matrix, described matrix are provided with kiln body, and the inside of kiln body is divided into preheating section, bakes section and cold
But section, is prefabricated with Zhu Re roads in the middle part of the inner bottom surface of kiln body, and the both sides in Zhu Re roads are provided with slide rail, bakes the kiln body wall of section
The first air channel and the second air channel are inside provided with, the first air channel and the second air channel replace and be equidistantly positioned, and bake the medial surface of section
Above equidistant to be provided with the first air outlet and the first air inlet, the first air outlet is connected with the outlet air end in the first air channel, the first air intake
Mouth is connected with the air intake in the second air channel, and the first blower fan, the air intake of the first blower fan and the second air channel are provided with the top of kiln body
Outlet air end is connected, and the outlet air end of the first blower fan is connected with the air intake in the first air channel, and the madial wall top and bottom of kiln body is pacified
Equipped with temperature sensor.
As a kind of optimal technical scheme of the present utility model, the 3rd air channel is provided with the side wall of the preheating section,
It is connected with 3rd air channel in the second air inlet extended in preheating section, the opposite side wall of preheating section and is provided with the 4th air channel,
The second air outlet extended in preheating section is connected with 4th air channel.
As a kind of optimal technical scheme of the present utility model, five-duct is provided with the side wall of the cooling section,
It is connected with five-duct in the 3rd air outlet extended in cooling section, the opposite side wall of cooling section and is provided with the 6th air channel,
The 3rd air inlet extended in preheating section is connected with 6th air channel.
As a kind of optimal technical scheme of the present utility model, the second wind is installed on an outside wall of the kiln body
Machine, the air intake of the second blower fan is connected by pipeline with the outlet air end in the 3rd air channel, the outlet air end of the second blower fan by pipeline with
The 3rd blower fan is installed on the air intake connection of five-duct, another outside wall of kiln body, the air intake of the 3rd blower fan passes through
Pipeline is connected with the outlet air end in the 6th air channel, and the outlet air end of the 3rd blower fan is connected by pipeline with the air intake in the 4th air channel.
As a kind of optimal technical scheme of the present utility model, it is installed with the outside wall of the kiln body automatically controlled
First fan speed regulation switch, the second fan speed regulation switch, the 3rd fan speed regulation switch and temperature are installed in case, electric cabinet to show
Device, the first fan speed regulation switch is electrically connected with the first blower fan, and the second fan speed regulation switch is electrically connected with the second blower fan, the 3rd blower fan
Speed-regulating switch is electrically connected with the 3rd blower fan, and temperature indicator is electrically connected with temperature sensor.
As a kind of optimal technical scheme of the present utility model, the inside in second air channel is provided with filtering by support
Net, the bottom in the second air channel is provided with the dust export being in communication with the outside, and is welded with sealing by hinge on the outside of dust export
Door.
As a kind of optimal technical scheme of the present utility model, first air outlet is obliquely installed, and it is adjacent between
The air-out direction of first air outlet is intersecting or deviates from.
Compared with prior art, the beneficial effects of the utility model are:This is used for the energy-saving of coal gangue baked brick production
The gas that tunnel cave is sprayed using the first air outlet for being obliquely installed will bake intersegmental part air flow, simultaneously as it is adjacent it
Between the first air outlet air-out direction it is intersecting or deviate from so that the flow direction moment for baking intersegmental part air becomes
Change, the gas of flowing make it that the air themperature for baking each region of section is all identical, allow each region fired brick temperature it is identical, effectively
Prevent because of the reason for temperature and caused by fired brick sintering quality problem.
Brief description of the drawings
Fig. 1 is the second air channel of the present utility model internal structure schematic diagram;
Fig. 2 is the first air channel of the present utility model internal structure schematic diagram;
Fig. 3 is overlooking the structure diagram of the present utility model;
Fig. 4 is electric cabinet internal structure schematic diagram of the present utility model.
In figure:1 matrix, 2 kiln bodies, 3 preheating sections, 4 bake section, 5 cooling sections, 6 Zhu Re roads, 7 slide rails, 8 first air channels, 9
Two air channels, 10 first air outlets, 11 first air inlets, 12 screen packs, 13 first blower fans, 14 dust exports, 15 hermatic doors, 16 temperature
Degree sensor, 17 the 3rd air channels, 18 second air inlets, 19 the 4th air channels, 20 second air outlets, 21 five-ducts, 22 the 3rd go out
Air port, 23 the 6th air channels, 24 the 3rd air inlets, 25 second blower fans, 26 the 3rd blower fans, 27 electric cabinets, 28 first fan speed regulations are opened
Close, 29 second fan speed regulations switch, 30 the 3rd fan speed regulations are switched, 31 temperature indicators.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of energy-conservation produced for coal gangue baked brick
Type tunnel cave, including matrix 1, matrix 1 are provided with kiln body 2, and the inside of kiln body 2 is divided into preheating section 3, bakes section 4 and cool down
Section 5, is prefabricated with Zhu Re roads 6, the both sides in Zhu Re roads 6 are provided with slide rail 7, bake the kiln body of section 4 in the middle part of the inner bottom surface of kiln body 2
The first air channel 8 and the second air channel 9 are provided with 2 walls, the first air channel 8 and the second air channel 9 replace and be equidistantly positioned, and bake section
Equidistant on 4 medial surface to be provided with the first air outlet 10 and the first air inlet 11, the first air outlet 10 is obliquely installed, and it is adjacent it
Between the first air outlet 10 air-out direction it is intersecting or deviate from, it is adjacent between the first air outlet 10 for intersecting or deviating from cause
The air-out direction of first air outlet 10 is different, and the air-flow of different directions causes the inner air for baking section 4 fully to circulate, the
One air outlet 10 is connected with the outlet air end in the first air channel 8, and the first air inlet 11 is connected with the air intake in the second air channel 9, kiln body 2
Top is provided with the first blower fan 13, and the air intake of the first blower fan 13 is connected with the outlet air end of the second air channel 9, the air-out of the first blower fan 13
End is connected with the air intake in the first air channel 8, and the first blower fan 13 coordinates with the first air outlet 10 and the first air inlet 11 and to bake
The inner air flowing of section 4 is accelerated, and the madial wall top and bottom of kiln body 2 is mounted on temperature sensor 16, temperature sensor
16 internal temperature for detecting kiln body 2.
It is provided with to be connected with the 3rd air channel 17, the 3rd air channel 17 in the side wall of preheating section 3 and extends in preheating section 3
It is provided with to be connected with the 4th air channel 19, the 4th air channel 19 in second air inlet 18, the opposite side wall of preheating section 3 and extends to preheating
The second air outlet 20 in section 3.
It is provided with to be connected with five-duct 21, five-duct 21 in the side wall of cooling section 5 and extends in cooling section 5
It is provided with to be connected with the 6th air channel 23, the 6th air channel 23 in 3rd air outlet 22, the opposite side wall of cooling section 5 and extends to preheating
The 3rd air inlet 24 in section 3.
Second blower fan 25 is installed, the air intake of the second blower fan 25 passes through pipeline and the 3rd on one outside wall of kiln body 2
The outlet air end connection in air channel 17, the outlet air end of the second blower fan 25 is connected by pipeline with the air intake of five-duct 21, kiln body 2
3rd blower fan 26 is installed, the air intake of the 3rd blower fan 26 passes through pipeline and the outlet air end in the 6th air channel 23 on another outside wall
Connection, the outlet air end of the 3rd blower fan 26 is connected by pipeline with the air intake in the 4th air channel 19, the 3rd air channel 17, the 4th air channel
19th, the air channel 23 of five-duct 21 and the 6th connects preheating section 3 with the inside of cooling section 5, will be preheated using the waste heat of cooling section 5
Preheating is dried in fired brick in section 3, while the cold air in preheating section 3 is admitted to cooling section 5 again so that in cooling section 5
Fired brick cooling faster.
It is installed with the outside wall of kiln body 2 in electric cabinet 27, electric cabinet 27 and first fan speed regulation switch is installed
28th, the second fan speed regulation switchs the 29, the 3rd fan speed regulation switch 30 and temperature indicator 31, the first fan speed regulation switch 28 and the
One blower fan 13 is electrically connected, and the second fan speed regulation switch 29 is electrically connected with the second blower fan 25, the 3rd fan speed regulation switch 30 and the 3rd
Blower fan 26 is electrically connected, and temperature indicator 31 is electrically connected with temperature sensor 16.
The inside in the second air channel 9 is provided with screen pack 12 by support, and screen pack 12 carried out the air baked in section 4
Filter, prevents dust in air from blocking the space between the fired brick piled up in flow process, so as to influence the burning of fired brick
Quality is tied, meanwhile, prevent that bulky grain dust hits the brick heap piled up in air, so as to cause the damage outside brick heap, influence is burnt
The total quality of brick is tied, the bottom in the second air channel 9 is provided with the dust export 14 being in communication with the outside, and logical in the outside of dust export 14
Cross hinge and be welded with hermatic door 15, dust export 14 facilitates the cleaning of dust.
The gas that the utility model is sprayed using the first air outlet 10 being obliquely installed will bake the flowing of the inner air of section 4,
Simultaneously as the air-out direction of the first air outlet 10 between adjacent is intersecting or deviates from so that bake the stream of the inner air of section 4
The dynamic direction moment changes, and the gas of flowing make it that the air themperature for baking each region of section 4 is all identical, allows the sintering in each region
The temperature of brick is identical, effectively prevent because of the reason for temperature and caused by fired brick sintering quality problem, while the second air channel 9 is interior
Portion is provided with screen pack 12 by support, and screen pack 12 can be filtered effectively to baking the air in section 4.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of energy-saving tunnel cave produced for coal gangue baked brick, including matrix (1), it is characterised in that:Described matrix
(1) kiln body (2) is provided with, the inside of kiln body (2) is divided into preheating section (3), section (4) and cooling section (5) is baked, in kiln body
(2) Zhu Re roads (6) are prefabricated with the middle part of inner bottom surface, the both sides of Zhu Re roads (6) are provided with slide rail (7), bake the kiln body of section (4)
(2) the first air channel (8) and the second air channel (9) are provided with wall, the first air channel (8) and the second air channel (9) are alternately and equidistant
Set, bake and equidistant on the medial surface of section (4) be provided with the first air outlet (10) and the first air inlet (11), the first air outlet
(10) outlet air end with the first air channel (8) is connected, and the first air inlet (11) is connected with the air intake of the second air channel (9), kiln body (2)
Top the first blower fan (13) is installed, the air intake of the first blower fan (13) is connected with the second air channel (9) outlet air end, the first blower fan
(13) outlet air end is connected with the air intake of the first air channel (8), and the madial wall top and bottom of kiln body (2) is mounted on temperature biography
Sensor (16).
2. a kind of energy-saving tunnel cave produced for coal gangue baked brick according to claim 1, it is characterised in that:Institute
State to be provided with to be connected with the 3rd air channel (17), the 3rd air channel (17) in the side wall of preheating section (3) and extend in preheating section (3)
The second air inlet (18), be provided with the 4th air channel (19), the 4th air channel (19) in the opposite side wall of preheating section (3) and be connected with
The second air outlet (20) extended in preheating section (3).
3. a kind of energy-saving tunnel cave produced for coal gangue baked brick according to claim 1, it is characterised in that:Institute
State to be provided with to be connected with five-duct (21), five-duct (21) in the side wall of cooling section (5) and extend in cooling section (5)
The 3rd air outlet (22), be provided with the 6th air channel (23), the 6th air channel (23) in the opposite side wall of cooling section (5) and be connected with
The 3rd air inlet (24) extended in preheating section (3).
4. a kind of energy-saving tunnel cave produced for coal gangue baked brick according to Claims 2 or 3, its feature exists
In:Second blower fan (25) is installed on one outside wall of the kiln body (2), the air intake of the second blower fan (25) by pipeline with
The outlet air end connection in the 3rd air channel (17), the outlet air end of the second blower fan (25) is connected by the air intake of pipeline and five-duct (21)
It is logical, the 3rd blower fan (26) is installed, the air intake of the 3rd blower fan (26) passes through pipeline and the on another outside wall of kiln body (2)
The outlet air end connection in six air channels (23), the outlet air end of the 3rd blower fan (26) is connected by pipeline and the air intake in the 4th air channel (19)
It is logical.
5. a kind of energy-saving tunnel cave produced for coal gangue baked brick according to claim 1, it is characterised in that:Institute
It is installed with the outside wall for stating kiln body (2) in electric cabinet (27), electric cabinet (27) and the first fan speed regulation switch is installed
(28), the second fan speed regulation switch (29), the 3rd fan speed regulation switch (30) and temperature indicator (31), the first fan speed regulation are opened
Close (28) to electrically connect with the first blower fan (13), the second fan speed regulation switch (29) is electrically connected with the second blower fan (25), the 3rd blower fan
Speed-regulating switch (30) is electrically connected with the 3rd blower fan (26), and temperature indicator (31) is electrically connected with temperature sensor (16).
6. a kind of energy-saving tunnel cave produced for coal gangue baked brick according to claim 1, it is characterised in that:Institute
The inside for stating the second air channel (9) is provided with screen pack (12) by support, and the bottom of the second air channel (9) is provided with what is be in communication with the outside
Dust export (14), and hermatic door (15) is welded with by hinge on the outside of dust export (14).
7. a kind of energy-saving tunnel cave produced for coal gangue baked brick according to claim 1, it is characterised in that:Institute
The first air outlet (10) is stated to be obliquely installed, and it is adjacent between the first air outlet (10) air-out direction it is intersecting or deviate from.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621390522.8U CN206488616U (en) | 2016-12-19 | 2016-12-19 | A kind of energy-saving tunnel cave produced for coal gangue baked brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621390522.8U CN206488616U (en) | 2016-12-19 | 2016-12-19 | A kind of energy-saving tunnel cave produced for coal gangue baked brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206488616U true CN206488616U (en) | 2017-09-12 |
Family
ID=59770833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621390522.8U Expired - Fee Related CN206488616U (en) | 2016-12-19 | 2016-12-19 | A kind of energy-saving tunnel cave produced for coal gangue baked brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206488616U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110553490A (en) * | 2019-09-23 | 2019-12-10 | 淮南东正道新型建材有限公司 | tunnel kiln drying device and using method |
-
2016
- 2016-12-19 CN CN201621390522.8U patent/CN206488616U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110553490A (en) * | 2019-09-23 | 2019-12-10 | 淮南东正道新型建材有限公司 | tunnel kiln drying device and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103423992A (en) | Energy-saving tunnel kiln used for gangue sintered brick production | |
CN203454723U (en) | Energy-saving tunnel kiln used for gangue sintered brick production | |
CN201440025U (en) | Self-circulation drying equipment of high-moisture extrusion brick | |
CN201630195U (en) | Energy-saving high-efficiency grain drier | |
CN206488616U (en) | A kind of energy-saving tunnel cave produced for coal gangue baked brick | |
CN114877672A (en) | Flue gas circulation energy-saving tunnel kiln | |
CN207991265U (en) | A kind of calciner for firing environmental protection brick using mine dead meal | |
CN2762034Y (en) | Grain drying machine for uniform drying high-moisture grain | |
CN205228024U (en) | Drying system of adobe | |
CN203396236U (en) | Large size alumina ceramic substrate sintering kiln | |
CN205228143U (en) | System for adobe stoving sintering | |
CN204718354U (en) | A kind of building materials material drying device | |
CN105277000A (en) | Heat recycling device of calcining kiln | |
CN2888376Y (en) | High-efficiency energy-saving grain drying machine | |
CN105423765A (en) | Automatic opening and closing device for waste heat recycling | |
CN203704647U (en) | Rotary type energy-saving kiln | |
CN209655785U (en) | Roller kilns | |
CN208901760U (en) | Energy conservation and environmental protection drying kiln | |
CN217423938U (en) | Flue gas circulation energy-saving tunnel kiln | |
CN107486930A (en) | A kind of shale green bricks environmental protection drying system | |
CN105277001B (en) | A kind of production method of refractory material | |
CN206073686U (en) | A kind of tunnel cave | |
CN205909683U (en) | Novel portable rotary kiln's cooling structure | |
CN206308401U (en) | A kind of molybdenum oxide baked for producing line | |
CN2876661Y (en) | Cooler for powdering grog |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170912 Termination date: 20191219 |