CN206484053U - A kind of steel construction perforating device equipped with mobile work platform - Google Patents
A kind of steel construction perforating device equipped with mobile work platform Download PDFInfo
- Publication number
- CN206484053U CN206484053U CN201621468902.9U CN201621468902U CN206484053U CN 206484053 U CN206484053 U CN 206484053U CN 201621468902 U CN201621468902 U CN 201621468902U CN 206484053 U CN206484053 U CN 206484053U
- Authority
- CN
- China
- Prior art keywords
- slide
- mounting disc
- perforating device
- plate
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of steel construction perforating device equipped with mobile work platform, including workbench, top plate, column, perforating device and slide rail;The perforating device is movably installed on top plate by slide bar;The card punch of the perforating device is movably installed in lower mounting disc;The workbench includes fixed plate and portable plate, and both are flexibly connected by upper slide bar and drop shot.Steel construction perforating device during this is new, with many advantages, such as versatility is good, space-consuming is few.
Description
Technical field
The utility model is related to the technical field of steel construction processing, and in particular to a kind of steel construction perforating device.
Background technology
Steel construction is that basic building block is made with shaped steel or steel plate in one kind, according to requirements, passes through welding or bolt connection
Etc. method, the load carrier constituted according to certain rule.Application of the steel construction in every engineering construction is extremely wide, such as steel
Bridge, Steel-Structure Factory with Steel, steel-slag sand, various large-scale pipeline containers, skyscraper and tower rail mechanism etc..Because steel structure system has deadweight
Gently, install easily, short construction period, anti-seismic performance are good, gain quick return for investment, the comprehensive advantage such as low in the pollution of the environment, obtained in construction industry
Extremely wide use is arrived.In order to improve the packaging efficiency of steel construction, accelerate building efficiency, steel construction bone of the prior art
Frame is typically to be punched in factory, after bending and surface treatment;Directly transport building site to be assembled, this is just to steel construction
Processing and processing propose higher requirement;Punch device of the prior art is usually not this kind of bar shaped of steel structure assembly
Component carried out optimization design, equipment and product type often occurs in actual process and size mismatches the life caused
Produce the problems such as inefficiency, poor product quality.
Utility model content
To achieve these goals, the utility model provides and is a kind of steel construction perforating device.
The steel construction perforating device is realized by the following technical solutions:
A kind of steel construction perforating device, including workbench, top plate, column, perforating device and slide rail;The perforating device
Including upper mounting disc, lower mounting disc, slide bar, lifting column and four drills;The lifting column is fixed on top plate bottom, its piston
Bar is connected with upper mounting disc;The slide bar top is movably installed on top plate by the slide opening being arranged on top plate, under slide bar
Portion is fixedly connected with upper mounting disc and lower mounting disc successively, and limited block is provided with the top of the slide bar;The upper mounting disc is
Double-decker, including top plate and lower plywood;The top plate and lower plywood are linked together by connecting pole;The lower plywood
On be provided with four equally distributed slide openings;Motor installing hole corresponding with slide opening position is provided with the top plate;It is described
The second slide opening corresponding with slide opening is provided with lower mounting disc;The drill includes motor, reduction box and drill bit;The motor
It is connected by controller with power supply;The drill bit is connected by the arbor of reduction box and motor;It is provided with outside the reduction box
Cylindrical housings;Drill is installed in upper mounting disc and lower mounting disc by cylindrical housings through slide opening and the second slide opening,
Drill bit is located at below lower mounting disc, and motor is located in motor installing hole;The workbench is fixed vertically including bottom plate, two
Plate, two portable plates, two upper slide bars and two drop shots;The bottom plate is installed on slide rail by bottom slide;Two
Individual vertical fixed plate is respectively arranged in the both sides of bottom plate;It is provided with two upper installing holes and two and pacifies in the vertical fixed plate
Fill hole;Two upper slide bars are respectively arranged in upper installing hole, and two drop shots are respectively arranged in two lower mounting holes;The work
Dynamic plate have with vertical fixed plate identical shape, be provided with two upper slide openings and two lower slide openings, it passes through upper slide opening
It is flexibly connected with lower slide opening with upper slide bar and drop shot;Positioning screw cap is provided with the upper slide bar and drop shot;It is described perpendicular
The upper surface of straight fixed plate and portable plate is provided with multiple inverted trapezoidal standing grooves of different sizes.
It is preferred that, the bolt for fixed cylinder shape shell position is provided with second slide opening;The positioning
Bolt is installed in lower mounting disc by riser.
It is preferred that, it is provided with multiple bar holes on the side wall of the vertical fixed plate and portable plate.
The steel construction punch device of this new middle offer, its perforating device is designed using suspension type, can significantly be subtracted
It is few to operating the occupancy of space of planes, while avoiding circuit is arranged at ground around workbench and asking for easily being trampled and pullled
Topic, adds operating space, decreases the danger of electric shock, be particularly suitable for use in the job shop of large-sized steel structure assembly;
By lifting column and the Activities Design of slide bar, perforating device is lifted relative to workbench, changes distance, is adapted to not consubstantiality
Long-pending product;Lead to and limited block is set at the top of slide bar, can prevent perforating device from excessively moving down shock workbench, improve peace
Quan Xing;Simultaneously multiple drills are set, can according to circumstances use different capacity drill, can also multiple drills simultaneously
Carry out different operations;Drill uses modularized design, allows it in upper mounting disc and lower installation using cylindrical housings
Detachably installed in disk, according to circumstances selection and deployment, raising has used flexibility;Workbench is arranged on base track, real
The movement of workbench is showed, perforating device can be coordinated to be used to process different types of product;In vertical fixed plate and portable plate
Upper surface be provided with multiple inverted trapezoidal standing grooves of different sizes, the steel structure assembly of different-diameter or width can be placed,
Improve the stability placed;Portable plate can horizontally slip relative to slide bar simultaneously, change it the distance between with fixed plate, this
Telescopic design is planted, workbench can be made to be applied to the steel structure assembly of different length, can be to work by positioning screw cap
Dynamic Board position is fixed;By further setting bar hole, vertical fixed plate and the weight of portable plate can be reduced, is improved
Flexibility.
Brief description of the drawings
Fig. 1 is the structure chart of steel construction perforating device in the utility model;
Fig. 2 is the top view of upper mounting disc in the utility model steel construction perforating device;
Fig. 3 is the structure chart of drill in the utility model steel construction perforating device;
Fig. 4 is upper mounting disc structure chart in the utility model steel construction perforating device;
Fig. 5 is the side view of vertical fixed plate in the utility model steel construction perforating device;
Fig. 6 is the side view of portable plate in the utility model steel construction perforating device.
Embodiment
The technical solution of the utility model is described in detail below by specific embodiment, but this practicality is new
The scope of type is not restricted by the embodiments.
Embodiment 1
As shown in figures 1 to 6, a kind of steel construction perforating device, including workbench, top plate 2, column are present embodiments provided
3rd, perforating device and slide rail;The perforating device includes upper mounting disc 201, lower mounting disc 202, slide bar 203, the and of lifting column 204
Four drills 207;The lifting column 204 is fixed on the bottom of top plate 2, and its piston rod 205 is connected with upper mounting disc 201;It is described
The top of slide bar 203 is movably installed on top plate 2 by the slide opening being arranged on top plate 2, and the bottom of slide bar 203 is installed with upper successively
Disk 201 is fixedly connected with lower mounting disc 202, and the top of the slide bar 203 is provided with limited block 206;The upper mounting disc 201 is
Double-decker, including top plate 211 and lower plywood 212;The top plate 211 and lower plywood 212 are connected to by connecting pole 213
Together;4 equally distributed slide openings are provided with the lower plywood 212;It is provided with the top plate 211 and slide opening position pair
The motor installing hole 214 answered;The second slide opening corresponding with slide opening is provided with the lower mounting disc 202;The drill 207 is wrapped
Include motor 215, reduction box 216 and drill bit 217;The motor is connected by controller with power supply;The drill bit 217 is by slowing down
Case 216 is connected with the arbor of motor 215;Cylindrical housings are provided with outside the reduction box 216;Drill 207 passes through cylinder
Shape housing is installed in mounting disc and lower mounting disc through slide opening and the second slide opening, and drill bit 217 is located under lower mounting disc 202
Side, motor 215 is located in motor installing hole 214;The workbench include bottom plate 104, two vertical fixed plates 101, two
Portable plate 105, two upper slide bars 102 and two drop shots 103;The bottom plate 104 is installed on slide rail 4 by bottom slide
On;Two vertical fixed plates 101 are respectively arranged in the both sides of bottom plate 104;Two upper peaces are provided with the vertical fixed plate 101
Fill hole 106 and two lower mounting holes 107;Two upper slide bars 102 are respectively arranged in upper installing hole 106, two 103 points of drop shots
It is not installed in two lower mounting holes 107;The portable plate 105 have with vertical fixed plate identical shape, be provided with
Two upper slide openings 108 and two lower slide openings 109, it passes through upper slide opening 108 and lower slide opening 109 and upper slide bar 102 and drop shot 103
It is flexibly connected;Positioning screw cap 110 is provided with the upper slide bar 102 and drop shot 103;The vertical fixed plate 101 and work
The upper surface of dynamic plate 105 is provided with multiple inverted trapezoidal standing grooves 111 of different sizes.
Embodiment 2
As shown in figures 1 to 6, a kind of steel construction perforating device is present embodiments provided, different from embodiment 1, described
The bolt 210 for fixed cylinder shape shell position is provided with two slide openings;The bolt 210 is installed by riser
In in lower mounting disc;Multiple bar holes 112 are provided with the side wall of the vertical fixed plate 103 and portable plate 105.
Embodiment above is only preferred embodiment of the present utility model, it should be pointed out that, for ordinary skill
For people, what is carried out on the premise of the utility model is not departed from is partially improved, still in protection domain of the present utility model it
In.
Claims (3)
1. a kind of steel construction perforating device equipped with mobile work platform, including workbench, top plate, column, perforating device and cunning
Rail;The perforating device includes upper mounting disc, lower mounting disc, slide bar, lifting column and four drills;The lifting column is fixed on
Top plate bottom, its piston rod is connected with upper mounting disc;The slide bar top is movably installed in by the slide opening being arranged on top plate
On top plate, the bottom of slide bar is fixedly connected with upper mounting disc and lower mounting disc successively, and limited block is provided with the top of the slide bar;
The upper mounting disc is double-decker, including top plate and lower plywood;The top plate and lower plywood are connected to by connecting pole
Together;Four equally distributed slide openings are provided with the lower plywood;It is provided with the top plate corresponding with slide opening position
Motor installing hole;The second slide opening corresponding with slide opening is provided with the lower mounting disc;The drill includes motor, reduction box
And drill bit;The motor is connected by controller with power supply;The drill bit is connected by the arbor of reduction box and motor;It is described to subtract
Cylindrical housings are provided with outside fast case;Drill is installed on upper mounting disc by cylindrical housings through slide opening and the second slide opening
In lower mounting disc, drill bit is located at below lower mounting disc, and motor is located in motor installing hole;The workbench include bottom plate,
Two vertical fixed plates, two portable plates, two upper slide bars and two drop shots;The bottom plate is installed by bottom slide
In on slide rail;Two vertical fixed plates are respectively arranged in the both sides of bottom plate;Two upper installations are provided with the vertical fixed plate
Hole and two lower mounting holes;Two upper slide bars are respectively arranged in upper installing hole, and two drop shots, which are respectively arranged under two, pacifies
Fill in hole;The portable plate have with vertical fixed plate identical shape, be provided with two upper slide openings and two lower slide openings,
It is flexibly connected by upper slide opening and lower slide opening with upper slide bar and drop shot;Positioning is provided with the upper slide bar and drop shot
Nut;The upper surface of the vertical fixed plate and portable plate is provided with multiple inverted trapezoidal standing grooves of different sizes.
2. the steel construction perforating device according to claim 1 equipped with mobile work platform, it is characterised in that:Described second slides
The bolt for fixed cylinder shape shell position is provided with hole;The bolt is installed on lower mounting disc by riser
On.
3. the steel construction perforating device according to claim 2 equipped with mobile work platform, it is characterised in that:It is described vertical solid
Multiple bar holes are provided with the side wall of fixed board and portable plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621468902.9U CN206484053U (en) | 2016-12-29 | 2016-12-29 | A kind of steel construction perforating device equipped with mobile work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621468902.9U CN206484053U (en) | 2016-12-29 | 2016-12-29 | A kind of steel construction perforating device equipped with mobile work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206484053U true CN206484053U (en) | 2017-09-12 |
Family
ID=59770931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621468902.9U Expired - Fee Related CN206484053U (en) | 2016-12-29 | 2016-12-29 | A kind of steel construction perforating device equipped with mobile work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206484053U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106694938A (en) * | 2016-12-29 | 2017-05-24 | 天津市金万方钢结构有限公司 | Movable workbench type steel structure punching machine |
CN108296517A (en) * | 2018-01-29 | 2018-07-20 | 宁波海蔓汽车科技有限公司 | A kind of plank multidigit drilling device |
-
2016
- 2016-12-29 CN CN201621468902.9U patent/CN206484053U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106694938A (en) * | 2016-12-29 | 2017-05-24 | 天津市金万方钢结构有限公司 | Movable workbench type steel structure punching machine |
CN108296517A (en) * | 2018-01-29 | 2018-07-20 | 宁波海蔓汽车科技有限公司 | A kind of plank multidigit drilling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10787343B2 (en) | Self-climbing robot for installing elevator guide rail | |
CN206484055U (en) | A kind of multi-function steel structure perforating device | |
CN106584061A (en) | Rotating disk platform type steel structure assembly device | |
CN206484053U (en) | A kind of steel construction perforating device equipped with mobile work platform | |
CN201807914U (en) | Multi-angle turnover drilling and flat milling device | |
CN106735424B (en) | Steel construction perforating device | |
CN106694938A (en) | Movable workbench type steel structure punching machine | |
CN202785364U (en) | Movable dual-door-type mast hoisting device | |
CN206484216U (en) | A kind of suspended steel structure assembles equipment | |
CN206484052U (en) | A kind of rotating disk working platform type steel construction punch device | |
CN104191194A (en) | Device for refrigerator compressor core to be automatically placed in shell | |
CN103433521A (en) | Two-way perforating machine | |
CN206484059U (en) | A kind of suspended steel structure punch device | |
CN106825668A (en) | Steel construction punch device | |
CN207139733U (en) | A kind of steel construction processing platform | |
CN102431904A (en) | Rotary crane | |
CN204524341U (en) | Lift top plate punching device | |
CN207139726U (en) | A kind of steel construction process equipment | |
CN103337801A (en) | Transformer substation overhaul platform | |
CN206484548U (en) | A kind of feeding manipulator | |
CN207175270U (en) | A kind of crane structure for bridge construction | |
CN207139273U (en) | A kind of steel construction processing equipment | |
CN207139734U (en) | A kind of steel construction processing unit (plant) | |
CN106737518A (en) | Steel construction bracket | |
CN204310675U (en) | The nut mounting device of rolling mill screwdown device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170912 Termination date: 20171229 |
|
CF01 | Termination of patent right due to non-payment of annual fee |