CN206479165U - Subway tunnel Vault settlement monitoring device - Google Patents

Subway tunnel Vault settlement monitoring device Download PDF

Info

Publication number
CN206479165U
CN206479165U CN201720189683.9U CN201720189683U CN206479165U CN 206479165 U CN206479165 U CN 206479165U CN 201720189683 U CN201720189683 U CN 201720189683U CN 206479165 U CN206479165 U CN 206479165U
Authority
CN
China
Prior art keywords
expansion link
electrically connected
control centre
monitoring device
stx
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720189683.9U
Other languages
Chinese (zh)
Inventor
林秋田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Substances Mdt Infotech Ltd
Original Assignee
Hefei Substances Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Substances Mdt Infotech Ltd filed Critical Hefei Substances Mdt Infotech Ltd
Priority to CN201720189683.9U priority Critical patent/CN206479165U/en
Application granted granted Critical
Publication of CN206479165U publication Critical patent/CN206479165U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses subway tunnel Vault settlement monitoring device, including device body;Described device body top is provided with rotating shaft, the rotating shaft both sides are provided with expansion link one, the bottom of expansion link one is stretched with expansion link two to be connected, the bottom of expansion link two is rotatably connected with angle monitor instrument TC/STX 702, the angle monitor instrument TC/STX 702 is located on the upside of support, the output ends of angle monitor instrument TC/STX 702 are electrically connected with by wire and control centre's input, display CRT and control button are provided with the upside of the control centre, data processor SYLVACSA is provided with the upside of the control centre, D300S, V2, the data processor SYLVACSA, D300S, V2 output ends are electrically connected with data display equipment CRT inputs.The utility model, accurate displacement monitor can carry out calculating settling data according to the length change inside expansion link one and expansion link two, can be contrasted with the data produced by angle change, increase the accuracy of settling data.

Description

Subway tunnel Vault settlement monitoring device
Technical field
The utility model is related to tunnel monitoring device technical field, specially subway tunnel Vault settlement monitoring device.
Background technology
Iron is a kind of form of railway transportation, there is two kinds of understandings to the word:Refer to the city rail based on running in underground to hand over The abbreviation of way system, i.e. " underground railway " or " subway ";Many such systems consider construction to coordinate the environment of build And operation costs, ground or overhead section may be changed into area beyond down town, in subway tunnel, tunnel top holds Easily settle, sedimentation is to follow hard on the sedimentation that the groundwork of pressurization occurs immediately, is easily caused danger, existing detection means Relatively complicated, detection method is single, and shortage is contrast.
Utility model content
The purpose of this utility model is to provide subway tunnel Vault settlement monitoring device to solve in above-mentioned background technology The existing existing detection means worked as proposed is relatively complicated, and detection method is single, the problem of shortage is contrast.
To achieve the above object, the utility model provides following technical scheme:Subway tunnel Vault settlement monitoring device, bag Include device body;The rotating shaft both sides are provided with expansion link one, and the bottom of expansion link one is stretched with expansion link two to be connected, described The bottom of expansion link two is rotatably connected with angle monitor instrument TC/STX-702, and the angle monitor instrument TC/STX-702 is located on support Side, the angle monitor instrument TC/STX-702 output ends are electrically connected with by wire and control centre's input, in the control Side is provided with display CRT and control button in the heart, and the control button output end is electrically connected with display CRT inputs, Data processor SYLVACSA, D300S, V2, the data processor SYLVACSA are provided with the upside of the control centre, D300S, V2 output end are electrically connected with data display equipment CRT inputs.
It is preferred that, it is provided with image composer M401855, described image maker M401855 on the upside of the control centre Output end is electrically connected with display CRT inputs.
It is preferred that, the control centre side is provided with network output mouth, and the network output mouth output end is with having Line network connection device input is electrically connected with.
It is preferred that, accurate displacement monitor, the precision are installed inside expansion link one and expansion link two junction Displacement monitor side is provided with spring.
It is preferred that, it is provided with warning device LTE-1101j LTE-1102J, the warning device on the inside of described device body LTE-1101j LTE-1102J inputs are electrically connected with data processor SYLVACSA, D300S, V2 output end.
It is preferred that, the stent outer is provided with guardrail, and the guardrail height is 1.5m.
Compared with prior art, the beneficial effects of the utility model are:Network output mouth can be by inside control centre Information be outwardly transmitted by network, facilitate staff to be understood and controlled, accurate displacement monitor can root Calculating settling data is carried out according to the length change inside expansion link one and expansion link two, can be with the data produced by angle change Contrasted, increase the accuracy of settling data, when claiming that data are larger, pass through warning device LTE-1101j LTE- 1102J sends alarm, prevents danger, image composer M401855 can to it is different when and distinct methods measure it is heavy Drafting pattern picture is dropped, facilitates staff to be observed, guardrail can not hit with protective cradle by the external world, prevent error.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is control centre's structural representation of the present utility model;
Fig. 3 is control flow chart of the present utility model.
In figure:1- device bodies;2- rotating shafts;3- expansion links one;4- accurate displacements monitoring meter TMI0650002423102;5- Expansion link two;6- angle monitor instrument TC/STX-702;7- supports;8- guardrails;9- control centres;10- warning devices LTE-1101j LTE-1102J;11- network output mouths;12- displays CRT;13- springs;14- image composers M401855;15- displays CRT;16- control buttons;17- data processors SYLVACSA, D300S, V2;.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-3, a kind of embodiment that the utility model is provided:Subway device body Vault settlement monitoring device, Including device body 1;The top of device body 1 is provided with rotating shaft 2, can be rotated, and the both sides of rotating shaft 2 are provided with expansion link 1, The bottom of expansion link 1 is stretched with expansion link 25 to be connected, and the bottom of expansion link 25 rotates with angle monitor instrument TC/STX-7026 to be connected Connect, convenient monitoring angle change, angle monitor instrument TC/STX-7026 is located at the upside of support 7, angle monitor instrument TC/STX-7026 Output end is electrically connected with by wire and the input of control centre 9, and information can be calculated, and the upside of control centre 9 is set There are display CRT15 and control button 16, the output end of control button 16 is electrically connected with display CRT15 inputs, in control The upside of the heart 9 is provided with data processor SYLVACSA, D300S, V217, data is handled, data processor SYLVACSA, D300S, V217 output end are electrically connected with data display equipment CRT12 inputs, and data are shown, the upside of control centre 9 Image composer M40185514 is provided with, image composer M40185514 output ends electrically connect with display CRT15 inputs Connect, can to it is different when and the sedimentation drafting pattern picture that measures of distinct methods, facilitate staff to be observed, control centre 9 sides are provided with network output mouth 11, and the output end of network output mouth 11 electrically connects with cable network attachment means input Connect, the information inside control centre can be outwardly transmitted by network, facilitate staff to be understood and controlled, Accurate displacement monitor 4 is installed, the side of accurate displacement monitor 4 is provided with inside expansion link 1 and the junction of expansion link 25 Spring 13, increases the accuracy of settling data, and the inner side of device body 1 is provided with warning device LTE-1101j LTE-1102J10, Warning device LTE-1101j LTE-1102J10 inputs and data processor SYLVACSA, D300S, V217 output end are electrical Connection, sends alarm, prevents danger, and the outside of support 7 is provided with guardrail 7, and the height of guardrail 7 is 1.5m, can be with protective cradle Do not hit by the external world, prevent to miss.
Specifically used mode:The angle for detecting expansion link 25 and horizontal area by angle monitor instrument TC/STX-7026 becomes Change, calculating tunnel subsidence is carried out by control centre 9, can be according to expansion link 1 and expansion link using accurate displacement monitor 4 Length change inside 25 carries out calculating settling data, can be contrasted with the data produced by angle change, increase sedimentation The accuracy of data, when claiming that data are larger, sends alarm by warning device LTE-1101j LTE-1102J10, prevents Cause danger, image composer M40185514 can to it is different when and the sedimentation drafting pattern picture that measures of distinct methods, it is convenient Staff is observed, when network output mouth 11 information inside control centre 9 can outwardly be carried out by network Transmission, facilitates staff to be understood and controlled, guardrail 8 can not hit with protective cradle 7 by the external world, prevent error.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.

Claims (5)

1. subway tunnel Vault settlement monitoring device, including device body (1);It is characterized in that:Described device body (1) top Rotating shaft (2) is provided with, rotating shaft (2) both sides are provided with expansion link one (3), described (3) bottom of expansion link one and expansion link two (5) stretch and connect, described (5) bottom of expansion link two is rotatably connected with angle monitor instrument TC/STX-702 (6), the angle monitor Instrument TC/STX-702 (6) is located on the upside of support (7), and angle monitor instrument TC/STX-702 (6) output ends pass through wire and control Center (9) input processed is electrically connected with, and display CRT (15) and control button (16) are provided with the upside of the control centre (9), Control button (16) output end is electrically connected with display CRT (15) input, is provided with the upside of the control centre (9) Data processor SYLVACSA, D300S, V2 (17), the data processor SYLVACSA, D300S, V2 (17) output ends and number It is electrically connected with according to display CRT (12) input.
2. subway tunnel Vault settlement monitoring device according to claim 1 is characterized in that:On the control centre (9) Side is provided with image composer M401855 (14), and image composer M401855 (14) output ends are inputted with display CRT (15) End is electrically connected with.
3. subway tunnel Vault settlement monitoring device according to claim 1 is characterized in that:The control centre (9) one Side is provided with network output mouth (11), and network output mouth (11) output end electrically connects with cable network attachment means input Connect.
4. subway tunnel Vault settlement monitoring device according to claim 1 is characterized in that:The expansion link one (3) and Accurate displacement monitor (4) is installed, accurate displacement monitor (4) side is provided with spring inside expansion link two (5) junction (13)。
5. subway tunnel Vault settlement monitoring device according to claim 1 is characterized in that:In described device body (1) Side is provided with warning device LTE-1101j LTE-1102J (10), warning device LTE-1101j LTE-1102J (10) input With data processor SYLVACSA, D300S, V2 (17) output end is electrically connected with.
CN201720189683.9U 2017-03-01 2017-03-01 Subway tunnel Vault settlement monitoring device Expired - Fee Related CN206479165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720189683.9U CN206479165U (en) 2017-03-01 2017-03-01 Subway tunnel Vault settlement monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720189683.9U CN206479165U (en) 2017-03-01 2017-03-01 Subway tunnel Vault settlement monitoring device

Publications (1)

Publication Number Publication Date
CN206479165U true CN206479165U (en) 2017-09-08

Family

ID=59746649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720189683.9U Expired - Fee Related CN206479165U (en) 2017-03-01 2017-03-01 Subway tunnel Vault settlement monitoring device

Country Status (1)

Country Link
CN (1) CN206479165U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109813280A (en) * 2019-01-03 2019-05-28 中铁隧道局集团有限公司 A kind of real-time tunnel stratum settlement detection device being easily installed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109813280A (en) * 2019-01-03 2019-05-28 中铁隧道局集团有限公司 A kind of real-time tunnel stratum settlement detection device being easily installed

Similar Documents

Publication Publication Date Title
CN106679625B (en) Wide scope electric power tower high-precision deformation monitoring method based on dipper system
CN104078088B (en) Nuclear power station Climbing Robot System and the method for detecting steam generator secondary side
CN109373980B (en) Monitoring method and system based on video monitoring measuring instrument and inclinometry terminal
CN107389028A (en) A kind of three-dimensional coordinate conversion method and device based on coordinate projection
CN113607145A (en) Distance measuring system and distance measuring method
CN107764213A (en) A kind of laser rail smooth degree detection means and method
CN105136109B (en) Highway bridges and culverts sinking deformation monitoring system
CN105066893A (en) Underground pipeline parameter measurement device and measurement method thereof
CN206479165U (en) Subway tunnel Vault settlement monitoring device
CN202124809U (en) Track geometry detecting complete system device
CN204662280U (en) Synchronously to turn Bridge Monitoring System
CN113900116A (en) Dynamic detection method and device for geometrical parameters of contact network
CN206876159U (en) Pole wire angle quick test device
CN206311100U (en) A kind of verticality measuring instrument
CN206339175U (en) One kind adopts ground fissure monitoring device
CN205861644U (en) A kind of gardens atmosphere quality monitoring device
CN105973201A (en) Device and method for measuring gradient of edge slope by fishing rod type gradient ruler from opening line position of edge slope
CN108508502A (en) A kind of nonmetal pipeline detection system and its detection method
CN218156154U (en) Road slope detection device for engineering supervision
CN107966138A (en) Underground utilities accurate positioning method based on single mouth of pipe geographic coordinate information
CN209264025U (en) A kind of electric power line pole tower monitoring device and system
CN105095671B (en) Settle Monitoring and forecasting system in real-time instrument and system and implementation method
CN207280448U (en) A kind of high accuracy tilts dynamic monitor
CN203274740U (en) Inclined angle measuring instrument of electric power pole tower
CN207073706U (en) Water supply line leakage measuring instrument by sonic and network diagnosis cloud platform based on GIS-Geographic Information System

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908

Termination date: 20180301

CF01 Termination of patent right due to non-payment of annual fee