CN206478303U - The supporting structure of heat distribution pipeline in pipe gallery - Google Patents

The supporting structure of heat distribution pipeline in pipe gallery Download PDF

Info

Publication number
CN206478303U
CN206478303U CN201720049086.6U CN201720049086U CN206478303U CN 206478303 U CN206478303 U CN 206478303U CN 201720049086 U CN201720049086 U CN 201720049086U CN 206478303 U CN206478303 U CN 206478303U
Authority
CN
China
Prior art keywords
heat distribution
distribution pipeline
pipe gallery
column
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720049086.6U
Other languages
Chinese (zh)
Inventor
赵泽昊
侯振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720049086.6U priority Critical patent/CN206478303U/en
Application granted granted Critical
Publication of CN206478303U publication Critical patent/CN206478303U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of supporting structure of heat distribution pipeline in pipe gallery, including is located in the column of the heat distribution pipeline both sides, and the column is erected between the top plate of the pipe gallery and bottom plate;And the anchor of formation first section in the top plate is embedded at the top of the column, bottom is embedded in formation second in the bottom plate and is anchored section.The utility model fixes support heat distribution pipeline using the column of heat distribution pipeline both sides is folded in, it is embedded at the top of the column in the top plate of pipe gallery, bottom is embedded in the bottom plate of pipe gallery, so the longitudinal thrust of heat distribution pipeline effectively can be delivered in the structure of pipe gallery by the column, and the thrust of heat distribution pipeline is unloaded while serving fixed heat distribution pipeline.Pipe gallery and the integral force structure of megarelief, the pipe gallery can be reduced to unlimited rigidity on vertical section, so as to form a power transmission closed-loop from the power transmission of heat distribution pipeline pressure to the earth, it can be ensured that the stable safety of structure.

Description

The supporting structure of heat distribution pipeline in pipe gallery
Technical field
The utility model is related to building materials field of stents, refers in particular to a kind of supporting structure of heat distribution pipeline in pipe gallery.
Background technology
Underground pipe gallery is also known as " common trench " or " Common Ducts ", is exactly that underground urban duct integrates corridor.In city A tunnel space is built in city underground, and the various utilities pipelines such as electric power, communication, combustion gas, heat supply, plumbing are integrated in one, if There are special access hole, hoisting port and monitoring system, implement unified planning, Uniting, unified construction and manage, be to ensure city The important infrastructure and " lifeline " of city's operation.It is to implement same planning, design, construction and safeguard, is built in honest underground Public utility for laying municipal public use pipeline.
Pipe gallery is concrete structure, and Normal practice has what is be made by field cast-in-place, also there is pre- by factory On-site consolidation processed.Pipe gallery includes bottom plate, top plate and erects wallboard between the bottom panel and top panel, passes through bottom Plate, top plate and wallboard are enclosed to form accommodation space, and various pipes are placed in the accommodation space, in order to ensure the safety of pipeline, Dividing wall is provided with pipe gallery, i.e., pipe gallery is separated into multiple spaces.
The heat distribution pipeline set in pipe gallery is made of pipe, and inside has the hot water of flowing, the usual heating power Pipe diameter is smaller, and the thrust that the hot water of flowing is produced by flowing to the heat distribution pipeline is also little, so it is typically employed in heat Heat distribution pipeline is supported using the support of concrete structure form at hydraulic piping, to stop or support pushing away suffered by the heat distribution pipeline Power, but be due to that concrete support needs to carry out the scene in secondary construction, pipe gallery again after the completion of pipe gallery construction Execution conditions are limited, and secondary operation precision controlling is difficult, is also unfavorable for site environment.In addition, for the heat distribution pipeline of major diameter, its Suffered thrust is larger, commonly reaches hundred tonnes, if continuing to use traditional concrete support, one side support strength is not Foot, another aspect difficulty of construction is larger.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, and there is provided a kind of branch of heat distribution pipeline in pipe gallery Frame structure, solve pipe gallery supports heat distribution pipeline to exist using concrete support in the prior art support strength it is not enough and The problem of difficulty of construction is big.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of supporting structure of heat distribution pipeline in pipe gallery, including is located in the thermal pipe The column of road both sides, the column is erected between the top plate of the pipe gallery and bottom plate;And the top of the column is buried Section is anchored in forming first in the top plate, bottom, which is embedded in the bottom plate, forms the second anchor section.
The utility model fixes support heat distribution pipeline, the top of the column using the column of heat distribution pipeline both sides is folded in It is embedded in the top plate of pipe gallery, bottom is embedded in the bottom plate of pipe gallery, so the column can be by heat distribution pipeline Longitudinal thrust is effectively delivered in the structure of pipe gallery, and pushing away for heat distribution pipeline is unloaded while serving fixed heat distribution pipeline Power.Pipe gallery is the structure for being embedded in underground, its force structure integral with megarelief, when the longitudinal thrust of heat distribution pipeline When being delivered to through column on pipe gallery, the greatly stress together with pipe gallery, so the pipe gallery can be with vertical section Unlimited rigidity is reduced to, so that a power transmission closed-loop from the power transmission of heat distribution pipeline pressure to the earth is formd, accordingly even when greatly The high thrust of hundred tonnes of the heat distribution pipeline formation of diameter, can also ensure that the stable safety of structure.Had in addition using column and applied The characteristics of work facilitates, construct pipe gallery when, can first by the top and bottom of column in the form of built-in fitting it is once pre-buried Shaping, subsequently when setting up heat distribution pipeline, then by the middle part connection construction of column, solves applying for conventional concrete support The problem of work difficulty is big.
Heat distribution pipeline supporting structure in the utility model pipe gallery further improvement is that, two columns Be connected with the first cross bar in first anchor section, first cross bar be attached at two described first outer surfaces for being anchored section and with institute The first anchor section is stated to be fixedly connected.
Heat distribution pipeline supporting structure in the utility model pipe gallery further improvement is that, described first is anchored section Top be installed with top sealing plate, the edge of the top sealing plate is to the described first outside extension for being anchored section and with corresponding described the One cross bar is fixedly connected.
Heat distribution pipeline supporting structure in the utility model pipe gallery further improvement is that, two columns Be connected with the second cross bar in second anchor section, second cross bar be attached at two described second outer surfaces for being anchored section and with institute The second anchor section is stated to be fixedly connected.
Heat distribution pipeline supporting structure in the utility model pipe gallery further improvement is that, described second is anchored section Bottom be installed with bottom sealing plate, the edge of the bottom sealing plate is to the described second outside extension for being anchored section and with corresponding described the Two cross bars are fixedly connected.
Brief description of the drawings
Fig. 1 is that the supporting structure of heat distribution pipeline in the utility model pipe gallery is located at side view when on pipe gallery.
Fig. 2 be Fig. 1 in perceive the pre- schematic diagram for being embedded in top plate and bottom plate inner structure.
Fig. 3 is the explosive decomposition structural representation of the supporting structure of heat distribution pipeline in the utility model pipe gallery.
Fig. 4 is that the supporting structure of heat distribution pipeline in the utility model pipe gallery omits the structural representation of pipe gallery.
Fig. 5 is Fig. 4 side view.
Fig. 6 is the sectional view of bottom in Fig. 4.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1 and Fig. 2, the utility model provides a kind of supporting structure of heat distribution pipeline in pipe gallery, the support The effect of structure is used for the large-scale heat distribution pipeline fixed in pipe gallery, and the large-scale heat distribution pipeline refers to diameter in 900mm extremely 1200mm pipeline, certain supporting structure can be used for fixing the heat distribution pipeline of minor diameter.The heat of flowing in heat distribution pipeline Water can produce larger thrust to pipeline, when heat distribution pipeline diameter in 900mm to 1200mm diameters when, pushing away produced by hot water Power can reach hundred tonnes, and so big thrust proposes challenge to the supporting structure of heat distribution pipeline, and the supporting structure is allowed for Support the high thrust, it is ensured that the safety of heat distribution pipeline, also ensure that the structure safety of pipe gallery.Supporting structure of the present utility model It is embedded in by setting at the top and bottom of the column of sandwiched heat distribution pipeline, and the column in comprehensive pipe gallery structure, by vertical The longitudinal thrust of heat distribution pipeline is effectively delivered in the structure of pipe gallery by post, and the pipe gallery turns into one with the earth again Body, is formed being delivered to thrust by column the power transmission closed-loop of the earth, it is ensured that stability under loading safety.It is of the present utility model Supporting structure serves the effect of the thrust of unloading heat distribution pipeline while fixed heat distribution pipeline.The construction party of the other pillar Just, supporting structure of the present utility model provides strong branch for the construction of the fast and high quality of the large-scale heat distribution pipeline of pipe gallery Support.The supporting structure of heat distribution pipeline in the utility model pipe gallery is illustrated below in conjunction with the accompanying drawings.
As shown in figure 1, the utility model provides a kind of supporting structure 21 of heat distribution pipeline in pipe gallery, the support Structure 21 is used for the heat distribution pipeline 11 fixed in pipe gallery 10, and the pipe gallery 10 includes bottom plate 12, wallboard 14, Yi Jiding Plate 13, bottom plate 12, wallboard 14 and top plate 13 enclose to form pipe gallery, are also separated out in pipe gallery by wallboard 14 many Individual independent space, to separate different types of pipeline.Supporting structure 21 of the present utility model includes being located in heat distribution pipeline The column 211 of 11 both sides, column 211 is erected between the top plate 13 of pipe gallery 10 and bottom plate 12, with reference to shown in Fig. 2, column 211 top, which is embedded in top plate 13, forms the first anchor section 2111, and the bottom of column 211, which is embedded in bottom plate 12, forms second It is anchored section 2112.Section 2112 is anchored by the first anchor section 2111 and second column 211 is connected with pipe gallery 10, The force structure of one is formed, then is folded in by column 211 on the both sides of heat distribution pipeline 11, heat distribution pipeline 11 due to inside stream Longitudinal thrust produced by dynamic hot water, which is acted on, to be folded on the column 211 of the both sides of heat distribution pipeline 11, will be given by column 211 Longitudinal thrust is delivered on pipe gallery 10, and the column 211 also acts unloading thermal pipe while fixed heat distribution pipeline 11 The effect of road longitudinal thrust.Pipe gallery 10 is embedded in underground, its force structure integral with megarelief, so as to integrate Piping lane 10 can be reduced to unlimited rigidity on vertical section, so one is formed by the pressure power transmission of heat distribution pipeline 11 to greatly The power transmission closed-loop on ground, can effectively ensure stability under loading and stress safety.
As a better embodiment of the present utility model, with reference to shown in Fig. 3 and Fig. 4, the first anchor of two columns 211 Connect and the first cross bar 212 be connected with section 2111, first cross bar 212 be attached at two first anchor section 2111 outer surfaces and with First anchor section 2111 is fixedly connected, and is connected laterally at the first anchor section 2111 of two columns 211 by the first cross bar 212 Together, when the first anchor section 2111 is embedded in top plate 13, first cross bar 212 is also together embedded in top plate 13.This The setting of one cross bar 212, increases power transmission area, enable to heat distribution pipeline 11 longitudinal thrust be more uniformly delivered to it is comprehensive Close on piping lane 10, rather than section 2111 is anchored only by first be embedded in top plate 13 and carry out single-point power transmission, it is to avoid only pass through First anchor section 2111 carries out power transmission and easily produces the phenomenon generation that power transmission point is destroyed by larger thrust.It is preferred that first Cross bar 212 is arranged on the front and rear sides at the top of column 211, and the front and rear sides refer to moving towards before direction along heat distribution pipeline 11 Rear side.First cross bar 212 uses double flute steel construction, and two channel-section steels are arranged side by side and are fixedly connected with the top of column 211.
With reference to shown in Fig. 5, section is anchored as another better embodiment of the present utility model, first in column 211 2111 top is installed with top sealing plate 214, the edge of the top sealing plate 214 to the first outside extension for being anchored section 2111 and with it is corresponding The first cross bar 212 be fixedly connected.Top sealing plate 214 is set also to increase power transmission area, and the cross bar of top sealing plate 214 and first 212 are fixedly connected, and strengthen the bonding strength of the first cross bar 212 so that stable structure is integrally formed in supporting structure 21, can Preferably realize power transmission function.
As shown in Figures 2 to 6, as another better embodiment of the present utility model, in the second anchor of two columns 211 Connect and the second cross bar 213 be connected with section 2112, second cross bar 213 be attached at two second anchor section 2112 outer surfaces and with Second anchor section 2112 is fixedly connected.Second anchor section 2112 of two columns 211 is connected laterally at by the second cross bar 213 Together, when the second anchor section 2112 is embedded in bottom plate 12, second cross bar 213 is also together embedded in bottom plate 12.This The setting of two cross bars 213, increases power transmission area, enable to heat distribution pipeline 11 longitudinal thrust be more uniformly delivered to it is comprehensive Close on piping lane 10, rather than section 2112 is anchored only by second be embedded in bottom plate 12 and carry out single-point power transmission, it is to avoid only pass through Second anchor section 2112 carries out power transmission and easily produces the phenomenon generation that power transmission point is destroyed by larger thrust.It is preferred that second Cross bar 213 is arranged on the front and rear sides of the bottom of column 211, and the front and rear sides refer to the direction of moving towards along heat distribution pipeline 11 Front and rear side.Second cross bar 213 uses double flute steel construction, and two channel-section steels are arranged side by side and are fixedly connected with the bottom of column 211.
It is fixed in the second of column 211 bottom for being anchored section 2112 as another better embodiment of the present utility model There is bottom sealing plate 215, the edge of bottom sealing plate 215 is consolidated to the second outside extension for being anchored section 2112 and with corresponding second cross bar 213 Fixed connection.Bottom sealing plate 215 is set also to increase power transmission area, and bottom sealing plate 215 is fixedly connected with the second cross bar 213, is strengthened The bonding strength of second cross bar 213 so that stable structure is integrally formed in supporting structure 21, can preferably realize power transmission work( Energy.
As another better embodiment of the present utility model, column 211 of the present utility model uses segmental structure, including Have and be embedded at the top of top cylinder 211a, middle part cylinder 211b and bottom cylinder 211c, top cylinder 211a in top plate 13 Form first and be anchored section 2111, and top cylinder 211a bottom protrudes out first connection end 2113 of the formation of top plate 13, bottom post Body 211c bottom, which is embedded in bottom plate 12 to be formed at the top of the second anchor section 2112, bottom cylinder 211c, protrudes out bottom plate 12 The second connection end 2114 is formed, the first connection end 2113 and the second connection end 2114 pass through adpting flange 2115 and middle part cylinder 211b is fastenedly connected, so as to connect the column 211 to be formed located at the sidepiece of heat distribution pipeline 11.Column 211 is designed to segmental structure Construction can be easy to, in the work progress of pipe gallery 10, first can be embedded to top cylinder 211a and bottom cylinder 211c In corresponding top plate and bottom plate, then when setting up heat distribution pipeline 11, then middle part cylinder 211b is connected to top cylinder 211a On the cylinder 211c of bottom, it can also be saved man-hour while convenient construction.Column 211 uses steel structure column, with reference to Shown in Fig. 6, the steel structure column is square column, reinforcing plate is provided with the middle part of the inside of square column, to improve steel structure column Structural strength.Using steel structure column, its own stress and switching performance, apparently higher than concrete structure, are the heat of integrated management 10 The construction of the fast and high quality of hydraulic piping 11 provides powerful support.
As shown in figure 1, when setting up heat distribution pipeline 11, poured on the bottom plate 12 of pipe gallery 10 and be formed with support pier 15, It is that heat distribution pipeline 11 provides support using the support heat distribution pipeline 11 of support pier 15 of concrete structure.And branch of the present utility model Move towards interval setting of the frame structure 21 along heat distribution pipeline 11, that is, it is arranged at intervals along the length direction of heat distribution pipeline 11, The spacing is rationally designed according to the thrust produced by heat distribution pipeline 11.Supporting structure 21 as heat distribution pipeline 11 power train System, effectively can pass to pipe gallery by longitudinal thrust (along the thrust for moving towards direction of heat distribution pipeline 11), pass through synthesis Piping lane and the earth carry the larger longitudinal thrust together, it can be ensured that the stabilization of structure and the stabilization of stress.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some of embodiment details should not be constituted to this practicality New restriction, the utility model regard the scope defined using appended claims as protection domain of the present utility model.

Claims (5)

1. the supporting structure of heat distribution pipeline in a kind of pipe gallery, it is characterised in that including being located in the heat distribution pipeline both sides Column, the column is erected between the top plate of the pipe gallery and bottom plate;And be embedded at the top of the column described First is formed in top plate and is anchored section, bottom is embedded in formation second in the bottom plate and is anchored section.
2. the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 1, it is characterised in that two columns Be connected with the first cross bar in first anchor section, first cross bar be attached at two described first outer surfaces for being anchored section and with institute The first anchor section is stated to be fixedly connected.
3. the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 2, it is characterised in that described first is anchored section Top be installed with top sealing plate, the edge of the top sealing plate is to the described first outside extension for being anchored section and with corresponding described the One cross bar is fixedly connected.
4. the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 1 or 2, it is characterised in that two are described vertical The second cross bar is connected with second anchor section of post, second cross bar is attached at two described second and is anchored the outer surface of section simultaneously It is fixedly connected with the described second anchor section.
5. the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 4, it is characterised in that described second is anchored section Bottom be installed with bottom sealing plate, the edge of the bottom sealing plate is to the described second outside extension for being anchored section and with corresponding described the Two cross bars are fixedly connected.
CN201720049086.6U 2017-01-16 2017-01-16 The supporting structure of heat distribution pipeline in pipe gallery Expired - Fee Related CN206478303U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720049086.6U CN206478303U (en) 2017-01-16 2017-01-16 The supporting structure of heat distribution pipeline in pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720049086.6U CN206478303U (en) 2017-01-16 2017-01-16 The supporting structure of heat distribution pipeline in pipe gallery

Publications (1)

Publication Number Publication Date
CN206478303U true CN206478303U (en) 2017-09-08

Family

ID=59753440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720049086.6U Expired - Fee Related CN206478303U (en) 2017-01-16 2017-01-16 The supporting structure of heat distribution pipeline in pipe gallery

Country Status (1)

Country Link
CN (1) CN206478303U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704708A (en) * 2017-01-16 2017-05-24 中建科技(北京)有限公司 Bracket structures for heat distribution pipelines in utility tunnel and construction method of bracket structures
CN108252723A (en) * 2018-04-12 2018-07-06 北京市热力工程设计有限责任公司 A kind of segmented heating-power tunnel antiskid item
CN108678128A (en) * 2018-06-28 2018-10-19 上海金山洋生管道有限公司 A kind of anti-settling intelligent pipeline system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704708A (en) * 2017-01-16 2017-05-24 中建科技(北京)有限公司 Bracket structures for heat distribution pipelines in utility tunnel and construction method of bracket structures
CN108252723A (en) * 2018-04-12 2018-07-06 北京市热力工程设计有限责任公司 A kind of segmented heating-power tunnel antiskid item
CN108678128A (en) * 2018-06-28 2018-10-19 上海金山洋生管道有限公司 A kind of anti-settling intelligent pipeline system

Similar Documents

Publication Publication Date Title
CN106704708B (en) The supporting structure and its construction method of heat distribution pipeline in pipe gallery
AU2014407470B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN105114105B (en) Steel-concrete combined type tunnel-liner support structure and making thereof and construction method
CN206478303U (en) The supporting structure of heat distribution pipeline in pipe gallery
CN105804292A (en) Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof
CN106381885B (en) A kind of Underground Steel pipe gallery with skeleton
CN206928305U (en) A kind of rigid passive area buttress type supporting construction
CN106894826B (en) Supporting structure and supporting method for collapse section in hole
CN106381886B (en) A kind of partial precast assembly steel concrete combination underground pipe gallery
CN111501771B (en) Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering
CN207498985U (en) A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template
CN206752667U (en) A kind of basement barrier wall structure
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN103362517A (en) Assembled jacking pipe
CN101532386A (en) Method and device for underpinning antifriction separator for shallow underground space construction
CN204826551U (en) Pipeline bracket fixed structure
CN109113749A (en) Four line large section railway tunnel construction method of weak surrounding rock
CN107514012A (en) A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template
CN108589708A (en) A kind of Multifunctional cast-in-situ major diameter foundation pit support pipe pile and ground temperature exchange system
CN205776355U (en) There is the underground transfer passage of line holder
CN203452103U (en) Waterstop
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN206626283U (en) A kind of new concrete push pipe
CN103132517A (en) Ground source heat energy anchor rod with expansion heat exchanger and construction method
CN212270943U (en) Prefabricated assembled steel concrete combined supporting pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908

Termination date: 20200116

CF01 Termination of patent right due to non-payment of annual fee