CN206477610U CN201720018546.9U CN201720018546U CN206477610U CN 206477610 U CN206477610 U CN 206477610U CN 201720018546 U CN201720018546 U CN 201720018546U CN 206477610 U CN206477610 U CN 206477610U
Authority
CN
China
Prior art keywords
protection network
building site
dismantled
fixed block
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720018546.9U
Other languages
Chinese (zh)
Inventor
张晓广
郝文朝
张迎秋
王甲
罗素
王东涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201720018546.9U priority Critical patent/CN206477610U/en
Application granted granted Critical
Publication of CN206477610U publication Critical patent/CN206477610U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to field of engineering building, and disclose a kind of building site protection network that effect is dismantled with Fast Installation, including bottom mounting rod, perpendicular strut is installed with the top of the bottom mounting rod, the safety guard net at the top of the mounting rod of bottom is installed with the inside of perpendicular strut, be installed with the inside of perpendicular strut at the top of safety guard net anti-drags dividing strip, the upper kelly on the inside of perpendicular strut is installed with the top of the safety guard net, mounting blocks are installed with the right side of the bottom mounting rod, the inner chamber of mounting blocks is movably installed with the fixing bolt through perpendicular strut, hold-doun nut is installed with the right side of fixing bolt, fixed block is installed with the right side of the upper kelly, pulley mounting seat is installed with the right side of fixed block.There is Fast Installation to dismantle the building site protection network of effect for this, can effectively strengthen the time of installation and removal, save time duration before and after construction.

Description

A kind of building site protection network that effect is dismantled with Fast Installation
Technical field
The utility model is related to field of engineering building, and specially a kind of building site for dismantling effect with Fast Installation is prevented Protecting wire net.
Background technology
Building site is typically all the job site for referring to building and structures, all existed under such environment and occasion or Many or few danger, to prevent these dangerous appearance, has all built steelframe on the outside of building, is typically all set on steelframe There is protection network, protection network drops primarily directed to eminence article produces what danger was arisen at the historic moment.
Existing building site protection network is improved mainly for structural integrity of protection network etc. in the market, but because The complex conditions of the huge and environment of building site and building, protection network assuming that and install when it is very inconvenient, dismounting It is also to waste time and energy to get up, and has influence on execution and the completion date of duration, so propose a kind of with Fast Installation dismounting effect Building site protection network to solve above-mentioned proposed the problem of.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of building site protection that effect is dismantled with Fast Installation Net, the advantages of possessing convenient dismounting and install solves the protection network on existing building site in the market in installation and removal On influence duration of wasting time and energy implement and the problem of completion date.
(2) technical scheme
To realize above-mentioned convenient dismounting and installing purpose, the utility model provides following technical scheme:One kind has quick Perpendicular strut is installed with the top of the building site protection network of installing/dismounting effect, including bottom mounting rod, the bottom mounting rod, support is erected It is installed with the top of the safety guard net at the top of the mounting rod of bottom, safety guard net and is installed with positioned at perpendicular support on the inside of bar Anti- on the inside of bar drags the upper kelly being installed with the top of dividing strip, the safety guard net on the inside of perpendicular strut.
Mounting blocks are installed with the right side of the bottom mounting rod, the inner chamber of mounting blocks is movably installed with through perpendicular strut Hold-doun nut is installed with the right side of fixing bolt, fixing bolt.
It is installed with the right side of the upper kelly on the right side of fixed block, fixed block and is installed with pulley mounting seat, it is sliding It is installed with the right side of wheel mounting seat on the right side of pulley support post, pulley support post on being movably installed with the left of perpendicular strut Roller, the contiguous block at the top of fixed block is installed with the top of the perpendicular strut.
The card being installed with the left of inserted block, inserted block at the top of fixed block is installed with the top of the fixed block It is installed with and is installed with the right side of raised fixture block, the card article positioned at the first past of inserted block inner chamber on the left of bar, card article Apparatus for coating, the bottom of the first reciprocating apparatus offers and is installed with pad at the top of the dead slot positioned at inserted block inner chamber, the inserted block It is installed with the top of piece, pad at the top of push pedal, push pedal and is installed with the second reciprocating apparatus, the second reciprocating apparatus Both sides offer the chute on contiguous block.
It is preferred that, second reciprocating apparatus includes spring retaining tab, and the bottom of spring retaining tab is installed with past Multiple spring, the bottom of reciprocal spring is installed with spring mounting seat.
It is preferred that, the quantity of the safety guard net is to drag dividing strip by anti-between four pieces, and every two pieces of safety guard nets It is fixedly connected.
It is preferred that, the both sides of the bottom mounting rod are installed with mounting blocks, fixing bolt and hold-doun nut, and install Block, fixing bolt and hold-doun nut are symmetrical using the longitudinal midline of bottom mounting rod as symmetry axis.
It is preferred that, the both sides of the upper kelly are installed with fixed block, pulley mounting seat, pulley support post, roller And contiguous block, and fixed block, pulley mounting seat, pulley support post, the longitudinal midline of roller and contiguous block above kelly are symmetrical Axial symmetry is distributed.
It is preferred that, the quantity of first reciprocating apparatus and the second reciprocating apparatus is three.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of building site protection network that effect is dismantled with Fast Installation, Possesses following beneficial effect:
1st, the building site protection network of effect should be dismantled with Fast Installation, by setting fixed block, pulley on the right side of upper kelly Structure connection between mounting seat, pulley support post and roller, whole safety guard net can be effectively ensured can be on perpendicular strut Enter line slip, it is convenient to pack up in order and smoothly protection network when protection network is dismantled.
2nd, building site protection network of effect should be dismantled with Fast Installation, by setting inserted block at the top of fixed block, card article, convex The structure connection between fixture block, the first reciprocating apparatus, dead slot, pad, push pedal, the second reciprocating apparatus and chute is played, can be effective Ensure that when needing to dismantle and installing, convenient installation is blocked by raised fixture block for whole protection network, it is reciprocal by first Device and the second reciprocating apparatus can facilitate the dismounting of whole protection network when dismounting conveniently by raised fixture block by entering, It so can effectively strengthen the time of installation and removal, save time duration before and after construction.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is enlarged drawing at B in Fig. 1;
Fig. 4 is enlarged drawing at C in Fig. 3;
Fig. 5 is the structural representation of the reciprocating apparatus of the utility model second.
In figure:1 bottom mounting rod, 2 perpendicular struts, 3 safety guard nets, 4 it is anti-drag dividing strip, spiral shells are fixed in kelly, 6 mounting blocks, 7 on 5 Bolt, 8 hold-doun nuts, 9 fixed blocks, 10 pulley mounting seats, 11 pulley support posts, 12 rollers, 13 contiguous blocks, 14 inserted blocks, 15 card articles, 16 raised fixture blocks, 17 first reciprocating apparatuses, 18 dead slots, 19 pads, 20 push pedals, 21 second reciprocating apparatuses, 211 spring retaining tabs, 212 reciprocal springs, 213 spring mounting seats, 22 chutes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of technical scheme:A kind of building site that effect is dismantled with Fast Installation Protection network, including bottom mounting rod 1, the top of bottom mounting rod 1 are installed with perpendicular strut 2, and the inner side of perpendicular strut 2 is installed with Safety guard net 3 positioned at the top of bottom mounting rod 1, the top of safety guard net 3 is installed with drags point positioned at the anti-of the perpendicular inner side of strut 2 Bar 4 is cut, the quantity of safety guard net 3 is to drag dividing strip 4 to be fixedly connected by anti-between four pieces, and every two pieces of safety guard nets 3, is pacified The top of full protecting wire net 3 is installed with the upper kelly 5 positioned at the perpendicular inner side of strut 2.
The right side of bottom mounting rod 1 is installed with mounting blocks 6, and the inner chamber of mounting blocks 6 is movably installed with through perpendicular strut 2 Fixing bolt 7, the right side of fixing bolt 7 is installed with hold-doun nut 8, and the both sides of bottom mounting rod 1 are installed with installation Block 6, fixing bolt 7 and hold-doun nut 8, and mounting blocks 6, fixing bolt 7 and hold-doun nut 8 are with the longitudinal midline of bottom mounting rod 1 It is symmetrical for symmetry axis.
The right side of upper kelly 5 is installed with fixed block 9, and the right side of fixed block 9 is installed with pulley mounting seat 10, sliding The right side of wheel mounting seat 10 is installed with pulley support post 11, and the right side of pulley support post 11 is movably installed with positioned at perpendicular strut Roller 12 on 2 left sides, the top of perpendicular strut 2 is installed with the contiguous block 13 positioned at the top of fixed block 9, the two of upper kelly 5 Side is installed with fixed block 9, pulley mounting seat 10, pulley support post 11, roller 12 and contiguous block 13, and fixed block 9, cunning Take turns the longitudinal midline of mounting seat 10, pulley support post 11, roller 12 and the kelly 5 of contiguous block more than 13 symmetrical for symmetry axis, By setting the structure between fixed block 9, pulley mounting seat 10, pulley support post 11 and the roller 12 on the right side of upper kelly to connect, Whole safety guard net 3 can be effectively ensured can be convenient to be protected when protection network is dismantled in the enterprising line slip of perpendicular strut 2 Net is orderly and smoothly packs up.
The top of fixed block 9 is installed with inserted block 14, and the left side of inserted block 14 is installed with positioned at the top of fixed block 9 Card article 15, the left side of card article 15 is installed with raised fixture block 16, and the right side of card article 15 is installed with positioned at the inner chamber of inserted block 14 The first reciprocating apparatus 17, the bottom of the first reciprocating apparatus 17 offers the dead slot 18 positioned at the inner chamber of inserted block 14, the top of inserted block 14 Portion is installed with pad 19, and the top of pad 19 is installed with push pedal 20, and the top of push pedal 20 is installed with second Reciprocating apparatus 21, the second reciprocating apparatus 21 includes spring retaining tab 211, and the bottom of spring retaining tab 211 is installed with past Multiple spring 212, the bottom of reciprocal spring 212 is installed with spring mounting seat 213, and the first reciprocating apparatus 17 and second is toward reassembling The quantity for putting 21 is three, and the both sides of the second reciprocating apparatus 21 offer the chute 22 on contiguous block 13, by setting Put the inserted block 14 at the top of fixed block 9, card article 15, raised fixture block 16, the first reciprocating apparatus 17, dead slot 18, pad 19, push pedal 20, Between second reciprocating apparatus 21 and chute 22 structure connection, can be effectively ensured whole protection network need dismantle and install When, convenient installation is blocked by raised fixture block 16, can torn open by the first reciprocating apparatus 17 and the second reciprocating apparatus 21 Conveniently by raised fixture block 16 by entering when unloading, facilitate the dismounting of whole protection network, so can effectively strengthen pacifying installation and dismantling The time unloaded, time duration before and after construction is saved.
In summary, the building site protection network of effect should be dismantled with Fast Installation, by setting the fixation on the right side of upper kelly Structure connection between block 9, pulley mounting seat 10, pulley support post 11 and roller 12, can be effectively ensured whole safety guard net 3 Can be convenient to pack up in order and smoothly protection network when protection network is dismantled in the enterprising line slip of perpendicular strut 2, by setting Put the inserted block 14 at the top of fixed block 9, card article 15, raised fixture block 16, the first reciprocating apparatus 17, dead slot 18, pad 19, push pedal 20, Between second reciprocating apparatus 21 and chute 22 structure connection, can be effectively ensured whole protection network need dismantle and install When, convenient installation is blocked by raised fixture block 16, can torn open by the first reciprocating apparatus 17 and the second reciprocating apparatus 21 Conveniently by raised fixture block 16 by entering when unloading, facilitate the dismounting of whole protection network, so can effectively strengthen pacifying installation and dismantling The time unloaded, time duration before and after construction is saved, the protection network solved on existing building site in the market is being installed With the problem of the influenceing duration execution and completion date that wasted time and energy in dismounting.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of building site protection network that effect is dismantled with Fast Installation, including bottom mounting rod (1), it is characterised in that:The bottom Perpendicular strut (2) is installed with the top of mounting rod (1), is installed with the inside of perpendicular strut (2) positioned at bottom mounting rod (1) top Be installed with the inside of perpendicular strut (2) at the top of the safety guard net (3) in portion, safety guard net (3) it is anti-drag dividing strip (4), The upper kelly (5) on the inside of perpendicular strut (2) is installed with the top of the safety guard net (3);
Mounting blocks (6) are installed with the right side of the bottom mounting rod (1), the inner chamber of mounting blocks (6) is movably installed with through perpendicular Hold-doun nut (8) is installed with the right side of the fixing bolt (7) of strut (2), fixing bolt (7);
It is installed with the right side of the upper kelly (5) on the right side of fixed block (9), fixed block (9) and is installed with pulley installation Pulley support post (11), the right side activity of pulley support post (11) are installed with the right side of seat (10), pulley mounting seat (10) It is provided with the top of the roller (12) on perpendicular strut (2) left side, the perpendicular strut (2) and is installed with positioned at fixed block (9) contiguous block (13) at the top of;
Inserted block (14) is installed with the top of the fixed block (9), inserted block is installed with positioned at fixed block on the left of (14) (9) raised fixture block (16) is installed with the left of the card article (15) at the top of, card article (15), the right side of the card article (15) is fixed The first reciprocating apparatus (17) positioned at inserted block (14) inner chamber is installed, the bottom of the first reciprocating apparatus (17) is offered positioned at inserted block (14) pad (19) is installed with the top of the dead slot (18) of inner chamber, the inserted block (14), pad has fixation at the top of (19) It is provided with the top of push pedal (20), push pedal (20) and is installed with the second reciprocating apparatus (21), the two of the second reciprocating apparatus (21) Side offers the chute (22) on contiguous block (13).
2. a kind of building site protection network that effect is dismantled with Fast Installation according to claim 1, it is characterised in that:It is described Second reciprocating apparatus (21) includes spring retaining tab (211), and the bottom of spring retaining tab (211) is installed with reciprocal spring (212), the bottom of reciprocal spring (212) is installed with spring mounting seat (213).
3. a kind of building site protection network that effect is dismantled with Fast Installation according to claim 1, it is characterised in that:It is described The quantity of safety guard net (3) is to drag dividing strip (4) to be fixedly connected by anti-between four pieces, and every two pieces of safety guard nets (3).
4. a kind of building site protection network that effect is dismantled with Fast Installation according to claim 1, it is characterised in that:It is described The both sides of bottom mounting rod (1) are installed with mounting blocks (6), fixing bolt (7) and hold-doun nut (8), and mounting blocks (6), Fixing bolt (7) and hold-doun nut (8) are symmetrical using the longitudinal midline of bottom mounting rod (1) as symmetry axis.
5. a kind of building site protection network that effect is dismantled with Fast Installation according to claim 1, it is characterised in that:It is described The both sides of upper kelly (5) be installed with fixed block (9), pulley mounting seat (10), pulley support post (11), roller (12) and It is more than contiguous block (13), and fixed block (9), pulley mounting seat (10), pulley support post (11), roller (12) and contiguous block (13) The longitudinal midline of kelly (5) is that symmetry axis is symmetrical.
6. a kind of building site protection network that effect is dismantled with Fast Installation according to claim 1, it is characterised in that:It is described The quantity of first reciprocating apparatus (17) and the second reciprocating apparatus (21) is three.
CN201720018546.9U 2017-01-09 2017-01-09 A kind of building site protection network that effect is dismantled with Fast Installation Active CN206477610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720018546.9U CN206477610U (en) 2017-01-09 2017-01-09 A kind of building site protection network that effect is dismantled with Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720018546.9U CN206477610U (en) 2017-01-09 2017-01-09 A kind of building site protection network that effect is dismantled with Fast Installation

Publications (1)

Publication Number Publication Date
CN206477610U true CN206477610U (en) 2017-09-08

Family

ID=59751061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720018546.9U Active CN206477610U (en) 2017-01-09 2017-01-09 A kind of building site protection network that effect is dismantled with Fast Installation

Country Status (1)

Country Link
CN (1) CN206477610U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030873A (en) * 2020-07-22 2020-12-04 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and using method thereof
CN112030873B (en) * 2020-07-22 2024-05-17 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030873A (en) * 2020-07-22 2020-12-04 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and using method thereof
CN112030873B (en) * 2020-07-22 2024-05-17 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and application method thereof

Similar Documents

Publication Publication Date Title
CN206477610U (en) A kind of building site protection network that effect is dismantled with Fast Installation
CN201953005U (en) Detachable protective railing
CN204675672U (en) A kind of spliced tower crane service platform
CN103982124A (en) Protective net adjustable in size
CN204252642U (en) A kind of building operations guardrail
CN209008613U (en) A kind of simple construction transport of materials device
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN103615013A (en) Repairable flexible passive protection system product
CN203392657U (en) Machine maintenance platform
CN203257459U (en) Mine draw shaft lattice sieve
CN207005039U (en) A kind of foundation bolt protective cover
CN203548300U (en) Quick disassembling and assembling device for fan inlet protective screening
CN206530029U (en) A kind of construction scaffold
CN206693743U (en) A kind of high gardens guard rail of security performance
CN206385820U (en) A kind of construction guardrail
CN206091446U (en) Efficiency of park is improved garage
CN204799405U (en) Broken whole grain machine
CN218880898U (en) Low-loss safe side slope passive protective net
CN216063743U (en) Impurity removing equipment for construction waste
CN209195172U (en) A kind of substation's protective fence being easily installed
CN209384689U (en) A kind of safety protection guard convenient for construction
CN206053388U (en) A kind of peace tears portable guard rail device open
CN203458975U (en) Urea feeding device for denitrification engineering equipment
CN209637366U (en) A kind of housing construction outside Fence structure
CN203066499U (en) Protective handrail