CN203066499U - Protective handrail - Google Patents

Protective handrail Download PDF

Info

Publication number
CN203066499U
CN203066499U CN 201220739717 CN201220739717U CN203066499U CN 203066499 U CN203066499 U CN 203066499U CN 201220739717 CN201220739717 CN 201220739717 CN 201220739717 U CN201220739717 U CN 201220739717U CN 203066499 U CN203066499 U CN 203066499U
Authority
CN
China
Prior art keywords
cross bar
protective railing
bolt hole
connector
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220739717
Other languages
Chinese (zh)
Inventor
邓建设
吴非
赖卫祖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN 201220739717 priority Critical patent/CN203066499U/en
Application granted granted Critical
Publication of CN203066499U publication Critical patent/CN203066499U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Description

Guard rail
Technical field
The utility model relates to construction engineering technical field, especially, relates to a kind of guard rail.
Background technology
In the work progress of engineering construction, the various unlimited edge in construction operation place all needs to carry out security protection, and personnel fall from eminence with preventive works, avoids causing workman's casualty accident and unnecessary loss.
Present common practices is to use scaffolding steel pipe to set up simple guard rail, the column of this guard rail, cross bar all use scaffolding steel pipe to set up, connect to adopt fastener to connect, locate to fix at concrete floor, metope etc., with embedded iron parts and steel pipe or with the reinforcing bar firm welding.
The shortcoming of existing guard rail is: need first embedded iron parts in the time of fixedly, the installation and removal difficulty is set up and is taken a lot of work, cost is higher, be difficult for having enough to meet the need use, do not reach the safety construction requirement, can't implementation toolization, regularization, repeat to have enough to meet the need the purpose of use for a long time.
The utility model content
The utility model purpose is to provide a kind of assembling facility, dismounting is simple and repeatedly used guard rail, dismantles relatively difficulty with guard rail in the solution prior art, is difficult for having enough to meet the need the technical problem of use.
For achieving the above object, the utility model provides a kind of guard rail, guard rail comprises two groups with the upper bracket protective unit, the support protective unit comprises vertical rod and the cross bar that laterally is connected with vertical rod, be provided with connector between the support protective unit, connector is connected with the cross bar of adjacent supports protective unit with fixing two adjacent support protective units.
Further, the lower end of vertical rod is connected with holder, holder be provided with for fixing first bolt hole in ground.
Further, vertical rod and holder are one-body molded.
Further, vertical rod is provided with for the connecting hole that connects cross bar.
Further, the number of the connecting hole in the vertical rod is two, and correspondingly, the quantity of the cross bar that laterally is connected with vertical rod in each support protective unit is two.
Further, the end of cross bar is provided with second bolt hole, and connector is the sleeve pipe that is provided with the 3rd bolt hole, by the cooperation realization connector of second bolt hole, the 3rd bolt hole and fixedlying connected of cross bar.
Further, the 3rd bolt hole on the connector is alternate a plurality of, and correspondingly, second bolt hole that is positioned at crossbar end is alternate a plurality of.
Further, the internal diameter of connector is more than or equal to the external diameter of cross bar.
The utlity model has following beneficial effect:
Guard rail of the present utility model, constituted by the support protective unit more than two groups, be provided with connector between every pack support protective unit of guard rail, connector is connected with the cross bar of adjacent supports protective unit with fixing adjacent supports protective unit, be connected and fixed the adjacent supports protective unit with connector, need not use other fasteners during the installation and removal operation, make installation and removal more convenient and easy, and can not cause damage to the support protective unit after the dismounting, the parts after the dismounting can repeat turnover and use.
Except purpose described above, feature and advantage, the utility model also has other purpose, feature and advantage.With reference to figure, the utility model is described in further detail below.
Description of drawings
The accompanying drawing that constitutes the application's a part is used to provide further understanding of the present utility model, and illustrative examples of the present utility model and explanation thereof are used for explaining the utility model, do not constitute improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation of the guard rail of the utility model preferred embodiment;
Fig. 2 is the side diagram of vertical rod of the guard rail of the utility model preferred embodiment;
Fig. 3 is the vertical view of vertical rod of the guard rail of the utility model preferred embodiment;
Fig. 4 is the structural representation of connector of the guard rail of the utility model preferred embodiment; And
Fig. 5 is the vertical view of connector of the guard rail of the utility model preferred embodiment.
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is elaborated, but the multitude of different ways that the utility model can be defined by the claims and cover is implemented.
As shown in Figure 1, the utility model provides a kind of guard rail, is used for the various unlimited edge in the construction operation place of engineering construction work progress is carried out security protection.Guard rail is made up of the support protective unit more than two groups, and every pack support protective unit comprises vertical rod 10 and the cross bars 20 that laterally are connected with vertical rod 10; Be provided with connector 30 between the support protective unit, connector 30 is connected with the cross bar 20 of adjacent supports protective unit with fixing two adjacent pack support protective units.When the assembly and disassembly of support protective unit, be connected and fixed two adjacent pack support protective units with connector 30, need not use other fasteners during installing/dismounting, installation and removal are more convenient and easy, and can not cause damage to the support protective unit after the dismounting, the parts after the dismounting can repeat turnover and use.
In conjunction with referring to Fig. 2, the vertical rod 10 of the guard rail of this preferred embodiment is provided with for the connecting hole 12 that connects cross bar 20, when forming guard rail, cross bar 20 laterally is connected with vertical rod 10 by the connecting hole 12 that passes through in the vertical rod 10, thereby forms a pack support protective unit.Particularly, the number of the connecting hole 12 in the vertical rod 10 is two, correspondingly, the quantity of the cross bar 20 that laterally is connected with vertical rod 10 in each support protective unit is two, be that every pack support protective unit is made up of a vertical rod 10 and two cross bars 20, make guard rail in simple in structure, can satisfy the demand of security protection.
As shown in Figure 3, in this preferred embodiment, the lower end of vertical rod 10 is connected with holder 11, and holder 11 is provided with first bolt hole 15, and the expansion bolt that sets on ground is fixed in ground by first bolt hole 15 on the holder 11 with vertical rod 10 and holder 11.Use expansion bolt fixedly vertical rod 10 and holder 11, need or not to carry out welding operation at the ground embedded iron parts, feasiblely set up time saving and energy savingly, reduced cost; Further, vertical rod 10 is one-body molded with holder 11, and is convenient when making support; Particularly, dismounting vertical rod 10 only needs during with holder 11 expansion bolt severed and get final product, only damages expansion bolt, can not cause loss to vertical rod 10 and holder 11, and vertical rod 10 and the holder of pulling down 11 can repeat the turnover use.
As Fig. 4, shown in Figure 5, in this preferred embodiment, two ends of the cross bar 20 of support protective unit are provided with second bolt hole 25, and connector 30 is for being provided with the sleeve pipe of the 3rd bolt hole 35, cross bar 20 and connector 30 by second bolt hole 25 and the 3rd bolt hole 35 cooperate be connected and fixed.When the cross bar 20 of support protective unit is connected with connector 30 bolts.Only need earlier connector 30 to be placed in adjacent two pack support protective unit cross bars, 20 interconnective ends, with bolt connector 30 is connected with the cross bar 20 of support protective unit then, only need pull down the separable cross bar 20 of connecting bolt and connector 30, simple to operate saving trouble during dismounting.
In this preferred embodiment, in order to make the sleeve pipe of connector 30 to be enclosed within smoothly on the cross bar 20, the internal diameter that the sleeve pipe of connector 30 is set is greater than or equal to the external diameter of cross bar 20; In the practical application, when the external diameter of connector 30 equated substantially with cross bar 20 internal diameters, effect was better.Preferably, in this preferred embodiment, second bolt hole 25 is arranged between two end homogeneous phases of cross bar 20, the 3rd bolt hole 35 is being arranged between homogeneous phase on the connector 30, can regulate the permanent position of connecting bolt on cross bar 20 ends and connector 30 according to the place needs, and then can piecewise uniform ground adjust the connection length of guard rail, and make that the application of guard rail is more flexible, strengthened practicality greatly.
To sum up, guard rail of the present utility model, cross bar 20 laterally is connected with vertical rod 10 by the connecting hole 13 in the vertical rod 10, thereby forms a pack support protective unit; The cross bar 20 of two adjacent pack support protective units is connected and fixed by connector, and is simple to operation.Vertical rod 10 lower ends are connected with holder 11, and first bolt hole 15 is set on the holder 11, finish fixing to vertical rod 10 and holder 11 by expansion bolt, good fixing effect, and also easy to implement; In addition, the cross bar 20 of each pack support protective unit of guard rail evenly respectively is provided with second bolt hole 25, evenly respectively be provided with the 3rd bolt hole 35 on the connector 30, during practical application, thereby can regulate the connection length of the position adjusting guard rail of connecting bolt according to the needs of construction plant, make that the utility model scope of application is wider.During the utility model dismounting, only need untie the bolt that connects cross bar 20 and connector 30, the expansion bolt of severing on the holder 12 gets final product, and the dismounting operation simply and not can cause damage to guard rail, the parts that disassemble can repeat turnover and use, and have improved the utilization ratio of guard rail.
The above is preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (8)

1.一种防护栏杆,其特征在于:所述防护栏杆包括两组以上支架防护单元,所述支架防护单元包括立杆(10)及与所述立杆(10)横向连接的横杆(20),所述支架防护单元之间设置有连接件(30),所述连接件(30)与相邻的所述支架防护单元的横杆(20)连接以固定相邻的两个所述支架防护单元。1. A protective railing, characterized in that: the protective railing includes more than two sets of bracket protection units, and the bracket protection unit includes a vertical pole (10) and a horizontal bar (20) horizontally connected to the vertical pole (10). ), the connecting piece (30) is arranged between the support protection units, and the connecting piece (30) is connected with the cross bar (20) of the adjacent support protection unit to fix the two adjacent supports protection unit. 2.根据权利要求1所述的防护栏杆,其特征在于,所述立杆(10)的下端连接有固定座(11),所述固定座(11)上设有用于与地面固定的第一螺栓孔(15)。2. The protective railing according to claim 1, characterized in that, the lower end of the pole (10) is connected with a fixing base (11), and the fixing base (11) is provided with a first Bolt holes (15). 3.根据权利要求2所述的防护栏杆,其特征在于,所述立杆(10)与所述固定座(11)一体成型。3. The protective railing according to claim 2, characterized in that, the upright rod (10) is integrally formed with the fixing seat (11). 4.根据权利要求1所述的防护栏杆,其特征在于,所述立杆(10)上设有用于连接所述横杆(20)的连接孔(12)。4. The protective railing according to claim 1, characterized in that, the upright bar (10) is provided with a connection hole (12) for connecting the cross bar (20). 5.根据权利要求4所述的防护栏杆,其特征在于,所述立杆(10)上的所述连接孔(12)的个数为两个,相应地,每个所述支架防护单元中与所述立杆(10)横向连接的所述横杆(20)的数量为两根。5. The protective railing according to claim 4, characterized in that, the number of the connecting holes (12) on the pole (10) is two, correspondingly, each of the bracket protection units The number of the cross bars (20) transversely connected with the upright bars (10) is two. 6.根据权利要求1所述的防护栏杆,其特征在于,所述横杆(20)的端部设有第二螺栓孔(25),所述连接件(30)为设有第三螺栓孔(35)的套管,通过所述第二螺栓孔(25)、第三螺栓孔(35)的配合实现所述连接件(30)与所述横杆(20)的固定连接。6. The protective railing according to claim 1, characterized in that, the end of the cross bar (20) is provided with a second bolt hole (25), and the connecting piece (30) is provided with a third bolt hole (35), through the cooperation of the second bolt hole (25) and the third bolt hole (35), the fixed connection between the connecting piece (30) and the cross bar (20) is realized. 7.根据权利要求6所述的防护栏杆,其特征在于:所述连接件(30)上的所述第三螺栓孔(35)为相间的多个,相应地,位于所述横杆(20)端部的所述第二螺栓孔(25)为相间的多个。7. The protective railing according to claim 6, characterized in that: the third bolt holes (35) on the connecting piece (30) are alternately multiple, correspondingly, located on the cross bar (20) ) The second bolt holes (25) at the end part are multiple alternately. 8.根据权利要求1所述的防护栏杆,其特征在于,所述连接件(30)的内径大于或等于所述横杆(20)的外径。8. The protective railing according to claim 1, characterized in that, the inner diameter of the connecting piece (30) is greater than or equal to the outer diameter of the cross bar (20).
CN 201220739717 2012-12-28 2012-12-28 Protective handrail Expired - Fee Related CN203066499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220739717 CN203066499U (en) 2012-12-28 2012-12-28 Protective handrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220739717 CN203066499U (en) 2012-12-28 2012-12-28 Protective handrail

Publications (1)

Publication Number Publication Date
CN203066499U true CN203066499U (en) 2013-07-17

Family

ID=48765309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220739717 Expired - Fee Related CN203066499U (en) 2012-12-28 2012-12-28 Protective handrail

Country Status (1)

Country Link
CN (1) CN203066499U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695718A (en) * 2013-12-06 2015-06-10 中建四局第五建筑工程有限公司 Adjustable limb support method and device
CN113152272A (en) * 2021-04-23 2021-07-23 广州宏途设备工程有限公司 Adjustable structure system of steel trestle guardrail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695718A (en) * 2013-12-06 2015-06-10 中建四局第五建筑工程有限公司 Adjustable limb support method and device
CN113152272A (en) * 2021-04-23 2021-07-23 广州宏途设备工程有限公司 Adjustable structure system of steel trestle guardrail

Similar Documents

Publication Publication Date Title
CN204627016U (en) A kind of crown protective device of the car sedan-chair top without scaffold construction elevator
CN103422714B (en) A kind of high ferro is the safety protecting method of wired construction and the protective fence of formation thereof both
CN207468059U (en) A kind of telescopic tower crane people row escape way
CN203066499U (en) Protective handrail
CN206800949U (en) Operating platform for construction work high above the ground
CN206859719U (en) A kind of efficient assembled safety barrier for edge protection
CN204717144U (en) A kind of concrete pump pipe setting tool cribbing
CN202157581U (en) Foundation-pit limb shaping protection device
CN205777440U (en) A kind of scaffold with safety guard net
CN203430009U (en) Construction hanging basket
CN201991203U (en) Scaffold
CN201924285U (en) Adjustable bridge support connecting frame
CN203783106U (en) Hanging assembling moving platform
CN205976397U (en) Portable handling frame
CN105587132A (en) Building guardrail for civil engineering
CN203034914U (en) Demountable rail structure
CN102957113B (en) Decoration construction temporary power construction system
CN210508494U (en) Combined fairway
CN202248819U (en) Lightweight wooden structure construction scaffolding
CN203008504U (en) Hard rod type protective barrier
CN201902026U (en) Building engineering edge protection railing with freely extended or reduced length
CN206250679U (en) A kind of power transmission and transformation line abrasionproof anti-wrap device of Midspan sag construction
CN201953088U (en) Combined support system for high and large special-shaped steel structure
CN201605823U (en) Safety protection device for building construction
CN205933024U (en) Perpendicular transport means of photovoltaic power generation component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20151228

EXPY Termination of patent right or utility model