CN206467660U - Drilling rod formula pile for prestressed pipe borehole cleaning construction tool - Google Patents
Drilling rod formula pile for prestressed pipe borehole cleaning construction tool Download PDFInfo
- Publication number
- CN206467660U CN206467660U CN201621408271.1U CN201621408271U CN206467660U CN 206467660 U CN206467660 U CN 206467660U CN 201621408271 U CN201621408271 U CN 201621408271U CN 206467660 U CN206467660 U CN 206467660U
- Authority
- CN
- China
- Prior art keywords
- connecting tube
- borehole cleaning
- pile
- construction tool
- prestressed pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of drilling rod formula pile for prestressed pipe borehole cleaning construction tool, including:Connecting tube, the handle for being arranged on connecting tube one end and the drill bit for setting the connecting tube other end, the drill bit is in the shape of a spiral.Above-mentioned pile for prestressed pipe borehole cleaning construction tool rotates connecting tube using handle, so that drill bit spiral carries out the cutting soil body, soil is set to become loose along helical form drill bit, so as to which the soil body be cleared, work well, borehole cleaning quality can be ensured very well, can simply be easily accomplished the construction of pre stressed empty piped piles borehole cleaning, safe devoid of risk, speed of application is very fast.
Description
Technical field
The utility model is related to technical field of building construction, more particularly, to a kind of drilling rod formula pile for prestressed pipe borehole cleaning
Construction tool.
Background technology
In construction process, because pile foundation engineering is that construction unit independently gives out a contract for a project, and relatively early march into the arena completes pre- answer
The construction of power hollow shell pill, the pile foundation deadline differs about 4 months with the formal digging time of the earthwork, before earth excavation and excavates
During, a large amount of soil are fallen into stake holes, and cause a core anchor bar concrete anchors into length reduction, in order to ensure to anchor into stake
The length of core armored concrete meets design requirement, and Luoyang Spade soil digging borehole cleaning is usually taken, and inefficiency, borehole cleaning effect is poor.
Utility model content
In view of the above problems, the purpose of this utility model is to provide that a kind of borehole cleaning effect is good, the high drilling rod formula of operating efficiency
Pile for prestressed pipe borehole cleaning construction tool.
To achieve these goals, the utility model provides a kind of drilling rod formula pile for prestressed pipe borehole cleaning construction tool, including:
Connecting tube, the handle for being arranged on connecting tube one end and the drill bit for setting the connecting tube other end, the drill bit is in the shape of a spiral.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, the handle is perpendicular to the connecting tube.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, the connecting tube and handle are coating steel pipe, the drill bit
It is welded by multiple steel discs.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, the handle and the connecting tube releasable connection, the brill
Head and the connecting tube releasable connection.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, in addition at least one layer of clay-receiving disc, it is arranged on connecting tube
On, the size of the clay-receiving disc be more than in the size of the drill bit, the connecting tube between the clay-receiving disc and drill bit be provided with it is many
Individual fumarole.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, multilayer clay-receiving disc, the phase are provided with the connecting tube
Multiple fumaroles are provided with connecting tube between adjacent two clay-receiving discs.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, in addition to range sensor, it is arranged at least one and connects soil
Disk senses digging depth towards the bottom surface of drill bit.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, in addition to rotating driving device, the rotation of drive connection pipe
Turn, lifted and decline.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, in addition to controller, with the range sensor and rotation
Drive device is wired or wireless connection, when the digging depth reaches set depth, sends stalling signal to rotation driving
Device.
Described pile for prestressed pipe borehole cleaning construction tool, wherein, in addition to weight sensor, it is arranged on each clay-receiving disc
Bottom, and the wired or wireless connection of the controller senses the weight of clay-receiving disc, when the weight reaches setting value, leads to
Cross rotating driving device lifting connecting tube.
Above-mentioned pile for prestressed pipe borehole cleaning construction tool rotates connecting tube using handle so that drill bit spiral carries out cutting soil
Body, makes soil become loose along helical form drill bit, so that the soil body be cleared, works well, can ensure borehole cleaning quality very well, letter
List can be easily accomplished the construction of pre stressed empty piped piles borehole cleaning, and safe devoid of risk, speed of application is very fast.
Above-mentioned pile for prestressed pipe borehole cleaning construction tool is adapted to the engineering of different tube diameters pile for prestressed pipe borehole cleaning construction, construction
Simply, conveniently, operating efficiency can be improved, simple operations can complete work.
Brief description of the drawings
By reference to detailed description below and with reference to accompanying drawing, other purposes and result of the present utility model will more
Understand and should be readily appreciated that.In the accompanying drawings:
Fig. 1 is the schematic diagram of the utility model drilling rod formula pile for prestressed pipe borehole cleaning construction tool one embodiment;
Fig. 2 is the schematic diagram of another embodiment of the utility model drilling rod formula pile for prestressed pipe borehole cleaning construction tool;
Fig. 3 is the schematic diagram of the utility model drilling rod formula pile for prestressed pipe borehole cleaning one preferred embodiment of construction tool.
Embodiment
In the following description, for purposes of illustration, in order to provide the comprehensive understanding to one or more embodiments, explain
Many details are stated.It may be evident, however, that these embodiments can also be realized in the case of these no details.
Come below with reference to accompanying drawings to being described in detail according to each embodiment of the present utility model.
Fig. 1 is the schematic diagram of the utility model drilling rod formula pile for prestressed pipe borehole cleaning construction tool one embodiment, such as Fig. 1 institutes
Show, the drilling rod formula pile for prestressed pipe borehole cleaning construction tool 100, including connecting tube 110, the handle for being arranged on connecting tube one end 110a
Hand 120 and the drill bit 130 for setting connecting tube other end 110b, the drill bit 130 is in the shape of a spiral.
The side that pre stressed empty piped piles carry out borehole cleaning is carried out using above-mentioned drilling rod formula pile for prestressed pipe borehole cleaning construction tool 100
Method includes:The instrument of pile for prestressed pipe borehole cleaning construction tool 100 is placed on pile tube center, connecting tube 110 is rotated using handle 120,
So that the spiral of drill bit 130 carries out the cutting soil body, soil is set to become loose, lifting construction instrument 100 along helical form drill bit, the soil body is also
As the lifting of construction tool 100 is cleared, so that the soil body be cleared.
Preferably, connecting tube 110 and handle 120 are coating steel pipe, and the handle 120 is perpendicular to the connecting tube 110, institute
Drill bit 130 is stated to be welded for multiple steel discs.Because coating steel pipe has certain toughness and ability of anti-deformation, in work progress
Middle active force can make coating steel pipe deform and be destroyed, and especially connecting tube 110 only serves the effect for transmitting power, substantially not shadow
Ring the size of both ends active force.
The replacing of drill bit 130 and handle 120 for convenience, it is preferable that the drill bit 130 and handle 120 and the connection
The releasable connection of pipe 110, such as by screw thread or snap connection.
Fig. 2 is the schematic diagram of another embodiment of the utility model drilling rod formula pile for prestressed pipe borehole cleaning construction tool, such as Fig. 2
It is shown, at least one layer of clay-receiving disc 140 is provided with the connecting tube 110 of drilling rod formula pile for prestressed pipe borehole cleaning construction tool 100, it is described
The size of clay-receiving disc 140, which is more than in the size of the drill bit, the connecting tube 110 between the clay-receiving disc 140 and drill bit 130, to be set
There are multiple fumaroles 150.
Preferably, it is provided with the connecting tube 110 between multilayer clay-receiving disc 140, the two neighboring clay-receiving disc 140
Multiple fumaroles 150 are provided with connecting tube 110.
Pile for prestressed pipe borehole cleaning construction tool 100 in this example is rotated by drill bit 130, makes native loose, progress borehole cleaning,
Aperture blowing is carried out by fumarole 150, because the size of clay-receiving disc 140 is more than the size of drill bit 130 so that fumarole 150 is not allowed
Easily by soil blocking.
In one preferred embodiment of the utility model, the work as shown in figure 3, the drilling rod formula pile for prestressed pipe borehole cleaning is constructed
Tool 100 includes connecting tube 110, the drill bit 130 for being arranged on the one end of connecting tube 110, the multilayer clay-receiving disc being arranged in connecting tube
140th, multiple fumaroles 150 and connecting tube air insertion in the connecting tube 110 between two neighboring clay-receiving disc 140 are arranged on
Air-supply arrangement 160, drive connection pipe 110 rotate rotating driving device 170, be arranged at least one direction of clay-receiving disc 140
The range sensor 180 and controller (not shown) of the bottom surface of drill bit 130, wherein, pass through rotating driving device drive connection
Rotation, lifting and the decline of pipe 110, digging depth, range sensor 180 and rotation driving are sensed by range sensor 180
Device 170 is connected by wired or wireless mode with controller, when the digging depth reaches set depth, passes through control
Device sends stalling signal to rotating driving device 170.
Preferably, controller noted above controls connecting tube 110 according to digging depth in the unit interval by rotating driving device
Rotating speed.
Furthermore it is preferred that above-mentioned pile for prestressed pipe borehole cleaning construction tool 100 also includes:Weight sensor 190, is arranged on
The bottom of each clay-receiving disc 140, with the wired or wireless connection of the controller, senses the weight of clay-receiving disc 140, when described heavy
When amount reaches setting value, connecting tube 110 is lifted by rotating driving device 170.
Preferably, the clay-receiving disc 140 is tapered, it is further preferred that the portion that the clay-receiving disc 140 is connected with connecting rod
It is in inwardly protruded shape to divide, and the weight sensor 190 and range sensor 180 may be mounted at the raised position, is prevented
Only native contaminant sensor, influences measurement accuracy.
Above-mentioned pile for prestressed pipe borehole cleaning construction tool 100 can be automatically performed borehole cleaning and aperture blowing work, time saving and energy saving.
In embodiment of the present utility model, drill bit 130 can be that individual layer spiral can also be multi-layer helical in the shape of a spiral,
Spiral is not exclusively wrapped in connecting tube 110, in umbrella spiral.
Although content disclosed above shows exemplary embodiment of the present utility model, it should be noted that not carrying on the back
On the premise of the scope limited from claim, it may be many modifications and change.Although in addition, element of the present utility model
It can describe or require in individual form, it is also contemplated that being unless explicitly limited individual element with multiple elements.
Claims (10)
1. a kind of drilling rod formula pile for prestressed pipe borehole cleaning construction tool, it is characterised in that including:Connecting tube, it is arranged on connecting tube one
The handle at end and the drill bit for setting the connecting tube other end, the drill bit is in the shape of a spiral.
2. pile for prestressed pipe borehole cleaning construction tool according to claim 1, it is characterised in that the handle is perpendicular to described
Connecting tube.
3. pile for prestressed pipe borehole cleaning construction tool according to claim 1, it is characterised in that the connecting tube and handle are
Coating steel pipe, the drill bit is welded by multiple steel discs.
4. pile for prestressed pipe borehole cleaning construction tool according to claim 1, it is characterised in that the handle and the connection
Pipe releasable connection, the drill bit and the connecting tube releasable connection.
5. pile for prestressed pipe borehole cleaning construction tool according to claim 1, it is characterised in that also connect soil including at least one layer
Disk, is arranged in connecting tube, and the size of the clay-receiving disc is more than the size of the drill bit, the company between the clay-receiving disc and drill bit
Multiple fumaroles are provided with adapter.
6. pile for prestressed pipe borehole cleaning construction tool according to claim 5, it is characterised in that be provided with the connecting tube
Multiple fumaroles are provided with connecting tube between multilayer clay-receiving disc, the two neighboring clay-receiving disc.
7. pile for prestressed pipe borehole cleaning construction tool according to claim 5, it is characterised in that also including range sensor,
Bottom surface of at least one clay-receiving disc towards drill bit is arranged on, digging depth is sensed.
8. pile for prestressed pipe borehole cleaning construction tool according to claim 7, it is characterised in that also filled including rotation driving
Put, rotation, lifting and the decline of drive connection pipe.
9. pile for prestressed pipe borehole cleaning construction tool according to claim 8, it is characterised in that also including controller, with institute
State range sensor and rotating driving device is wired or wireless connection, when the digging depth reaches set depth, send
Signal is stalled to rotating driving device.
10. pile for prestressed pipe borehole cleaning construction tool according to claim 9, it is characterised in that also including weight sensor,
The bottom of each clay-receiving disc is arranged on, with the wired or wireless connection of the controller, the weight of clay-receiving disc is sensed, when described heavy
When amount reaches setting value, connecting tube is lifted by rotating driving device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621408271.1U CN206467660U (en) | 2016-12-21 | 2016-12-21 | Drilling rod formula pile for prestressed pipe borehole cleaning construction tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621408271.1U CN206467660U (en) | 2016-12-21 | 2016-12-21 | Drilling rod formula pile for prestressed pipe borehole cleaning construction tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206467660U true CN206467660U (en) | 2017-09-05 |
Family
ID=59712240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621408271.1U Active CN206467660U (en) | 2016-12-21 | 2016-12-21 | Drilling rod formula pile for prestressed pipe borehole cleaning construction tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206467660U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356159A (en) * | 2018-11-30 | 2019-02-19 | 江苏兴厦建设工程集团有限公司 | A kind of simple stake core hole cleaning device and borehole cleaning method |
CN112095607A (en) * | 2020-07-30 | 2020-12-18 | 北京建工土木工程有限公司 | Device and method for quickly removing pile core soil of precast tubular pile |
CN116815746A (en) * | 2023-06-16 | 2023-09-29 | 甘肃省安装建设集团有限公司 | Construction auxiliary equipment and construction method for large centralized photovoltaic grid-connected power generation system |
-
2016
- 2016-12-21 CN CN201621408271.1U patent/CN206467660U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356159A (en) * | 2018-11-30 | 2019-02-19 | 江苏兴厦建设工程集团有限公司 | A kind of simple stake core hole cleaning device and borehole cleaning method |
CN112095607A (en) * | 2020-07-30 | 2020-12-18 | 北京建工土木工程有限公司 | Device and method for quickly removing pile core soil of precast tubular pile |
CN112095607B (en) * | 2020-07-30 | 2021-11-02 | 北京建工土木工程有限公司 | Device and method for quickly removing pile core soil of precast tubular pile |
CN116815746A (en) * | 2023-06-16 | 2023-09-29 | 甘肃省安装建设集团有限公司 | Construction auxiliary equipment and construction method for large centralized photovoltaic grid-connected power generation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2906026Y (en) | Double-barrel hard rock core drill for large-diameter pile hole | |
CN206467660U (en) | Drilling rod formula pile for prestressed pipe borehole cleaning construction tool | |
CN109653682B (en) | Drill bit with adjustable drill diameter and hole digging machine | |
CN207093008U (en) | Drill | |
CN102011549A (en) | Non-coring cylindrical rock drill of rotary drilling rig | |
JP4903620B2 (en) | Excavation device for pile construction and pile construction method | |
CN110886577B (en) | Construction method for perpendicularity control of rotary excavating hard secant pile in deep and thick rockfill area | |
CN111764818A (en) | Eccentric casing following drilling construction structure and method for anchoring engineering | |
CN104141455B (en) | Drilling equipment and rig drilling method | |
CN107420047A (en) | A kind of composite multi-functional ground spiral drill | |
CN201843132U (en) | Large-aperture deep-pile long-auger drilling rig | |
CN217841523U (en) | Miniature steel-pipe pile construction drilling equipment and construction system | |
CN103938621B (en) | A kind of screw cast-in-place pile pile-forming apparatus with nut obvolvent lazy-tongs | |
CN211422529U (en) | Rotary drilling rig convenient for rotary drilling of hard secant pile | |
CN205840789U (en) | A kind of all standing type cone palm sheet | |
CN113530476A (en) | Drill rod lifting and lowering device for drilling process of down-the-hole hammer of rotary drilling rig | |
CN206513332U (en) | Drilling tool for mechanical pile in hole | |
CN207033350U (en) | A kind of composite multi-functional ground spiral drill | |
CN208563419U (en) | A kind of set digging device | |
CN205713988U (en) | A kind of efficient rotary digs rock drill bit | |
CN208472721U (en) | A kind of anchor pole constructed in loose media stratum using hand air drill | |
CN207017947U (en) | A kind of drilling tool of four wings alloy bit | |
CN202401978U (en) | Deep hole drilling machine | |
CN106468141A (en) | A kind of long-spiral drilling machine reducing rotary digging drill bit | |
CN206693911U (en) | Pile foundation rig tup component and cobble geology pile foundation rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |