CN206467578U - Bridge construction bracket bearing assembly - Google Patents

Bridge construction bracket bearing assembly Download PDF

Info

Publication number
CN206467578U
CN206467578U CN201720035602.XU CN201720035602U CN206467578U CN 206467578 U CN206467578 U CN 206467578U CN 201720035602 U CN201720035602 U CN 201720035602U CN 206467578 U CN206467578 U CN 206467578U
Authority
CN
China
Prior art keywords
box
bracket body
bracket
bearing assembly
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720035602.XU
Other languages
Chinese (zh)
Inventor
王芮文
高越
曹妍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Senmiao Engineering Quality Testing Co
Original Assignee
Jiangsu Senmiao Engineering Quality Testing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Senmiao Engineering Quality Testing Co filed Critical Jiangsu Senmiao Engineering Quality Testing Co
Priority to CN201720035602.XU priority Critical patent/CN206467578U/en
Application granted granted Critical
Publication of CN206467578U publication Critical patent/CN206467578U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge construction bracket bearing assembly, including bracket body, lift top box, built-in fitting, fixing bolt, in former and later two faces of the middle part of bracket body, horizontal correspondence position respectively opens a circular hole, if a round steel pipe is penetrated from circular hole, the two ends of the round steel pipe are welded to connect with two bore edges respectively, a mobilizable hole door is set in the bottom of bracket body, the lifting top box includes box body, box top plate, safe blend stop, box body can enter bracket body by bracket body upper part opening, the box top plate is located at box body top, the safe blend stop is arranged vertically within box top plate, built-in fitting includes pre-embedded steel slab, long nut, long nut is vertically fixedly connected on the one side of pre-embedded steel slab, the long nut that the screw rod of fixing bolt may pass through round steel pipe with being embedded in concrete is threadedly coupled.The utility model carries the bracket bearing assembly of lowering or hoisting gear, conveniently falls frame;Stress safety and reliability is coordinated using built-in fitting and fixing bolt.

Description

Bridge construction bracket bearing assembly
Technical field
The utility model is related to a kind of bridge construction bracket bearing assembly, belongs to highway and technical field of bridge construction.
Background technology
In Bridge Pier cap, Coping Construction in highway bridge, prior art is divided into trestle construction and erection without scaffolding Two ways.
Existing trestle construction is primarily present following shortcoming:
1. the rigidity of support is difficult to meet construction requirement.Existing when having support pier cap and cast-in-place bent cap, its support is past It is abound with and sets up toward using bowl fastening type or portal support, particularly insecure, the support body integral rigidity in bowl fastening type bearing attachment position Deficiency, causes rack elasticity deformation excessive, causes the defects such as distress in concrete.
2. safety coefficient is relatively low.It is abound with formula support resistance to overturning bad, often occurs leading after a pillar goes wrong Cause the overall security incident decayed.
3. pair ground processing requirement is high.The formula support of being abound with needs to carry out ground disposed of in its entirety, costly, long in time limit.
4. bowl fastening type or portal support, which are abound with, sets up labor intensive.
There is following drawback in existing erection without scaffolding:
Existing non-stand construction method uses hoop formula support system, and stirrup is tightly bound round on pier stud surface during due to construction, is passed through It can often cause pier stud surface concrete to be damaged, influence presentation quality.And triangle without support supporting assembly need in supporting part Wedge-shaped stopper is placed in position, so as to form removal support, due to the shape and the limitation of intensity of stopper, easily cause support slide and Come to nothing, influence safety.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction bracket bearing assembly, applied to Bridge Pier cap, lid In beam erection without scaffolding formwork bracing system, the support body for solving prior art presence removes dangerous, and stirrup causes pier stud surface Concrete is damaged, the problem of influenceing construction quality.
The purpose of this utility model is achieved by the following technical programs:
A kind of bridge construction bracket bearing assembly, including bracket body 1, lifting top box 2, built-in fitting 3, fixing bolt 4, institute State that bracket body 1 is big for top, small bucket-shaped in bottom, in former and later two faces of the middle part of bracket body 1, horizontal correspondence position is respectively opened One circular hole, if a round steel pipe 5 is penetrated from circular hole, the two ends of the round steel pipe 5 are welded to connect with two bore edges respectively, described The bottom of bracket body 1 sets a mobilizable hole door 6, and the lifting top box 2 includes box body 7, box top plate 8, safe blend stop 9, The box body 7 is obturator, and the external diameter of the box body 7 and the internal diameter gap on the top of bracket body 1 coordinate, and the box body 7 can be by The upper opening of bracket body 1 enters bracket body 1, and the box top plate 8 is located at the top of box body 7, the external diameter of the box top plate 8 More than the external diameter of the upper opening of bracket body 1, the safe blend stop 9 is arranged vertically within box top plate 8, and the built-in fitting 3 is wrapped Pre-embedded steel slab 10, long nut 11 are included, the long nut 11 is vertically fixedly connected on the one side of pre-embedded steel slab 10, the fixing bolt 4 coordinate with the screw thread of long nut 11, and the screw rod of the fixing bolt 4 may pass through round steel pipe 5 and the long nut being embedded in concrete 11 threaded connections.
The purpose of this utility model can also further be realized by following technical measures:
Foregoing bridge construction bracket bearing assembly, in addition to support channel-section steel 12, side block bar 13, the support channel-section steel 12 and ox The bottom of leg body 1 is fixedly connected, and is horizontally disposed with, and the side block bar 13 is vertically installed on support channel-section steel 12.
Compared with prior art, the beneficial effects of the utility model are:With there is support mode to compare, use bridge construction ox Leg bearing assembly, easy construction, materials, recruitment are few;Bracket bearing assembly with lowering or hoisting gear, conveniently falls frame;Using pre-buried Part and fixing bolt coordinate stress, more safe and reliable, it is easy to dismantle, convenient to reuse.
Brief description of the drawings
Fig. 1 is structure chart of the present utility model;
Fig. 2 is lifting top box structure chart of the present utility model;
Fig. 3 is embedded part structure figure of the present utility model;
Fig. 4 is the utility model bridge construction bracket bearing assembly left view;
Fig. 5 is structure chart when bracket bearing assembly of the present utility model is applied to bridge pier column construction;
Fig. 6 is top view when the utility model bracket bearing assembly is applied to bridge pier column construction.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, bridge construction bracket bearing assembly, including bracket body 1, lifting top box 2, built-in fitting 3, fixed spiral shell Bolt 4, the bracket body 1 is that top is big, small bucket-shaped in bottom, in former and later two face levels correspondence positions of the middle part of bracket body 1 Put and respectively open a circular hole, if a round steel pipe 5 is penetrated from circular hole, the two ends of the round steel pipe 5 are welded to connect with two bore edges respectively, A mobilizable hole door 6 is set in the bottom of the bracket body 1, as shown in Fig. 2 the lifting top box 2 includes box body 7, box top Panel 8, safe blend stop 9, the box body 7 are obturator, and the external diameter of the box body 7 and the internal diameter gap on the top of bracket body 1 are matched somebody with somebody Close, the box body 7 can be entered bracket body 1 by the upper opening of bracket body 1, the box top plate 8 is located at the top of box body 7, institute The external diameter for stating box top plate 8 is more than the external diameter of the upper opening of bracket body 1, and the safe blend stop 9 is arranged vertically within box top plate 8 On, as shown in figure 3, the built-in fitting 3 includes pre-embedded steel slab 10, long nut 11, the long nut 11 is vertically fixedly connected on pre- The one side of steel plate 10 is buried, the fixing bolt 4 coordinates with the screw thread of long nut 11, and the screw rod of the fixing bolt 4 may pass through round steel Pipe 5 is threadedly coupled with the long nut 11 being embedded in concrete.
As shown in figure 4, bracket bearing assembly is the main load part of erection without scaffolding, when it is implemented, bracket body 1 It is welded by thickness for 6mm steel plate, the bracket first half is rectangle, lower half is trapezoidal, and inside can be with sand loading.Lift top box 2 be also the closing box that steel plate is welded into, and its external diameter size is more slightly smaller than the upper opening internal diameter of bracket body 1, with can be successfully The sand that fill in bracket body 1 ensures in bracket body 1 again is unlikely to the effusion from top and is advisable.
Pier stud answers pre-buried built-in fitting 3, before pier stud concreting, should set the position of built-in fitting 3 before construction, And the measure that properly protects, it is to avoid cement mortar, which is immersed in nut, damages nut.
Completion is poured Deng pier stud, after form removable, using the screw rod of fixing bolt 4 through round steel pipe 5 with being embedded in coagulation Long nut 11 in soil is threadedly coupled, and bracket bearing assembly is fixed on pier stud.Sand is filled out in the inside of bracket body 1, and Ensure that sand top surface is smooth (sand top surface will below bracket top surface at least 10cm), lifting top box 2 is finally installed.
As shown in figure 5, both sides are symmetrically installed two bracket bearing assemblies before and after pier stud, bracket bearing assembly install with Afterwards, I-steel 14 is installed on lifting top box 2, safe blend stop 9 is to prevent I-steel 14 from breakking away.I-steel 14 is held as main Weight beam rigidity must is fulfilled for requirement, and the model of I-steel 14 is determined according to the construction loads of bent cap, laying side on I-steel 14 Wood 15, the top of the lumps of wood 15 can lay template 17.
As indicated with 6, in order to ensure safety, the I-steel 14 on both sides is connected with girt 16 before and after pier stud 18, water The number of horizontal drawing bar 16 is determined on a case-by-case basis.
Bent cap concreting is completed, and intensity reaches i.e. dismountable supporting system after design strength.
The girt 16 between I-steel 14 is removed first, is then opened the hole door 6 of bracket bearing assembly, is allowed sand to delay Slowly flow out, with the outflow of sand, lifting top box 2 declines, while the lumps of wood on the I-steel 14 and I-steel 14 on top box 15 and template 17 also with decline.
When template declines more than 5cm, template departs from surface of concrete structure, at this moment, extracts the lumps of wood 15 and template 17 out, Finally remove I-steel 14.
After template 17 and I-steel 14 are all removed, bracket bearing assembly is unloaded, it is pre- with the filling closure of concrete repair glue Bury the preformed hole left during built-in fitting 3.
The effect of the support channel-section steel 12 of bridge construction bracket bearing assembly is, in a structure of an essay for the support channel-section steel 12 of adjacent pier stud If the lumps of wood, in order to which workmen walks between adjacent pier stud, convenient construction, the effect of the side block bar 13 is to prevent the lumps of wood Break away, it is ensured that safety.
In addition to the implementation, the utility model can also have other embodiment, all use equivalent substitutions or equivalent change The technical scheme to be formed is changed, in the protection domain for all falling within the utility model requirement.

Claims (2)

1. a kind of bridge construction bracket bearing assembly, it is characterised in that including bracket body, lifting top box, built-in fitting, fixed spiral shell Bolt, the bracket body is that top is big, small bucket-shaped in bottom, and in former and later two faces of the middle part of bracket body, horizontal correspondence position is each A circular hole is opened, if a round steel pipe is penetrated from circular hole, the two ends of the round steel pipe are welded to connect with two bore edges respectively, described The bottom of bracket body sets a mobilizable hole door, and the lifting top box includes box body, box top plate, safe blend stop, the box Body is obturator, and the external diameter of the box body coordinates with the internal diameter gap of bracket body upper part, and the box body can be on bracket body Portion's opening enters bracket body, and the box top plate is located at box body top, and the external diameter of the box top plate is more than on bracket body The external diameter of portion's opening, the safe blend stop is arranged vertically within box top plate, and the built-in fitting includes pre-embedded steel slab, long nut, The long nut is vertically fixedly connected on the one side of pre-embedded steel slab, and the fixing bolt coordinates with long nut screw thread, the fixation The long nut that the screw rod of bolt may pass through round steel pipe with being embedded in concrete is threadedly coupled.
2. bridge construction bracket bearing assembly as claimed in claim 1, it is characterised in that also including support channel-section steel, side block bar, The support channel-section steel is fixedly connected with the bottom of bracket body, is horizontally disposed with, and the side block bar is vertically installed on support channel-section steel.
CN201720035602.XU 2017-01-12 2017-01-12 Bridge construction bracket bearing assembly Expired - Fee Related CN206467578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720035602.XU CN206467578U (en) 2017-01-12 2017-01-12 Bridge construction bracket bearing assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720035602.XU CN206467578U (en) 2017-01-12 2017-01-12 Bridge construction bracket bearing assembly

Publications (1)

Publication Number Publication Date
CN206467578U true CN206467578U (en) 2017-09-05

Family

ID=59706138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720035602.XU Expired - Fee Related CN206467578U (en) 2017-01-12 2017-01-12 Bridge construction bracket bearing assembly

Country Status (1)

Country Link
CN (1) CN206467578U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481845A (en) * 2022-01-25 2022-05-13 内蒙古路桥集团有限责任公司 Table cap bracket type construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481845A (en) * 2022-01-25 2022-05-13 内蒙古路桥集团有限责任公司 Table cap bracket type construction method

Similar Documents

Publication Publication Date Title
CN108412125A (en) A kind of strengthening concrete composite structure frame beam column construction
CN105544587B (en) The construction method of tower crane is fixed using combined type foundation for tower crane
CN107090975A (en) A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN105350458B (en) Construction method of composite structure platform for construction of Y-shaped pier of bridge
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN111910902A (en) Construction method of high-altitude double-layer overlong cantilever reinforced concrete structure
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN210458891U (en) Road and bridge crack reinforcing apparatus
CN206127746U (en) Isolation bearing handles accurate location structure of pre -buried steel sheet in back
CN108999398A (en) The Formwork Installation Method of steel and concrete composite structure beam
CN106120562A (en) Overpass rod iron bracket bent cap support for shuttering integral hoisting construction method
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN114150766A (en) Prefabricated reinforced concrete column connecting joint and construction method thereof
CN103161313B (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN206971769U (en) A kind of rubber support installation positioning special purpose device
CN206467578U (en) Bridge construction bracket bearing assembly
CN208121808U (en) Die body system is hung in bottom plate and side wall one-time-concreting molding pond
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN106939557B (en) A kind of pin-connected panel bracket casting platform of brace support
CN108978870A (en) Fold-line-shaped girder steel and concrete combined structure construction method
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN109736202A (en) Great cantilever bent cap Bracket method for construction method
CN206034929U (en) Hoisting frame of dress behind concrete square column capital
CN202577763U (en) Adjustable support seat of reinforcing steel bar of foundation slab for construction of underground structure
CN107299596A (en) Support beam template system and its construction method under concrete support trestle plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170905

Termination date: 20200112