CN206467150U - Plaster of Paris calcine technology equipment - Google Patents
Plaster of Paris calcine technology equipment Download PDFInfo
- Publication number
- CN206467150U CN206467150U CN201621124696.XU CN201621124696U CN206467150U CN 206467150 U CN206467150 U CN 206467150U CN 201621124696 U CN201621124696 U CN 201621124696U CN 206467150 U CN206467150 U CN 206467150U
- Authority
- CN
- China
- Prior art keywords
- plaster
- paris
- calcining
- gypsum
- technology equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
The utility model provides a kind of plaster of Paris calcine technology equipment, and production process is stable, and automaticity is high, product quality it is high and stably, it is easy to control, realize that discarded object is recycled.1. the land plaster after grinding or drying is calcined, calcining heat is in 150 160 DEG C, the 40min of calcination time 20;2. the gypsum after calcining is cooled, 50 60 DEG C are cooled to;3. the finished product land plaster after cooling is conveyed into finished bin or packaging storehouse.Gypsum calcining special furnace using low temperature at a slow speed by the way of calcine, substantially increase the quality and stability of product.Cooled down, cooled down using air using cooling heat exchanger, energy-conserving and environment-protective.Using biomass-burning direct combustion hotblast stove, biomass-burning can only produce carbon dioxide and flyash, will not produce the pernicious gases such as sulfur dioxide.Supported the use using box pulse deduster and cyclone dust collectors and dedusting is carried out to gypsum calcining special furnace, and a little repair, high treating effect.
Description
Technical field
The present invention relates to gypsum calcining new technology.
Background technology
At present, the main heating source of calcining plaster of Paris is coal, gas, timber equal energy source, but the economic benefit of coal is higher, but
Pollution is more serious;Natural gas pollution is few, but use cost is higher;Timber price inexpensively, but calorific value it is relatively low, it is necessary to
Substantial amounts of timber could meet production requirement.It is biomass fuel as the economic benefit of coal is only second to.Biomass molding fuel
Sulfur content is low, ash content is low, and main pollutant is flue dust after burning.The biomass boiler of efficient cleaner is configured normal
During operation, it can reach《Emission standard of air pollutants for boilers》GB13271-2014 discharge standard, is a kind of renewable energy
Source, national all departments are all actively pushing forward the development and utilization of biomass molding fuel.
The content of the invention
For many weak points present in existing calcining plaster of Paris thermal source, the present invention provides a kind of new thermal source system
Controlling is for the method and its device of plaster of Paris, and production process is stable, meets the relevant regulations of national all departments, can be achieved
Large-scale production.
To achieve the above object, the technical solution adopted by the present invention is:
A kind of plaster of Paris calcine technology equipment, the hot wind inlet of gypsum calcining special furnace is connected with biomass thermal wind furnace,
Hot-blast outlet priority and ceramic multicyclone dust collector, the moisture film device for abatement of smoke and dust of gypsum calcining special furnace;On gypsum calcining special furnace
End is successively connected with cyclone dust collectors, box pulse deduster.
According to described plaster of Paris calcine technology equipment, NE chain bucket hoists successively pass through middle roll-over, spiral meter
Amount device is finally connected with described gypsum calcining special furnace charging;The dust outlet of cyclone dust collectors, box pulse deduster
It is connected through FU chain-linked conveyers with NE chain bucket hoist feeding mouths.
According to described plaster of Paris calcine technology equipment, described middle roll-over carries roof scrubber.
According to described plaster of Paris calcine technology equipment, one end of the special furnace discharge of gypsum calcining and cooling heat exchanger
Connection.
Advantages of the present invention is as follows.
1. carry out raw material using gypsum calcining special furnace to be calcined, gypsum calcining special furnace using low temperature at a slow speed by the way of
Calcining, with hot blast as heating medium, internally the residence time is long for material, is conducive to the formation and overall phase composition of half crystalline
Distribution, calcining is relatively uniform, and properties of product are stablized relatively, with preferable intensity.Faster calcination method can effectively improve product
The stability of performance, reduces energy energy consumption, reduces processing cost.The material overwhelming majority is semi-hydrated gypsum after calcining, is contained simultaneously
A small amount of dead plaster and micro calcium sulphate dihydrate, phase composition distribution, substantially increase the quality and stability of product.
2. being cooled down using cooling heat exchanger, cooled down using air, energy-conserving and environment-protective.It is with cooling device because just forging
Burned powder temperature is up to more than 150 DEG C, and follow-up equipment easily shortens the service life of equipment because being in the condition of high temperature;Dropped after putting in storage
It is warm slow, if directly packing, easily by bag weaved boiling hotization;Feed powder is contacted with bulkhead under high temperature, because ambient temperature is low, easily in bulkhead
On, the globule is produced, corrodes feed bin.After cooling exchanger, shorten and be not likely to produce water on material and extraneous temperature difference, bulkhead
Material temperature is close to normal temperature after pearl, cooling, follow-up equipment and bag weaved can meet requirement.
3. using biomass-burning direct combustion hotblast stove, hot-blast stove uses combustion fan, air distribution blower fan and air-introduced machine, compared with
Heat conducting oil boiler save energy consumption more than half;Using biomass as fuel, production cost can be effectively reduced;Direct combustion hotblast stove
Temperature control is high, and normal temperature-controlled precision is ± 5 DEG C, and temperature-controlled precision can mention ± 3 DEG C, fully meet gypsum calcining and thermal source is wanted
Ask;Biomass-burning can only produce carbon dioxide and flyash, will not produce the pernicious gases such as sulfur dioxide.
4. supported the use using box pulse deduster and cyclone dust collectors and dedusting is carried out to gypsum calcining special furnace, because of stone
Material temperature can take off most of water, therefore Dust Capacity up to more than 150 DEG C, and during material calcining during cream calcining special furnace calcining
Can be especially big, traditional deduster does not fully meet the requirement, and adds two grades of cyclone dust collectors using box pulse deduster
The mode of dedusting can meet requirement, and cyclone dust collectors have treating capacity big, are hardly damaged without any drive disk assembly, and resistance to height
Temperature, can play cooling effect, and box pulse deduster is grease proofing using anti-condensation, and resistance to 170 DEG C, discharge standard is up to 30mg/m3
The dust-removal cloth-bag of specific customization, fully meets state environmental emissioning standard, and a whole set of dedusting can save 30-40% compared with electrostatic precipitator
Energy consumption, and a little repair, high treating effect.
5. ceramic multicyclone dust collector and moisture film device for abatement of smoke and dust two-stage dust removal are used, because hot-blast stove is biomass-burning, so
Carbon dioxide and cigarette ash are primarily present in tail gas, most of cigarette ash is handled using ceramic multicyclone dust collector, removed eventually through moisture film
Dirt device thoroughly removes flue dust, and most CO2 emission, into air, will not pollute air at last.
Brief description of the drawings
Fig. 1 is each equipment connecting relation figure of the present invention.
In accompanying drawing:
1. box pulse fan of dust remover;2. box pulse deduster;3. cyclone dust collectors;4.FU chain-linked conveyers;
5.NE chain bucket hoists;6. in roll-over;7. roof scrubber;8. screw metering device;9. volume damper;10. gypsum
Calcine special furnace;11. cooling heat exchanger;12. sedimentation basin;13. moisture film device for abatement of smoke and dust;14. submerged pump;15. ceramic multi-tube
Deduster;16. biomass thermal wind furnace;17. roots blower;18. volume damper;19.FU chain-linked conveyers;20. frequency conversion is rigid
Revolving plow reclaimer;21. cooling heat exchanger blower fan.
Embodiment
Embodiment
The concrete technology step that the present invention is used is as follows.
Land plaster after grinding or drying is calcined, calcining heat is in 150-160 DEG C, calcination time 20-40min;Will
Gypsum after calcining is cooled, and is cooled to 50-60 DEG C;By the finished product land plaster conveying finished bin after cooling or packaging storehouse.
The process manufactured using the various equipment in the present invention:Entered using gypsum calcining special furnace 10 come raw material
Row calcining, gypsum calcining special furnace use low temperature at a slow speed by the way of calcine, with hot blast be used as heat medium, hot-blast stove air outlet
Temperature accuracy is controlled at ± 5 DEG C;Internally the residence time is long for material, is conducive to the formation and overall phase composition point of half crystalline
Cloth, calcining is relatively uniform, and properties of product are stablized relatively, with preferable intensity.Faster calcination method can effectively improve product
The stability of energy, reduces energy energy consumption, reduces processing cost.
The equipment is supported the use with front drying plant, and the product indices after drying comply fully with plaster of Paris will
Ask, optimal calcination parameter is:Calcining heat:150-160 DEG C, calcination time 20-40min.After calcining, the material crystallization water of discharge
It is semi-hydrated gypsum that content, which is less than the material overwhelming majority after 5%, therefore calcining, and a small amount of dead plaster and micro is contained simultaneously
Calcium sulphate dihydrate, phase composition distribution, substantially increases the quality and stability of product.And gypsum calcining special furnace 10 is using box
The mode of pulse dust collector 2 plus the two-stage dust removal of cyclone dust collectors 3 carries out dedusting, and cyclone dust collectors 3 have treating capacity big, without any
Drive disk assembly is hardly damaged, and high temperature resistant, can play cooling effect, and box pulse deduster 2 is grease proofing using anti-condensation, resistance to
170 DEG C, discharge standard is up to 30mg/m3The dust-removal cloth-bag of specific customization, fully meets state environmental emissioning standard, a whole set of dedusting
Compared with the energy consumption that electrostatic precipitator can save 30-40%, and a little repair, high treating effect.
Discharge end of furnace is cooled down using cooling heat exchanger 11, is cooled down using air, energy-conserving and environment-protective.With cooling dress
Put is that follow-up equipment easily shortens the use of equipment because being in the condition of high temperature because the powder temperature just calcined is up to more than 150 DEG C
Life-span;Cool after putting in storage slow, if directly packing, easily by bag weaved boiling hotization, feed powder is contacted with bulkhead under high temperature, because of ambient temperature
It is low, the globule is easily produced on bulkhead, corrodes feed bin, after cooling exchanger, shortens material and extraneous temperature difference, bulkhead
On be not likely to produce after the globule, cooling material temperature close to normal temperature, follow-up equipment and bag weaved can meet requirement.
Using biomass-burning direct combustion hotblast stove, biomass such as stalk, sawdust, bagasse, rice chaff etc. can be used.Biomass
Hot-blast stove 16 is using combustion fan, air distribution blower fan and air-introduced machine.Through overtesting, under identical yield, compared with heat conducting oil boiler section
About energy consumption more than half., can be effectively compared with low production cost using biomass as fuel;Temperature control is high, and normal temperature-controlled precision is
± 5 DEG C, temperature-controlled precision can mention ± 3 DEG C, fully meet requirement of the gypsum calcining to thermal source.Biomass-burning can only produce titanium dioxide
Carbon and flyash, will not produce the pernicious gases such as sulfur dioxide.Biomass thermal wind furnace 16 uses ceramic multicyclone dust collector 15 and water
The two-stage dust removal of film device for abatement of smoke and dust 13, most of cigarette ash is handled using ceramic multicyclone dust collector 16, is eliminated smoke and is removed eventually through moisture film
Dirt device 13 thoroughly removes flue dust, most at last CO2 emission into air.
After this process equipment, its presetting period of final gypsum product 6-10min, final setting time 20-30min, 2h are anti-
Intensity 2.4-3.2MPa is rolled over, is complied fully with《Plaster of Paris》GB9776-2008 standards.The technique can realize with production with packaging,
With production with the function of using, a large amount of cool times are saved, substantial amounts of time and space is saved.
Cyclone dust collectors 3 and the feed back of box pulse deduster 2 use FU chain-linked conveyers 4, its conveying powdered, small shot-like particle
The product of material, service life is long, and operating reliability is high, efficient energy-saving, sealing, safe and easy to maintenance.The lifting of each equipment turns
Fortune uses elevator, is that the integration production of equipment improves efficiency, solves floor space.Spiral metering after middle roll-over 6
Device 8, the gypsum quality of calcining is control effectively, and improves calcination efficiency and calcining effect.Total system is in the easy airborne dust of equipment
Position set dust pelletizing system, the dust in reduction production operation environment, it is to avoid dust recycling has undesirable effect to equipment.
Above capital equipment and corollary equipment control access DCS control in, can according to calcining, chilling temperature change come
Voluntarily control the feeding coal of conveying equipment;Hourly output, can be per portion temperature, machine operation, opening of device etc.
Shown on computer, can also realize that biomass thermal wind furnace 16 is interlocked with gypsum calcining special furnace, spiral shell is automatically controlled according to hot blast temperature
Metering device feed is revolved, automation is fully achieved, not only saves substantial amounts of manpower and materials, the product quality produced is stable.
Material is all conveyed in closed equipment in whole production line, and cleaner is housed in key position, completely negative
Pressure operation, without any airborne dust point, has the advantages that green, environmental protection, energy-conservation.
Claims (5)
1. a kind of plaster of Paris calcine technology equipment, it is characterised in that:Gypsum calcining special furnace(10)Hot wind inlet with it is biological
Matter hot-blast stove(16)Connection, gypsum calcining special furnace(10)Hot-blast outlet successively and ceramic multicyclone dust collector(15), moisture film disappears
Fume and dust device(13)Connection;Gypsum calcining special furnace(10)Upper end priority and cyclone dust collectors(3), box pulse deduster(2)
Connection.
2. plaster of Paris calcine technology equipment according to claim 1, it is characterised in that:NE chain bucket hoists(5)
Successively pass through middle roll-over(6), screw metering device(8)Finally with described gypsum calcining special furnace(10)Charging aperture is connected;Rotation
Wind deduster(3), box pulse deduster(2)Dust outlet through FU chain-linked conveyers(4)With NE chain bucket hoists(5)
Feeding mouth is connected.
3. plaster of Paris calcine technology equipment according to claim 2, it is characterised in that:Described middle roll-over(6)Carry
Roof scrubber(7).
4. plaster of Paris calcine technology equipment according to claim 1, it is characterised in that:Biomass thermal wind furnace(16)Including
Combustion fan, air distribution blower fan and air-introduced machine.
5. plaster of Paris calcine technology equipment according to claim 1, it is characterised in that:Gypsum calcining special furnace(10)Go out
One end of material and cooling heat exchanger(11)Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621124696.XU CN206467150U (en) | 2016-10-17 | 2016-10-17 | Plaster of Paris calcine technology equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621124696.XU CN206467150U (en) | 2016-10-17 | 2016-10-17 | Plaster of Paris calcine technology equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206467150U true CN206467150U (en) | 2017-09-05 |
Family
ID=59710461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621124696.XU Active CN206467150U (en) | 2016-10-17 | 2016-10-17 | Plaster of Paris calcine technology equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206467150U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106630710A (en) * | 2016-10-17 | 2017-05-10 | 山东先罗新型建材科技开发有限公司 | Novel building plaster calcining process and processing equipment therefor |
CN114716166A (en) * | 2022-04-18 | 2022-07-08 | 安丘市华星机械设备有限公司 | Automatic drying system that calcines of gypsum |
-
2016
- 2016-10-17 CN CN201621124696.XU patent/CN206467150U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106630710A (en) * | 2016-10-17 | 2017-05-10 | 山东先罗新型建材科技开发有限公司 | Novel building plaster calcining process and processing equipment therefor |
CN114716166A (en) * | 2022-04-18 | 2022-07-08 | 安丘市华星机械设备有限公司 | Automatic drying system that calcines of gypsum |
CN114716166B (en) * | 2022-04-18 | 2023-05-30 | 安丘市华星机械设备有限公司 | Automatic gypsum calcining and drying system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107619208A (en) | A kind of production system and its implementation that plaster of Paris is produced with desulfurated plaster | |
CN103075727B (en) | High-efficiency and environment-friendly coal-fired system for vertical boiler with bottom-built burner | |
CN104229855B (en) | Utilize electricity generation boiler or the technique of sintering device flue gas on-line heating oxidation sweetening ash | |
CN109970375A (en) | A kind of building gypsum plaster production line | |
CN203115991U (en) | High-efficiency environment-friendly coal burning system with vertical boiler with bottom burner | |
CN207567121U (en) | A kind of system that desulfurated plaster recycling is carried out using power plant exhaust waste heat | |
CN214142115U (en) | Calcination system for producing semi-hydrated gypsum and anhydrous gypsum | |
CN201242342Y (en) | Shaft kiln | |
CN206467150U (en) | Plaster of Paris calcine technology equipment | |
CN106630710A (en) | Novel building plaster calcining process and processing equipment therefor | |
CN2767419Y (en) | Device for burning nano silica dioxide by use of rice husk | |
CN202156936U (en) | Sintering rotary kiln device using coal ash to produce alumina in low temperature-ammonia method | |
CN105953252B (en) | Heat exchanger and heating equipment | |
CN202626043U (en) | Calcination production line of industrial by-product gypsum | |
CN105003910A (en) | Centralized heat supply device adopting biomass briquette as raw materials | |
CN204063993U (en) | The bypass device of cement kiln associated treatment rubbish | |
CN104748508A (en) | Coal slurry drying system | |
CN2620844Y (en) | Vertical drying machinery | |
CN209602363U (en) | A kind of device using brickkiln smoke residual heat to dry sludge | |
CN105731843A (en) | Dustless production method of building gypsum powder | |
CN202016957U (en) | Continuous gypsum powder production system of small gypsum boards for architectural decoration | |
CN102701617A (en) | Calcination production line and calcination method for industrial by-product gypsum | |
CN214009940U (en) | Energy-saving suspension roasting coal gangue treatment system | |
CN2381894Y (en) | Rotary combined firing kiln | |
CN204555552U (en) | A kind of coal slime drying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |