CN206458074U - A kind of aerial work basket outer support support - Google Patents
A kind of aerial work basket outer support support Download PDFInfo
- Publication number
- CN206458074U CN206458074U CN201720133098.7U CN201720133098U CN206458074U CN 206458074 U CN206458074 U CN 206458074U CN 201720133098 U CN201720133098 U CN 201720133098U CN 206458074 U CN206458074 U CN 206458074U
- Authority
- CN
- China
- Prior art keywords
- fixed
- mobile jib
- support
- pulley
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a kind of aerial work basket outer support support, belong to technical field of building construction, including rack body, pulley, high-strength bolt, stabiliser bar and anchoring piece;Rack body is triangular structure, including two respectively symmetrically set regulation mobile jib, two fix bars and two oblique support bars;Pulley being fixed on two regulation mobile jibs through the screw rod hole horizontal by high-strength bolt, front end fixed pulley described in hanging basket steel wire penetrating and rear portion roll adjustment pulley, the combination by adjusting two pulleys change the vertical overhanging position of hanging basket steel wire rope;Stabiliser bar horizontal symmetrical is set, and the front end of the regulation mobile jib is fixed in one end, and the other end is fixed on the upper surface of floor by chemical anchor bolts.The utility model realizes the change of hanging basket horizontal level using assembly pulley, it is to avoid the repetition dismounting of cable bearer, does not change the natural stress of hanging basket steel wire rope, improves efficiency of construction, it is ensured that construction safety.
Description
Technical field
The utility model is related to technical field of building construction, specifically a kind of aerial work basket outer support support.
Background technology
The existing decades history of building curtain wall development, and high-rise working construction hanging basket be must be indispensable in building curtain wall construction
A kind of construction machinery.Along with economic development, traditional flat glass curtain wall can not meet the aesthetic requirement of masses, respectively
The curved surface of formula various kinds, special-shaped curtain wall are appeared in the visual field of the public.Construction hanging basket is only capable of vertical because of its design structure simultaneously
In the range of lift, the necessary ability of moving horizontally is lacked in curved surface curtain wall construction and aobvious helpless.
To solve curved surface curtain wall construction, generally there are 3 kinds by the way of:One kind be layer and section construction, increase hanging basket or
Person's increase hanging basket peace tears number of times open and ensures construction;Be for second hanging basket is drawn to by construction surface, fixed hanging basket using certain way and
After construct.The third be it is simple using support will outside hanging basket steel wire rope support or it is interior draw, to ensure construction hanging basket and working face
Distance.First way add hanging basket quantity or increase hanging basket peace tears number of times open, be all using the increase of hanging basket lease expenses as
Cost;Second and third kind of mode is then the force way for changing construction hanging basket to a certain extent, is held in construction hanging basket support
It is to increase potential safety hazard as cost by horizontal force is added on the basis of vertical load.This 3 kinds of modes are all covert to be added
Construction risk, should give and avoid or correct.Accordingly, it is desirable to provide it is a kind of it is new, safety, do not change construction hanging basket beaer
The construction hanging basket outer support support of system.
The content of the invention
Technical assignment of the present utility model is that there is provided a kind of aerial work basket outer support branch for above weak point
The change of hanging basket horizontal level is realized in frame, the setting by changing assembly pulley, improves efficiency of construction, it is ensured that construction safety.
The utility model solves the technical scheme that its technical problem used:
A kind of aerial work basket outer support support, including rack body, pulley, high-strength bolt, stabiliser bar and anchoring piece;
The anchoring piece includes front end post-install and rear end through-flooring embedded part, for hanging basket outer support support to be fixed on
Floor;
Rack body is the rock-steady structure of triangle, including two regulation mobile jibs, two fix bars respectively symmetrically set
With two oblique support bars;Adjust mobile jib to be horizontally disposed with, multigroup screw rod coordinated with high-strength bolt is provided with regulation mobile jib
Hole, the anterior cantilevered out floor of regulation mobile jib, rear portion is fixed on the upper surface of floor by rear end through-flooring embedded part;Fix bar is set vertically
Put, the regulation mobile jib is fixed on the top of fix bar, and bottom is fixed on the front end face of floor by front end post-install;Support
Bar upper end is fixed with the regulation mobile jib front end, and lower end is fixedly connected with the bottom of fixed, forms stable triangle knot
Structure;
Pulley being fixed on two regulation mobile jibs through the screw rod hole horizontal by high-strength bolt, including front end is fixed
Pulley and rear portion roll adjustment pulley, front end fixed pulley described in hanging basket steel wire penetrating and rear portion roll adjustment pulley, by adjusting two cunnings
The combination of wheel changes the vertical overhanging position of hanging basket steel wire rope;
Stabiliser bar horizontal symmetrical is set, and the front end of the regulation mobile jib is fixed in one end, and the other end is solid by chemical anchor bolts
Due to the upper surface of floor.
It is preferred that, rear end through-flooring embedded part includes Rebar anchor and chemical anchor bolts, and Rebar anchor includes base and weldering
The fixed frame on base is connected on, base is fixed on the upper surface of floor by chemical anchor bolts, and fixed frame consolidates two regulation mobile jibs
Due on base.
It is preferred that, regulation mobile jib, fix bar and the support bar of the rack body use steel pipe manufacturing, and pass through bolt
Interfix, it is easy to draw materials, convenient disassembly.
Further, the both ends of regulation mobile jib, fix bar and support bar are welded with fixed termination, and fixed termination is set
There are bolt and connecting hole, regulation mobile jib, fix bar and support bar are provided with connecting hole and are connected with each other by fixed termination, made
Connection is more solid and reliable, it is ensured that safety.
Further, stabiliser bar selects the steel pipe manufacturing of same size with regulation mobile jib, is connected by bolt with regulation mobile jib
Fixation is connect, stabiliser bar keeps identical intensity, rigidity with rack body, it is ensured that supporting & stablizing is reliable, it is ensured that service life.
It is preferred that, pulley is high-strength abrasion-proof pulley.
In use, select the position of the suitable hanging basket outer support support for installing high-rise working first, root on the body construction
Front end post-install and rear end through-flooring embedded part are installed according to stent data punching;Rack body is high according to required size
Strength bolt is fixed;The stabiliser bar of selection suitable dimension is fixed with rack body with bolt;Rack body and stabiliser bar connection is solid
After setting, the Rebar anchor bolt of rear end through-flooring embedded part is tightened in rack body rear end, fixation;According to stabiliser bar
Preformed hole is stablizing the suitable position punching installation chemical anchor bolts of rod rear end selection, fixed stably fixed pole;
By construction hanging basket steel wire rope from through hanging basket outer support support, and steel wire rope is set to have certain relaxation surplus;According to
It is required that construction hanging basket basketry outer support or inside contract, select suitable High-strength bolt hole that assembly pulley is fixedly mounted;Construction is started to hang
Basket, tightens up steel wire rope, inspects for acceptance.
A kind of aerial work basket outer support support of the present utility model compared to the prior art, with following beneficial effect
Really:
The outer support supporting structure of triangle system, the firm of support is ensure that using the stability of triangle, after
Portion, which reserves free end, to be fixed on floor, rack body and opens up multigroup High-strength bolt hole and be used for fixed block, constitutes different cunnings
Wheel group changes the plan-position of construction hanging basket basketry, it is not necessary to increase extra construction hanging basket to adjust the distance of outer support, it is to avoid
Extra construction hanging basket support dismounting, saves expense;
Construction hanging basket changes the direction of hanging basket steel wire rope by the combination of two pulleys, hanging basket is turned in vertical, horizontal element
Change, change the plan-position of construction hanging basket basketry in the case where not changing construction hanging basket support force direction, security is obtained
Ensure;
Simple in construction, generally bolt is fixed, convenient disassembly, is reduced influence of the hanging basket support dismounting to the duration, can be weighed
It is multiple to utilize, it is easy to promote.
Brief description of the drawings
Fig. 1 is the utility model aerial work basket outer support supporting structure schematic diagram;
Fig. 2 is to change hanging basket steel wire rope position view by pulley position.
In figure:1st, mobile jib is adjusted, 2, fix bar, 3, support bar, 4, stabiliser bar, 5, fixed termination, 6, front end post-install,
7th, rear end through-flooring embedded part, 71, base, 72, fixed frame, 8, pulley, 81, front end fixed pulley, 82, rear portion roll adjustment pulley, 9, spiral shell
Rod aperture, 10, high-strength bolt, 11, hanging basket steel wire rope, 12, floor.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
A kind of aerial work basket outer support support, including rack body, pulley 8, high-strength bolt 10, stabiliser bar 4 and anchor
Firmware;
The anchoring piece includes front end post-install 6 and rear end through-flooring embedded part 7, for hanging basket outer support support to be fixed
In floor 12;
Rack body is the rock-steady structure of triangle, including two regulation mobile jibs 1, two fix bars respectively symmetrically set
2 and two oblique support bars 3;
Adjust mobile jib 1 to be horizontally disposed with, multigroup screw hole 9 coordinated with high-strength bolt 10, regulation are provided with regulation mobile jib 1
The anterior cantilevered out floor 12 of mobile jib 1, rear portion is fixed on the upper surface of floor 12 by rear end through-flooring embedded part 7;Rear end through-flooring is buried
Part 7 includes Rebar anchor and chemical anchor bolts, and Rebar anchor includes base 71 and the fixed frame 72 being fixed on base, fixed
Two regulation mobile jibs 1 are fixed on base 71 by frame 72, and base 71 is fixed on the upper surface of floor 12 by chemical anchor bolts;
Fix bar 2 is vertically arranged, and the regulation mobile jib 1 is fixed on the top of fix bar 2, and bottom passes through front end post-install
6 are fixed on the front end face of floor 12;
The upper end of support bar 3 and the front end of the regulation mobile jib 1 are fixed, and lower end is fixedly connected with the bottom of the fix bar 2,
Form stable triangular structure.
Regulation mobile jib 1, fix bar 2 and the support bar 3 of the rack body use steel pipe manufacturing, and adjust mobile jib 1, consolidate
The both ends of fixed pole 2 and support bar 3 are welded with fixed termination 5, and fixed termination 4 sets bolt and connecting hole, regulation mobile jib 1,
Fix bar 2 and support bar 3 are connected with each other by fixed termination 5, make connection more solid and reliable, it is ensured that safety.
Being fixed on two regulation mobile jibs 1 through the level of screw hole 9 by high-strength bolt 10 of pulley 8, including
Front end fixed pulley 81 and rear portion roll adjustment pulley 82, hanging basket steel wire rope 11 pass through the front end fixed pulley 81 and rear portion roll adjustment pulley
82, the combination by adjusting two pulleys changes the vertical overhanging position of hanging basket steel wire rope 11;Pulley 8 is slided for high-strength abrasion-proof
Wheel.
The horizontal symmetrical of stabiliser bar 4 is set, and the front end of the regulation mobile jib 1 is fixed in one end, and the other end passes through chemical anchor bolts
It is fixed on the upper surface of floor 12.Stabiliser bar 4 with regulation mobile jib 1 from same size steel pipe manufacturing, by high-strength bolt with
Regulation mobile jib 1 is connected, and stabiliser bar 4 keeps identical intensity, rigidity with rack body, it is ensured that supporting & stablizing is reliable, it is ensured that
Service life.
In use, select the position of the suitable hanging basket outer support support for installing high-rise working first, root on the body construction
Front end post-install 6 and rear end through-flooring embedded part 7 are installed according to stent data punching;Rack body is used according to required size
High-strength bolt is fixed;The stabiliser bar 4 of selection suitable dimension is fixed with rack body with bolt;Rack body and stabiliser bar 4 are connected
Connect after fixing, tighten the Rebar anchor bolt of rear end through-flooring embedded part 7 in rack body rear end, fixation;According to
The preformed hole of stabiliser bar 4 is stablizing the suitable position punching installation chemical anchor bolts of rod rear end selection, fixed stably fixed pole 4;
By construction hanging basket steel wire rope 11 from through hanging basket outer support support, and hanging basket steel wire rope 11 is set to have more than certain relaxation
Amount;Construction hanging basket basketry outer support as requested is inside contracted, and selects suitable screw hole 9 that assembly pulley is fixedly mounted;Start and apply
Work hanging basket, tightens up hanging basket steel wire rope 11, inspects for acceptance.
By embodiment above, the those skilled in the art can readily realize the utility model.But
It is it should be appreciated that the utility model is not limited to above-mentioned embodiment.It is described on the basis of disclosed embodiment
Those skilled in the art can be combined different technical characteristics, so as to realize different technical schemes.
It is the known technology of those skilled in the art in addition to the technical characteristic described in specification.
Claims (6)
1. a kind of aerial work basket outer support support, it is characterised in that including rack body, pulley, high-strength bolt, stabiliser bar
And anchoring piece;
The anchoring piece includes front end post-install and rear end through-flooring embedded part;
Rack body is triangular structure, including two respectively symmetrically set regulation mobile jib, two fix bars and two are oblique
Support bar;Adjust mobile jib to be horizontally disposed with, multigroup screw hole coordinated with high-strength bolt is provided with regulation mobile jib, mobile jib is adjusted
Anterior cantilevered out floor, the upper surface of floor is fixed at rear portion by rear end through-flooring embedded part;Fix bar is vertically arranged, fix bar
The regulation mobile jib is fixed on top, and bottom is fixed on the front end face of floor by front end post-install;The upper end of support bar with
The front end of the regulation mobile jib is fixed, and lower end is fixedly connected with the bottom of the fix bar;
Pulley being fixed on two regulation mobile jibs through the screw rod hole horizontal by high-strength bolt, including front end fixed pulley
With rear portion roll adjustment pulley, front end fixed pulley described in hanging basket steel wire penetrating and rear portion roll adjustment pulley pass through two pulleys of adjustment
Combination changes the vertical overhanging position of hanging basket steel wire rope;
Stabiliser bar horizontal symmetrical is set, and the front end of the regulation mobile jib is fixed in one end, and the other end is fixed on by chemical anchor bolts
The upper surface of floor.
2. a kind of aerial work basket outer support support according to claim 1, it is characterised in that rear end through-flooring embedded part
Including Rebar anchor and chemical anchor bolts, Rebar anchor includes base and the fixed frame being fixed on base, and base is by changing
The upper surface that crab-bolt is fixed on floor is learned, two regulation mobile jibs are fixed on base by fixed frame.
3. a kind of aerial work basket outer support support according to claim 1, it is characterised in that the rack body
Adjust mobile jib, fix bar and support bar and use steel pipe manufacturing, and interfixed by bolt.
4. a kind of aerial work basket outer support support according to claim 3, it is characterised in that regulation mobile jib, fix bar
Be welded with fixed termination with the both ends of support bar, fixed termination is provided with bolt and connecting hole, regulation mobile jib, fix bar and
Support bar is respectively provided with connecting hole and is connected with each other by fixed termination.
5. a kind of aerial work basket outer support support according to claim 3, it is characterised in that stabiliser bar is led with regulation
Bar selects the steel pipe manufacturing of same size, is connected by bolt with regulation mobile jib.
6. a kind of aerial work basket outer support support according to claim 1, it is characterised in that pulley is that high intensity is resistance to
Wear smooth wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720133098.7U CN206458074U (en) | 2017-02-14 | 2017-02-14 | A kind of aerial work basket outer support support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720133098.7U CN206458074U (en) | 2017-02-14 | 2017-02-14 | A kind of aerial work basket outer support support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206458074U true CN206458074U (en) | 2017-09-01 |
Family
ID=59693850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720133098.7U Active CN206458074U (en) | 2017-02-14 | 2017-02-14 | A kind of aerial work basket outer support support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206458074U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112282345A (en) * | 2020-11-24 | 2021-01-29 | 中天建设集团有限公司 | Prestressed cable-stayed hanging basket installation method and installation structure |
CN112502423A (en) * | 2020-12-21 | 2021-03-16 | 中建八局第四建设有限公司 | Hanging basket suspension mechanism |
CN112775889A (en) * | 2019-05-27 | 2021-05-11 | 胡方明 | Detachable screw interface board |
-
2017
- 2017-02-14 CN CN201720133098.7U patent/CN206458074U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112775889A (en) * | 2019-05-27 | 2021-05-11 | 胡方明 | Detachable screw interface board |
CN112282345A (en) * | 2020-11-24 | 2021-01-29 | 中天建设集团有限公司 | Prestressed cable-stayed hanging basket installation method and installation structure |
CN112502423A (en) * | 2020-12-21 | 2021-03-16 | 中建八局第四建设有限公司 | Hanging basket suspension mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206458074U (en) | A kind of aerial work basket outer support support | |
CN205476394U (en) | A pull -up formula I -steel cantilever beam structure for coiling detain scaffold | |
CN210105268U (en) | Hanging basket hanging mechanism for steel structure oblique beam | |
CN101705660B (en) | Reaction frame prestress anchoring system and method for vertical rotating steel pipe arch on concrete bridge | |
CN101210418A (en) | Non-floor-bracket construction method for suspension bridge tower frame cross beam | |
CN106602979A (en) | Fixed cable rod bracket system for installing photovoltaic module | |
CN203334664U (en) | Ultra-long cantilever truss structure high formwork supporting system | |
CN207332288U (en) | Rod-pulling type hanging basket suspension device on roof frame girder | |
CN202323772U (en) | Upside-down hanging construction device for steel stranded wires of bridge V-shaped support | |
CN209194364U (en) | A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment | |
CN205953378U (en) | Tower crane counter weight is from dismouting to put | |
CN201297040Y (en) | Pre-stress stretching bracket | |
CN208264028U (en) | A kind of novel combination type carrier cable homing device | |
CN216113032U (en) | Lifting support of monitoring sensor | |
CN110080083A (en) | The method for installing basket type steel truss arch main chord | |
CN207330116U (en) | Pre-install stair connection structure | |
CN110185250A (en) | A kind of nacelle construction device | |
CN210917046U (en) | Device for adjusting height and balance of outer side template of guardrail | |
CN209957286U (en) | Liftable simple and easy installation device of jib | |
CN210710456U (en) | Bearing structure of inner climbing frame of super high-rise tower crane | |
CN206458070U (en) | A kind of aerial work basket spider | |
CN211312514U (en) | Movable ground anchor device for mounting conical section of steel structure cooling tower | |
CN210914944U (en) | Adjustable multilayer cross-shaped lifting appliance | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN106495026A (en) | Attachment built temporarily by construction tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |