CN206458068U - Vertical equipment assembly platform - Google Patents
Vertical equipment assembly platform Download PDFInfo
- Publication number
- CN206458068U CN206458068U CN201720063404.4U CN201720063404U CN206458068U CN 206458068 U CN206458068 U CN 206458068U CN 201720063404 U CN201720063404 U CN 201720063404U CN 206458068 U CN206458068 U CN 206458068U
- Authority
- CN
- China
- Prior art keywords
- arc plate
- plate
- screw rod
- vertical equipment
- assembly platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model, which is primarily adapted for use in outside the vertical equipment of all size, is being formed a team, weld seam is welded, work in terms of polishing, more particularly to a kind of vertical equipment assembly platform, including spaced apart first arc plate and the second arc plate, pass through hinge between the first adjacent arc plate and the second arc plate, the two ends of first arc plate set the installing plate stretched out, second arc plate two ends correspondence installing plate sets mounting groove, mounting hole is set respectively on installing plate and mounting groove, bearing pin is installed in mounting hole, the medium position of first arc plate and the second arc plate is radially arranged connecting hole, screw rod is installed in connecting hole, screw rod end sets attaching nut.The utility model shortens the engineering time.Original scaffold building, remove and need about 7 people 3~4 days to complete altogether, it is now this to only need to 2~3 people and complete for 1 day.
Description
Technical field
The utility model is related to a kind of vertical equipment assembly platform, is primarily adapted for use in outside the vertical equipment of all size
Portion is being formed a team, weld seam welding, the work in terms of polishing.
Background technology
Shandong Qilu Petrochemical Construction Co., Ltd. in 2015 is split in Shengli Refinery petrol and diesel oil upgrading (S-ZroB) and catalysis
Change project construction, which has been built, is mounted with 6 towers, it is necessary to be divided to two sections to transport field assembly installation to.According to the original vertical equipment of my company
Conventional construction method, be that scaffold from bottom to top is set up outside vertical equipment, equipment to be grouped, welding, polishing
The work such as weld seam, Non-Destructive Testing, it is contemplated that so the amount of setting up of construction scaffolding is quite big, typically set up and remove a frame
Son needs people more than 6 dry 3~4 days altogether, and with the increase of device diameters and height, the manpower and time for setting up and removing scaffold are got over
Many, security risk, the influence of duration are big.
Utility model content
The technical problems to be solved in the utility model is:There is provided it is a kind of shorten construction period, increase security, flexibility and
Versatility, reduces the vertical equipment assembly platform of total time of construction influence.
Vertical equipment assembly platform described in the utility model, including spaced apart first arc plate and the second arc
Plate, by hinge between the first adjacent arc plate and the second arc plate, the two ends of the first arc plate set the installing plate stretched out, the
Two arc plate two ends correspondence installing plate is set sets mounting pin in mounting hole, mounting hole respectively on mounting groove, installing plate and mounting groove
The medium position of axle, the first arc plate and the second arc plate, which is radially arranged in connecting hole, connecting hole, installs screw rod, and screw rod end, which is set, to be connected
Connected nut.
The first described arc plate and the second arc plate use steel plate.
Described screw head sets through hole.
High-altitude group is sub-assembly to frock, each other using types of attachment such as screw rod, bearing pins so that Assembling is simple
Change and high-speeding.Single part weight is controlled within 25kg, and to ensure that it is dynamic that 1 people can be easier to take, 2~3 people are
Can smoothly it be completed., can be with design using link form to ensure the vertical equipment for adapting to multiple diameter as far as possible
The vertical equipment of different-diameter is adapted to by adjusting bolt or carrier bar quantity;Due to being in ground assembling, using can after finishing
It is smaller than setting up scaffold security risk so that by removing a bearing pin, ground decomposition is adjusted to crane, using artificial few.This work
Dress uses chain structure, good, the system safety and stability of rigidity, and to set up scaffold high for security ratio when using.
The beneficial effects of the utility model are:
1st, the engineering time is shortened.Original scaffold building, dismounting need about 7 people to complete for 3~4 days altogether, now this
Only needing to 2~3 people can complete for 1 day.
2nd, highly versatile, produces once, and is used for multiple times, economical and practical.
3rd, the stability of a system is good, and security risk is small.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the first arc plate in Fig. 1.
Fig. 3 is Fig. 2 overlooking the structure diagram.
Fig. 4 is the structural representation of the second arc plate in Fig. 1.
Fig. 5 is Fig. 4 overlooking the structure diagram.
Fig. 6 is the structural representation of screw rod in Fig. 1.
In figure:1st, the first arc plate;2nd, bearing pin;3rd, the second arc plate;4th, attaching nut;5th, screw rod;6th, installing plate;7th, install
Hole;8th, mounting groove;9th, connecting hole;10th, through hole.
Embodiment
The utility model is described further below in conjunction with the accompanying drawings:
As shown in Fig. 1~Fig. 6, vertical equipment assembly platform described in the utility model, including spaced apart
One arc plate 1 and the second arc plate 3, are hinged, the two of the first arc plate 1 between the first adjacent arc plate 1 and the second arc plate 3 by bearing pin 2
The installing plate 6 for setting and stretching out is held, the two ends of the second arc plate 3 correspondence installing plate 6 is set to be divided on mounting groove 8, installing plate 6 and mounting groove 8
Not She Zhi mounting hole 7, bearing pin 2 is installed, the medium position of the first arc plate 1 and the second arc plate 3 is radially arranged connecting hole in mounting hole 7
9, connecting hole 9 is interior to install screw rod 5, and the end of screw rod 5 sets attaching nut 4.First arc plate 1 and the second arc plate 3 use steel plate.Spiral shell
The head of bar 5 sets through hole 10.
Use process:
First the first arc plate 1, the second arc plate 3 and screw rod 5, attaching nut 4 are assembled and according to the diameter of vertical equipment alone
Coarse adjustment screw rod 5.
The assembly of the first arc plate 1, the second arc plate 3, screw rod 5, attaching nut 4 are being stood with bearing pin 2, pad, split pin
Connected on formula equipment is cylindrical.
Accurate adjustment screw rod 5 so that arc plate cycle basis sheet is coaxial with equipment, tightens adjustment attaching nut 4 after screw rod 5, makes connection spiral shell
The spacing of mother 4 and equipment outer wall is hanger angle steel thickness.
Brandreth plate is spread after mounting hung rack, protection railing is set up, so whole group just completes to frock.
Claims (3)
1. a kind of vertical equipment assembly platform, it is characterised in that:Including spaced apart first arc plate (1) and the second arc plate
(3), it is hinged between the first adjacent arc plate (1) and the second arc plate (3) by bearing pin (2), the two ends of the first arc plate (1), which are set, stretches
The installing plate (6) gone out, second arc plate (3) two ends correspondence installing plate (6) sets mounting groove (8), installing plate (6) and mounting groove (8)
It is upper that the medium position that bearing pin (2), the first arc plate (1) and the second arc plate (3) are installed in mounting hole (7), mounting hole (7) is set respectively
It is radially arranged in connecting hole (9), connecting hole (9) and screw rod (5) is installed, screw rod (5) end sets attaching nut (4).
2. vertical equipment assembly platform according to claim 1, it is characterised in that:First arc plate (1) and the second arc
Plate (3) uses steel plate.
3. vertical equipment assembly platform according to claim 1, it is characterised in that:Screw rod (5) head sets through hole
(10)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720063404.4U CN206458068U (en) | 2017-01-19 | 2017-01-19 | Vertical equipment assembly platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720063404.4U CN206458068U (en) | 2017-01-19 | 2017-01-19 | Vertical equipment assembly platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206458068U true CN206458068U (en) | 2017-09-01 |
Family
ID=59695689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720063404.4U Expired - Fee Related CN206458068U (en) | 2017-01-19 | 2017-01-19 | Vertical equipment assembly platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206458068U (en) |
-
2017
- 2017-01-19 CN CN201720063404.4U patent/CN206458068U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207108387U (en) | The adjustable maintenance hoisting frame of hoisting machinery | |
CN108425509B (en) | Bolt ball joint net rack house steel structure replacement rod piece and bolt ball construction method | |
CN1987200A (en) | Self unloading binding overhead torch, its loading and unloading system and its loading and unloading method | |
CN108002255A (en) | Movable arm tower crane climbing beam support system and its application method | |
CN206458068U (en) | Vertical equipment assembly platform | |
CN106239398A (en) | Control arm lining endurancing fixture before a kind of | |
CN203235469U (en) | Vertical type rapidly opened type pressure container inner part lifting mechanism | |
CN112211353A (en) | Rope ladder for mounting metal roof panel and mounting method of metal roof panel | |
CN204282232U (en) | Helicopter platform safety net | |
CN103663126B (en) | A kind of detachable suspension hook group of hydraulic hoisting machine and the hoisting crane with this suspension hook group | |
DE202007018365U1 (en) | Temporary paint booth | |
CN114837447A (en) | Pushable overhanging horizontal protection device and construction method thereof | |
CN112903319A (en) | Vibration testing device of wide-body vehicle | |
CN208763525U (en) | A kind of anti-high wind composite electrical tower structure | |
CN106392997A (en) | Detachment device for bottom flange cover of container | |
CN203390492U (en) | Suspension supporting platform for detaching and installing large-scale diesel engine crankshaft bearing | |
DE102017128143B3 (en) | Maintenance platform for maintenance of installations in a tower for a wind turbine and arrangement of a maintenance platform | |
CN102762804A (en) | Telescopic structure and hoisting system thereof | |
RU172673U1 (en) | COMPONENT STAND OF THE PLANE SUPPORT OF THE REM-500 METAL STRUCTURE | |
DE202018102433U1 (en) | Support system for platforms in a tower of a wind turbine and tower with such a support system | |
CN204287566U (en) | Lower sheave autocollimation device | |
CN212296725U (en) | Wind generating set main frame climbing device and wind generating set | |
CN105297624B (en) | Arch bridge inspection car rail device | |
CN220361200U (en) | Detachable polytetrafluoroethylene grating | |
CN202924629U (en) | Luffing jib tower crane and suspended platform thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170901 Termination date: 20190119 |